PROJECT : DMRC PROJECT CC-125R2

CLIENT : DELHI METRO RAIL CORPORATION, NEW DELHI


CONTRACTOR :Pragati Construction Consultant
   Date :

Tandem Lifting
Details of Lifting Crew, Crane Configuration & Load Calculation
NAME OF CONTRACTOR CONTRACT NO.
PERMIT No. ____________________ Date ______________________ Time ____________________
Location_________________________ Activity being performed _______________________________
Part - 1: Details of Lifting Crew
Name of Lifting Engineer: _______________________________________________________________
Name of Operators: ____________________________________________________________________
Names of Riggers:
______________________________________________________________________
Name of Signalman: ____________________________________________________________________
Part – 2: Crane Details
Crane Make, Model & Year: ___________________________ Max. Lifting Capacity: _______________
Maximum Boom Length: _______________________ Maximum Radius: _________________________
Outrigger full extension (in mtr.): _________ Percentage of deration in crane capacity: _______________
Automatic Safe Load Indicator: ________________ Over Hoist Cut-off Limit Switch: _______________
Part – 3: Load Details
Description of the Load:_______________________Lifting points on Load:_______________________
Rigging Manner of load:_______________________Dimension of Load:_________________________
Part – 4: Load Calculation (____________% of Load chart referred/followed)
a) Crane Boom Length:________, b)Crane Boom Radius:___________, c) Rope Diameter(mm): _______
d) No. of falls: _______________, e) Deration in capacity:__________, f) Counter weight:____________
g) SWL (after deration):________, h) Weight of Load: _____________, h) Rigging Weight: ___________
i) Hook Block Weight: _________, j) Total Weight to be lift: ________.
k) Safety margin in crane capacity: (SWL of crane on lifting configuration – Load to be
lifted)__________
l) Outriggers extension (in mtrs) _____________________
Part 5 : Receipt
I (Name of Lifting Engineer) hereby declare that the load calculation as mentioned in Part – 4 of this
permit shall not exceeds in any circumstances and work shall be carried out in safe manners. In addition,
the checklist along with lifting sketches as mentioned in section B of this permit shall be followed and
also attached. All measures have been adopted to ensure the stability & rigidity of the cranes as well as
rigging. All safety devices of the crane are in proper working order. Section A shall be treated as invalid
without section B.
Name: __________________________Signed _______________ Time ________ Date ____________
Part – 6: Clearance from Safety Department
I (Name of Safety In-charge) also checked the above load calculation which is within the crane lifting
configuration for safe lifting operation.

Name: _____________________Signed __________________ Time ________ Date ______________


NATIONAL CAPITAL REGION TRANSPORT COPORATION LTD.

FORM No. : SF/24


PERMIT TO WORK – TANDEM LIFTING PERMIT
SECTION – A: Details of Lifting Crew, crane configuration & Load calculation
NAME OF CONTRACTOR CONTRACT NO.
PERMIT No. ______________________ Date ____________________ Time ____________________
Location___________________________ Activity being performed _____________________________

Part - 1: Details of Lifting Crew


Name of Lifting Engineer: _______________________________________________________________
Name of Operators: ____________________________________________________________________
Names of Riggers: _____________________________________________________________________
Name of Signalman: ____________________________________________________________________

Part – 2: Crane Details


Crane – 1: Crane – 2:
Crane Make, Model & Year: __________________ Crane Make, Model & Year:
Max. Lifting Capacity: ______________________ __________________
Maximum Boom Length: ____________________ Max. Lifting Capacity:
Maximum Radius: __________________________ ______________________
Outrigger full extension (in mtr.): ______________ Maximum Boom Length:
Percentage of deration in crane capacity: ________ ____________________
Automatic Safe Load Indicator: ________________ Maximum Radius:
Over Hoist Cut-off Limit Switch: ______________ __________________________ Outrigger full
extension (in mtr.): ______________
Percentage of deration in crane capacity:
________
Automatic Safe Load Indicator:
________________
Over Hoist Cut-off Limit Switch:
______________

Part – 3: Load Details


Description of the Load:________________________Lifting points on Load:_______________________
Rigging Manner of load:________________________Dimension of Load:_________________________

