Seema Engineering: Rework List
Seema Engineering: Rework List
Date: 21/09/2014
REWORK LIST
Sr. No. Rework Disc
1 Germ Cyclone 1 & 2 Feed, U/f & O/f Lines rework
2 Decenter Pump change with process wt. pump.
3 Decenter feed line dismantled & fabricate new line.
4 PS o/f hopper line dismantled & fabricate new line
5 Decenter PHE line Butterfly Valve added.
6 Fiber tr pump motor frame dismantled & fabricate new frame.
7 Fiber tr return line refabricate up to sump no 4 & 6.
8 PS wash wt. pump change with So2 water pump.
9 Sluice water pump dis line NRV & Valve change location.
10 Mod Starch Dryer Scrubber pump Suction line dismantled & fabricate new line
11 Native Starch Dryer Scrubber pump Suction line dismantled & fabricate new line
12 Fiber tr return line nozzle added for tank.
13 0.5" SS Elbow welded with coupling. (12 Nos.)