You are on page 1of 86

PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)

Installation Guide

Issue 02
Date 2020-06-20

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees
or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: https://www.huawei.com
Email: support@huawei.com

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. i


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide About This Document

About This Document

Purpose
This document describes how to install the cabinet, boards, modules and cables,
and provides installation checklists for reference.
The figures provided in this document are for reference only.

Intended Audience
This document is intended for:
● Hardware installation engineers
● Installation and commissioning engineers
● Network management administrator

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Description

Indicates a hazard with a high level of risk which,


if not avoided, will result in death or serious
injury.

Indicates a hazard with a medium level of risk


which, if not avoided, could result in death or
serious injury.

Indicates a hazard with a low level of risk which,


if not avoided, could result in minor or moderate
injury.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. ii


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide About This Document

Symbol Description

Indicates a potentially hazardous situation which,


if not avoided, could result in equipment damage,
data loss, performance deterioration, or
unanticipated results.
NOTICE is used to address practices not related to
personal injury.

Supplements the important information in the


main text.
NOTE is used to address information not related
to personal injury, equipment damage, and
environment deterioration.

Change History
Changes between document issues are cumulative. The latest document issue
contains all the changes made in earlier issues.

Issue 02 (2020-06-20)
Added ATS.

Issue 01 (2020-03-15)
This issue is the first official release.
The SMU version is SMU V500R003C00.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. iii


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide Contents

Contents

About This Document................................................................................................................ ii


1 Safety Precautions...................................................................................................................1
1.1 General Safety.......................................................................................................................................................................... 1
1.2 Personnel Requirements....................................................................................................................................................... 5
1.3 Electrical Safety........................................................................................................................................................................ 6
1.4 Installation Environment Requirements.......................................................................................................................... 7
1.5 Mechanical Safety................................................................................................................................................................... 9
1.6 Battery Safety......................................................................................................................................................................... 11

2 Installation Preparations..................................................................................................... 15
2.1 Tools.......................................................................................................................................................................................... 15
2.2 Cabinet Installation Dimensions...................................................................................................................................... 16
2.3 Cabinet Cable Hole Positions and Definitions............................................................................................................ 17
2.4 Unpacking and Acceptance............................................................................................................................................... 17

3 Installing the ICC................................................................................................................... 19


3.1 Installing the ICC710............................................................................................................................................................19
3.2 Install the Cabinet Ground Cable.................................................................................................................................... 22

4 Installing Components......................................................................................................... 24
4.1 Cabinet Device Layout........................................................................................................................................................ 24
4.2 Installing a Rectifier............................................................................................................................................................. 25
4.3 Installing a DG Battery Charger.......................................................................................................................................26
4.4 Adjusting ODF Mounting Ears..........................................................................................................................................27
4.5 Installing a VCN510............................................................................................................................................................. 28
4.6 Installing an IP Camera (optionl).................................................................................................................................... 28

5 Installing Batteries and Cables.......................................................................................... 32


5.1 Installing Lithium Batteries............................................................................................................................................... 34
5.2 Installing Lithium Battery Cables.................................................................................................................................... 34

6 Installing Cables.................................................................................................................... 38
6.1 (Optional) Installing Dry Contact Signal Cables........................................................................................................ 38
6.2 Installing a Communications Cable................................................................................................................................ 39
6.2.1 IP Networking..................................................................................................................................................................... 39
6.2.2 BBU In-band Networking............................................................................................................................................... 39

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. iv


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide Contents

6.3 Installing IP Camera Cables............................................................................................................................................... 40


6.4 Installing DC Output Power Cables................................................................................................................................ 41
6.5 Installing Output Power Cables for the DCDB............................................................................................................42
6.6 Installing DG Cables............................................................................................................................................................. 43
6.6.1 Installing DG Control Signal Cables(Huawei DG, BOM Number: 52262366 and 52262013)................ 43
6.6.2 Installing Control Signal Cables for the Reused DG.............................................................................................. 45
6.6.3 Installing a DG Battery Charging Cable.....................................................................................................................46
6.6.4 Installing a Battery Charging Cable for the Reused DG (BCU-1203A)........................................................... 47
6.7 Installing Inverter Cables....................................................................................................................................................48
6.8 Installing AC Input Power Cables.................................................................................................................................... 48

7 Installation Verification....................................................................................................... 50
8 Commissioning....................................................................................................................... 52
8.1 Connecting the AC Power Supply....................................................................................................................................52
8.2 Setting the Display Language.......................................................................................................................................... 53
8.3 Setting Parameters............................................................................................................................................................... 53
8.4 Setting Communications Parameters.............................................................................................................................54
8.4.1 Setting Communications Parameters for IP Networking.....................................................................................54
8.4.2 Set BBU In-band Networking Parameters................................................................................................................ 56
8.5 Setting 57 V Constant Voltage Output Parameters.................................................................................................. 57
8.6 Setting AC Peak Clipping Parameters............................................................................................................................ 57
8.7 Connecting the Lithium Battery Supply........................................................................................................................ 58
8.8 Setting DG Parameters....................................................................................................................................................... 58
8.9 Manually Connecting the DG Supply(BOM Number: 52262013)........................................................................62
8.10 Manually Connecting the DG Supply(BOM Number: 52262366)..................................................................... 66
8.11 Connecting the Reused DG Supply...............................................................................................................................68
8.12 Starting the DG Self-Check............................................................................................................................................. 70
8.13 Opening an Electronic Door Lock................................................................................................................................. 71

9 Subsequent Operations....................................................................................................... 74
A Associations Between UIM Dry Contacts and Alarms..................................................75
B Preparing Terminals............................................................................................................. 76
C Installing Floating Nuts.......................................................................................................77
D Acronym and Abbreviation.................................................................................................79

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. v


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

1 Safety Precautions

1.1 General Safety


Statement
Before installing, operating, and maintaining the equipment, read this document
and observe all the safety instructions on the equipment and in this document.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this
document do not cover all the safety instructions. They are only supplements to
the safety instructions. Huawei will not be liable for any consequence caused by
the violation of general safety requirements or design, production, and usage
safety standards.
Ensure that the equipment is used in environments that meet its design
specifications. Otherwise, the equipment may become faulty, and the resulting
equipment malfunction, component damage, personal injuries, or property
damage are not covered under the warranty.
Follow local laws and regulations when installing, operating, or maintaining the
equipment. The safety instructions in this document are only supplements to local
laws and regulations.
Huawei will not be liable for any consequences of the following circumstances:
● Operation beyond the conditions specified in this document
● Installation or use in environments which are not specified in relevant
international or national standards
● Unauthorized modifications to the product or software code or removal of the
product
● Failure to follow the operation instructions and safety precautions on the
product and in this document
● Equipment damage due to force majeure, such as earthquakes, fire, and
storms
● Damage caused during transportation by the customer
● Storage conditions that do not meet the requirements specified in this
document

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 1


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

General Requirements
● Before installing, operating, or maintaining the equipment, remove any
conductive objects such as watches or metal jewelry like bracelets, bangles,
and rings to avoid electric shock.
● When installing, operating, or maintaining the equipment, wear dedicated
protective gears such as insulation gloves, goggles, and safety clothing,
helmet, and shoes, as shown in the following figure.

● Use insulated tools or tools with insulated handles, as shown in the following
figure.

● Follow the specified procedures for installation, operation, and maintenance.


● Ensure that bolts are tightened with a torque wrench and marked using red or
blue color. Installation personnel mark tightened bolts in blue. Quality
inspection personnel confirm if the bolts are tightened and then mark them in
red. (The marks should cross the edges of the bolts, as shown in the following
figure.)

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 2


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

● Before installing, operating, or maintaining a cabinet, clean up any water, ice,


snow, or other sundries on the top of the cabinet to prevent sundries from
falling into the cabinet when you open the cabinet door.
● Do not install, use, or operate outdoor equipment and cables (including but
not limited to moving equipment, operating equipment and cables, inserting
connectors to or removing connectors from signal ports connected to outdoor
facilities, working at heights, and performing outdoor installation) in harsh
weather conditions such as lightning, rain, snow, and level 6 or stronger wind.
● Before handling a conductor surface or terminal, measure the contact point
voltage and ensure that there is no risk of electric shock.
● Ensure that all slots are installed with boards or filler panels. Avoid hazards
caused by hazardous voltages or energy on boards. Ensure that the air
channel is normal, control electromagnetic interference, and prevent dust and
other sundries on the backplane, baseplate, and boards.
● After installing the equipment, remove idle packing materials such as cartons,
foam, plastics, and cable ties from the equipment area.
● In the case of a fire, immediately leave the building or the equipment area,
and turn on the fire alarm bell or make an emergency call. Do not enter the
building on fire in any case.
● Do not stop using protective devices. Pay attention to the warnings, cautions,
and related precautionary measures in this document and on the equipment.
Promptly replace warning labels that have worn out.
● Keep irrelevant people away from the equipment. Only operators are allowed
to access the equipment.
● All cable holes should be sealed. Seal the used cable holes with firestop putty.
Seal the unused cable holes with the caps delivered with the cabinet. The
following figure shows the criteria for correct sealing with firestop putty.

