"PILEGRP.

xls" Program
Version 3.6

PILE GROUP ANALYSIS FOR RIGID PILE CAP


Using the Elastic Method for up to 25 Total Piles
(For English Units)
Job Name: HMC PP4 Project (PTT) Subject:
Job Number: Originator: Checker:

Input Data:
Results:
Number of Piles, Np = 4 PILE GROUP PLAN
2.0
Pile Coordinates: Pile Reactions (kg)
Xo (m.) Yo (m.) Vert. Rz Horiz. Rh
1.5
#1: -0.500 0.500 #1: -1341.75 1090.33
#2: 0.500 0.500 #2: -1341.75 1076.90
#3: -0.500 -0.500 #3: -7701.75 1102.33 1.0

#4: 0.500 -0.500 #4: -7701.75 1089.05


0.5

Y - AXIS (m.)
0.0
-2.0 -1.0 0.0 1.0 2.0

-0.5

-1.0

-1.5

-2.0

X - AXIS (m.)

Pile Group Properties:


Xc = 0.000 kg.
Yc = 0.000 kg.
Ix = 1.00 m^2
Iy = 1.00 m^2
J= 2.00 m^2
Ixy = 0.00 m^2
q = 0.000 deg.

Number of Piers, N = 1 S Pier Loads @ C.G. of Group:


S Pz = 18087.00 kg
Pier/Loading Data: Pier #1 S Hx = 2923.00 kg
X-Coordinate (m.) = 0.000 S Hy = -3233.00 kg
Y-Coordinate (m.) = 0.000 S Mx = -6360.00 kg-m
Dist. to T/Piles, h (m.) = 0.000 S My = 0.00 kg-m
Vertical Load, Pz (kg) = 18087.00 S Mz = 36.00 kg-m
Horiz. Load, Hx (kg) = 2923.00
Horiz. Load, Hy (kg) = -3233.00 Pile Reaction Summary:
Moment, Mx (kg-m) = -6360.00 Rz(max) = -1341.75 kg
Moment, My (kg-m) = 0.00 Rz(min) = -7701.75 kg
Moment, Mz (kg-m) = 36.00 Rh(max) = 1102.33 kg