As per the attached statement, the value of work executed and /or AMOUNT IN (BIRR)
materials supplied to date is: --------------------------------------------------- 24,594,432.89
Previous Payments
Date Net Pay Amount
PC# No (Birr) VAT (Birr) DEDUCTIONS Amount (Birr)
Advc.- 1 11-Jun-13 1,217,391.30 182,608.70 1. Previous Payment 20,473,010.00
1 09-Sep-13 1,043,478.26 156,521.74 2. Retention -
2 9-Dec-13 1,304,347.83 195,652.17 3. Penalty
3 4-Nov-14 513,913.04 77,086.96 4. Advance Repayment 1,217,391.30
4 8-May-14 904,347.83 135,652.17 5. Others
5 4-Sep-15 869,565.22 130,434.78
6 21-Sep-15 1,226,233.96 183,935.09 Total Deduction 21,690,401.30 (21,690,401)
7 21-Oct-15 5,797,431.77 869,614.77 Net Sum Due to the Contractor 2,904,032
8 29-Dec-17 3,202,709.10 480,406.37 Net VAT Payable on this Certificate 435,604.7
9 24-Oct-18 4,100,000.00 615,000.00 Total Amount Due to the Contractor 3,339,636.32
1,510,983.00 226,647.50
Total 20,473,010.00 3,070,951.55
Certified Approved
Project: Residential Houses
SUBSTRUCTURE
01 Excavation & Earthworks 88,756.75 88,756.75
02 Concrete works 317,245.57 309,793.85
03 Masonry works 92,781.75 185,563.50
498,784.07 584,114.10
SUPERSTRUCTURE
01 Concrete works 526,095.94 498,993.54
02 Block works 114,001.41 108,301.33
03 Finishing 241,192.90 214,347.08
04 Roofing 150,037.84 142,535.94
05 Sanitary Installation 123,343.50 103,731.88
07 Electrical Installation 70,091.00 -
08 Site Works 61,939.50 58,842.53
1,286,702.08 1,126,752.29
A - SUB-STRUCTURE
2. CONCRETE WORK
2.2 Under grade beams and ground slabs m2 76.30 76.30 69.50 5,302.85 5,302.85
2.3 Under grade beams and basement slabs m2 152.60 152.60 69.50 10,605.70 10,605.70
2.8 In Grade Beams and entrance stairs m3 9.90 9.90 2,200.00 21,780.00 21,780.00
2.9 In 15 cm thick suspended ground Slab m2 102.10 102.10 330.00 33,693.00 33,693.00
2.12 Grade Beams and entrance stairs m2 35.51 35.51 190.00 6,746.90 6,746.90
3- MASONARY WORK
Project: Residential Houses
Location: Kotebe/ Addis Ababa
Contractor: TDT PLC A- PHASE-1 | HOUSE TYPE- 1
Item Quantity Unit Price Total Amount (Birr)
Description Unit
No Contractual Executed (Birr) Contractual Executed
B- SUPER-STRUCTURE
1- CONCRETE WORK
2- BLOCK WORK
Project: Residential Houses
Location: Kotebe/ Addis Ababa
Contractor: TDT PLC A- PHASE-1 | HOUSE TYPE- 1
Item Quantity Unit Price Total Amount (Birr)
Description Unit
No Contractual Executed (Birr) Contractual Executed
2.1 20 cm thick Hollow Concrete Block (HCB)
work for external wall in cement mortar. Both
sides left for
plastering. m2 260.06 247.06 238.00 61,894.28 58,799.57
3- FINISHING
3.2 Ditto to concrete ceiling surfaces m2 278.77 418.16 160.00 44,603.20 66,904.80
4- ROOFING
5- SANITARY INSTALLATION
6- ELECTRICAL INSTALLATION
LIGHT POINTS
6.1 Light points fed through PVC insulated
conductors of 2 X 2.5 sqmm run in concealed
PVC conduits of diameter 16mm including pull
boxes with covers and other necessary
accessories. N.B. All connections shall be
done at the wiring terminals of light fittings and
no connection shall be made in junction boxes.
Price shall include supply and installation of
electrical wires, conduites, junction boxes
including all fixing accessories.
DISTRIBUTION BOARDS
Project: Residential Houses
Location: Kotebe/ Addis Ababa
Contractor: TDT PLC A- PHASE-1 | HOUSE TYPE- 1
Item Quantity Unit Price Total Amount (Birr)
Description Unit
No Contractual Executed (Birr) Contractual Executed
6.4 Supply and fix MDB- Flash mountable,
enameled sheet steel cover and frames, with
Copper bus bar system of 63A, F/M as per the
EL Drawings
Pcs 1.00 1,487.50 1,487.50 -
TELE / TV OUTLETS
CABLES
GROUNDING
6.11 Supply and install earthing system with bare
copper conductor of 1x6 sq.mm diameter,
earthing lead of 6 sq.mm, complete with
coupling and driving stud as per the detailed
electrical drawing.
Set 1.00 1,445.00 1,445.00 -
7- SITE WORKS
SUBSTRUCTURE
01 Excavation & Earthworks 111,203.24 111,203.24
02 Concrete works 316,665.38 372,365.14
03 Masonary works 100,572.00 150,858.00
528,440.63 634,426.38
SUPERSTRUCTURE
01 Concrete works 711,779.72 677,393.20
02 Block works 145,009.07 137,758.61
03 Finishing 286,645.50 241,530.75
04 Roofing 239,758.99 227,771.04
05 Sanitary Installation 128,588.00 105,480.75
07 Electrical Installation 76,891.00 -
08 Site Works 61,939.50 60,517.03
1,650,611.78 1,450,451.38
A - SUB-STRUCTURE
2. CONCRETE WORK
2.2 Under grade beams and ground slabs m2 91.94 91.94 69.50 6,389.83 6,389.83
2.3 Under grade beams and basement slabs m2 183.88 183.88 69.50 12,779.66 12,779.66
2.4 Under retaining walls m2 65.73 98.60 69.50 4,568.47 6,852.70
2.8 In Grade Beams and entrance stairs m3 10.53 10.53 2,200.00 23,166.00 23,166.00
2.9 In 15 cm thick suspended ground Slab m2 16.35 16.35 330.00 5,396.99 5,396.99
2.12 Grade Beams and entrance stairs m2 39.97 39.97 190.00 7,594.30 7,594.30
3- MASONARY WORK
B- SUPER-STRUCTURE
1- CONCRETE WORK
2- BLOCK WORK
2.1 20 cm thick Hollow Concrete Block (HCB)
work for external wall in cement mortar. Both
sides left for
plastering. m2 296.38 281.56 238.00 70,538.44 67,011.52
3- FINISHING
3.2 Ditto to concrete ceiling surfaces m2 292.50 438.75 160.00 46,800.00 70,200.00
4- ROOFING
5- SANITARY INSTALLATION
6- ELECTRICAL INSTALLATION
LIGHT POINTS
6.1 Light points fed through PVC insulated
conductors of 2 X 2.5 sqmm run in concealed
PVC conduits of diameter 16mm including pull
boxes with covers and other necessary
accessories. N.B. All connections shall be
done at the wiring terminals of light fittings and
no connection shall be made in junction boxes.
Price shall include supply and installation of
electrical wires, conduites, junction boxes
including all fixing accessories.
DISTRIBUTION BOARDS
TELE / TV OUTLETS
TV outlet points(only conduits of diameter
6.6 25mm including pull boxes with covers)
TELE outlet points(in conduits of diameter 13
mm with 2x1 mm2 telephone wire, including
pull boxes with covers) Pcs 10.00 255.00 2,550.00 -
CABLES
GROUNDING
6.11 Supply and install earthing system with bare
copper conductor of 1x6 sq.mm diameter,
earthing lead of 6 sq.mm, complete with
coupling and driving stud as per the detailed
electrical drawing.
Set 1.00 1,445.00 1,445.00 -
7- SITE WORKS
SUBSTRUCTURE
01 Excavation & Earthworks 83,402.43 83,402.43
02 Concrete works 235,444.36 342,709.33
03 Masonary works 75,429.00 50,286.00
394,275.79 476,397.76
SUPERSTRUCTURE
01 Concrete works 475,106.36 502,950.16
02 Block works 108,756.80 163,135.20
03 Finishing 185,905.78 114,608.79
04 Roofing 179,819.24 170,828.28
05 Sanitary Installation 121,877.25 104,941.00
07 Electrical Installation 66,504.00 -
08 Site Works 61,939.50 59,767.75
1,199,908.93 1,116,231.18
A - SUB-STRUCTURE
2. CONCRETE WORK
2.2 Under grade beams and ground slabs m2 51.72 51.72 69.50 3,594.28 3,594.28
2.3 Under grade beams and basement slabs m2 137.91 137.91 69.50 9,584.75 9,584.75
2.4 Under retaining walls m2 36.98 24.65 69.50 2,569.76 1,713.18
2.8 In Grade Beams and entrance stairs m3 7.90 7.90 2,200.00 17,374.50 17,374.50
2.9 In 15 cm thick suspended ground Slab m2 12.27 12.27 330.00 4,047.74 4,047.74
2.12 Grade Beams and entrance stairs m2 29.98 29.98 190.00 5,695.73 5,695.73
3- MASONARY WORK
B- SUPER-STRUCTURE
1- CONCRETE WORK
2- BLOCK WORK
2.1 20 cm thick Hollow Concrete Block (HCB)
work for external wall in cement mortar. Both
sides left for
plastering. m2 222.29 333.43 238.00 52,903.83 79,355.75
3- FINISHING
3.2 Ditto to concrete ceiling surfaces m2 171.49 214.36 160.00 27,438.00 34,297.50
4- ROOFING
5- SANITARY INSTALLATION
6- ELECTRICAL INSTALLATION
LIGHT POINTS
6.1 Light points fed through PVC insulated
conductors of 2 X 2.5 sqmm run in concealed
PVC conduits of diameter 16mm including pull
boxes with covers and other necessary
accessories. N.B. All connections shall be
done at the wiring terminals of light fittings and
no connection shall be made in junction boxes.
Price shall include supply and installation of
electrical wires, conduites, junction boxes
including all fixing accessories.
DISTRIBUTION BOARDS
TELE / TV OUTLETS
TV outlet points(only conduits of diameter
6.6 25mm including pull boxes with covers)
TELE outlet points(in conduits of diameter 13
mm with 2x1 mm2 telephone wire, including
pull boxes with covers) Pcs 10.00 255.00 2,550.00 -
CABLES
GROUNDING
6.11 Supply and install earthing system with bare
copper conductor of 1x6 sq.mm diameter,
earthing lead of 6 sq.mm, complete with
coupling and driving stud as per the detailed
electrical drawing.