● Do not use water, alcohol, oil, or other solvents to clean electrical components
inside and outside a cabinet.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 3


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

Personal Safety
● If there is a probability of personal injury or equipment damage during
operations on the equipment, immediately stop the operations, report the
case to the supervisor, and take feasible protective measures.
● To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits
to telecommunication network voltage (TNV) circuits.
● Do not power on the equipment before it is installed or confirmed by
professionals.

Symbol Conventions
To ensure personal and equipment safety, observe all the safety instructions
marked on the equipment when installing, operating, and maintaining the
equipment.

Symbol Description

Indicates a part exposed to high voltage. This symbol


warns operators that both direct and indirect contact with
the power grid is fatal. Such areas include hazardous
voltage points or protective power supply covers that may
be removed during maintenance.

Warns users of overheating. This symbol is attached to a


device surface that may overheat and cause scalding. It
warns users not to touch the surface during operations or
maintenance. Users should wear heat insulation gloves
before operations to prevent scalding.

Indicates protection earthing. This symbol is attached next


or to a protection ground terminal next to grounded
equipment and an external ground system. An equipment
ground cable is connected to an external ground bar
through the protection ground terminal.

Indicates equipotential bonding. This symbol is found with


equipotential terminals inside equipment.

Indicates electrostatic discharge (ESD). This symbol is used


in all electrostatic sensitive areas. Before operating
equipment in these areas, wear ESD gloves or an ESD
wrist strap.

Indicates that the equipment is safe to use at altitudes


below 2000 m (6561.6 ft.).

Indicates that the equipment is not safe to use in tropical


climates.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 4


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

Symbol Description

Indicates a fan assembly or moving part. This symbol is


silkscreened on or attached to the panel of a fan
or assembly, warning operators to keep away. Do not touch
the blades when the fan is rotating.

Indicates that users should refer to the instruction. This


symbol is used when the usage of a device port cannot be
or clearly described. For example, this symbol can be used in
but not limited to the following scenarios:
1. For a multi-power device, use it near the power supply
to replace the multi-power supply identifier. The
symbol indicates that the device has multiple power
inputs. Therefore, when powering off the device, you
must disconnect all power inputs.
or
2. If there are multiple output ports, use the symbol near
the output ports. Connect cables according to the rated
power output and configuration parameter information
in the instruction.
3. If there are multiple slots, use the symbol near the slot
information. For details, see the description of slot
information, restrictions on boards, and usage
conditions in the instruction.

1.2 Personnel Requirements


● Personnel who plan to install or maintain Huawei equipment must receive
thorough training, understand all necessary safety precautions, and be able to
correctly perform all operations.
● Only qualified professionals or trained personnel are allowed to install,
operate, and maintain the equipment.
● Only qualified professionals are allowed to remove safety facilities and inspect
the equipment.
● Personnel who will operate the equipment, including operators, trained
personnel, and professionals, should possess the local national required
qualifications in special operations such as high-voltage operations, working
at heights, and operations of special equipment.
NOTE

● Professionals: personnel who are trained or experienced in equipment operations and


are clear of the sources and degree of various potential hazards in equipment
installation, operation, and maintenance
● Trained personnel: personnel who are technically trained, have required experience, are
aware of possible hazards on themselves in certain operations, and are able to take
protective measures to minimize the hazards on themselves and other people
● Operators: operation personnel who may come in contact with the equipment, except
trained personnel and professionals

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 5


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

1.3 Electrical Safety


Grounding
● The protective ground of the equipment should be reliably connected to the
ground screw on the metal enclosure (grounding resistance ≤ 0.1 ohm).
● For the equipment that needs to be grounded, install the ground cable first
when installing the equipment and remove the ground cable last when
removing the equipment.
● Do not damage the ground conductor.
● Do not operate the equipment in the absence of a properly installed ground
conductor.
● For the equipment that uses a three-pin socket, ensure that the ground
terminal in the socket is connected to the protection ground.

AC and DC Power

DANGER

● The power system is energized by power sources with hazardous voltage. Direct
or indirect contact (through damp objects) with the power sources may result
in electric shock.
● Non-standard and improper operations may result in fire or electric shock.
● Do not connect or disconnect power cables with power on. Transient contact
between the core of the power cable and the conductor will generate electric
arcs or sparks, which may cause fire or personal injury.

● If the power supply to the equipment is permanently connected, install an


easily accessible disconnector at the exterior of the device.
● Before making electrical connections, switch off the disconnector on the
upstream device to cut off the power supply if people may contact energized
components.
● If a "high electricity leakage" tag is attached on the equipment, ground the
protective ground terminal on the equipment enclosure before connecting the
AC power supply; otherwise, electric shock as a result of electricity leakage
may occur.
● Before installing or removing a power cable, turn off the power switch.
● Before connecting a power cable, check that the label on the power cable is
correct.
● Before connecting the power supply, ensure that cable connections are
correct.
● If the equipment has multiple inputs, disconnect all the inputs before
operating the equipment.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 6


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

Cabling
● When routing cables, ensure that a distance of at least 30 mm exists between
the cables and heat-generating components or areas. This prevents damage
to the insulation layer of the cables.
● Do not route cables behind the air intake and exhaust vents of the
equipment.
● Ensure that cables meet the VW-1 flame spread rating requirements.
● Bind cables of the same type together. When routing cables of different types,
ensure that they are at least 30 mm away from each other.
● Ensure that all cables are securely bound. Route and bind cables so that they
appear neat and tidy and their cable sheaths are intact.
● If an AC input power cable is connected to the cabinet from the top, bend the
cable in a U shape outside the cabinet and then route it into the cabinet.
● Ensure that the bending radius of each cable is at least five times the
diameter of the cable.
● When routing power cables, ensure that there is no coiling or twisting. Do not
join or weld power cables. If necessary, use a longer cable.

ESD
● When installing, operating, and maintaining the equipment, comply with the
ESD protection regulations and wear the ESD clothing, gloves, and wrist strap.
● When holding a board, hold its edge without touching any components. Do
not touch the components with your bare hands.
● Package boards with ESD packaging materials before storing or transporting
them.

1.4 Installation Environment Requirements


● To prevent fire due to high temperature, ensure that the ventilation vents or
heat dissipation system are not blocked when the equipment is running.
● Ensure that there are no acid, alkaline, or other corrosive gases in the
installation place.
● Do not place the equipment near heat sources or exposed fire sources, such
as electric heaters, microwave ovens, roasters, water heaters, furnace fire,
candles, or other places where high temperature may occur. Otherwise, the
enclosure will melt or the equipment will heat up, which can cause a fire.
● Install the equipment in an area far away from liquids. Do not install it under
areas prone to condensation, such as under water pipes and air exhaust vents,
or areas prone to water leakage, such as air conditioner vents, ventilation
vents, or feeder windows of the equipment room. Ensure that no liquid enters
the equipment to prevent faults or short circuits.
● Before installing the equipment into a cabinet, ensure that the cabinet is
secured and will not tilt or fall down due to loss of balance, which can cause
personal injury or equipment damage.
● Do not expose the equipment to flammable or explosive gas or smoke. Do
not perform any operation on the equipment in such environments.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 7


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

Installation at Heights
Working at heights refers to operations that are performed at least 2 meters
above the ground.

Do not at heights in any of the following situations:

● Rainwater remains on steel pipes or other risky conditions exist. After the
preceding conditions no longer exist, the safety director and relevant technical
personnel need to check the involved equipment. Operators can begin
working only after obtaining consent.
● When working at heights, comply with local relevant laws and regulations.
● Only trained and qualified personnel are allowed to work at heights.
● Before working at heights, check the climbing tools and safety gears such as
safety helmets, safety belts, ladders, springboards, scaffolding, and lifting
equipment. If they do not meet the requirements, take corrective measures or
disallow working at heights.
● Wear personal protective equipment such as the safety helmet and safety belt
or waist rope and fasten it to a solid structure. Do not mount it on an
insecure moveable object or metal object with sharp edges. Make sure that
the hooks will not slide off.