Part – 4: Load Calculation


Crane – 1: Crane – 2:
a) Crane Boom Length:______________________ a) Crane Boom Length:_____________________
b) Crane Boom Radius:______________________ b) Crane Boom
c) Rope Diameter(mm): ______________________ Radius:______________________
d) No. of falls: _____________________________ c) Rope Diameter(mm):
e) f) Counter weight:________________________ _____________________
f) Weight of Load: __________________________ d) No. of falls:
g) Rigging Weight: _________________________ _____________________________
h) Hook Block Weight: ______________________ e) f) Counter
i) Total Weight to be lift: ____________________ weight:________________________
j) Total weight to be lift on crane 1: ____________ f) Weight of Load:
__________________________
g) Rigging Weight:
_________________________
h) Hook Block Weight:
______________________
i) Total Weight to be lift:
_____________________
j) Total weight to be lift on crane 2:
____________

k) SWL (as per 75% of Load Chart):_________ k) SWL (as per 75% of Load
l) SWL (after deduction of 15% on 75% chart):___ Chart):__________
m) Safety margin in crane capacity: (j – l)_______ l) SWL (after deduction of 15% on 75%
n) Outriggers extension (in mtrs): _____________ chart):____
m) Safety margin in crane capacity: (j –
l)_______
n) Outriggers extension (in mtrs):
_____________
Part 5 : Receipt
I (Name of lifting engineer) hereby declare that the load calculation as mentioned in Part – 4 of this
permit shall not exceeds in any circumstances and work shall be carried out in safe manners. In addition,
the checklist along with lifting sketch as mentioned in section B of this permit shall be followed and also
attached. All measures have been adopted to ensure the stability & rigidity of the cranes as well as rigging.
All safety devices of the crane are in proper working order. Section A shall be treated as invalid without
section B.
Name: ______________________Signed __________________ Time ________ Date ______________

Part – 6: Clearance from Safety Department


I (Name of Safety In-charge) also checked the above load calculation which is within the crane lifting
configuration for safe lifting operation.

Name: _____________________Signed __________________ Time ________ Date ______________


SECTION – B: Safety Checklist & Sketch
Part - 7: Safety Measures Checklist
S Measures/particulars Yes/No/Avl./other
No.
1 Crane use for lifting is suitable as per site condition and type of
lifting
2 Are lifting crew trained for lifting operation
3 Is crane set up on compacted and firm ground condition
4 Are crane outriggers fully extended and placed on metal plate
5 Are condition of lifting gears free from any type of defects
6 Is condition of lifting appliance operator cabin in good condition
and not no hindrance to any thing
7 Is adequate means of communication between lifting crew arranged
8 Is underground utilities presents, if yes, mentioned measures to
overcome & crane stability (mentioned in Method Statement)
9 Is any power cable/OHE cable available, if yes, then measures to
encounter that (mentioned in Method Statement)
10 Safe means of access arranged
11 Safe working platform arranged
12 Measures for working at height adopted
13 Traffic diversion alongwith provision of traffic marshal arranged
14 Is wind velocity check and under acceptable limit as recommended
by manufacturer
15 Is copy of approved method statement available
16 Is Automatic Safe Load Indicator working and cut-off switch
provided & working
17 All certificate & document like TPI, Load chart etc. available
18 Is proper arrangement of illumination done & level of lux
maintained
19 Is rigging done by taking consideration of CG of load w.r.t crane
hook
20 Swing area of crane properly barricaded
21 Other system of crane like control lever, fail safe device, boom,
winch etc. are in good condition or working properly
22 Is tag line to control the load is provided
Any other measures
Part – 8: Lifting Sketch
(this sketch shall be site specific and reflects all hazards/obstruction along with dimension)
Part 9 : Final Authorization
I (Name of Lifting Engineer) hereby declare that the load calculation as mentioned in Part – 4 of section
A and measures as mentioned in part 7 of section B shall be ensured. In addition, arrangement for safe
lifting, public safety, traffic diversion, working at height, means of access etc has been adopted.

Name: ______________________Signed __________________ Time ________ Date ______________


Part – 10: Clearance from Safety Department
I (Name of Safety In-charge) certify that, measures for safe lifting have been adopted at site.

Name: _____________________Signed __________________ Time ________ Date ______________

PART 11: Clearance Certificate (By Lifting Engineer)


I declare that all persons under my charge have been withdrawn and warned that it is no longer safe to work at site,
and that all gear, tools and other equipment have been removed.

Name ____________________________Signed ______________ Time ___________ Date _________________

Part 12: Cancellation (Being the Authorized Person)


I acknowledge receipt of the clearance of this Permit

This permit is now cancelled

Name: ______________________Signed __________________ Time ________ Date ______________