Set 1.00 1,445.00 1,445.00 -
7- SITE WORKS
SUBSTRUCTURE
01 Excavation & Earthworks 163,302.10 249,000.33 190,394.13 - 439,394.47
02 Concrete works 525,618.24 805,402.43 805,402.73 - 1,610,805.15
03 Masonary works 122,981.30 56,290.52 56,290.52 - 112,581.04
SUBTOTAL -A 811,901.64 1,110,693.28 1,052,087.38 - - 2,162,780.66
SUPERSTRUCTURE -
01 Concrete works 879,108.77 622,199.85 621,195.45 552,567.06 1,795,962.36
02 Block works 167,036.10 - 323,405.14 - 323,405.14
03 Finishing 337,284.50 - - - -
04 Roofing 379,518.50 - - - 690,912.30 690,912.30
05 Sanitary Installation 164,260.00 - - 205,799.91 205,799.91
07 Electrical Installation 82,460.00 - - -
08 Site Works 72,870.00 - - 14,834.80 14,834.80
SUBTOTAL -B 2,082,537.87 622,199.85 944,600.59 773,201.76 690,912.30 3,030,914.50
SUBTOTAL(A+B) 2,894,439.51 1,732,893.13 1,996,687.97 773,201.76 690,912.30 5,193,695.16
ADD VAT 15% 434,165.93 259,933.97 299,503.20 115,980.26 103,636.84 779,054.27
GRAND TOTAL 3,328,605.44 1,992,827.10 2,296,191.17 889,182.03 794,549.14 5,972,749.43
PHASE- 2
A - SUB-STRUCTURE
work for external wall in cement mortar. Both sides left for - - -
plastering. m2 260.06 - 349.47 349.47 350.00 91,021.00 - 122,312.79 - - 122,312.79
- - - - - -
2.2 Ditto item 2.1 above but 15cm thick for - - - - - -
internal wall m2 245.21 - 648.69 648.69 310.00 76,015.10 - 201,092.35 - - 201,092.35
- - - - - -
TOTAL CARRIED TO SUMMARY ----------------------------------------------------------- - 167,036.10 - 323,405.14 - - 323,405.14
- - -
3- FINISHING - - -
- - -
3.1 Apply 3 coats of plastering to all - - -
wall, beam and column faces m2 649.68 - 220.00 142,929.60 - -
- - -
3.2 Ditto to concrete ceiling surfaces m2 278.77 - 220.00 61,329.40 - -
- - -
3.3 4.8cm thik cement sand screed trowelled - - -
smooth & level to receive PVC tile flooring m2 237.85 - 250.00 59,462.50 - -
- - -
3.4 Apply 2 coats of Gypsum Plaster to all - - -
plastered internal wall surfaces m2 490.42 - 150.00 73,563.00 - -
- - -
TOTAL CARRIED TO SUMMARY ----------------------------------------------------------- - 337,284.50 - -
- - -
4- ROOFING - - -
- - -
4.1 Roof cover in Decra Tiles fixed to Zigba - - -
purlins and price shall include purlins, wooden trusses and all the
necessary - - -
fixing accessories as per detailed drawings - - -
Price shall include all carpentry works, - - -
roof ridge coverand flashing along all the - - -
parapet, concrete gutter and wall joints - - -
with the required development length. m2 236.03 428.77 428.77 1,450.00 342,243.50 - - - 621,712.30 621,712.30
- - - - - -
4.2 Supply and fix diameter 110mm PVC down - - - - - -
pipes with all fixing accessories ml 52.50 - 210.00 11,025.00 - - - - -
- - - - - -
4.2 Supply and fix G28 sheet metal gutter with - - - - - -
development length of 130cm ml 105.00 276.80 276.80 250.00 26,250.00 - - - 69,200.00 69,200.00
- - -
TOTAL CARRIED TO SUMMARY ----------------------------------------------------------- - 379,518.50 - - - 690,912.30 690,912.30
- - -
5- SANITARY INSTALLATION - - - - - -
- - - - - -
Supply and install PPR pipes - - - - - -
for cold and hot water distribution to - - - - - -
sanitary fixtures as shown on drawings, - - - - - -
on axis 5
Err:522
12 3,800.00 3 2 22.800 Err:522
12 3,200.00 3 2 19.200 Err:522
St 8 1,100.00 15 2 33.000 Err:522
on axis 6 12 6,730.00 3 2 40.380 Err:522
12 6,730.00 3 2 40.380 Err:522
St 8 1,100.00 30 2 66.000 Err:522
GUTTER WORK REBAR
TDT P.L.C
Project:- Zena zena gessese real state________________________________ Block-13, House Type-1
contractor- TDT PLC
on axis 1 8 2,400.00 88 1 211.200 Err:522
8 13,000.00 8 1 104.000 Err:522
on axis D 8 2,400.00 103 1 247.200 Err:522
8 15,170.00 8 1 121.360 Err:522
on axis A 8 2,400.00 63 1 151.200 Err:522
8 9,180.00 8 1 73.440 Err:522
on axis 6 8 2,400.00 41 1 98.400 Err:522
8 6,000.00 8 1 48.000 Err:522
on axis 5 8 2,400.00 21 1 50.400 Err:522
8 2,900.00 8 1 23.200 Err:522
on axis B 8 2,400.00 23 1 55.200 Err:522
8 3,180.00 8 1 25.440 Err:522
on axis 4 8 2,400.00 29 1 69.600 Err:522
8 4,100.00 8 1 32.800 Err:522
Total Length (m) 0.00 2,316.04 0.00 413.79 747.39 152.00 0.00 Err:522
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 914.84 0.00 367.45 902.85 239.86 0.00 Err:522
SUMMARY
Total Length (m) 0.22 2,316.04 0.00 413.79 747.39 152.00 0.00 Err:522
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.05 914.84 0.00 367.45 902.85 239.86 0.00 Err:522
4.50 m2 11.00 m2
7 1.70 F3 (7pcs) Under Hard core Ground
1.70 Floor area
20.23 m2 2.50 on axis A-B b/n 4-5 (Toilet)
1 1.60 F4 (1pcs) 2.50
1.60 6.25 m2
2.56 m2 2.70 on axis B -C b/n 4-5 (stair)
2 1.80 F5 (2pcs) 2.88
1.80 7.78 m2
6.48 m2 5.70 on axis C -D b/n 4 -5 (Garage)
2 1.20 For Footing pad (G.F) 4.00
1.20 F1 (2pcs) 22.8 m2
2.88 m2 69.82 m2 Total item 2.2
2 1.50 F2 (2pcs) 2.3 Under grade beams
1.50 and basement slabs
4.50 m2 under stone masnary
For shear wall 3 7.33 from axis A-C
2 11.60 On axis 1&4//A-D 0.50
1.20 footing pad 11.00 m2
27.84 m2 Under Hard core
1 7.18 On axis D//1-4 basment floor area
1.20 footing pad 8.87 on axis A-B b/n 1 - 4
8.62 m2 3.80
2
77.61 m Total item 2.1 33.71 m2
2.2 Under grade 8.87 on axis B -C b/n 1-4
beams and ground slabs 2.70
under stone masnery 23.95 m2
22.00 (grade beam) G.F (permater) 8.87 on axis C -D b/n 1-4
0.50 4.00
11.00 m2 35.48 m2
104.13 m2 Total item 2.3
TDT P.L.C
Project:- Zena zena gessese real state________________________________Block-13, House Type-1
contractor- TDT PLC
Take off sheet no
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
Take off sheet no
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
Take off sheet no
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
Take off sheet no
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
Take off sheet no
3.80 3.40
2
19.114 m 4.80
3.55 on axis 2 & 4 b/n A & B 0.80
3.80 13.06 m3
13.49 m2
2.60 on axis 1 & 2 4.50
5.03 b/n B & C 0.50
2
13.078 m 0.80
1.80 m3
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
Take off sheet no
3.14
0.25 m3
4.33 m3 Total item 1.1
1.2 To suspend floor beam,
gread beam and top tiebeam
9.46 on axis A
0.20 5.73 m3
0.30
0.57 m3
12.66 on axis B
0.20
0.30
0.76 m3
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
TDT P.L.C
Project:- Zena zena gessese real state________________________________
contractor- TDT PLC
Take off sheet no
Description
1.6 Back fill
Under Hard core
Basement Floor
Description
on axis C -D b/n 1-4
9
Block-13, House Type-1
Description
under stone masnary
to axis A-C
Description
FOR SHEAR WALL PAD
C-25 RC COCRETE
on axis1&4 b/n A-D
Description
F1 (2pcs)
F2 (2pcs)
To basment colomons
on axis 2 (A-C)
To shear wall
On axis 1&4//A-D
On axis D//1-3
Description
on axis 2 &4 b/n B & C
On axis B//1-4
On axis C//1-4
of the building
under gread beam
on axis A-B b/n 4-5 (Toilet)
(perimeter )
Description
on axis C & D
on axis 1 ,2 & 4
on axis 5
on axis 6
Total item 1.2
Form work
1.5 To elevation column
C1(1pcs) ,C2(5pcs)
C3(3pcs),C4(1pcs)
C5(1pcs),C6(1pcs)
C1'(3pcs)&C3'(1pcs)
circular column
on axis B
on axis C & D
on axis 1
on axis 1 ,2 & 4
on axis 5
on axis 6
Description
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________ Block-13, House Type-1
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12 14 16 20 24
Footing pad
F2 12 1,900.00 22 2 83.600
F3 14 2,200.00 22 7 338.800
F4 14 2,100.00 22 1 46.200
F5 14 2,400.00 24 2 115.200
Footing column
C1 14 2,700.00 8 1 21.600
C2 14 2,700.00 8 5 108.000
C3 16 2,700.00 8 3 64.800
C4 16 2,700.00 8 1 21.600
C5 16 2,700.00 10 1 27.000
C6 16 2,700.00 10 1 27.000
Stirrup
C1 8 1,100.00 8 1 8.800
C2 8 1,100.00 8 5 44.000
C3 8 1,100.00 8 7 61.600
C4 8 1,100.00 8 1 8.800
C5 8 1,100.00 8 1 8.800
C6 8 1,300.00 8 1 10.400
Total Length (m) 0.00 142.40 0.00 83.60 629.80 140.40 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 56.25 0.00 74.24 760.80 221.55 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________ Block-13, House Type-1
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Shearwall 6 8 10 12 14 16 20 24
SW-1 Footing
On axis 1&4 b/n A&D 10 1,132.00 114 2 258.096
" 8 11,500.00 10 2 230.000
Horizontal
On axis 1&4 b/n A&D 8 11,500.00 28 2 644.000
Vertical
On axis 1&4 b/n A&D under baeam10 1,500.00 149 2 447.000
and abave beam 10 3,000.00 52 2 312.000
" 8 3,000.00 52 2 312.000
Internal under beam 8 1,500.00 52 2 156.000
SW-1 Footing
On axis D b/n 1&4 10 1,332.00 82 1 109.224
" 8 8,980.00 10 1 89.800
Horizontal
On axis D b/n 1&4 8 9,380.00 18 1 168.840
Vertical 10 1,500.00 59 1 88.500
On axis D b/n 1&4 10 1,200.00 45 1 54.000
" 10 2,000.00 45 1 90.000
" 10 2,000.00 45 1 90.000
Internal under beam 8 1,500.00 45 1 67.500
Total Length (m) 0.00 1,668.14 1,448.82 0.00 0.00 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 658.92 893.92 0.00 0.00 0.00 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________ Block-13, House Type-1
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Basment Beam 6 8 10 12 14 16 20 24
on axis A,B,C&D 14 10,080.00 3 4 120.960
14 9,480.00 3 4 113.760
St 1-1 8 1,100.00 48 4 211.200
on axis 1,2&4 14 6,500.00 3 3 58.500
14 6,300.00 3 3 56.700
14 11,600.00 3 3 104.400
St 1-1 8 1,100.00 56 3 184.800
Basemnt elvation
colomon
C1(1 pcs) 14 3,400.00 6 1 20.400
C2(5pcs) 14 3,400.00 10 5 170.000
C3(3pcs) 16 3,500.00 8 3 84.000
C4(1pcs) 16 3,500.00 8 1 28.000
C5(1pcs) 16 3,500.00 10 1 35.000
C6(1pcs) 16 3,500.00 10 1 35.000
St 1-1 8 1,100.00 14 12 184.800
Ground Beam
on axis A 14 9,100.00 3 1 27.300
14 8,500.00 3 1 25.500
Neg 12 3,180.00 3 1 9.540
12 3,180.00 3 1 9.540
St 1-1 8 1,200.00 46 1 55.200
Total Length (m) 0.00 636.00 0.00 19.08 697.52 182.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 251.22 0.00 16.94 842.60 287.20 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________ Block-13, House Type-1
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground Beam 6 8 10 12 14 16 20 24
on axis B 14 8,010.00 3 1 24.030
14 5,860.00 3 1 17.580
14 5,760.00 3 1 17.280
14 10,270.00 3 1 30.810
Neg 12 2,230.00 3 1 6.690
12 3,060.00 2 1 6.120