DANGER

● Set a restricted area and eye-catching signs for working at heights to warn
away irrelevant personnel.
● Carry the operation machinery and tools properly to prevent them from falling
off and causing injuries.
● Personnel involving working at heights are not allowed to throw objects from
the height to the ground, or vice versa. Objects should be transported by tough
slings, hanging baskets, highline trolleys, or cranes.
● Do not perform operations on the upper and lower layers at the same time. If
unavoidable, install a dedicated protective shelter between the upper and lower
layers or take other protective measures. Do not pile up tools or materials on
the upper layer.
● Ensure that guard rails and warning signs are set at the edges and openings of
the area involving working at heights to prevent falls.
● Do not pile up scaffolding, springboards, or other sundries on the ground under
the area involving working at heights. Do not allow people to stay or pass
under the area involving working at heights.
● Inspect the scaffolding, springboards, and workbenches used for working at
heights in advance to ensure that their structures are solid and not overloaded.
● Dismantle the scaffolding from top down after finishing the job. Do not
dismantle the upper and lower layers at the same time. When removing a part,
ensure that other parts will not collapse.
● Do not loiter when working at heights. Do not sleep at heights.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 8


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

● Any violations must be promptly pointed out by the site manager or safety
supervisor and the involved personnel should be prompted for correction.
Personnel who fail to stop violations will be forbidden from working.
● Operators who violate the safety regulations are responsible for accidents
caused. The supervisor has to bear the responsibility accordingly.

1.5 Mechanical Safety


Hoisting Devices

DANGER

Do not walk under hoisted objects.

● Only trained and qualified personnel should perform hoisting operations.


● Check that hoisting tools are available and in good condition.
● Before hoisting objects, ensure that hoisting tools are firmly secured onto a
load-bearing object or wall.
● Ensure that the angle formed by two hoisting cables is no more than 90
degrees, as shown in the following figure.

● Do not drag steel ropes and hoisting tools or bump hoisted objects against
hard objects during hoisting.

Using Ladders
● Use wooden or fiberglass ladders when you need to perform live working at
heights.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 9


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

● When a step ladder is used, ensure that the pull ropes are secured and the
ladder is held firm.
● Before using a ladder, check that it is intact and confirm its load bearing
capacity. Do not overload it.
● Ensure that the wider end of the ladder is at the bottom, or protective
measures have been taken at the bottom to prevent the ladder from sliding.
● Ensure that the ladder is securely positioned. The recommended angle for a
ladder against the floor is 75 degrees, as shown in the following figure. An
angle rule can be used to measure the angle.

When climbing a ladder, take the following precautions to reduce risks and ensure
safety:

● Keep your body steady.


● Do not climb higher than the fourth rung of the ladder from the top.
● To climb onto a roof, ensure that the ladder top is at least one meter higher
than the roof line, as shown in the following figure.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 10


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

● Ensure that your body's center of gravity does not shift outside the legs of the
ladder.

Drilling Holes
When drilling holes into a wall or floor, observe the following safety precautions:

NOTICE

Do not drill holes into the equipment. Doing so may affect the electromagnetic
shielding of the equipment and damage components or cables inside. Metal
shavings from drilling may short-circuit boards inside the equipment.

● Wear goggles and protective gloves when drilling holes.


● When drilling holes, protect the equipment from shavings. After drilling, clean
up any shavings that have accumulated inside or outside the equipment.

Moving Heavy Objects


● Be cautious to avoid injury when moving heavy objects.

● When moving the equipment by hand, wear protective gloves to prevent


injuries.
● Move or lift the equipment by holding its handles or lower edges. Do not hold
the handles of modules (such as power supply units, fans, and boards) that
are installed in the equipment because they cannot support the weight of the
equipment.

1.6 Battery Safety


If no battery is involved, skip this section.

Before installing, operating, or maintaining batteries, read the battery


manufacturer's instructions. The safety precautions specified in this document are
highly important precautions that require special attention. For additional safety
precautions, see the instructions provided by the battery manufacturer.

Basic Requirements
Before operating batteries, carefully read the safety precautions for battery
handling and master the correct battery connection methods.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 11


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

DANGER

● Do not expose batteries at high temperatures or around heat-generating


devices, such as sunlight, fire sources, transformers, and heaters. Excessive heat
exposure may cause the batteries to explode.
● Do not burn batteries. Otherwise, the batteries may explode.
● To avoid leakage, overheating, fire, or explosions, do not disassemble, alter, or
damage batteries, for example, insert sundries into batteries or immerse
batteries in water or other liquids.
● When replacing a battery, use a battery of the same model or type. Improper
replacement may cause the battery to explode.
● Do not connect a metal conductor to the battery poles or touch the battery
terminals. Otherwise, the battery may be short-circuited and heat up, which
can cause injuries such as burning.

To ensure safety during battery installation, operation, and maintenance, pay


attention to the following:

● Do not wear conductive articles such as watches, bracelets, bangles, and rings.
● Wear goggles, rubber gloves, and protective clothing to prevent skin contact
with electrolyte in the case of electrolyte overflow. If a battery leaks, protect
the skin or eyes from the leaking liquid. If the skin or eyes come in contact
with the leaking liquid, wash it immediately with clean water and go to the
hospital for medical treatment.
● Use dedicated insulated tools.
● Move batteries in the required direction. Do not place a battery upside down
or tilt it.
● Keep the battery loop disconnected during installation and maintenance.
● Do not drop, squeeze, or puncture a battery. Protect batteries from external
high pressure to prevent internal short circuits and overheating.
● Dispose of waste batteries in accordance with local laws and regulations. Do
not dispose of batteries as household waste. If a battery is disposed of
improperly, it may explode.
● Do not use a damaged battery.
● To prevent injuries or explosion, do not allow children or pets to swallow or
bite a battery.
● If batteries experience discoloration, deformation, abnormal heating, or other
abnormalities during working, charging, or storage, stop using the batteries
and replace them with new ones.
● Batteries can work properly with the allowed charge and discharge
parameters when the temperature is within the specified range. If the
temperature is outside the specified range, the battery charge and discharge
performance and safety are affected.

Battery Installation
Before installing batteries, observe the following safety precautions:

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 12


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

● Install batteries in a dry and cool environment with good ventilation, which is
away from high temperature and flammable materials, and take precautions
against fire.
● Place and secure batteries horizontally.
● Note the polarities when installing batteries. Do not short-circuit the positive
and negative poles of the same battery or battery string. Otherwise, the
battery may be short-circuited.
● When installing a battery string, retain at least one breakpoint to prevent a
loop being formed. After checking that the installation is correct, close the
breakpoints to finish the installation.
● During the installation, insulate the terminals of cables connecting batteries.
Ensure that the terminals do not come into contact with metal components
such as the cabinet.
● Secure battery cables or copper bars by tightening bolts to the required
torque. Loose connections will result in excessive voltage drop or cause
batteries to burn out in the case of excessive current.
● Check battery connections periodically, ensuring that all bolts are securely
tightened.

Battery Short Circuit

DANGER

Battery short circuits can generate high instantaneous current and release a great
amount of energy, which may cause equipment damage or personal injury.

● If permitted, disconnect the batteries in use before performing any other


operations.
● To avoid battery short-circuit, do not maintain batteries with power on.

Flammable Gas

NOTICE

● Do not use unsealed lead-acid batteries.


● To prevent fire or corrosion, ensure that flammable gas (such as hydrogen) is
properly exhausted for lead-acid batteries.

Lead-acid batteries emit flammable gas when used. Ensure that batteries are kept
in a well-ventilated area and take preventive measures against fire.

Battery Leakage

NOTICE

Battery overheating causes deformation, damage, and electrolyte spillage.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 13


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 1 Safety Precautions

If the battery temperature exceeds 60°C, check for and promptly handle any
leakage.
Electrolyte overflow may damage the equipment. It will corrode metal parts and
boards, and ultimately damage the boards.

WARNING

When the electrolyte overflows, absorb and neutralize the electrolyte immediately.
When moving or handling a battery whose electrolyte leaks, note that the leaking
electrolyte may hurt human bodies.

If the electrolyte overflows, follow the instructions of the battery manufacturer or


neutralize the electrolyte by using sodium bicarbonate (NaHCO3) or sodium
carbonate (Na2CO3).

Lithium Battery
The safety precautions for lithium batteries are similar to those for lead-acid
batteries except that you also need to note the precautions described in this
section.

WARNING

There is a risk of explosion if a battery is replaced with an incorrect model.

