CURRENT SCENARIO AFTER DCS S/NO. AREA BREAKUP BEFORE AUTOMATION INCORPORATION OBSERVATIONS/STATUS DIFFERENT INDICATORS AVAILABLE, STEAM PRESSURE, DRUM LEVEL & FURNACE BOILER COMMISSIONING COMPLETE. DRUM LEVEL CONTROL AVAILABLE, DRAFT CONTROL LOOPS INCORPORATED. CONTROL LOOPS LIKE FURNACE MANUAL FEEDING IN PRACTICE, VFDS ADDED FOR FD & SA FANS. PRESSURE, DRUM LEVEL AND STEAM VFDS AVAILABLE FOR ID FAN AND BAGASSE O2 CONTROL ADDED IN STEAM PRESS. LOOP PRESSURE ARE WORKING PROPERLY. 1 BOILER-1 FEEDERS, BUT MANUAL OPERATION IN USE. FOR AIR OPTIMIZATION. OPERATIONS TEAM AT BOILER IS NO O2 CONTROL, DRAFT PRESSURES OPERATING STATION AVAILABLE. SATISFIED WITH AUTOMATION. INDICATIONS UNAVAILABLE. BLOILERS LOAD MANAGEMENT IS NO SPEED CONTROL FOR FD, SA FANS. INCORPORATED. DIFFERENT INDICATORS AVAILABLE, STEAM PRESSURE, DRUM LEVEL & FURNACE BOILER COMMISSIONING COMPLETE. DRUM LEVEL CONTROL AVAILABLE, DRAFT CONTROLS INCORPORATED. CONTROL LOOPS LIKE FURNACE MANUAL FEEDING IN PRACTICE, VFDS ADDED FOR FD,SA FANS & FEEDERS. PRESSURE, DRUM LEVEL AND STEAM VFD AVAILABLE FOR ID FAN ONLY BUT O2 CONTROL ADDED IN STEAM PRESS. LOOP PRESSURE ARE WORKING PROPERLY. 2 BOILER-2 OPERATED MANUALLY. FOR AIR OPTIMIZATION. OPERATIONS TEAM AT BOILER IS NO O2 CONTROL, DRAFT PRESSURES FEEDING CONTROLLED VIA CONTROLLER SATISFIED WITH AUTOMATION. INDICATIONS UNAVAILABLE. WITH VFDS. BLOILERS LOAD MANAGEMENT IS NO SPEED CONTROL FOR FD, SA FANS. OPERATING STATION AVAILABLE. INCORPORATED. DIFFERENT INDICATORS AVAILABLE, STEAM PRESSURE, DRUM LEVEL & FURNACE BOILER COMMISSIONING COMPLETE. DRUM LEVEL CONTROL AVAILABLE, DRAFT CONTROLS INCORPORATED. CONTROL LOOPS LIKE FURNACE MANUAL FEEDING IN PRACTICE, O2 CONTROL ADDED IN STEAM PRESS. LOOP PRESSURE, DRUM LEVEL AND STEAM VFDS AVAILABLE FOR FD,ID,SA FANS & BAG. FOR AIR OPTIMIZATION. PRESSURE ARE WORKING PROPERLY. 3 BOILER-3 FEEDERS, BUT MANUAL OPERATION IN USE. FEEDING CONTROLLED VIA CONTROLLER OPERATIONS TEAM AT BOILER IS NO O2 CONTROL, DRAFT PRESSURES WITH VFDS. SATISFIED WITH AUTOMATION. INDICATIONS UNAVAILABLE. OPERATING STATION AVAILABLE. BLOILERS LOAD MANAGEMENT IS FEEDWATER PRESSURE CONTROL LOOP INCORPORATED. ADDED. (COMMON FOR ALL BOILERS) DIFFERENT INDICATORS AVAILABLE, STEAM PRESSURE, DRUM LEVEL & FURNACE BOILER COMMISSIONING COMPLETE. DRUM LEVEL CONTROL AVAILABLE, DRAFT CONTROLS INCORPORATED. CONTROL LOOPS LIKE FURNACE MANUAL FEEDING IN PRACTICE, O2 CONTROL ADDED IN STEAM PRESS. LOOP PRESSURE, DRUM LEVEL AND STEAM VFDS AVAILABLE FOR FD,ID,SA FANS & BAG. FOR AIR OPTIMIZATION. PRESSURE ARE WORKING PROPERLY. FEEDERS, BUT MANUAL OPERATION IN USE. FEEDING CONTROLLED VIA CONTROLLER OPERATIONS TEAM AT BOILER IS 4 BOILER-4 NO O2 CONTROL, DRAFT PRESSURES WITH VFDS. SATISFIED WITH AUTOMATION AND INDICATIONS UNAVAILABLE. OPERATING STATION AVAILABLE. OPERATING BOILERS ON AUTO MODE. ABB PLC AVAILABLE WITH ONLY DRUM LEVEL CONTROL IN AUTO LOOP REST OPERATED IN MANUAL MODE IN PREVIOUS PRACTICE. MANUAL DOSING OF CHEMICALS. NO PH LIQUOR FLOW,TEMP, TANK LEVEL CONTROL TALO REFINERY COMMISSIONED IN CONTROL INCORPORATED. INCORPORATED. FEB END. SUCCESSFULLY TUNED AUTO DOSING OF CHEMICALS AS PER FLOW. AND OBSERVED WORKING PROPERLY TALO 5 REFINERY BETTER PH CONTROL INCORPORATED, Defecation pH control, Liqor brix control, liqor temp control also incorporated
I- MILL HOUSE AUTOMATION IS RECOMMENDED TO MAINTAIN A REGULAR FEEDING OF LESS MOISTURE BAGASSE AND A CONSTANT
SITE COMMENTS/ & LESS VARIABLE STEAM LOAD ON BOILERS.
RECOMMENDATIONS II- KEY ACHIEVEMENTS INCLUDE ENERGY SAVINGS IN BOILER AIR FANS, FUEL SAVINGS, BETTER LOOPS CONTROLS, BETTER BAGASSE
FEEDING, LESS SAFETY VALVE BLOWING AND IMPROVED BOILER EFFICIENCY.
KEY INDICATORS I-ENERGY SAVINGS AT AIR FANS. II- FUEL SAVINGS. III- SMOOTH STEAM PRESSURE CONTROL. IV- LESS SAFETY VALVE BLOWING. V- SMOOTH FEEDING. VI- BETTER AIR REGULATION. VII- IMPROVED BOILER EFFICIENCY