12 2,340.00 2 1 4.680
St 1-1 8 1,200.00 46 1 55.200
St 2-2 8 1,100.00 17 1 18.700
on axis C& D 12 8,010.00 3 2 48.060
12 8,670.00 3 2 52.020
14 5,760.00 3 2 34.560
14 10,270.00 3 2 61.620
Neg 12 2,230.00 3 2 13.380
12 3,030.00 3 2 18.180
12 8,670.00 3 2 52.020
St 1-1 8 1,200.00 46 2 110.400
8 1,100.00 50 1 55.000
on axis 1 ,2& 4 14 4,430.00 3 3 39.870
14 9,910.00 3 3 89.190
14 9,160.00 3 3 82.440
Total Length (m) 0.00 239.30 0.00 201.15 397.38 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 94.52 0.00 178.62 480.04 0.00 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________ Block-13, House Type-1
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground Beam 6 8 10 12 14 16 20 24
on axis 1 ,2 &4
14 4,530.00 3 3 40.770
Neg 12 3,410.00 3 3 30.690
12 2,400.00 3 3 21.600
12 2,340.00 3 3 21.060
12 182.00 3 3 1.638
Neg only on axis 1 14 8,320.00 1 1 8.320
St 4-4 & 5-5 8 1,200.00 64 3 230.400
on axis 5 12 3,800.00 3 1 11.400
14 3,200.00 3 1 9.600
St 2-2 8 1,100.00 14 1 15.400
on axis 6 12 5,200.00 3 1 15.600
14 4,600.00 3 1 13.800
St 1-1 8 1,200.00 22 1 26.400
Ground floor slab
on axis A -D b/n 1-4 upper bar 10 9,440.00 60 1 566.400
On axis 1 -4 b/n B - D
12 9,100.00 42 1
bottom bar 382.200
On axis 1 -4 b/n A -B
10 4,390.00 42 1
bottom bar 184.380
Neg on axis A b/ n 1-4 10 1,570.00 53 1 83.210
Neg on axis 1 b/n A-D 10 2,030.00 75 1 152.250
Total Length (m) 0.00 272.20 986.24 484.19 72.49 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 107.52 608.51 429.96 87.57 0.00 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________ Block-13, House Type-1
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor slab 6 8 10 12 14 16 20 24
Neg on axis 2 b/n A-D 10 3,060.00 75 1 229.500
Neg on axis 4 b/n A-D 10 1,540.00 75 1 115.500
Neg on axis B b/n 1-4 10 2,340.00 55 1 128.700
Neg on axis C b/n 1-4 10 2,400.00 55 1 132.000
Neg on axis C b/n 1-4 10 3,310.00 72 1 238.320
Kebeleto 12 1,000.00 90 1 90.000
Mager 8 1,400.00 46 1 64.400
" 8 2,000.00 66 1 132.000
Total Length (m) 0.00 196.40 844.02 90.00 0.00 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 77.58 520.76 79.92 0.00 0.00 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________ Block-13, House Type-1
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12 14 16 20 24
Footing pad (@0.00)
F1 (2pcs) 12 1,500.00 16 2 48.000
F2(2pcs) 12 1,900.00 22 2 83.600
Footing column
C1' (3 pcs) 14 3,000.00 6 3 54.000
C3' (1pcs) 14 3,000.00 8 1 24.000
Stirrup (for above) 8 1,100.00 8 4 35.200
For Eevation column
C1' (3 pcs) 14 4,000.00 6 3 72.000
C3 (1pcs)
' 14 4,000.00 6 1 24.000
C1 (1pcs) 14 4,000.00 6 1 24.000
C2 (5pcs) 14 4,000.00 8 5 160.000
C3(3pcs) 16 4,000.00 6 3 72.000
C4(1pcs) 16 4,000.00 6 1 24.000
C5(1pcs) 16 4,000.00 10 1 40.000
C6(1pcs) 16 4,000.00 10 1 40.000
Stirrup (for above) 8 1,100.00 17 16 299.200
On Hard core Mash
ON Tolet 8 2,500.00 20 1 50.000
Under STAIR CASE FLOOR 8 3,000.00 26 1 78.000
ON GERAGE 8 6,000.00 54 1 324.000
Total Length (m) 0.00 786.40 0.00 131.60 358.00 176.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 310.63 0.00 116.86 432.46 277.73 0.00 0.00
SUMMARY
Total Length (m) 0.22 3,940.84 3,279.08 1,009.62 2,155.19 498.40 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.05 1,556.63 2,023.19 896.54 2,603.47 786.48 0.00 0.00
Block-13, House Type-1
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12 14 16 20 24
on axis A 12 9,100.00 3 1 27.300
14 8,500.00 4 1 34.000
Neg 12 3,200.00 3 3 28.800
St 8 1,200.00 47 1 56.400
on axis B 12 8,010.00 3 1 24.030
12 5,860.00 3 1 17.580
12 5,760.00 4 1 23.040
12 7,460.00 4 1 29.840
Neg 12 2,223.00 2 1 4.446
12 3,060.00 2 1 6.120
12 2,340.00 2 0.000
12 1,580.00 2 1 3.160
St 8 1,100.00 62 1 68.200
on axis C 12 8,010.00 3 1 24.030
12 8,670.00 3 1 26.010
14 5,760.00 4 1 23.040
14 10,270.00 4 1 41.080
Neg 12 2,223.00 2 1 4.446
" 12 3,060.00 2 1 6.120
12 2,340.00 2 3 14.040
St 8 1,100.00 78 1 85.800
Total Length (m) 0.00 210.40 0.00 238.96 98.12 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 83.11 0.00 212.20 118.53 0.00 0.00 0.00
Block-13, House Type-1
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12 14 16 20 24
on axis D 14 8,010.00 3 1
14 8,670.00 3 1 26.010
14 5,760.00 4 1 23.040
14 10,270.00 4 1 41.080
Neg 12 2,230.00 2 1 4.460
2 3,060.00 2 2
St 8 1,100.00 78 1 85.800
14 8,320.00 1 1 8.320
St 8 1,100.00 55 2 121.000
Total Length (m) 0.00 206.80 0.00 83.50 209.37 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 81.69 0.00 74.15 252.92 0.00 0.00 0.00
Block-13, House Type-1
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12 14 16 20 24
on axis 4 14 4,430.00 2 1 8.860
12 9,910.00 2 1 19.820
12 9,160.00 5 1 45.800
12 4,530.00 5 1 22.650
12 3,410.00 2 1 6.820
12 2,400.00 2 2 9.600
12 1,820.00 2 1 3.640
St 8 1,100.00 55 1 60.500
on axis 5
12 3,800.00 3 1 11.400
12 3,200.00 5 1 16.000
12 1,500.00 2 2 6.000
St 8 1,100.00 15 1 16.500
on axis 6 12 6,730.00 3 1 20.190
12 6,730.00 3 1 20.190
12 2,450.00 3 1 7.350
12 1,880.00 3 1 5.640
St 8 1,100.00 30 1 33.000
Total Length (m) 0.00 110.00 0.00 195.10 8.86 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 43.45 0.00 173.25 10.70 0.00 0.00 0.00
Block-13, House Type-1
1st FLOOR SLAB
on axis A -B b/n 1-4 10 9,180.00 12 1 110.160
10 1,188.00 16 1 19.008
10 4,400.00 48 1 211.200
on axis B-D b/n 1-4 10 9,470.00 40 1 378.800
12 9,040.00 44 1 397.760
on axis C-D b/n 1-4 10 6,250.00 36 1 225.000
10 6,220.00 30 1 186.600
Neg on axis 1 10 2,030.00 36 1 73.080
Neg on axis 2 10 3,060.00 36 1 110.160
Neg on axis 4 b/n A -B 10 1,550.00 26 1 40.300
Neg on axis 4 b/n C -D 10 3,280.00 38 1 124.640
Neg on axis 6 b/n C -D 10 2,350.00 38 1 89.300
Neg on axis A 10 1,570.00 57 1 89.490
Neg on axis B 10 2,340.00 57 1 133.380
Neg on axis C 10 2,400.00 57 1 136.800
Neg on axis D 12 3,240.00 115 1 372.600
STAIR CASE
Neg on axis on tolet 12 2,700.00 22 1 59.400
mager 12 2,500.00 110 1 275.000
Kebeleto 12 1,000.00 140 1 140.000
Total Length (m) 0.00 0.00 1,927.92 1,244.76 0.00 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 0.00 1,189.53 1,105.35 0.00 0.00 0.00 0.00
Block-13, House Type-1
STAIR CASE
A-A no 1 16 6,430.00 8 1 51.440
A-A no 2 14 2,010.00 8 1 16.080
A-A no 3 14 2,280.00 8 1 18.240
A-A no 4 14 700.00 8 1 5.600
A-A no 5 14 700.00 8 1 5.600
A-A no 6 8 770.00 6 11 50.820
A-A no 7 8 1,150.00 3 11 37.950
Stair case beam 14 3,600.00 3 1 10.800
14 2,850.00 3 1 8.550
St 8 1,100.00 16 1 17.600
B-B no 1 16 5,370.00 8 1 42.960
B-B no 2 14 1,770.00 8 1 14.160
B-B no 3 14 2,520.00 8 1 20.160
B-B no 4 14 700.00 8 1 5.600
B-B no 5 14 700.00 8 1 5.600
B-B no 6 8 770.00 6 11 50.820
B-B no 7 8 1,150.00 3 11 37.950
Landing 10 3,000.00 8 2 48.000
Basment mash
At axis 1-4 b/n A-D 8 8,700.00 54 1 469.800
At axis A-D b/n 1-4 8 11,000.00 35 1 385.000
Total Length (m) 0.00 1,049.94 48.00 0.00 110.39 94.40 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 414.73 29.62 0.00 133.35 148.96 0.00 0.00
Block-13, House Type-1
ELEVATION COLUMM
C1' (3 pcs) 14 3,800.00 6 3 68.400
C3 (1pcs)
' 14 3,800.00 6 1 22.800
C1 (1pcs) 14 3,800.00 6 5 114.000
C2 (5pcs) 14 3,800.00 6 5 114.000
C3(3pcs) 16 3,800.00 6 30 684.000
C4(1pcs) 16 3,800.00 6 3 68.400
C5(1pcs) 16 3,800.00 8 1 30.400
C6(1pcs) 16 3,800.00 8 1 30.400
circral colomo from G.L up first 14 3,800.00 6 4 91.200
ST FOR ALL ABOVE 8 1,100.00 16 18 316.800
Total Length (m) 0.00 316.80 0.00 0.00 410.40 813.20 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 125.14 0.00 0.00 495.76 1,283.23 0.00 0.00
SUMMARY
Total Length (m) 0.22 1,893.94 1,975.92 1,762.32 837.14 907.60 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.05 748.11 1,219.14 1,564.94 1,011.27 1,432.19 0.00 0.00
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12
Footing pad
F2 12 1,900.00 22 2 83.600
F3 14 2,200.00 22 7
F4 14 2,100.00 22 1
F5 14 2,400.00 24 2
Footing column
C1 14 2,700.00 8 1
C2 14 2,700.00 8 5
C3 16 2,700.00 8 3
C4 16 2,700.00 8 1
C5 16 2,700.00 10 1
C6 16 2,700.00 10 1
Stirrup
C1 8 1,100.00 8 1 8.800
C2 8 1,100.00 8 5 44.000
C3 8 1,100.00 8 7 61.600
C4 8 1,100.00 8 1 8.800
C5 8 1,100.00 8 1 8.800
C6 8 1,300.00 8 1 10.400
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Shearwall 6 8 10 12
SW-1 Footing
On axis 1&4 b/n A&D 10 1,132.00 114 2 258.096
" 8 11,500.00 10 2 230.000
Horizontal
On axis 1&4 b/n A&D 8 11,500.00 28 2 644.000
Vertical
On axis 1&4 b/n A&D under baeam10 1,500.00 149 2 447.000
and abave beam 10 3,000.00 52 2 312.000
" 8 3,000.00 52 2 312.000
Internal under beam 8 1,500.00 52 2 156.000
SW-1 Footing
On axis D b/n 1&4 10 1,332.00 82 1 109.224
" 8 8,980.00 10 1 89.800
Horizontal
On axis D b/n 1&4 8 9,380.00 18 1 168.840
Vertical 10 1,500.00 59 1 88.500
On axis D b/n 1&4 10 1,200.00 45 1 54.000
" 10 2,000.00 45 1 90.000
" 10 2,000.00 45 1 90.000
Internal under beam 8 1,500.00 45 1 67.500
Total Length (m) 0.00 1,668.14 1,448.82 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 658.92 893.92 0.00
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Basment Beam 6 8 10 12
on axis A,B,C&D 14 10,080.00 3 4
14 9,480.00 3 4
St 1-1 8 1,100.00 48 4 211.200
on axis 1,2&4 14 6,500.00 3 3
14 6,300.00 3 3
14 11,600.00 3 3
St 1-1 8 1,100.00 56 3 184.800
Basemnt elvation
colomon
C1(1 pcs) 14 3,400.00 6 1
C2(5pcs) 14 3,400.00 10 5
C3(3pcs) 16 3,500.00 8 3
C4(1pcs) 16 3,500.00 8 1
C5(1pcs) 16 3,500.00 10 1
C6(1pcs) 16 3,500.00 10 1
St 1-1 8 1,100.00 14 12 184.800
Ground Beam
on axis A 14 9,100.00 3 1
14 8,500.00 3 1
Neg 12 3,180.00 3 1 9.540
12 3,180.00 3 1 9.540
St 1-1 8 1,200.00 46 1 55.200
Total Length (m) 0.00 636.00 0.00 19.08
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 251.22 0.00 16.94
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground Beam 6 8 10 12
on axis B 14 8,010.00 3 1
14 5,860.00 3 1
14 5,760.00 3 1
14 10,270.00 3 1
Neg 12 2,230.00 3 1 6.690
12 3,060.00 2 1 6.120
12 2,340.00 2 1 4.680
St 1-1 8 1,200.00 46 1 55.200
St 2-2 8 1,100.00 17 1 18.700
on axis C& D 12 8,010.00 3 2 48.060
12 8,670.00 3 2 52.020
14 5,760.00 3 2
14 10,270.00 3 2
Neg 12 2,230.00 3 2 13.380
12 3,030.00 3 2 18.180