● A battery can be replaced only with a battery of the same or similar model
recommended by the manufacturer.
● When handling a lithium battery, do not place it upside down, tilt it, or bump
it with other objects.
● Keep the lithium battery loop disconnected during installation and
maintenance.
● When the ambient temperature is lower than the lower limit of the operating
temperature (charge is forbidden at 0°C), do not charge the battery.
Otherwise, a short circuit would occur inside the battery.
● Do not throw a lithium battery in fire.
● When maintenance is complete, return the waste lithium battery to the
maintenance office.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 14


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 2 Installation Preparations

2 Installation Preparations

2.1 Tools

NOTICE

Use insulated tools. The following figure is for reference only.

Table 2-1 Tools

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 15


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 2 Installation Preparations

2.2 Cabinet Installation Dimensions


Figure 2-1 Installation dimensions

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 16


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 2 Installation Preparations

2.3 Cabinet Cable Hole Positions and Definitions


Figure 2-2 Positions and definitions of cable holes at the bottom of the ICC710

(1) For DC power cables (2) Reserved (3) For signal and ground cables

2.4 Unpacking and Acceptance


Context
NOTE

When transporting, carrying, and installing equipment:


● Ensure that components do not collide with doors, walls, or shelves.
● Wear clean gloves. Do not touch components with bare hands or wet or dirty gloves.

Procedure
Step 1 Check the total number of goods against the packing list attached to each packing
case.

If... Then...

The total number of goods is Go to Step 2.


consistent with that on the packing
list.

The total number of goods is Find the cause and contact the local
inconsistent with that on the packing Huawei office.
list.

Step 2 Check each packing case.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 17


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 2 Installation Preparations

If... Then...

The packing case is intact. Go to Step 3.

The packing case is severely damaged Find the cause and contact the local
or water intrudes into the packing Huawei office.
case.

Step 3 Check the number and types of devices in each packing case against the packing
list.
If... Then...

The number and types of devices are Sign on the Packing List with the
consistent with that on the packing customer.
list.

Any device is missing, damaged, or of Contact the local Huawei office.


a wrong type.

CAUTION

To protect devices and facilitate future problem diagnosis, store unpacked devices
and packing materials indoors. Take photos of the storage site, any rusty or
corroded devices, and the packing cases and materials. Keep the photos for future
reference.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 18


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 3 Installing the ICC

3 Installing the ICC

3.1 Installing the ICC710


Procedure
Step 1 Remove the cabinet packing case.
Step 2 Remove the cabinet pallets.

Figure 3-1 Removing cabinet pallets

(1) Pallet

Step 3 Mark the cabinet installation position based on cabinet dimensions.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 19


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 3 Installing the ICC

Figure 3-2 Marking mounting hole positions

Step 4 Drill holes and install expansion sleeves.


1. Drill a hole in the concrete floor using a hammer drill. The hole depth should
be in the range from 52 mm to 60 mm.
2. Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
3. Partially tighten the expansion bolt.
4. Remove the bolt, spring washer, and flat washer.

Figure 3-3 Drilling a hole and installing an expansion sleeve

(1) M12 bolt (2) Spring washer (3) Flat washer

(4) Expansion sleeve (5) Expansion bolt (6) Concrete floor

Step 5 Hoist the cabinet.


1. Bind the cabinet using lifting ropes and then hoist the cabinet to the target
position.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 20


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 3 Installing the ICC

NOTICE

– To prevent scraping the cabinet coating, do not use metal lifting ropes such
as steel ropes.
– To avoid friction between the hoist ropes and the cabinet when hoisting
the cabinet, place protective materials (such as paper and foamed plastics)
where the ropes will contact the cabinet.

Figure 3-4 Hoisting the cabinet

2. Remove the lifting ropes.


Step 6 Secure the cabinet.
1. Place flat washers, spring washers, and bolts into the cabinet mounting holes
in sequence.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 21


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 3 Installing the ICC

2. Tighten the bolts to secure the cabinet.


NOTE

If the cabinet is not level, add a spacer.

Figure 3-5 Securing the cabinet

----End

3.2 Install the Cabinet Ground Cable


Procedure
Step 1 Prepare a cable with a suitable length and install OT terminals on both ends of
the cable.
Step 2 Route the ground cable and secure it to the ground bar.

NOTICE

Ensure that the ground cables are installed securely. If devices are not properly
grounded, damage to devices or personal injury may occur.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 22


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 3 Installing the ICC

Figure 3-6 Installing a ground cable (front view)

(1) Site ground bar

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 23


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

4 Installing Components

4.1 Cabinet Device Layout


Figure 4-1 Cabinet Device Layout

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 24


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

4.2 Installing a Rectifier


Prerequisites
● The rectifier is intact after being unpacked.
● The filler panel has been removed from the rectifier slot.

NOTICE

● If the rectifier is damaged, contact your local Huawei office.


● The rectifier slot presents a risk of electric shock. Do not touch the slot with
your hands.
● High temperature is generated around the air exhaust vent when the rectifier is
running. Do not touch the vent with your hands or cover the vent with cables
or other objects.
● In an indoor scenario, you are advised to power on the rectifier within seven
days after unpacking. If the rectifier cannot be powered on in time, place it in
an indoor environment that is dry and without corrosive gas.
● In an outdoor scenario, you are advised to power on the rectifier within 24
hours after unpacking. If the rectifier cannot be powered on in time, place it in
an indoor environment that is dry and without corrosive gas.

Procedure
Step 1 Push the locking latch towards the left.
Step 2 Draw the handle downwards.
Step 3 Gently push the rectifier into its slot along the guide rails.
Step 4 Push the handle upwards.
Step 5 Push the locking latch towards the right to secure the handle.

Figure 4-2 Installing a rectifier

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 25


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

4.3 Installing a DG Battery Charger


Context
The BCU-1203A installation position is for reference.

NOTE

Install the BCU-1203A in the slot for installing the DCDU.

Figure 4-3 BCU-1203A installation layout (DCDU)

Procedure
Step 1 If there is a filler panel in the installation slot, remove the filler panel.

Figure 4-4 Removing a filler panel

Step 2 Install a BCU-1203A.


1. Push the locking latch leftward.
2. Pull the handle downward.
3. Put the BCU-1203A at the entry of the slot and push it into the slot until it is
in good contact with the backplane.
4. Push the handle upward and lock it.
5. Push the locking latch rightward to secure the handle.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 26


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

Figure 4-5 Installing a BCU-1203A

----End

4.4 Adjusting ODF Mounting Ears


Figure 4-6 Adjusting ODF Mounting Ears

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 27


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

4.5 Installing a VCN510


Figure 4-7 Installing a VCN510

4.6 Installing an IP Camera (optionl)


Step 1 Remove the transparent cover of the camera.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 28


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

Figure 4-8 Removing the transparent cover

Step 2 Insert an SD card into the SD card slot in the IP camera.

Figure 4-9 Installing an SD card

(1) SD card

Step 3 Secure the camera to the mounting holes using tapping screws.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 29


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

Figure 4-10 Installing a camera

Step 4 Adjust the camera angle. Loosen the screws on the camera inner cover, adjust the
camera angle, and tighten the screws.

Figure 4-11 Adjusting the camera angle

(1) Inner cover screw (2) Angle mark

Step 5 Install the transparent cover on the camera by aligning the positioning slot.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 30


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 4 Installing Components

Figure 4-12 Installing the transparent cover

(1) Positioning slot

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 31


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 5 Installing Batteries and Cables

5 Installing Batteries and Cables

Prerequisites

NOTICE

● Ensure that batteries are from the same manufacturer, of the same model, and
in the same batch. Do not mix old and new batteries together.
● Comply with regulations and warnings of the battery manufacturer.

DANGER

● Smoking and sparks are prohibited near batteries.


● Use tools with insulated handles, otherwise, batteries may be burnt out and
personal injury may occur.
● During battery operations, wear goggles, rubber gloves, and protective clothes.
Remove conductive articles such as watches, bracelets, and rings.
● If battery acid gets in the eyes, rinse with cold water for more than 15 minutes
and seek medical advice immediately. If battery acid contacts skin or clothing,
wash with soap and water immediately.
● Do not use a metal to simultaneously touch two or more battery terminals or
simultaneously touch a battery terminal and a grounded object (such as the
battery compartment). Otherwise, short circuits will occur, causing sparks or
explosion.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 32


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 5 Installing Batteries and Cables

CAUTION

● Carry batteries by referring to local regulations. To avoid damages, handle with


care when carrying batteries.
● Place batteries in strict accordance with the figure in this chapter. Otherwise,
the batteries may be short-circuited and damaged.
● During battery installation, never reversely connect positive and negative
battery terminals. Connect the negative battery cable first, and then the
positive battery cable.
● Before connecting a battery cable, remove the protective lids or protective
covers from battery terminals, and reinstall them after connecting the cable.
● Secure battery cables to the torque specified in this chapter. Loose battery bolt
connections will cause batteries to be burnt.

