SF 23 & 24 Work Permit Lifting - Tandem Lifting
SF 23 & 24 Work Permit Lifting - Tandem Lifting
Tandem Lifting
Details of Lifting Crew, Crane Configuration & Load Calculation
NAME OF CONTRACTOR CONTRACT NO.
PERMIT No. ____________________ Date ______________________ Time ____________________
Location_________________________ Activity being performed _______________________________
Part - 1: Details of Lifting Crew
Name of Lifting Engineer: _______________________________________________________________
Name of Operators: ____________________________________________________________________
Names of Riggers:
______________________________________________________________________
Name of Signalman: ____________________________________________________________________
Part – 2: Crane Details
Crane Make, Model & Year: ___________________________ Max. Lifting Capacity: _______________
Maximum Boom Length: _______________________ Maximum Radius: _________________________
Outrigger full extension (in mtr.): _________ Percentage of deration in crane capacity: _______________
Automatic Safe Load Indicator: ________________ Over Hoist Cut-off Limit Switch: _______________
Part – 3: Load Details
Description of the Load:_______________________Lifting points on Load:_______________________
Rigging Manner of load:_______________________Dimension of Load:_________________________
Part – 4: Load Calculation (____________% of Load chart referred/followed)
a) Crane Boom Length:________, b)Crane Boom Radius:___________, c) Rope Diameter(mm): _______
d) No. of falls: _______________, e) Deration in capacity:__________, f) Counter weight:____________
g) SWL (after deration):________, h) Weight of Load: _____________, h) Rigging Weight: ___________
i) Hook Block Weight: _________, j) Total Weight to be lift: ________.
k) Safety margin in crane capacity: (SWL of crane on lifting configuration – Load to be
lifted)__________
l) Outriggers extension (in mtrs) _____________________
Part 5 : Receipt
I (Name of Lifting Engineer) hereby declare that the load calculation as mentioned in Part – 4 of this
permit shall not exceeds in any circumstances and work shall be carried out in safe manners. In addition,
the checklist along with lifting sketches as mentioned in section B of this permit shall be followed and
also attached. All measures have been adopted to ensure the stability & rigidity of the cranes as well as
rigging. All safety devices of the crane are in proper working order. Section A shall be treated as invalid
without section B.
Name: __________________________Signed _______________ Time ________ Date ____________
Part – 6: Clearance from Safety Department
I (Name of Safety In-charge) also checked the above load calculation which is within the crane lifting
configuration for safe lifting operation.
k) SWL (as per 75% of Load Chart):_________ k) SWL (as per 75% of Load
l) SWL (after deduction of 15% on 75% chart):___ Chart):__________
m) Safety margin in crane capacity: (j – l)_______ l) SWL (after deduction of 15% on 75%
n) Outriggers extension (in mtrs): _____________ chart):____
m) Safety margin in crane capacity: (j –
l)_______
n) Outriggers extension (in mtrs):
_____________
Part 5 : Receipt
I (Name of lifting engineer) hereby declare that the load calculation as mentioned in Part – 4 of this
permit shall not exceeds in any circumstances and work shall be carried out in safe manners. In addition,
the checklist along with lifting sketch as mentioned in section B of this permit shall be followed and also
attached. All measures have been adopted to ensure the stability & rigidity of the cranes as well as rigging.
All safety devices of the crane are in proper working order. Section A shall be treated as invalid without
section B.
Name: ______________________Signed __________________ Time ________ Date ______________