12 8,670.00 3 2 52.020
St 1-1 8 1,200.00 46 2 110.400
8 1,100.00 50 1 55.000
on axis 1 ,2& 4 14 4,430.00 3 3
14 9,910.00 3 3
14 9,160.00 3 3
Total Length (m) 0.00 239.30 0.00 201.15
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 94.52 0.00 178.62
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground Beam 6 8 10 12
on axis 1 ,2 &4
14 4,530.00 3 3
Neg 12 3,410.00 3 3 30.690
12 2,400.00 3 3 21.600
12 2,340.00 3 3 21.060
12 182.00 3 3 1.638
Neg only on axis 1 14 8,320.00 1 1
St 4-4 & 5-5 8 1,200.00 64 3 230.400
on axis 5 12 3,800.00 3 1 11.400
14 3,200.00 3 1
St 2-2 8 1,100.00 14 1 15.400
on axis 6 12 5,200.00 3 1 15.600
14 4,600.00 3 1
St 1-1 8 1,200.00 22 1 26.400
Ground floor slab
on axis A -D b/n 1-4 upper bar 10 9,440.00 60 1 566.400
On axis 1 -4 b/n B - D
12 9,100.00 42 1
bottom bar 382.200
On axis 1 -4 b/n A -B
10 4,390.00 42 1
bottom bar 184.380
Neg on axis A b/ n 1-4 10 1,570.00 53 1 83.210
Neg on axis 1 b/n A-D 10 2,030.00 75 1 152.250
Total Length (m) 0.00 272.20 986.24 484.19
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 107.52 608.51 429.96
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor slab 6 8 10 12
Neg on axis 2 b/n A-D 10 3,060.00 75 1 229.500
Neg on axis 4 b/n A-D 10 1,540.00 75 1 115.500
Neg on axis B b/n 1-4 10 2,340.00 55 1 128.700
Neg on axis C b/n 1-4 10 2,400.00 55 1 132.000
Neg on axis C b/n 1-4 10 3,310.00 72 1 238.320
Kebeleto 12 1,000.00 90 1 90.000
Mager 8 1,400.00 46 1 64.400
" 8 2,000.00 66 1 132.000
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12
Footing pad (@0.00)
F1 (2pcs) 12 1,500.00 16 2 48.000
F2(2pcs) 12 1,900.00 22 2 83.600
Footing column
C1' (3 pcs) 14 3,000.00 6 3
C3 (1pcs)
' 14 3,000.00 8 1
Stirrup (for above) 8 1,100.00 8 4 35.200
For Eevation column
C1' (3 pcs) 14 4,000.00 6 3
C3' (1pcs) 14 4,000.00 6 1
C1 (1pcs) 14 4,000.00 6 1
C2 (5pcs) 14 4,000.00 8 5
C3(3pcs) 16 4,000.00 6 3
C4(1pcs) 16 4,000.00 6 1
C5(1pcs) 16 4,000.00 10 1
C6(1pcs) 16 4,000.00 10 1
Stirrup (for above) 8 1,100.00 17 16 299.200
On Hard core Mash
ON Tolet 8 2,500.00 20 1 50.000
Under STAIR CASE FLOOR 8 3,000.00 26 1 78.000
ON GERAGE 8 6,000.00 54 1 324.000
Total Length (m) 0.00 786.40 0.00 131.60
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 310.63 0.00 116.86
SUMMARY
Total Length (m) 0.22 3,940.84 3,279.08 1,009.62
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.05 1,556.63 2,023.19 896.54
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis A 12 9,100.00 3 1 27.300
14 8,500.00 4 1
Neg 12 3,200.00 3 3 28.800
St 8 1,200.00 47 1 56.400
on axis B 12 8,010.00 3 1 24.030
12 5,860.00 3 1 17.580
12 5,760.00 4 1 23.040
12 7,460.00 4 1 29.840
Neg 12 2,223.00 2 1 4.446
12 3,060.00 2 1 6.120
12 2,340.00 2 0.000
12 1,580.00 2 1 3.160
St 8 1,100.00 62 1 68.200
on axis C 12 8,010.00 3 1 24.030
12 8,670.00 3 1 26.010
14 5,760.00 4 1
14 10,270.00 4 1
Neg 12 2,223.00 2 1 4.446
" 12 3,060.00 2 1 6.120
12 2,340.00 2 3 14.040
St 8 1,100.00 78 1 85.800
Total Length (m) 0.00 210.40 0.00 238.96
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 83.11 0.00 212.20
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis D 14 8,010.00 3 1
14 8,670.00 3 1
14 5,760.00 4 1
14 10,270.00 4 1
Neg 12 2,230.00 2 1 4.460
2 3,060.00 2 2
St 8 1,100.00 78 1 85.800
14 8,320.00 1 1
St 8 1,100.00 55 2 121.000
Total Length (m) 0.00 206.80 0.00 83.50
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 81.69 0.00 74.15
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis 4 14 4,430.00 2 1
12 9,910.00 2 1 19.820
12 9,160.00 5 1 45.800
12 4,530.00 5 1 22.650
12 3,410.00 2 1 6.820
12 2,400.00 2 2 9.600
12 1,820.00 2 1 3.640
St 8 1,100.00 55 1 60.500
on axis 5
12 3,800.00 3 1 11.400
12 3,200.00 5 1 16.000
12 1,500.00 2 2 6.000
St 8 1,100.00 15 1 16.500
on axis 6 12 6,730.00 3 1 20.190
12 6,730.00 3 1 20.190
12 2,450.00 3 1 7.350
12 1,880.00 3 1 5.640
St 8 1,100.00 30 1 33.000
Total Length (m) 0.00 110.00 0.00 195.10
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 43.45 0.00 173.25
Block-13, House Type-1
1st FLOOR SLAB
on axis A -B b/n 1-4 10 9,180.00 12 1 110.160
10 1,188.00 16 1 19.008
10 4,400.00 48 1 211.200
on axis B-D b/n 1-4 10 9,470.00 40 1 378.800
12 9,040.00 44 1 397.760
on axis C-D b/n 1-4 10 6,250.00 36 1 225.000
10 6,220.00 30 1 186.600
Neg on axis 1 10 2,030.00 36 1 73.080
Neg on axis 2 10 3,060.00 36 1 110.160
Neg on axis 4 b/n A -B 10 1,550.00 26 1 40.300
Neg on axis 4 b/n C -D 10 3,280.00 38 1 124.640
Neg on axis 6 b/n C -D 10 2,350.00 38 1 89.300
Neg on axis A 10 1,570.00 57 1 89.490
Neg on axis B 10 2,340.00 57 1 133.380
Neg on axis C 10 2,400.00 57 1 136.800
Neg on axis D 12 3,240.00 115 1 372.600
STAIR CASE
Neg on axis on tolet 12 2,700.00 22 1 59.400
mager 12 2,500.00 110 1 275.000
Kebeleto 12 1,000.00 140 1 140.000
STAIR CASE
A-A no 1 16 6,430.00 8 1
A-A no 2 14 2,010.00 8 1
A-A no 3 14 2,280.00 8 1
A-A no 4 14 700.00 8 1
A-A no 5 14 700.00 8 1
A-A no 6 8 770.00 6 11 50.820
A-A no 7 8 1,150.00 3 11 37.950
Stair case beam 14 3,600.00 3 1
14 2,850.00 3 1
St 8 1,100.00 16 1 17.600
B-B no 1 16 5,370.00 8 1
B-B no 2 14 1,770.00 8 1
B-B no 3 14 2,520.00 8 1
B-B no 4 14 700.00 8 1
B-B no 5 14 700.00 8 1
B-B no 6 8 770.00 6 11 50.820
B-B no 7 8 1,150.00 3 11 37.950
Landing 10 3,000.00 8 2 48.000
Basment mash
At axis 1-4 b/n A-D 8 8,700.00 54 1 469.800
At axis A-D b/n 1-4 8 11,000.00 35 1 385.000
Total Length (m) 0.00 1,049.94 48.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 414.73 29.62 0.00
ELEVATION COLUMM
C1' (3 pcs) 14 3,800.00 6 3
C3' (1pcs) 14 3,800.00 6 1
C1 (1pcs) 14 3,800.00 6 5
C2 (5pcs) 14 3,800.00 6 5
C3(3pcs) 16 3,800.00 6 30
C4(1pcs) 16 3,800.00 6 3
C5(1pcs) 16 3,800.00 8 1
C6(1pcs) 16 3,800.00 8 1
circral colomo from G.L up first 14 3,800.00 6 4
ST FOR ALL ABOVE 8 1,100.00 16 18 316.800
Total Length (m) 0.00 316.80 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 125.14 0.00 0.00
SUMMARY
Total Length (m) 0.22 1,893.94 1,975.92 1,762.32
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.05 748.11 1,219.14 1,564.94
Block-13, House Type-1
Length (m)
14 16 20 24
338.800
46.200
115.200
21.600
108.000
64.800
21.600
27.000
27.000
Length (m)
14 16 20 24
0.00 0.00 0.00 0.00
1.208 1.578 2.468 3.551
0.00 0.00 0.00 0.00
Length (m)
14 16 20 24
120.960
113.760
58.500
56.700
104.400
20.400
170.000
84.000
28.000
35.000
35.000
27.300
25.500
Length (m)
14 16 20 24
24.030
17.580
17.280
30.810
34.560
61.620
39.870
89.190
82.440
397.38 0.00 0.00 0.00
1.208 1.578 2.468 3.551
480.04 0.00 0.00 0.00
Block-13, House Type-1
Length (m)
14 16 20 24
40.770
8.320
9.600
13.800
14 16 20 24
Length (m)
14 16 20 24
54.000
24.000
72.000
24.000
24.000
160.000
72.000
24.000
40.000
40.000
Length (m)
14 16 20 24
34.000
23.040
41.080
Length (m)
14 16 20 24
26.010
23.040
41.080
54.960
27.180
20.460
8.320
Page 1
8.320
209.37 0.00 0.00 0.00
1.208 1.578 2.468 3.551
252.92 0.00 0.00 0.00
Block-13, House Type-1
Length (m)
14 16 20 24
8.860
51.440
16.080
18.240
5.600
5.600
10.800
8.550
42.960
14.160
20.160
5.600
5.600
68.400
22.800
114.000
114.000
684.000
68.400
30.400
30.400
91.200
Ground Floor
6.00 6.00 living & Dining
5.00 5.00 kichen
2.00 2.00 corridor
0.00 office
2.00 2.00 toilet
First Floor
4.00 4.00 M. bed room
34.00
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12
Footing pad
F2 12 1,900.00 22 2 83.600
F3 14 2,200.00 22 7
F4 14 2,100.00 22 1
F5 14 2,400.00 24 2
Footing column
C1 14 2,700.00 8 1
C2 14 2,700.00 8 5
C3 16 2,700.00 8 3
C4 16 2,700.00 8 1
C5 16 2,700.00 10 1
C6 16 2,700.00 10 1
Stirrup
C1 8 1,100.00 8 1 8.800
C2 8 1,100.00 8 5 44.000
C3 8 1,100.00 8 7 61.600
C4 8 1,100.00 8 1 8.800
C5 8 1,100.00 8 1 8.800
C6 8 1,300.00 8 1 10.400
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Shearwall 6 8 10 12
SW-1 Footing
On axis 1&4 b/n A&D 10 1,132.00 114 2 258.096
" 8 11,500.00 10 2 230.000
Horizontal
On axis 1&4 b/n A&D 8 11,500.00 28 2 644.000
Vertical
On axis 1&4 b/n A&D under baeam10 1,500.00 149 2 447.000
and abave beam 10 3,000.00 52 2 312.000
" 8 3,000.00 52 2 312.000
Internal under beam 8 1,500.00 52 2 156.000
SW-1 Footing
On axis D b/n 1&4 10 1,332.00 82 1 109.224
" 8 8,980.00 10 1 89.800
Horizontal
On axis D b/n 1&4 8 9,380.00 18 1 168.840
Vertical 10 1,500.00 59 1 88.500
On axis D b/n 1&4 10 1,200.00 45 1 54.000
" 10 2,000.00 45 1 90.000
" 10 2,000.00 45 1 90.000
Internal under beam 8 1,500.00 45 1 67.500
Total Length (m) 0.00 1,668.14 1,448.82 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 658.92 893.92 0.00
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Basment Beam 6 8 10 12
on axis A,B,C&D 14 10,080.00 3 4
14 9,480.00 3 4
St 1-1 8 1,100.00 48 4 211.200
on axis 1,2&4 14 6,500.00 3 3
14 6,300.00 3 3
14 11,600.00 3 3
St 1-1 8 1,100.00 56 3 184.800
Basemnt elvation
colomon
C1(1 pcs) 14 3,400.00 6 1
C2(5pcs) 14 3,400.00 10 5
C3(3pcs) 16 3,500.00 8 3
C4(1pcs) 16 3,500.00 8 1
C5(1pcs) 16 3,500.00 10 1
C6(1pcs) 16 3,500.00 10 1
St 1-1 8 1,100.00 14 12 184.800
Ground Beam
on axis A 14 9,100.00 3 1
14 8,500.00 3 1
Neg 12 3,180.00 3 1 9.540
12 3,180.00 3 1 9.540
St 1-1 8 1,200.00 46 1 55.200
Total Length (m) 0.00 636.00 0.00 19.08
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 251.22 0.00 16.94
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground Beam 6 8 10 12
on axis B 14 8,010.00 3 1
14 5,860.00 3 1
14 5,760.00 3 1
14 10,270.00 3 1
Neg 12 2,230.00 3 1 6.690
12 3,060.00 2 1 6.120
12 2,340.00 2 1 4.680
St 1-1 8 1,200.00 46 1 55.200
St 2-2 8 1,100.00 17 1 18.700
on axis C& D 12 8,010.00 3 2 48.060
12 8,670.00 3 2 52.020
14 5,760.00 3 2
14 10,270.00 3 2
Neg 12 2,230.00 3 2 13.380
12 3,030.00 3 2 18.180
12 8,670.00 3 2 52.020
St 1-1 8 1,200.00 46 2 110.400
8 1,100.00 50 1 55.000
on axis 1 ,2& 4 14 4,430.00 3 3
14 9,910.00 3 3
14 9,160.00 3 3
Total Length (m) 0.00 239.30 0.00 201.15
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 94.52 0.00 178.62
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground Beam 6 8 10 12
on axis 1 ,2 &4
14 4,530.00 3 3
Neg 12 3,410.00 3 3 30.690
12 2,400.00 3 3 21.600