Figure 5-1 Lithium battery layout

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 33


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 5 Installing Batteries and Cables

5.1 Installing Lithium Batteries


Prerequisites

NOTICE

● Before installing lithium batteries, ensure that the cabinet anchor bolts are
tightened.
● Install lithium batteries at the lower layer and then the upper layer.
● At least two persons are required to move a lithium battery.
● Before pushing a lithium battery into the cabinet, reset the handles on both
sides of the battery to prevent the support bars from being stuck.

Procedure
Step 1 Secure a lithium battery to the rack.

Figure 5-2 Securing a lithium battery

----End

5.2 Installing Lithium Battery Cables


Procedure
Step 1 Install ground cables for the lithium batteries.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 34


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 5 Installing Batteries and Cables

Figure 5-3 Installing ground cables for the lithium batteries

(1) Cabinet ground bar

Step 2 Install communications cables and a build-out resistor for lithium batteries.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 35


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 5 Installing Batteries and Cables

Figure 5-4 Installing communications cables (CAN communication) for lithium


batteries

Step 3 Install lithium battery power cables.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 36


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 5 Installing Batteries and Cables

Figure 5-5 Installing lithium battery power cables

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 37


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

6 Installing Cables

DANGER

● Ensure that the upstream AC input circuit breaker is OFF, and attach labels such
as "No operations allowed."
● Switch off all circuit breakers before installing cables.

6.1 (Optional) Installing Dry Contact Signal Cables


Procedure
Step 1 Press the contact plate using a flat-head screwdriver to flip the metal spring inside
each dry contact.
Step 2 Connect the signal cables to the corresponding dry contacts.
Step 3 Remove the flat-head screwdriver and check that the signal cables are connected
securely.

Figure 6-1 Installing a dry contact signal cable

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 38


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

6.2 Installing a Communications Cable

6.2.1 IP Networking
Procedure
Step 1 Connect one end of a communications cable to the FE port on the SMU.
Step 2 Connect the other end to the network access device.

Figure 6-2 Installing a communications cable

(1) FE port on the SMU (2) Network access device

Step 3 Route the part of cables that are outside the cabinet through a PVC corrugated
pipe and secure the pipe to a cable hole on the cabinet.

----End

6.2.2 BBU In-band Networking


Prerequisites
The SMU connects to the baseband unit (BBU) of the base transceiver station
(BTS) for in-band communication. The BTS is required to be later than GBSS12.0
and support in-band networking.

Procedure
Step 1 Connect one end of a cable to the RS485/RS232 port on the SMU.
Step 2 Connect the other end to the MON1 or MON0 port on the BBU.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 39


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-3 Installing a communications cable

(1) RS232/RS485 port on the SMU (2) MON1 port on the BBU

Step 3 Route the part of cables that are outside the cabinet through a PVC corrugated
pipe and secure the pipe to a cable hole on the cabinet.

----End

6.3 Installing IP Camera Cables


Figure 6-4 Installing IP Camera Cables

NOTICE

The cable connection method is the same if there are multiple cameras.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 40


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

6.4 Installing DC Output Power Cables


Step 1 Use cables (cross-sectional area: 1.5–16 mm2) and cord end terminals to prepare
DC output power cables.

Table 6-1 Preparing cables


Cross-Sectional Recommended Cord End Terminal Recommended Bare Wire
Area Specifications Specifications

1.5 mm2 Pre-insulated and with an insertion 16 mm2


depth of 18 mm NOTICE
Cord end terminals are
4 mm2 Pre-insulated and with an insertion recommended. When bare wires are
depth of 18 mm used, you are advised to add heat
shrink tubing to ensure that the wire
10 mm2 Pre-insulated and with an insertion ends are not split.
depth of 18 mm

16 mm2 Pre-insulated and with an insertion


depth of 18 mm (supports bare wire
installation)

Figure 6-5 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Step 2 Install DC output power cables.


1. Insert a flat-head screwdriver (2 mm wide) into the holes for DC output
circuit breakers.
2. Connect DC output power cables to the corresponding DC output circuit
breakers.
3. Remove the flat-head screwdriver.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 41


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-6 Installing DC output power cables

(1) DC load

----End

6.5 Installing Output Power Cables for the DCDB

DANGER

Switch off all circuit breakers before installing the power cables.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 42


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-7 Installing DC output power cables

(1) DC load

6.6 Installing DG Cables


NOTE

If a site requires a DG, perform the following steps to install it.

6.6.1 Installing DG Control Signal Cables(Huawei DG, BOM


Number: 52262366 and 52262013)

Procedure
Step 1 Connect one end of the cables to the J4 port on the GMU interface board.

Step 2 Connect the other end of the cables to the DG1_CTL, RST1, and COM ports on the
GIM01C.

NOTICE

For single-DG scenarios, connect the DG startup/shutdown and resetting signal


cables to the DG1_CTL and RST1 ports respectively on the GIM01C. Otherwise,
power supply to the site may be disconnected.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 43


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-8 Installing DG control signal cables

Table 6-2 Cable connections

Cable J4 Port Silk Screen on the Port Silk Screen on the


GMU Interface Board GIM01C

DG DG_COM DG1_CTL M
startup/
shutdown DG_NC DG1_CTL NC
signal
cable

DG RST_NO RST1_NO
resetting
signal RST_COM RST1_M
cable

DG RS+ COM_R+
communic
ations RS- COM_R-
cable

Step 3 Route the part of cables that are outside the cabinet through a PVC corrugated
pipe and secure the pipe to a cable hole on the cabinet.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 44


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

6.6.2 Installing Control Signal Cables for the Reused DG


Context

NOTICE

● For single-DG scenarios, connect the DG startup/shutdown and resetting signal


cables to the DG1_CTL and RST1 ports on the GIM01C.
● For dual-DG scenarios, connect the DG 1 startup/shutdown and resetting signal
cables to the DG1_CTL and RST1 ports on the GIM01C, and connect the DG 2
signal cables to the DG2_CTL and RST2 ports on the GIM01C.
● For the DG that starts when the dry contact is closed, connect the DG remote
startup/shutdown signal cables to the NC and M ports. For the DG that starts
when the dry contact is open, connect the signal cables to the NO and M ports.

Procedure
Step 1 Connect one end of the DG start/shutdown and resetting signal cables respectively
to the DG1_CTL and RST1 ports on the GIM01C.
Step 2 Connect the other end by following instructions in the DG manual.

NOTICE

The DG start/shutdown and resetting signal cables must be respectively connected


to the DG1_CTL and RST1 ports on the GIM01C. Otherwise, power supply to the
site may be disconnected.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 45


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-9 Installing control signal cables for the reused DG

(1) DG

Step 3 Route the part of cables that are outside the cabinet through a PVC corrugated
pipe and secure the pipe to a cable hole on the cabinet.

----End

6.6.3 Installing a DG Battery Charging Cable


If a site requires a BCU-1203A, perform the following steps to install it.

Procedure
Step 1 Flip the BCU-1203A power switch to OFF.
Step 2 Install a DC output power cable for the BCU-1203A.
1. Connect the wiring terminal on one end of the cable to the BAT_OUT_A port
on the BCU-1203A.
2. Connect the other end to the J1001 port on the GMU interface board.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 46


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-10 Installing a DC output power cable for the BCU-1203A

----End

6.6.4 Installing a Battery Charging Cable for the Reused DG


(BCU-1203A)
If a site requires a BCU-1203A, perform the following steps to install it.

Procedure
Step 1 Flip the BCU-1203A power switch to OFF.
Step 2 Install a DC output power cable for the BCU-1203A.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 47


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Figure 6-11 Installing a DC output power cable for the BCU-1203A

(1) DG

----End

6.7 Installing Inverter Cables


Procedure
Step 1 Installing AC output power cables for an inverter.

Figure 6-12 Installing AC output power cables for an inverter

----End

6.8 Installing AC Input Power Cables


Context
For the colors and appearances of power cables, site cables prevail.

DANGER

Switch off all AC upstream circuit breakers before installing AC input power cables.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 48


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 6 Installing Cables

Procedure
Step 1 Install AC input power cables for the ATS.