12 2,340.00 3 3 21.060
12 182.00 3 3 1.638
Neg only on axis 1 14 8,320.00 1 1
St 4-4 & 5-5 8 1,200.00 64 3 230.400
on axis 5 12 3,800.00 3 1 11.400
14 3,200.00 3 1
St 2-2 8 1,100.00 14 1 15.400
on axis 6 12 5,200.00 3 1 15.600
14 4,600.00 3 1
St 1-1 8 1,200.00 22 1 26.400
Ground floor slab
on axis A -D b/n 1-4 upper bar 10 9,440.00 60 1 566.400
On axis 1 -4 b/n B - D
12 9,100.00 42 1
bottom bar 382.200
On axis 1 -4 b/n A -B
10 4,390.00 42 1
bottom bar 184.380
Neg on axis A b/ n 1-4 10 1,570.00 53 1 83.210
Neg on axis 1 b/n A-D 10 2,030.00 75 1 152.250
Total Length (m) 0.00 272.20 986.24 484.19
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 107.52 608.51 429.96
Project Name: _ZENA GESSESE REAL STATE_________________________
Consultant:ARCHI CONSULT ____________________________
Contractor:TDT PLC ____________________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor slab 6 8 10 12
Neg on axis 2 b/n A-D 10 3,060.00 75 1 229.500
Neg on axis 4 b/n A-D 10 1,540.00 75 1 115.500
Neg on axis B b/n 1-4 10 2,340.00 55 1 128.700
Neg on axis C b/n 1-4 10 2,400.00 55 1 132.000
Neg on axis C b/n 1-4 10 3,310.00 72 1 238.320
Kebeleto 12 1,000.00 90 1 90.000
Mager 8 1,400.00 46 1 64.400
" 8 2,000.00 66 1 132.000
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12
Footing pad (@0.00)
F1 (2pcs) 12 1,500.00 16 2 48.000
F2(2pcs) 12 1,900.00 22 2 83.600
Footing column
C1' (3 pcs) 14 3,000.00 6 3
C3 (1pcs)
' 14 3,000.00 8 1
Stirrup (for above) 8 1,100.00 8 4 35.200
For Eevation column
C1' (3 pcs) 14 4,000.00 6 3
C3' (1pcs) 14 4,000.00 6 1
C1 (1pcs) 14 4,000.00 6 1
C2 (5pcs) 14 4,000.00 8 5
C3(3pcs) 16 4,000.00 6 3
C4(1pcs) 16 4,000.00 6 1
C5(1pcs) 16 4,000.00 10 1
C6(1pcs) 16 4,000.00 10 1
Stirrup (for above) 8 1,100.00 17 16 299.200
On Hard core Mash
ON Tolet 8 2,500.00 20 1 50.000
Under STAIR CASE FLOOR 8 3,000.00 26 1 78.000
ON GERAGE 8 6,000.00 54 1 324.000
Total Length (m) 0.00 786.40 0.00 131.60
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 310.63 0.00 116.86
SUMMARY
Total Length (m) 0.22 3,940.84 3,279.08 1,009.62
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.05 1,556.63 2,023.19 896.54
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis A 12 9,100.00 3 1 27.300
14 8,500.00 4 1
Neg 12 3,200.00 3 3 28.800
St 8 1,200.00 47 1 56.400
on axis B 12 8,010.00 3 1 24.030
12 5,860.00 3 1 17.580
12 5,760.00 4 1 23.040
12 7,460.00 4 1 29.840
Neg 12 2,223.00 2 1 4.446
12 3,060.00 2 1 6.120
12 2,340.00 2 0.000
12 1,580.00 2 1 3.160
St 8 1,100.00 62 1 68.200
on axis C 12 8,010.00 3 1 24.030
12 8,670.00 3 1 26.010
14 5,760.00 4 1
14 10,270.00 4 1
Neg 12 2,223.00 2 1 4.446
" 12 3,060.00 2 1 6.120
12 2,340.00 2 3 14.040
St 8 1,100.00 78 1 85.800
Total Length (m) 0.00 210.40 0.00 238.96
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 83.11 0.00 212.20
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis D 14 8,010.00 3 1
14 8,670.00 3 1
14 5,760.00 4 1
14 10,270.00 4 1
Neg 12 2,230.00 2 1 4.460
2 3,060.00 2 2
St 8 1,100.00 78 1 85.800
14 8,320.00 1 1
St 8 1,100.00 55 2 121.000
Total Length (m) 0.00 206.80 0.00 83.50
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 81.69 0.00 74.15
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis 4 14 4,430.00 2 1
12 9,910.00 2 1 19.820
12 9,160.00 5 1 45.800
12 4,530.00 5 1 22.650
12 3,410.00 2 1 6.820
12 2,400.00 2 2 9.600
12 1,820.00 2 1 3.640
St 8 1,100.00 55 1 60.500
on axis 5
12 3,800.00 3 1 11.400
12 3,200.00 5 1 16.000
12 1,500.00 2 2 6.000
St 8 1,100.00 15 1 16.500
on axis 6 12 6,730.00 3 1 20.190
12 6,730.00 3 1 20.190
12 2,450.00 3 1 7.350
12 1,880.00 3 1 5.640
St 8 1,100.00 30 1 33.000
Total Length (m) 0.00 110.00 0.00 195.10
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 43.45 0.00 173.25
Block-13, House Type-1
1st FLOOR SLAB
on axis A -B b/n 1-4 10 9,180.00 12 1 110.160
10 1,188.00 16 1 19.008
10 4,400.00 48 1 211.200
on axis B-D b/n 1-4 10 9,470.00 40 1 378.800
12 9,040.00 44 1 397.760
on axis C-D b/n 1-4 10 6,250.00 36 1 225.000
10 6,220.00 30 1 186.600
Neg on axis 1 10 2,030.00 36 1 73.080
Neg on axis 2 10 3,060.00 36 1 110.160
Neg on axis 4 b/n A -B 10 1,550.00 26 1 40.300
Neg on axis 4 b/n C -D 10 3,280.00 38 1 124.640
Neg on axis 6 b/n C -D 10 2,350.00 38 1 89.300
Neg on axis A 10 1,570.00 57 1 89.490
Neg on axis B 10 2,340.00 57 1 133.380
Neg on axis C 10 2,400.00 57 1 136.800
Neg on axis D 12 3,240.00 115 1 372.600
STAIR CASE
Neg on axis on tolet 12 2,700.00 22 1 59.400
mager 12 2,500.00 110 1 275.000
Kebeleto 12 1,000.00 140 1 140.000
STAIR CASE
A-A no 1 16 6,430.00 8 1
A-A no 2 14 2,010.00 8 1
A-A no 3 14 2,280.00 8 1
A-A no 4 14 700.00 8 1
A-A no 5 14 700.00 8 1
A-A no 6 8 770.00 6 11 50.820
A-A no 7 8 1,150.00 3 11 37.950
Stair case beam 14 3,600.00 3 1
14 2,850.00 3 1
St 8 1,100.00 16 1 17.600
B-B no 1 16 5,370.00 8 1
B-B no 2 14 1,770.00 8 1
B-B no 3 14 2,520.00 8 1
B-B no 4 14 700.00 8 1
B-B no 5 14 700.00 8 1
B-B no 6 8 770.00 6 11 50.820
B-B no 7 8 1,150.00 3 11 37.950
Landing 10 3,000.00 8 2 48.000
Basment mash
At axis 1-4 b/n A-D 8 8,700.00 54 1 469.800
At axis A-D b/n 1-4 8 11,000.00 35 1 385.000
Total Length (m) 0.00 1,049.94 48.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 414.73 29.62 0.00
ELEVATION COLUMM
C1' (3 pcs) 14 3,800.00 6 3
C3' (1pcs) 14 3,800.00 6 1
C1 (1pcs) 14 3,800.00 6 5
C2 (5pcs) 14 3,800.00 6 5
C3(3pcs) 16 3,800.00 6 30
C4(1pcs) 16 3,800.00 6 3
C5(1pcs) 16 3,800.00 8 1
C6(1pcs) 16 3,800.00 8 1
circral colomo from G.L up first 14 3,800.00 6 4
ST FOR ALL ABOVE 8 1,100.00 16 18 316.800
Total Length (m) 0.00 316.80 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 125.14 0.00 0.00
SUMMARY
Total Length (m) 0.22 1,893.94 1,975.92 1,762.32
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.05 748.11 1,219.14 1,564.94
Block-13, House Type-1
Length (m)
14 16 20 24
338.800
46.200
115.200
21.600
108.000
64.800
21.600
27.000
27.000
Length (m)
14 16 20 24
0.00 0.00 0.00 0.00
1.208 1.578 2.468 3.551
0.00 0.00 0.00 0.00
Length (m)
14 16 20 24
120.960
113.760
58.500
56.700
104.400
20.400
170.000
84.000
28.000
35.000
35.000
27.300
25.500
Length (m)
14 16 20 24
24.030
17.580
17.280
30.810
34.560
61.620
39.870
89.190
82.440
397.38 0.00 0.00 0.00
1.208 1.578 2.468 3.551
480.04 0.00 0.00 0.00
Block-13, House Type-1
Length (m)
14 16 20 24
40.770
8.320
9.600
13.800
14 16 20 24
Length (m)
14 16 20 24
54.000
24.000
72.000
24.000
24.000
160.000
72.000
24.000
40.000
40.000
Length (m)
14 16 20 24
34.000
23.040
41.080
Length (m)
14 16 20 24
26.010
23.040
41.080
54.960
27.180
20.460
8.320
Page 1
8.320
209.37 0.00 0.00 0.00
1.208 1.578 2.468 3.551
252.92 0.00 0.00 0.00
Block-13, House Type-1
Length (m)
14 16 20 24
8.860
51.440
16.080
18.240
5.600
5.600
10.800
8.550
42.960
14.160
20.160
5.600
5.600
68.400
22.800
114.000
114.000
684.000
68.400
30.400
30.400
91.200
SUBSTRUCTURE
01 Excavation & Earthworks 130,762.69 174,064.01 134,399.94 308,463.94
02 Concrete works 341,248.54 518,265.39 520,560.39 1,038,825.77
03 Masonary works 118,320.00 91,812.00 91,812.00
SUB-TOTAL -A 590,331.23 692,329.39 746,772.32 - - 1,439,101.72
SUPERSTRUCTURE -
01 Concrete works 638,951.84 390,350.01 390,350.01 267,742.55 1,048,442.57
02 Block works 149,441.75 - 289,201.07 - 289,201.07
03 Finishing 286,645.50 - - - -
04 Roofing 240,887.40 - - - 291,705.54 291,705.54
05 Sanitary Installation 125,200.00 - 201,400.00 201,400.00
07 Electrical Installation 90,460.00 - - -
08 Site Works 72,870.00 - - - -
SUB-TOTAL -B 1,604,456.49 390,350.01 679,551.08 469,142.55 291,705.54 1,830,749.18
SUB-TOTAL -(A+B) 2,194,787.72 1,082,679.40 1,426,323.41 469,142.55 291,705.54 3,269,850.90
ADD 15% VAT 329,218.16 162,401.91 213,948.51 70,371.38 43,755.83 490,477.64
GRAND TOTAL 2,524,005.87 1,245,081.31 1,640,271.92 539,513.94 335,461.37 3,760,328.54
PHASE- 2
A - SUB-STRUCTURE
B- SUPER-STRUCTURE
1 CONCRET WORK
C -25 cm RC concret
on axis 2 12 7,320.00 3 1
21.96
12 4,280.00 3 1 12.84
14 10,500.00 3 1 31.50
St 8 1,100.00 60 1 66.00
on axis 3 12 8,360.00 3 1 25.08
12 5,470.00 3 1 16.41
12 8,450.00 3 1 25.35
14 5,630.00 3 1 16.89
14 5,050.00 3 1 15.15
St 8 1,100.00 87 1 95.70
on axis 4 12 8,360.00 3 1 25.08
12 7,650.00 3 1 22.95
14 10,540.00 3 1 31.62
14 4,920.00 3 1 14.76
St 8 1,100.00 83 1 91.30
GUTTER WORK REBAR
on axis 1 8 2,400.00 69 1 165.60
8 10,200.00 8 1 81.60
on axis 1` 8 2,400.00 36 1 86.40
8 5,200.00 8 1 41.60
on axis A 8 2,400.00 91 1 218.40
8 13,430.00 8 1 107.44
on axis C 8 2,400.00 9 1 21.60
8 1,200.00 8 1 9.60
on axis D 8 2,400.00 17 1 40.80
8 23,901.00 8 1 191.21
on axis E 8 2,400.00 72 1 172.80
8 10,610.00 8 1 84.88
Total Length (m) 0.00 1,929.53 0.00 358.83 367.97 0.00 0.00 0.00
E- PHASE- 2 | HOUSE TYPE- 2 FOR BLOCK#09,10,11&12
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 762.16 0.00 318.64 444.51 0.00 0.00 0.00
SUMMARY
Total Length (m) 0.22 1,929.53 0.00 358.83 367.97 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.05 762.16 0.00 318.64 444.51 0.00 0.00 0.00
Total Length (m) 0.00 3,851.04 2,929.17 0.00 0.00 0.00 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578 2.468 3.551
Weight (Kg) 0.00 1,521.16 1,807.30 0.00 0.00 0.00 0.00 0.00
1 5.44
5.99
32.59 m2
1 5.99
5.02
30.07 m2
0.5 10.88
5.60
30.46 m2
0.5 2.87
5.86
8.41 m2
1 1.69
5.86
9.90 m2
1 3.75
3.05
11.44 m2
0.5 3.75
2.81
5.27 m2
1 1.00
3.05
3.05 m2
0.5 3.05
2.76
4.21 m2
0.5 3.05
5.45
8.31 m2
1 1.00
4.15
4.15 m2
1 4.80
6.10
29.28 m2
1 1.60
7.98
12.72 m2
1 5.22
7.90
41.24 m2
462.19 m2
1 6.05
6.05 ml
1 13.79
13.79 ml
1 16.13
16.13 ml
1 11.48
11.48 ml
1 5.30
5.30 ml
1 1.80
1.80 ml
1 5.10
5.10 ml
1 1.30
1.30 ml
60.95 ml
1 8.20
8.20 ml
1 4.45
4.45 S
12.65 ml
1 60.95
60.95 ml
269.10 ml
TDT P.L.C
te- House Type-2,House #-09,10,11,12/ Kotebe Site
Description
4.1 Roof cover in Decra Tiles fixed to Zigba
purlins and price shall include purlins, wooden trusses
& all the necessary fixing accessories as per detailed
drawings,Price shall include all carpentry works,
roof ridge coverand flashing along all the parapet,
concrete gutter and wall joints with the required
development length.
area-1
area-2
area-3
area-4
area-5
area-6
area-6`
area-7
area-8
area-9
area-10
area-11
area-12
area-13
axis A
Axis 5
Axis D
Axis 2
Axis C
Axis 1'
Axis B
sub total
B)valy gutter
C)Gutter coping
TDT PLC
Project:- Zena gessese real state Date
contractor TDT PLC Page
EMPLOYER -zena gessese real state Block-11, House Type-2
NO. L/W/H Quantity Description no L/W/H Quantity Description
1.8 25 cm Hard core 3 1.40 F2 (3pcs)
on a basment floor area 1.40
5.88 m2
5.00 on axis A-C b/n 3 - 4 3 1.60 F3(3pcs)
5.09 1.60
25.45 7.68 m2
5.03 on axis C-D b/n 3 - 4 43.42 total item 2.1
4.70 2.1a For shear wall pad
23.64 10.13 On axis E (1'-4)
10.21 on axis D-E b/n 4-1' 1.20
5.00 12.156 m2
51.05 4.20 On axis 1(E-D)
4.70 on Ground Floor 1.20
5.10 on axis A-C b/n 1 - shear wall 5.04 m2
23.97 1.95 on axis D b/n 1-3
4.70 on axis C-C' b/n 1 -shear wall 1.20
2.40 2.34 m2
11.28 9.10 on axis 1&3 b/n A-D
4.70 on axis C'-D b/n 1 - shear wall 1.20
2.00 10.92 m2
9.40 7.18 on axis A b/n 2,3,&4
1.20
144.79 total item 1.8 8.62 m2
2. Concrete work 39.07 m2 total item 2.1a
Lean concrete 82.49 m2 total item2.1
2.1 For footings 2.2 under grade beam and
ground floor slab
1 1.50 F1( 1Pcs) 25.07 under grade beam
1.50 0.05 (permater)
2.25 1.25 m2
2 1.50 F2 (2pcs) Under Ground Floor slab
1.50 4.70 on axis A-C b/n 1 - 3
4.5 5.10
5 1.70 F3(5pcs) 23.97 m2
1.70 4.70 on axis C-C' b/n 1 - 3
14.45 2.40
2 1.90 F4 (2pcs) 11.28 m2
1.90 4.70 on axis C '-Db/n 1 - 3
7.22 2.00
1 1.20 F1 (2pcs) 9.40 m2
1.20 45.90 m2 total item 2.2
1.44
TDT PLC
Project:- Zena gessese real state Date
contractor TDT PLC Page
EMPLOYER -zena gessese real state Block-11, House Type-2
NO. L/W/H Quantity Description no L/W/H Quantity Description
2.3 under grade beam 0.45 5.83 m3
& basement slab
2 13.80 basment beam 1 1.20 F1 (1pcs)
0.50 1.20
13.80 on axis 3&4 0.30
0.43 m3
2 6.18 on axis D&C b/n 3,4 3 1.40 F2 (3pcs)
0.50 1.40
6.18 0.35
on a basment floor area 2.06 m3
6.60 on axis A-C b/n 3 - 4 3 1.60 F3(3pcs)
5.10 1.60
33.66 0.35 0.896 m3
6.60 on axis C-D b/n 3 - 4 17.67 m3 total item2.6
4.70 2.7 For foundation column
31.02 4 0.40 All foundation columns
10.21 on axis D-E b/n 1'-4 0.20
5.00 0.70
51.05 0.224 m3
135.71 total item 2.3 7 0.40 Foundation colomons G.F
Reinforced concrete 0.20 7 pcs
in C-25, 360kg of 0.70
cement per m3 of concrete 0.39 m3
2.5 10 cm thick RC floor slab In basement elevation column
144.79 All area of Hard core 4 2.50 c1 (1pcs),c2(2pcs)& c3(1pcs)
1.00 0.40
144.791 total item 2.5 0.20
2.6 For Footing 0.8 m3
1 1.40 F1(1pcs) 20 cm thick shear wall
1.40 10.21 on axis E b/n 1'-4
0.30 2.60
0.59 0.20
2 1.40 F2 (2pcs) 5.31 m3
1.40 5.00 On axis 1'// D-E
0.35 2.60
2.74 0.20
5 1.60 F3 (5pcs) 5.20 m3
1.60 10.18 on axis 1'&3 b/n A-D
0.40 2.60
5.12 0.20
2 1.80 F4(2pcs) 5.29 m3
1.80
TDT PLC
Project:- Zena gessese real state Date
contractor TDT PLC Page
EMPLOYER -zena gessese real state Block-11, House Type-2
NO. L/W/H Quantity Description no L/W/H Quantity Description
7.15 on axis A b/n 2,3,&4 18.13 total item 2.8
2.60 130.061 2.9 To 15 cm thick suspend floor slab
0.20 1.00 130.1 m2 All floor
7.436 130.06 m2 total item 2.9
-10.5 Dedacte windows at axis E,1&A Provideand fix in position
0.40 formwork to:
0.20 2.10 side of isolated footing
-0.8384
23.82 total item 2.7 5.60 F1 (1pcs)
2.8 in grade beam and 0.30
entrance stair 1.68 m2
2 14.60 For basement Grade beam 5.60 F2 (1pcs)
0.40 On axis 3&4 b/n A -E 0.35
0.20 1.96 m2
2.34 5 6.40 F3 (5pcs)
3 5.00 0.40
0.40 on axis B,C,D b/n D-E 12.8 m2
0.20
1.20 2 7.20 F4(2pcs)
3 6.95 0.45
0.40 on axis B,C,D b/n 4- shear wall 6.48 m2
0.20 To Footing on ground floor
3.34 1 4.80 F1 (1pcs)
2 10.21 0.30
0.40 on axis E&D b/n 1'-4 1.44 m2
0.20 3 5.60 F2 (3pcs)
4.08 0.35
In grade beam 5.88 m2
2 15.60 On axis 3& 4b/n A-E 3 6.40 F3(3pcs)
0.35 0.40
0.20 7.68 m2
2.18 37.92 m2 total item 2.10
on axisA & C b/n 1 -4 2.11Foundation Columns
2 11.03 17 1.20 All Foundation column
0.35 0.70
0.20 14.28 m2
3.09 4 2.40 To basment colomons
1 6.80 on axis C' 1-3 0.70 c1 (1pcs),c2(2pcs)&c3(1pcs)
0.35 6.72
0.20 0.48 20 cm thick Shear wall
2 10.21 on axis D&E b/n 4-1' 2 10.61 on axis E b/n 1-4
0.35 2.60
0.20 1.4294
TDT PLC
Project:- Zena gessese real state Date
contractor TDT PLC Page
EMPLOYER -zena gessese real state Block-11, House Type-2
NO. L/W/H Quantity Description no L/W/H Quantity Description
55.172 15.60 on axis 3 b/n A-E
2 5.00 on axis 1' b/n D& E 0.40
2.60 6.24 m2
26.00 5.30 on axis 1' b/ n D & E
2 10.19 b/n axis (A-D)&(1'-3) 0.55
2.60 2.915 m2
52.988 7.00 on axis C" b/n 1 & 3
2 7.15 on axis A b/n 4-shear wall 0.40
2.60 2.80 m2
37.18 10.21 on axis 2'
2 3.28 on axisD b/n 1' 0.55
2.60 5.6155 m2
17.056 82.52 m2 total item 2.12
209.40 total item 2.11 2.13 in suspended ground
2.12 to grade beam &entrance stair slab
To Basment Grade beam To Ground floor slab
2 15.60 On axis 3 &4//A-E 5.03 on axis A-C b/n 3 & 4
0.80 5.09
24.96 25.60 m2
1 7.20 On axis D//4- shear wall 4.71 on axis C & D b/n 3 & 4
0.80 5.03
5.76 23.69 m2
1 10.61 On axis E// 4-1' 5.00 on axis D & E b/n 3 & 4
0.80 5.03
8.49 25.15 m2
To Grade beam 5.00 on axis D & E b/n 1' & 3
10.81 4.41
0.55 On axis E bln 1-4 22.05 m2
5.95 5.09 on axis A& C b/n 3- shear wall
1.72
10.81 on axis D b/n 1-4 8.75 m2
0.40 4.71 on axis C & D b/n 3-shearwall
4.324 1.72
7.25 on axis C b/n2,3,4 8.1012 m2
0.40 113.4 m2 total item 2.13
2.9 3 massonry
7.25 on axis A b/n 2,3,4 3.1 50 cm thick massonry
0.55 under basement beam
3.9875 14.70 On axis 4 b/n A -E
0.40
15.60 on axis 4 b/ n A-E 0.50
0.55 2.94 m3
8.58
TDT PLC
Project:- Zena gessese real state Date
contractor TDT PLC Page
EMPLOYER -zena gessese real state Block-11, House Type-2
NO. L/W/H Quantity Description no L/W/H Quantity Description
14.70 On axis 3 b/n A-E 7.32 on axis C'
1.00 0.30
0.50 0.20
7.35 1 0.44 m3
6.39 On axis C b/n 2 -4 10.81 on axis E
0.80 0.30
0.50 0.20
2.56 1 0.65 m3
6.39 2 15.40 on axis 3 and 4
0.80 on axis D b/n 2-4 0.30
0.50 0.20
2.56 1.85 m3
under grade beam 2 10.20 on axis 1&2
2 9.60 on axis 1,2b/n A-D 0.30
0.50 0.20
1.10 1.22 m3
10.56 4.80 on axis 1'
3 2.09 on axis A,C,C'b/n 1-SHEAR WALL 0.30
0.50 0.20
1.20 0.29 m3
3.76 6.70 m3 total item 1.2
1 1.10 on axis D// 1-1' 1.3 To STAIR CASE 1
1.60 (perimeter ) SEX A-A & B-B
0.50 2 3.67
0.88 1.20
30.60 total item 3.1 0.15
B- SUPER-STRUCTURE 1.32 m3
1- CONCRETE WORK 21 1.2 for steps
Reinforced concrete 0.3
in C-25, 360kg of 0.14
cement per m3 of concret 1.06
1.1 in elevation column 1 2.60 ON BEAM
17 3.00 all column 0.25
0.20 0.20
0.40 - m3
4.08 total item1.1 1 2.60 ON LANDING
1.2 in suspended floor beam 1.45
3 12.53 on axis A ,C and D 0.15
0.30 0.57 m3
0.20 2.95 m3 total item 1.3
2.26
TDT PLC
Project:- Zena gessese real state Date
contractor- TDT PLC Page
EMPLOYER -zena gessese real state Block-11, House Type-2
NO. L/W/H Quantity Description no L/W/H Quantity Description
1.4 15cm thick floor slab SEX A-A & B-B
10.40 on axis A-D b/n 1-4 2 3.67
12.54 1.20
130.42 8.81 m2
10.81 on axis D -E b/n 1'-4 3.00 ON BEAM
5.40 0.70
58.37 2.10 m2
5.50 canitliver 3.00 ON LANDING
1.00 1.45
5.50 4.35 m2
194.29 total item 1.4 15.26 m2 total item 1.7
Provide and fix in position 1.8 to slab
formwork to: 10.40 on axis A-D b/n 1-4
1.5 to elevation column 12.54
17 1.30 all column 130.42 m2
2.90 10.81 on axis D -E b/n 1'-4
64.09 total item 1.5 5.40
1.6 suspended beam 58.37 m2
2 12.45 on axis C and D 5.50 cantrilver
0.40 1.00
9.96 5.50 m2
7.00 on axis C '
194.29 m2 total item 1.8
0.70
4.90
12.45 on axis A
0.7
8.715
2 10.40 on axis 1 and 2
0.70
14.56
15.61 on axis 3
0.40
6.244
15.61 on axis 4
0.55
8.5855
5.30 on axis 1'
0.55
2.915
47.16 total item 1.6
1.7 to stair case
ation column
spend floor slab
x in position
ground floor
3- shear wall
3-shearwall
TDT PLC
Project Name:zena gessese real state Block-11, House Type-2
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12 14 16
Footing pad
F1 12 1,500.00 16 1 24.000
F2 14 1,900.00 20 2 76.000
F3 14 2,100.00 22 5 231.000
F4 14 2,400.00 24 2 115.200
Footing column
C1 14 2,600.00 8 1 20.800
C2 14 2,600.00 10 5 130.000
C3 16 2,600.00 8 4 83.200
Stirrup foundation colomon 8 1,100.00 3 10 33.000
Shearwall
SW-1 Footing
on axis A b/n 2-4 10 1,320.00 66 1 87.120
Horizontal 8 6,640.00 10 1 66.400
Internal Vertical under beam 8 1,500.00 32 1 48.000
External " 10 1,500.00 64 1 96.000
on axis D b/n 1`-3 10 1,320.00 35 1 46.200
Horizontal 8 3,400.00 10 1 34.000
Internal Vertical under beam 8 1,500.00 16 1 24.000
External " 10 1,500.00 32 1 48.000
Total Length (m) 0.00 205.40 277.32 24.00 573.00 83.20
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 81.13 171.11 21.31 692.18 131.29
TDT PLC
Project Name:zena gessese real state Block-11, House Type-2
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Shearwall 6 8 10 12 14 16
SW-1 Footing 0.000
on axis 1' b/n D-E 10 1,320.00 44 1 58.080
Horizontal 8 5,000.00 10 1 50.000
Internal Vertical under beam 8 1,500.00 25 1 37.500
External " 10 1,500.00 50 1 75.000
on axis E b/n 1-4 10 1,320.00 100 1 132.000
Horizontal 8 1,091.00 10 1 10.910
Internal Vertical under beam 8 1,500.00 41 1 61.500
External " 10 1,500.00 82 1 123.000
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Shearwall 6 8 10 12 14 16
Above basment
grade beam
b/n axis(2-3)&(A-D)
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Basement Beam 6 8 10 12 14 16
on axis A &C 14 7,880.00 3 2 47.280
14 7,280.00 3 2 43.680
St 8 1,100.00 33 2 72.600
on axis D&E 14 11,510.00 3 2 69.060
14 10,910.00 3 2 65.460
St 8 1,100.00 55 2 121.000
on axis 3& 4 14 8,500.00 3 2 51.000
14 8,410.00 3 2 50.460
14 5,720.00 3 2 34.320
14 10,540.00 3 2 63.240
St 8 1,100.00 78 2 171.600
Basement elvation colomon
C1(1pcs) 14 3,400.00 8 1 27.200
C2(5pcs) 14 3,400.00 10 5 170.000
C3(4pcs) 16 3,490.00 8 4 111.680
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Beam 6 8 10 12 14 16
on axis A& C 14 5,450.00 3 2 32.700
14 8,290.00 3 2 49.740
14 7,430.00 3 2 44.580
14 5,660.00 3 2 33.960
Neg on axis C 14 1,250.00 2 2 5.000
" 14 2,340.00 2 2 9.360
" 14 2,190.00 2 2 8.760
St 1-1 8 1,100.00 62 2 136.400
on axis C' 14 7,900.00 3 1 23.700
14 7,300.00 3 1 21.900
St 1-1 8 1,100.00 35 1 38.500
on axis D 14 5,060.00 3 1 15.180
14 8,670.00 3 1 26.010
Total Length (m) 0.00 174.90 0.00 0.00 270.89 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 69.09 0.00 0.00 327.24 0.00
Prepared by_________________ Checked by___________
approved by……….
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Beam 6 8 10 12 14 16
on axis D 14 5,040.00 3 1 15.120
" 14 5,660.00 4 1 22.640
Neg on axis D 14 3,860.00 3 1 11.580
" 16 3,530.00 2 1 7.060
" 14 2,190.00 2 1 4.380
St 1 -1 8 1,100.00 63 1 69.300
on axis E 14 11,510.00 3 1 34.530
" 14 10,910.00 3 1 32.730
Neg on axis E 14 2,240.00 2 1 4.480
16 3,530.00 2 1 7.060
14 2,190.00 2 1 4.380
St 2 - 2 8 1,200.00 55 1 66.000
on axis 1' 14 6,100.00 3 1 18.300
14 5,500.00 3 1 16.500
Neg on axis 1' 12 2,180.00 4 1 8.720
St 2 -2 8 1,100.00 24 1 26.400
on axis 1 14 11,100.00 3 1 33.300
14 10,500.00 3 1 31.500
St 1-1 8 1,100.00 53 1 58.300
Total Length (m) 0.00 220.00 0.00 8.72 229.44 14.12
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 86.90 0.00 7.74 277.16 22.28
Prepared by_________________ Checked by____________________ approved by……….