Figure 6-13 Installing AC input power cables for the ATS

(1) Mains (2) DG

Step 2 Cover a PVC corrugated pipe over the cable parts outside the cabinet and secure
the PVC corrugated pipe to the cable hole.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 49


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 7 Installation Verification

7 Installation Verification

After installing the cabinet and all equipment, check the installation items,
installation environment, and cables.

Checking the Cabinet Installation

Table 7-1 Cabinet installation checklist


No. Check That Result

1 The cabinet is placed in accordance with the design □ Yes □ No


drawing.

2 The base is secured. □ Yes □ No

3 All bolts, especially the bolts used for electrical □ Yes □ No


connections, are fully tightened. Flat washers and
spring washers are all installed in correct sequence.

4 The cabinet is clean, free of dust and dirt. □ Yes □ No

5 All labels are correct, clear, and complete. □ Yes □ No

Checking the Environment

Table 7-2 Environment checklist


No. Check That Result

1 There are no unnecessary adhesive tape or cable □ Yes □ No


ties on cables.

2 There are no adhesive tapes, cable ties, paper □ Yes □ No


scraps, or packing materials around the cabinet.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 50


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 7 Installation Verification

Checking Electrical Connections

Table 7-3 Electrical connection checklist

No. Check That Result

1 All the ground cables prepared onsite contain □ Yes □ No


copper core wires and have correct diameters. No
switches or fuses are installed on the cables and no
short-circuit occurs.

2 Ground cables, AC input power cables, and internal □ Yes □ No


cables are connected in accordance with the circuit
diagram and screws are fully tightened. No short-
circuit occurs on power inputs or outputs.

3 Power cables and ground cables are not coiled and □ Yes □ No
extra parts are cut off.

4 Connectors for power cables and ground cables are □ Yes □ No


soldered or crimped securely.

5 Bare cables and terminal handles are completely □ Yes □ No


wrapped with heat-shrink tubings.

6 Flat washers and spring washers are securely □ Yes □ No


installed for all OT terminals, and all OT terminals
are intact and properly connected.

Cable Checklist

Table 7-4 Cable checklist

No. Check That Result

1 All cable joints are secured properly, especially □ Yes □ No


signal cables and the cables to the bottom of the
cabinet.

2 Cables are bound neatly, and cable ties are secured □ Yes □ No
evenly and properly in the same direction.

3 Power cables, protection cables, and signal cables □ Yes □ No


are bound separately.

4 Cables are routed in a way convenient for □ Yes □ No


maintenance and capacity expansion.

5 The cable tie tails on indoor cables are cut smoothly □ Yes □ No
from the root, and the cable tie tails on outdoor
cables are cut with a margin of 3 mm to 5 mm.

6 Unused ports are protected. □ Yes □ No

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 51


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

8 Commissioning

NOTICE

● Performing commissioning procedure provided in this chapter may result in


power failure or alarms. Inform the alarm center before commencing the
procedure and after completing the procedure.
● Commissioning should be performed by trained personnel according to the
commissioning instructions provided in this chapter.
● Commissioning is performed with the power on. Before you perform
commissioning, remove any conductors such as jewelry or watches, stand on
dry insulating material, and use insulated tools.
● During commissioning, do not establish contact between electrical points that
have different electric currents.
● Check that the status of a unit or component meets requirements before
turning on its switch.
● If you are maintaining or servicing equipment and do not want others to
perform any operation, attach the label "Currently being serviced. Do not
switch on." to the equipment.
● During commissioning, shut down the power system immediately if any fault is
detected. Rectify the fault, start the power system, and proceed with the
commissioning.

8.1 Connecting the AC Power Supply


Procedure
Step 1 Check that the AC input circuit breakers on the ATS is OFF, and switch on the
upstream AC input circuit breakers for the ATS.

Step 2 Check that the input voltage of the AC input circuit breaker on the ATS ranges
from 85 V AC to 300 V AC.

Step 3 Switch the AC input circuit breakers on the ATS to ON, and set the transfer switch
of the ATS to the mains supply state.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 52


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Step 4 Switch on the AC input circuit breaker and measure the output voltage of the AC
input circuit breaker. The value should range from 85 V AC to 300 V AC.
Step 5 Check that the RUN indicator on the rectifier is steady on.
Step 6 Check that the busbar voltage is in the range of 43.2 V DC to 56.4 V DC using a
clamp meter.

----End

8.2 Setting the Display Language


After powering on the SMU, press or on the LCD to select a display

language. Then press to enter the standby screen.

NOTE

● If an undesired language is selected, reinstall and restart the SMU and then select the
desired language.
● The preset password for login is 000001.

8.3 Setting Parameters


Procedure
Step 1 After the Setup Wizard Init screen is displayed, set the following parameters.

Table 8-1 Parameter settings


Item Setting

Time Zone Set this parameter to the local time


zone.

Date and Time Set this parameter to the local date


and time.

Battery Factory AGISSON

Battery Model ESM-A

The SMU may restart. Yes

Step 2 Setting the Date and Time.


Set the date and time as required. Skip the setting if they have been correctly set
in the setup wizard.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 53


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Main Menu Second-Level Third-Level Default Value Settings


Menu Menu

Setting Wizard Date and Time Time Zone UTC +08:00 Set to the local time
NOTE Beijing zone.
The date and time
vary with time Date and Time - Set to the local date
zones. Set the and time.
time zone, date,
and time based NTP Enable No Yes/No
on the local NOTE
situation. Set the parameter to Yes
if you need to
synchronize the SMU
time and the site
network server time.

Step 3 (Optional) Set sensor parameters.

Table 8-2 Setting sensor parameters

Main Second- Third- Fourth-Level Menu Default Value Setting


Menu Level Level
Menu Menu

Parame Setup Sensor Ambient Temp. - Set this parameter


ters Paramet Config Sensor as required.
Settings er
Ambient Humi. - Set this parameter
Sensor as required.

Step 4 Setting the AC Input System

Main Menu Second-level Third-Level Setting


Menu Menu

Parameters Mains AC Mode Set to the local power supply input


Settings system.

----End

8.4 Setting Communications Parameters

8.4.1 Setting Communications Parameters for IP Networking

Procedure
Step 1 Set the IP address, subnet mask, and gateway address on the LCD.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 54


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Table 8-3 IP parameters


Main Second-Level Third-Level Fourth-Level Default Value Setting
Menu Menu Menu Menu

Paramete Comm. Network IP Address 192.168.0.10 Set this


rs Parameters Parameters parameter based
Settings on the address
assigned by the
network
administrator.

Subnet Mask 255.255.255.0 Set this


parameter based
on the address
assigned by the
network
administrator.

Default 192.168.0.1 Set this


Gateway parameter based
on the address
assigned by the
network
administrator.

Step 2 Set IP addresses and port numbers for the active and standby NetEco servers on
the LCD.

Table 8-4 NetEco parameters


Main Second-Level Third-Level Fourth-Level Default Value Setting
Menu Menu Menu Menu

Paramete Comm. Network NetEco 192.168.0.10 Set this parameter


rs Parameters Parameters Primary IP to the IP address
Settings of the active
NetEco server.

NetEco 192.168.0.10 Set this parameter


Backup IP to the IP address
of the standby
NetEco server.

NetEco Port 31220 Set a port number


Number for the NetEco.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 55


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

8.4.2 Set BBU In-band Networking Parameters.


Procedure
Step 1 Set BBU in-band networking parameters.

Table 8-5 BBU in-band networking parameters


Main Second-Level Third-Level Fourth-Level Fifth-Level Setting
Menu Menu Menu Menu Menu

Parameter Comm. Serial Port Northbound Port Mode Manual


s Settings Parameters
Protocol Type M/S Protocol

M/S Protocol Baud Rate - 9600

Comm. - 3
Address

Step 2 Set IP addresses and port numbers for the active and standby NetEco servers on
the LCD.

Table 8-6 NetEco parameters


Main Second-Level Third-Level Fourth-Level Default Setting
Menu Menu Menu Menu Value

Parameter Comm. Network NetEco 192.168.0.10 Set this


s Settings Parameters Parameters Primary IP parameter to the
IP address of the
active NetEco
server.

NetEco Backup 192.168.0.10 Set this


IP parameter to the
IP address of the
standby NetEco
server.

NetEco Port 31220 Set a port


Number number for the
NetEco.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 56


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

8.5 Setting 57 V Constant Voltage Output Parameters


Table 8-7 Setting 57 V constant voltage output parameters

Main Menu Second-level Third-Level Fourth-Level Setting


Menu Menu Menu

Parameters Li Battery Basic Work Mode 48V Mode/57V Mode


Settings Parameters NOTE
Set the output voltage for the
lithium battery as required.