Project Name:zena gessese real state
Consultant:archi consult Block-11, House Type-2
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Beam 6 8 10 12 14 16
on axis 2 14 11,100.00 3 1 33.300
14 10,500.00 3 1 31.500
Neg on axis 2 12 1,200.00 1 1 1.200
" 12 1,640.00 2 1 3.280
" 14 2,650.00 3 1 7.950
" 14 2,210.00 3 1 6.630
St 1 - 1 8 1,100.00 53 1 58.300
on axis 3 & 4 12 8,410.00 3 2 50.460
12 8,500.00 3 2 51.000
14 5,630.00 3 2 33.780
12 5,470.00 3 2 32.820
14 5,720.00 3 2 34.320
Neg on axis 3 12 2,180.00 3 2 13.080
" 12 3,370.00 2 2 13.480
" 14 3,400.00 3 2 20.400
" 12 2,210.00 2 2 8.840
St 3 -3 8 1,200.00 78 2 187.200
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Slab 6 8 10 12 14 16
on axis 3& 4 b/n A- C 12 5,480.00 36 1 197.280
on axis 3& 4 b/n C- E 12 10,300.00 32 1 329.600
on axis 3b/n A-D 12 8,120.00 14 1 113.680
on axis 3b/n C`-E 10 7,640.00 14 1 106.960
on axis D&E b/n 1`
10 5,570.00 30 1
-3 167.100
on axis A &D b/n 2 -4 10 6,920.00 30 1 207.600
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12 14 16
Footing pad (@0.00)
F1 (1pcs) 12 1,500.00 16 1 24.000
F2(3pcs) 12 1,900.00 22 3 125.400
F3 (1pcs) 14 2,100.00 22 3 138.600
Footing column
C1' (2pcs) 14 3,000.00 8 3 72.000
C4(1pcs) 14 3,000.00 8 1 24.000
C5(3pcs) 14 3,000.00 10 3 90.000
C5(3pcs) 16 3,000.00 6 1 0.000
Stirrup (for above) 8 1,100.00 5 7 38.500
For Eevation column
C1' (2pcs) 14 3,800.00 8 2 60.800
C1 (1pcs) 14 3,800.00 8 1 30.400
C2 (5pcs) 14 3,800.00 10 5 190.000
C3 (4pcs) 16 3,800.00 8 4 121.600
C4 (1pcs) 14 3,800.00 8 1 30.400
C5(4pcs) 14 3,800.00 10 4 152.000
C6(1pcs) 16 3,800.00 5 1 19.000
Stirrup (for above) 8 1,100.00 16 17 299.200
Total Length (m) 0.00 337.70 0.00 149.40 788.20 140.60
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 133.39 0.00 132.67 952.15 221.87
Prepared by_________________ Checked by____________________ approved by……….
Project Name:zena gessese real state
Consultant:archi consult Block-11, House Type-2
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12 14 16
on axis A ,C and D 14 5,016.00 3 3 45.144
14 8,670.00 3 3 78.030
14 5,040.00 3 3 45.360
14 5,660.00 4 1 22.640
Neg 14 3,860.00 3 3 34.740
16 3,530.00 2 3 21.180
14 2,190.00 2 3 13.140
St 8 1,100.00 62 3 204.600
on axis c' 14 7,900.00 3 1 23.700
14 7,300.00 3 1 21.900
Neg 12 1,250.00 1 1 1.250
12 2,340.00 1 1 2.340
12 990.00 2 1 1.980
St 8 1,100.00 33 1 36.300
on axis E 14 11,510.00 3 1 34.530
14 10,910.00 3 1 32.730
Neg 14 2,240.00 2 1 4.480
16 3,530.00 2 1 7.060
" 14 2,190.00 2 1 4.380
St 8 1,100.00 58 1 63.800
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12 14 16
on axis 1 and 2 12 11,100.00 3 2 66.600
14 10,500.00 3 2
12 3,590.00 2 2 14.360
Neg 14 2,650.00 3 2 15.900
14 2,210.00 3 2 13.260
St 8 1,100.00 53 2 116.600
on axis 3 & 4 12 8,410.00 3 2 50.460
12 7,700.00 2 2 30.800
14 5,630.00 3 2
12 5,470.00 3 2 32.820
14 4,920.00 3 2 29.520
Neg 12 2,180.00 2 2 8.720
12 3,370.00 2 2 13.480
12 3,140.00 2 2 12.560
12 2,000.00 2 2 8.000
St 8 1,100.00 78 2 171.600
Total Length (m) 0.00 288.20 0.00 237.80 58.68 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 113.84 0.00 211.17 70.89 0.00
Prepared by_________________ Checked by____________________ approved by……….
Project Name:zena gessese real state Block-11, House Type-2
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12 14 16
on axis 1'
14 6,100.00 3 1 18.300
14 5,500.00 3 1 16.500
Neg 12 2,180.00 2 2 8.720
St 8 1,100.00 25 1 27.500
1st FLOOR SLAB
on axis A -E b/n 3-4 10 5,420.00 105 1 569.100
on axis A -C b/n 3-1 10 4,810.00 28 1 134.680
on axis C'-D b/n 3-1 10 7,410.00 14 1 103.740
on axis A-C b/n 1-2 10 3,490.00 36 1 125.640
on axis A-C b/n 3-4 12 5,420.00 36 1 195.120
on axis A-C b/n 2-3 12 8,140.00 13 1 105.820
on axis A-C b/n 2-3 12 5,440.00 22 1 119.680
on axis A-C b/n 1-2 10 5,460.00 13 1 70.980
on axis C-E b/n 3-4 12 10,300.00 31 1 319.300
on axis C-E b/n 1-3 10 7,640.00 37 1 282.680
on axis C-D b/n 1-2 10 5,440.00 16 1 87.040
Neg
on axis A 12 2,000.00 84 1 168.000
on axis C 12 3,140.00 52 1 163.280
on axis C 12 2,656.00 18 1 47.808
Total Length (m) 0.00 27.50 1,373.86 1,127.73 34.80 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 10.86 847.67 1,001.42 42.04 0.00
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC Block-11, House Type-2
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR SLAB 6 8 10 12 14 16
Neg
on axis D 12 3,370.00 36 1 121.320
on axis D 12 2,900.00 36 1 104.400
on axis E 12 2,000.00 85 1 170.000
on axis 1 10 2,000.00 30 1 60.000
on axis 2 10 2,360.00 34 1 80.240
on axis 2 10 2,200.00 16 1 35.200
on axis 3 12 3,280.00 107 1 350.960
on axis 4 12 2,000.00 93 1 186.000
on axis C` 10 2,058.00 20 1 41.160
mager 12 2,400.00 26 6 374.400
Kebelato 12 800.00 35 4 112.000
STAIR CASE
A-A no 1 16 6,430.00 8 1 51.440
A-A no 2 14 2,010.00 8 1 16.080
A-A no 3 14 2,280.00 8 1 18.240
A-A no 4 14 700.00 8 1 5.600
A-A no 5 14 700.00 8 1 5.600
A-A no 6 8 770.00 6 11 50.820
A-A no 7 8 1,150.00 3 11 37.950
Total Length (m) 0.00 88.77 216.60 1,419.08 45.52 51.44
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 35.06 133.64 1,260.14 54.99 81.17
Prepared by_________________ Checked by____________________ approved by……….
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC Block-11, House Type-2
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
STAIR CASE 6 8 10 12 14 16
Stair case beam 14 3,600.00 3 1 10.800
14 2,850.00 3 1 8.550
St 8 1,100.00 16 1 17.600
B-B no 1 16 5,370.00 8 1 42.960
B-B no 2 14 1,770.00 8 1 14.160
B-B no 3 14 2,520.00 8 1 20.160
B-B no 4 14 700.00 8 1 5.600
B-B no 5 14 700.00 8 1 5.600
B-B no 6 8 770.00 6 11 50.820
B-B no 7 8 1,150.00 3 11 37.950
Landing 10 3,000.00 8 2 48.000
Basment mash
At axis A-C b/n 2-4 8 5,090.00 33 1 167.970
8 6,540.00 25 1 163.500
At axis D-E b/n 1-4 8 1,020.00 25 1 25.500
8 5,000.00 51 1 255.000
onaxis C-D&2-4 8 4,710.00 33 1 155.430
8 6,540.00 1 52320
on Ground floor 8 5,000.00 47 1 235.000
At axis 1-3 b/n A-D 8 9,450.00 24 1 226.800
Total Length (m) 0.00 925.14 48.00 0.00 64.87 42.96
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 365.43 29.62 0.00 78.36 67.79
Project Name:zena gessese real state
Consultant:archi consult Block-11, House Type-2
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
6 8 10 12 14 16
FIRST FLOOR
ELEVATION COLUMM
C1' (2PCS) 14 3,800.00 8 2 60.800
C1 (1PCS) 14 3,800.00 6 1 22.800
C2 (5PCS) 14 3,800.00 8 5 152.000
C3 (4PCS) 14 4,100.00 8 4 131.200
C4 (1PCS) 14 3,800.00 6 7 159.600
C5 (3PCS) 14 3,800.00 8 3 91.200
C6 (1PCS) 14 3,800.00 8 1 30.400
ST FOR ALL ABOVE 8 1,100.00 16 17 299.200
Total Length (m) 0.00 299.20 0.00 0.00 648.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.00 118.18 0.00 0.00 782.78 0.00
Prepared by_________________ Checked by____________________ approved by……….
SUMMARY
Total Length (m) 0.22 2,271.21 1,638.46 2,939.58 2,000.84 263.24
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888 1.208 1.578
Weight (Kg) 0.05 897.13 1,010.93 2,610.35 2,417.02 415.39
TDT PLC
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12
Footing pad
F1 12 1,500.00 16 1 24.000
F2 14 1,900.00 20 2
F3 14 2,100.00 22 5
F4 14 2,400.00 24 2
Footing column
C1 14 2,600.00 8 1
C2 14 2,600.00 10 5
C3 16 2,600.00 8 4
Stirrup foundation colomon 8 1,100.00 3 10 33.000
Shearwall
SW-1 Footing
on axis A b/n 2-4 10 1,320.00 66 1 87.120
Horizontal 8 6,640.00 10 1 66.400
Internal Vertical under beam 8 1,500.00 32 1 48.000
External " 10 1,500.00 64 1 96.000
on axis D b/n 1`-3 10 1,320.00 35 1 46.200
Horizontal 8 3,400.00 10 1 34.000
Internal Vertical under beam 8 1,500.00 16 1 24.000
External " 10 1,500.00 32 1 48.000
Total Length (m) 0.00 205.40 277.32 24.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 81.13 171.11 21.31
TDT PLC
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Dia. Length No. of No.of
(mm) (mm) bars Mem
Shearwall 6 8 10 12
SW-1 Footing 0.000
on axis 1' b/n D-E 10 1,320.00 44 1 58.080
Horizontal 8 5,000.00 10 1 50.000
Internal Vertical under beam 8 1,500.00 25 1 37.500
External " 10 1,500.00 50 1 75.000
on axis E b/n 1-4 10 1,320.00 100 1 132.000
Horizontal 8 1,091.00 10 1 10.910
Internal Vertical under beam 8 1,500.00 41 1 61.500
External " 10 1,500.00 82 1 123.000
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Shearwall 6 8 10 12
Above basment
grade beam
b/n axis(2-3)&(A-D)
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Basement Beam 6 8 10 12
on axis A &C 14 7,880.00 3 2
14 7,280.00 3 2
St 8 1,100.00 33 2 72.600
on axis D&E 14 11,510.00 3 2
14 10,910.00 3 2
St 8 1,100.00 55 2 121.000
on axis 3& 4 14 8,500.00 3 2
14 8,410.00 3 2
14 5,720.00 3 2
14 10,540.00 3 2
St 8 1,100.00 78 2 171.600
Basement elvation colomon
C1(1pcs) 14 3,400.00 8 1
C2(5pcs) 14 3,400.00 10 5
C3(4pcs) 16 3,490.00 8 4
St For all colomon 8 1,100.00 12 10
132.000
Total Length (m) 0.00 497.20 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 196.39 0.00 0.00
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Beam 6 8 10 12
on axis A& C 14 5,450.00 3 2
14 8,290.00 3 2
14 7,430.00 3 2
14 5,660.00 3 2
Neg on axis C 14 1,250.00 2 2
" 14 2,340.00 2 2
" 14 2,190.00 2 2
St 1-1 8 1,100.00 62 2 136.400
on axis C' 14 7,900.00 3 1
14 7,300.00 3 1
St 1-1 8 1,100.00 35 1 38.500
on axis D 14 5,060.00 3 1
14 8,670.00 3 1
Total Length (m) 0.00 174.90 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 69.09 0.00 0.00
Prepared by_________________ Checked by__________
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Beam 6 8 10 12
on axis D 14 5,040.00 3 1
" 14 5,660.00 4 1
Neg on axis D 14 3,860.00 3 1
" 16 3,530.00 2 1
" 14 2,190.00 2 1
St 1 -1 8 1,100.00 63 1 69.300
on axis E 14 11,510.00 3 1
" 14 10,910.00 3 1
Neg on axis E 14 2,240.00 2 1
16 3,530.00 2 1
14 2,190.00 2 1
St 2 - 2 8 1,200.00 55 1 66.000
on axis 1' 14 6,100.00 3 1
14 5,500.00 3 1
Neg on axis 1' 12 2,180.00 4 1 8.720
St 2 -2 8 1,100.00 24 1 26.400
on axis 1 14 11,100.00 3 1
14 10,500.00 3 1
St 1-1 8 1,100.00 53 1 58.300
Total Length (m) 0.00 220.00 0.00 8.72
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 86.90 0.00 7.74
Prepared by_________________ Checked by____________________
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Beam 6 8 10 12
on axis 2 14 11,100.00 3 1
14 10,500.00 3 1
Neg on axis 2 12 1,200.00 1 1 1.200
" 12 1,640.00 2 1 3.280
" 14 2,650.00 3 1
" 14 2,210.00 3 1
St 1 - 1 8 1,100.00 53 1 58.300
on axis 3 & 4 12 8,410.00 3 2 50.460
12 8,500.00 3 2 51.000
14 5,630.00 3 2
12 5,470.00 3 2 32.820
14 5,720.00 3 2
Neg on axis 3 12 2,180.00 3 2 13.080
" 12 3,370.00 2 2 13.480
" 14 3,400.00 3 2
" 12 2,210.00 2 2 8.840
St 3 -3 8 1,200.00 78 2 187.200
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Ground floor Slab 6 8 10 12
on axis 3& 4 b/n A- C 12 5,480.00 36 1 197.280
on axis 3& 4 b/n C- E 12 10,300.00 32 1 329.600
on axis 3b/n A-D 12 8,120.00 14 1 113.680
on axis 3b/n C`-E 10 7,640.00 14 1 106.960
on axis D&E b/n 1`
10 5,570.00 30 1
-3 167.100
on axis A &D b/n 2 -4 10 6,920.00 30 1 207.600
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
Footing 6 8 10 12
Footing pad (@0.00)
F1 (1pcs) 12 1,500.00 16 1 24.000
F2(3pcs) 12 1,900.00 22 3 125.400
F3 (1pcs) 14 2,100.00 22 3
Footing column
C1' (2pcs) 14 3,000.00 8 3
C4(1pcs) 14 3,000.00 8 1
C5(3pcs) 14 3,000.00 10 3
C5(3pcs) 16 3,000.00 6 1
Stirrup (for above) 8 1,100.00 5 7 38.500
For Eevation column
C1' (2pcs) 14 3,800.00 8 2
C1 (1pcs) 14 3,800.00 8 1
C2 (5pcs) 14 3,800.00 10 5
C3 (4pcs) 16 3,800.00 8 4
C4 (1pcs) 14 3,800.00 8 1
C5(4pcs) 14 3,800.00 10 4
C6(1pcs) 16 3,800.00 5 1
Stirrup (for above) 8 1,100.00 16 17 299.200
Total Length (m) 0.00 337.70 0.00 149.40
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 133.39 0.00 132.67
Prepared by_________________ Checked by____________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis A ,C and D 14 5,016.00 3 3
14 8,670.00 3 3
14 5,040.00 3 3
14 5,660.00 4 1
Neg 14 3,860.00 3 3
16 3,530.00 2 3
14 2,190.00 2 3
St 8 1,100.00 62 3 204.600
on axis c' 14 7,900.00 3 1
14 7,300.00 3 1
Neg 12 1,250.00 1 1 1.250
12 2,340.00 1 1 2.340
12 990.00 2 1 1.980
St 8 1,100.00 33 1 36.300
on axis E 14 11,510.00 3 1
14 10,910.00 3 1
Neg 14 2,240.00 2 1
16 3,530.00 2 1
" 14 2,190.00 2 1
St 8 1,100.00 58 1 63.800
Total Length (m) 0.00 304.70 0.00 5.57
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 120.36 0.00 4.95
Prepared by_________________ Checked by____________________
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR BEAMS 6 8 10 12
on axis 1 and 2 12 11,100.00 3 2 66.600
14 10,500.00 3 2
12 3,590.00 2 2 14.360
Neg 14 2,650.00 3 2
14 2,210.00 3 2
St 8 1,100.00 53 2 116.600
on axis 3 & 4 12 8,410.00 3 2 50.460
12 7,700.00 2 2 30.800
14 5,630.00 3 2
12 5,470.00 3 2 32.820
14 4,920.00 3 2
Neg 12 2,180.00 2 2 8.720
12 3,370.00 2 2 13.480
12 3,140.00 2 2 12.560
12 2,000.00 2 2 8.000
St 8 1,100.00 78 2 171.600
Total Length (m) 0.00 288.20 0.00 237.80
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 113.84 0.00 211.17
Prepared by_________________ Checked by____________________
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
1st FLOOR SLAB 6 8 10 12
Neg
on axis D 12 3,370.00 36 1 121.320
on axis D 12 2,900.00 36 1 104.400
on axis E 12 2,000.00 85 1 170.000
on axis 1 10 2,000.00 30 1 60.000
on axis 2 10 2,360.00 34 1 80.240
on axis 2 10 2,200.00 16 1 35.200
on axis 3 12 3,280.00 107 1 350.960
on axis 4 12 2,000.00 93 1 186.000
on axis C` 10 2,058.00 20 1 41.160
mager 12 2,400.00 26 6 374.400
Kebelato 12 800.00 35 4 112.000
STAIR CASE
A-A no 1 16 6,430.00 8 1
A-A no 2 14 2,010.00 8 1
A-A no 3 14 2,280.00 8 1
A-A no 4 14 700.00 8 1
A-A no 5 14 700.00 8 1
A-A no 6 8 770.00 6 11 50.820
A-A no 7 8 1,150.00 3 11 37.950
Total Length (m) 0.00 88.77 216.60 1,419.08
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 35.06 133.64 1,260.14
Prepared by_________________ Checked by____________________
Project Name:zena gessese real state
Consultant:archi consult
Contractor:TDT PLC
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
STAIR CASE 6 8 10 12
Stair case beam 14 3,600.00 3 1
14 2,850.00 3 1
St 8 1,100.00 16 1 17.600
B-B no 1 16 5,370.00 8 1
B-B no 2 14 1,770.00 8 1
B-B no 3 14 2,520.00 8 1
B-B no 4 14 700.00 8 1
B-B no 5 14 700.00 8 1
B-B no 6 8 770.00 6 11 50.820
B-B no 7 8 1,150.00 3 11 37.950
Landing 10 3,000.00 8 2 48.000
Basment mash
At axis A-C b/n 2-4 8 5,090.00 33 1 167.970
8 6,540.00 25 1 163.500
At axis D-E b/n 1-4 8 1,020.00 25 1 25.500
8 5,000.00 51 1 255.000
onaxis C-D&2-4 8 4,710.00 33 1 155.430
8 6,540.00 1 52320
on Ground floor 8 5,000.00 47 1 235.000
At axis 1-3 b/n A-D 8 9,450.00 24 1 226.800
Total Length (m) 0.00 925.14 48.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 365.43 29.62 0.00
N
Location Dia. Length No. of No.of Length (m)
o.
(mm) (mm) bars Mem
6 8 10 12
FIRST FLOOR
ELEVATION COLUMM
C1' (2PCS) 14 3,800.00 8 2
C1 (1PCS) 14 3,800.00 6 1
C2 (5PCS) 14 3,800.00 8 5
C3 (4PCS) 14 4,100.00 8 4
C4 (1PCS) 14 3,800.00 6 7
C5 (3PCS) 14 3,800.00 8 3
C6 (1PCS) 14 3,800.00 8 1
ST FOR ALL ABOVE 8 1,100.00 16 17 299.200
Total Length (m) 0.00 299.20 0.00 0.00
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.00 118.18 0.00 0.00
Prepared by_________________ Checked by____________________
SUMMARY
Total Length (m) 0.22 2,271.21 1,638.46 2,939.58
Unit Weight (Kg/m) 0.222 0.395 0.617 0.888
Weight (Kg) 0.05 897.13 1,010.93 2,610.35
Block-11, House Type-2
Length (m)
14 16
76.000
231.000
115.200
20.800
130.000
83.200
573.00 83.20
1.208 1.578
692.18 131.29
Length (m)
14 16
0.00 0.00
1.208 1.578
0.00 0.00
Length (m)
14 16
0.00 0.00
1.208 1.578
0.00 0.00
Length (m)
14 16
47.280
43.680
69.060
65.460
51.000
50.460
34.320
63.240
27.200
170.000
111.680
621.70 111.68
1.208 1.578
751.01 176.23
approved by……….
Length (m)
14 16
32.700
49.740
44.580
33.960
5.000
9.360
8.760
23.700
21.900
15.180
26.010
270.89 0.00
1.208 1.578
327.24 0.00
approved by……….
Block-11, House Type-2
Length (m)
14 16
15.120
22.640
11.580
7.060
4.380
34.530
32.730
4.480
7.060
4.380
18.300
16.500
33.300
31.500
229.44 14.12
1.208 1.578
277.16 22.28
approved by……….
Length (m)
14 16
33.300
31.500
7.950
6.630
33.780
34.320
20.400
167.88 0.00
1.208 1.578
202.80 0.00
approved by……….
Length (m)
14 16
0.00 0.00
1.208 1.578
0.00 0.00
1,862.91 209.00
1.208 1.578
2,250.40 329.80
Length (m)
14 16
138.600
72.000
24.000
90.000
0.000
60.800
30.400
190.000
121.600
30.400
152.000
19.000
788.20 140.60
1.208 1.578
952.15 221.87
approved by……….
Length (m)
14 16
45.144
78.030
45.360
22.640
34.740
21.180
13.140
23.700
21.900
34.530
32.730
4.480
7.060
4.380
360.77 28.24
1.208 1.578
435.81 44.56
approved by……….
Length (m)
14 16
15.900
13.260
29.520
58.68 0.00
1.208 1.578
70.89 0.00
approved by……….
14 16
18.300
16.500
34.80 0.00
1.208 1.578
42.04 0.00
Length (m)
14 16
51.440
16.080
18.240
5.600
5.600
45.52 51.44
1.208 1.578
54.99 81.17
approved by……….
Length (m)
14 16
10.800
8.550
42.960
14.160
20.160
5.600
5.600
64.87 42.96
1.208 1.578
78.36 67.79
Length (m)
14 16
60.800
22.800
152.000
131.200
159.600
91.200
30.400
648.00 0.00
1.208 1.578
782.78 0.00
approved by……….
2,000.84 263.24
1.208 1.578
2,417.02 415.39
Project:- ZENA GESSESE REAL STATE
contractor- TDT PLC
EMPLOYER -TDT PLC
NO. L/W/H Quantity Description NO L/W/HQuantity
ELETRICAL INSTALATION
1 . Light point
Basement Floor
1.00 1.00 no
2.00 2.00 no kichen
7.00 7.00 no corridor 1.00 1.00 no
2.00 2.00 no Two stores
2 1.00 2.00 no Two maids rooms 1.00 1.00 no
2.00 2.00 no toilet
2.00 2.00 no Gym 3.00 NO
Ground Floor
6.00 6.00 no living & Dining
2.00 2.00 no kichen
3.00 3.00 no Guest bed room 2.00 2.00 no
7.00 7.00 no corridor 1.00 1.00 no
2.00 2.00 no office 2.00 2.00 no
2.00 2.00 no toilet 1.00 1.00 no
2.00 2.00 no stair 1.00 1.00 no
2.00 2.00 no car park 1.00 1.00 no
2.00 2.00 veranda
45.00 NO sub total
2. power outlet(socket or stove) 2.00 2.00 no
Basement Floor 1.00 1.00 no
1.00 1.00 no
7.00 7.00 no kichen 1.00 1.00 no
2 1.00 2.00 Two stores 1.00 1.00 no
2 2.00 4.00 Two maids rooms 1.00 1.00 no
2.00 2.00 toilet
2.00 2.00 Gym 15.00 NO
Ground Floor
6.00 6.00 living & Dining
6.00 6.00 kichen
2.00 2.00 Guest bed room
2.00 2.00 office
2.00 2.00 toilet
First Floor
3.00 3.00 M. bed room
3.00 3.00 M. bed bath room
3 3.00 9.00 Three C .bed room
50.00 NO sub total
Date
Page
Take off sheet no
Description
3. Distrubution Bord
Basement Floor
SDB 1
Ground Floor
MDB
First Floor
SDB 2
sub total
First Floor
M. bed room TEL
M. bed room TV
M. bed room Bell push
Three C .bed room TEL
Three C .bed room TV
Three C .bed room Bell push
sub total
Project:- ZENA GESSESE REAL STATE
contractor- TDT PLC
EMPLOYER -TDT PLC
NO. L/W/H Quantity Description NO L/W/HQuantity
ELETRICAL INSTALATION
1 . Light point
Basement Floor
1.00 1.00 no
2.00 2.00 no kichen
7.00 7.00 no corridor 1.00 1.00 no
2.00 2.00 no Two stores
2 1.00 2.00 no Two maids rooms 1.00 1.00 no
2.00 2.00 no toilet
2.00 2.00 no Gym 3.00 NO
Ground Floor
6.00 6.00 no living & Dining
2.00 2.00 no kichen
3.00 3.00 no Guest bed room 2.00 2.00 no
7.00 7.00 no corridor 1.00 1.00 no
2.00 2.00 no office 2.00 2.00 no
2.00 2.00 no toilet 1.00 1.00 no
2.00 2.00 no stair 1.00 1.00 no
2.00 2.00 no car park 1.00 1.00 no
2.00 2.00 veranda
45.00 NO sub total
2. power outlet(socket or stove) 2.00 2.00 no
Basement Floor 1.00 1.00 no
1.00 1.00 no
7.00 7.00 no kichen 1.00 1.00 no
2 1.00 2.00 Two stores 1.00 1.00 no
2 2.00 4.00 Two maids rooms 1.00 1.00 no
2.00 2.00 toilet
2.00 2.00 Gym 15.00 NO
Ground Floor
6.00 6.00 living & Dining
6.00 6.00 kichen
2.00 2.00 Guest bed room
2.00 2.00 office
2.00 2.00 toilet
First Floor
3.00 3.00 M. bed room
3.00 3.00 M. bed bath room
3 3.00 9.00 Three C .bed room
50.00 NO sub total
Date
Page
Take off sheet no
Description
3. Distrubution Bord
Basement Floor
SDB 1
Ground Floor
MDB
First Floor
SDB 2
sub total
First Floor
M. bed room TEL
M. bed room TV
M. bed room Bell push
Three C .bed room TEL
Three C .bed room TV
Three C .bed room Bell push
sub total