8.6 Setting AC Peak Clipping Parameters


Set peak shaving parameters based on site requirements.

Table 8-8 Setting peak shaving parameters

Main Second- Fourth-Level Menu Setting Description


Menu Level
Menu

Parameters AC Mains Peak Shave Enb Enable or disable the peaking shaving
Settings parameters function. When the mains capacity or
circuit breaker capacity is insufficient,
you are advised to enable the peak
shaving function.

Cap for Peak Shave ● If the input transformer power is


insufficient, set this parameter to the
transformer power (unit: kW).
● If the input transformer power is
sufficient, keep the default value.

Breaker Rated Curr ● If the circuit breaker capacity is


insufficient, set this parameter to the
circuit breaker capacity (unit: A).
● If the circuit breaker capacity is
sufficient, keep the default value.

Derating Coef Indicates the high temperature derating


coefficient of the circuit breaker. Keep
the default value (0.8) unless otherwise
specified.

Peak Peak Shaving SOC If power failure occurs, reserve the


Shaving battery capacity for peak shaving.
Para

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 57


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Main Second- Fourth-Level Menu Setting Description


Menu Level
Menu

Power-On Hysteresis for By default, this parameter does not


LLVD in Peak Shaving need to be set.

Batt Backup Enable Indicates whether the peak shaving


battery is used as the backup battery in
the case of power failure. Default value:
No.

Allow A/C Shutdown in Indicates whether the air conditioner


Peak Shaving can be turned off during peak shaving.
You are advised to disable this function.

Allow LLVD n Indicates whether to power off the


Disconnection in Peak minor loads when the battery capacity
Shaving reserved for peak shaving is fully
discharged.

Rated Phase Volt Set the parameter based on the rated


voltage of the power grid. Default
value: 220 V.

8.7 Connecting the Lithium Battery Supply


Procedure
Step 1 Check whether the lithium batteries communicate properly. If the run indicator on
a lithium battery is steady on, the battery communicates properly with the
monitoring device. If it blinks fast (4 Hz), the communication between them is
interrupted. If so, check whether the communications cable is properly connected.

Step 2 Observe the lithium batteries for 15 minutes. The lithium batteries are running
properly if the alarm indicators are off.

Step 3 Set all circuit breakers to the appropriate status based on site requirements.

Step 4 Observe the power system for 15 minutes. If no alarm (except the door status
alarm) is generated on the SMU during this period, the current and voltage for
batteries and loads are normal.

----End

8.8 Setting DG Parameters


Procedure
Step 1 Set the number of DGs and DG scheduling mode.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 58


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Table 8-9 Setting the number of DGs and DG scheduling mode


Main Menu Second-Level Third-Level Default Setting
Menu Menu Value

Setting Site Unit Genset Qty 0 Set this parameter as


Wizard required.

Tank Qty 1 Set this parameter as


required.

Genset Group Schedule Mode Cycle Mode Set this parameter as


Para. required.
NOTE
● No Control Mode: The DG
startup or shut down is not
controlled.
● Tradition Mode: The DG is
started when the mains
power fails and is shut down
when the mains power is
normal.
● Cycle Mode: Execute the DG
startup/shutdown control
logic in cyclic mode.

Step 2 Switch the GMU power circuit breaker to ON.


Step 3 Set DG parameters.

Table 8-10 Set DG parameters(BOM Number: 52262013)


Main Second-Level Third-Level Fourth-Level Default Value Setting
Menu Menu Menu Menu

Parameters ESP-D ESP-D1 D.G Rated 12.5 kW Set based on


Settings Power site
requirements.

Auto Add Oil No Yes

Routine Maint 9999 h 1000 h

Timed Maint 500 h 4320 h


Per

Fuel Tank 1 Tank Type - Horizontal Cuboid


Column

Cuboid Tank - 1.00 m 1.8 m


Length

Cuboid Tank - 1.00 m 1.01 m


Width

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 59


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Main Second-Level Third-Level Fourth-Level Default Value Setting


Menu Menu Menu Menu

Cuboid Tank - 1.50 m 0.68 m


Height

Fuel Level UL - 300.0 cm 67.7 cm

Fuel Level LL - 0.0 cm 2.7 cm

Low Fuel THR - 15.0% 15.0%

Refuel THR - 20.0% 20.0%

Level Chg - 3.0 cm 3.0 cm


Alarm

Level Chg - 10.0 Min 10.0 Min


Time

Level Filt Time - 30.0 Min 30.0 Min

Table 8-11 Set DG parameters(BOM Number: 52262366)


Main Second-Level Third-Level Fourth-Level Default Value Setting
Menu Menu Menu Menu

Parameters ESP-D ESP-D1 D.G Rated 12.5 kW Set based on


Settings Power site
requirements.

Auto Add Oil No Yes

Routine Maint 9999 h 1000 h

Timed Maint 500 h 4320 h


Per

Fuel Tank 1 Tank Type - Horizontal Cuboid


Column

Cuboid Tank - 1.00 m 2.2 m


Length

Cuboid Tank - 1.00 m 0.81 m


Width

Cuboid Tank - 1.50 m 0.58 m


Height

Fuel Level UL - 300.0 cm 57.7 cm

Fuel Level LL - 0.0 cm 2.7 cm

Low Fuel THR - 15.0% 15.0%

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 60


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Main Second-Level Third-Level Fourth-Level Default Value Setting


Menu Menu Menu Menu

Refuel THR - 20.0% 20.0%

Level Chg - 3.0 cm 3.0 cm


Alarm

Level Chg - 10.0 Min 10.0 Min


Time

Level Filt Time - 30.0 Min 30.0 Min

Step 4 Set parameters for the reused DG.

Table 8-12 Setting parameters for the reused DG


Main Menu Second-Level Third-Level Fourth-Level Default Setting
Menu Menu Menu Value

Parameters Genset Genset 1 Rated Power 12.5 kW Set this


Settings parameter as
required.

Power Limit 80.0% Set this


Rate parameter as
required.

Over Voltage 120.0% Set this


parameter as
required.

Under Voltage 80.0% Set this


parameter as
required.

Run Hour for 9999 h Set this


Maint parameter as
required.

Days for 500 h Set this


Maint parameter as
required.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 61


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

8.9 Manually Connecting the DG Supply(BOM Number:


52262013)
Prerequisites

DANGER

Sparks, flames, and inflammable objects must not be close to a DG because this
may cause fire or explosions.

Check according to the following table before powering on and commissioning the
DG.

Item Expected Result

Appearance ● No engine oil leaks.


● No fuel leaks.
● No coolant leaks.
● No component is damaged or lost.
● No fastener is loose, lost, or damaged.
● No component is cracked, worn out, or damaged, and no connector is damaged
or corroded.
● The EMERGENCY STOP button is in the self-lock state, and the load circuit
breaker is in a proper position.
● No hose is cracked, worn out, damaged, or stuck.

Fuel, lube Levels of fuel, lube oil, and engine coolant are within the normal range.
oil, and
coolant

Battery The battery voltage is greater than 12 V DC.


voltage

Procedure
Step 1 Prepare for starting the DG.
1. Rotate the EMERGENCY button until it is ejected.
2. Check that the DG AC output circuit breaker is OFF.
3. Turn on the power switch for the DG battery charger.
4. Set the GMU to work in manual mode.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 62


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Figure 8-1 Starting the DG manually

Step 2 Exhaust air from fuel pipes.


1. When you start the DG for the first time, set Prestart Time/PreFuel Time on
the GMU to 120s so that the DG automatically exhausts air from fuel pipes
during startup. Path: Settings > Engine Setting > Prestart Time/PreFuel
Time.
NOTE

– If the GMU software version is V322 or earlier, the Prestart Time is displayed on
the screen. If the GMU software version is V330, the PreFuel Time is displayed.
– To view the GMU software version, choose Main Menu > Product Info >
Software.
– The initial GMU password is 1111.
2. Press the START button on the GMU panel to start the DG.
3. After the DG starts properly, change the value of Prestart Time/PreFuel Time
to 15s.
Step 3 Check the DG output voltage.
1. Press I/O on the GMU panel.
2. Open the door of the generator monitoring box (GMB) and check that the DG
output voltage is in the correct voltage range (207–253 V AC) using a clamp
meter.

Figure 8-2 Checking the DG output voltage

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 63


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Step 4 If the DG works properly, switch the DG AC output circuit breaker to ON.
Step 5 Switch the DG input circuit breakers on the ATS to ON.

----End

Procedure
Step 1 Exhaust air from fuel pipes.
1. Loosen the air exhaust screw on the fuel filter.

Figure 8-3 Loosening the air exhaust screw

2. Repeatedly pinch the hand feed pump until liquid is continuously flowing out
at the air exhaust screw.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 64


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Figure 8-4 Pinching the hand feed pump

(1) Hand feed pump

3. Tighten the air exhaust screw on the fuel filter.


Step 2 Start the DG manually.
1. Rotate the EMERGENCY STOP button until it is ejected.
2. Check that the DG AC output circuit breaker is OFF.
3. Turn on the power switch for the DG battery charger.
4. Set the DG to work in manual mode.

Figure 8-5 Starting the DG manually

5. Press the START button on the GMU panel to start the DG.
Step 3 Check the DG output voltage: Open the door of the DG control box and use a
clamp meter to measure the DG output voltage. The phase voltage needs to be
230 V AC±10%.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 65


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Figure 8-6 Checking the DG output voltage

Step 4 After checking that the DG can start properly, set the DG to work in automatic
mode on the GMU.

Figure 8-7 Setting the DG working mode

Step 5 Switch the AC output circuit breaker of the DG to ON.


Step 6 Switch the DG input circuit breakers on the ATS to ON.

----End

8.10 Manually Connecting the DG Supply(BOM


Number: 52262366)
Prerequisites

DANGER

Never allow sparks, flames, and inflammable objects to be close to the DG


because this may cause fire or explosions.

Check as follows before powering on and commissioning the DG:

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 66


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Item Expected Result

Appearan ● No engine oil leaks.


ce ● No fuel leaks.
● No coolant leaks.
● No component is damaged or lost.
● No fastener is loose, lost, or damaged.
● No component is cracked, worn out, or damaged, and no
connector is damaged or corroded.
● The EMERGENCY STOP button is in the self-lock state, and the
load circuit breaker is in a proper position.
● No hose is cracked, worn out, damaged, or stuck.

Fuel, lube Levels of fuel, lube oil, and engine coolant are within the normal
oil, and range.
coolant

Battery The battery voltage is greater than 12 V DC.


voltage

Procedure
1. Prepare for starting the DG.
a. Rotate the EMERGENCY STOP button until it is ejected.
b. Switch the DG AC output circuit breaker to OFF.
c. Turn on the power switch for the DG battery charger.
d. Switch the GMU power circuit breaker to ON.
e. Set the DG to work in manual mode.

Figure 8-8 Manual mode

f. On the GMU, change the value of Prestart Time to 120s. Path: Main
Menu > Settings > Engine Setting > Prestart Time
2. Press the START button on the GMU to start the DG.
NOTE

Before the DG starts, it automatically expels air from the fuel pipes.
3. After the DG starts properly, change the value of Prestart Time to 15s.
4. Check the DG output voltage: Open the door of the DG control box and use a
clamp meter to measure the DG output voltage. The phase voltage needs to
be 230 V AC±10%.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 67


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

5. After the DG output voltage becomes normal, change the DG working mode
to automatic mode.

Figure 8-9 Automatic mode

6. Switch the AC output circuit breaker of the DG to ON.


7. Check whether the information on the SMU LCD standby screen matches the
actual configurations. If they do not match, check cable connections and the
number and specifications of components.
8. Perform a DG self-check on the SMU and verify that the check result
represents the actual number of DGs and that the DGs work properly.

NOTICE

Path for DG self-check: Running Control > EPS-D > DG Self Check > Confirm
Self-Check > Yes
Ensure the following items before you start a DG check. Otherwise, power
supply to the site may be disconnected during the DG check.
● No battery alarms are active on the SMU.
● The mains AC input circuit breaker on the ATS is OFF.
● A single-DG check takes about 4 minutes.

9. Run the DG for 5 minutes and shut it down. Take out the oil level dipstick to
check the engine oil level.
10. Loosen the coolant filler port cover. Ensure that the coolant level reaches the
top of the upper chamber of the radiator.

8.11 Connecting the Reused DG Supply


Prerequisites

DANGER

Sparks, flames, and inflammable objects must not be close to a DG because this
may cause fire or explosions.

Check according to the following table before powering on and commissioning the
DG.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 68


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Table 8-13 Power-on check

Item Expected Result

Appearance ● No engine oil leaks.


● No fuel leaks.
● No coolant leaks.
● No component is damaged or lost.
● No fastener is loose, lost, or damaged.
● No component is cracked, worn out, or damaged, and no
connector is damaged or corroded.
● The EMERGENCY STOP button is in the self-lock state, and the
load circuit breaker is in a proper position.
● No hose is cracked, worn out, damaged, or stuck.
● No water or impurities exist in the fuel filter. Remove any
water and impurities.

Fuel, lube Levels of fuel, lube oil, and engine coolant are within the normal
oil, and range.
coolant

Battery The battery voltage is greater than 12 V DC.


voltage

Procedure
Step 1 Check that all DG switches and circuit breakers are OFF.

Step 2 Turn on the power switch for the DG battery charger.

Step 3 Manually start the DG. For details, see the DG manual.

Step 4 Check that the output voltage of the DG ranges from 207–253 V AC using a clamp
meter.

Step 5 If the DG works properly, switch the DG AC output circuit breaker to ON.

Step 6 Switch the DG input circuit breaker on the ATS to ON.

Step 7 Switch the mains input circuit breaker on the ATS to OFF.

Step 8 Check that the RUN indicator on the PSU is steady on.

Step 9 Check that the voltage between the –48 V busbar and the RTN(+) busbar ranges
from –43.2 V DC to –56.4 V DC.

Step 10 Switch the AC input circuit breakers on the ATS to ON, and set the transfer switch
of the ATS to the mains supply state.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 69


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

8.12 Starting the DG Self-Check


Context
● There is no battery alarm on the SMU, and battery power supply is normal.
● If the mains power is used, ensure that the mains AC input circuit breaker on
the ATS is OFF.

Procedure
Step 1 Set the DG to work in auto mode on the GMU.

Step 2 Start a DG self-check.

Table 8-14 Starting the DG self-check

Main Menu Second-Level Third-Level Fourth-Level Setting


Menu Menu Menu

Running Control Genset Genset Self Confirm Self Yes


Check Check

NOTE

Self-check process:
1. About 2 minutes after starting the DG 1, the SMU checks the DG running status to
determine whether the DG has started.
2. About 2 minutes after stopping the DG 1, the SMU checks the DG running status to
determine whether the DG has stopped.
After the self-check is complete, the SMU displays the results on the screen:
● Control DG Number (0/1)
● DG 1 Start Result (Success/Fail)
● DG 1 Stop Result (Success/Fail)
A single-DG self-check takes about 4 minutes.

Step 3 Verify that the self-check result is consistent with the actual number of DGs and
the DGs work properly. If the DG self-check fails, see the DG manual for
troubleshooting and DG cable connection checking.

----End

Follow-up Procedure
After the DG self-check is complete, switch the mains input circuit breaker on the
ATS to ON.

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 70


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

8.13 Opening an Electronic Door Lock


Context
The SMU manages the permission for opening an electronic door lock on a
cabinet. The lock can be opened using the access card, WebUI (with an
administrator account), or mechanical key.

Prerequisites
● The following are the prerequisites for opening an electronic lock on the
WebUI:
a. An electronic door lock has been installed on the cabinet.
b. A communications expansion module has been installed in the cabinet.
c. You have an administrator account.
● The following are the prerequisites for opening an electronic lock using an
access card:
a. An electronic door lock has been installed on the cabinet.
b. A communications expansion module has been installed in the cabinet.
c. You have the access card that matches the electronic door lock.

Setting Parameters

Table 8-15 Electronic door lock parameters


Parameter Description Default Value Value Range

Access Card Set this mode to Yes. The No Yes, No


Authenticated access card information
can be recorded onsite.

Card No. Authorized access card - A string of not more than


number. 10 digits

Start Date Validity start time for the Current time YYYY-MM-DD HH:MM:SS
access card.

Expire Date Validity end time for the 2069-12-31 YYYY-MM-DD HH:MM:SS
access card. 23:59:59

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 71


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Parameter Description Default Value Value Range

Lock No. Specifies the application Elock1, Elock2, Elock1


scope of the access card. Elock3, and Elock2
If you set this parameter Elock4
to Elock1, the access Elock3
card can only open door Elock4
lock 1.
The SMU manages a
maximum of four
electronic door locks.
The SMU identifies the
electronic door locks that
connect to the COM
ports on the
communications
expansion board, and
sets door lock numbers
from left to right and
from top to bottom.

Lock Close Delay After the access card is 60s 3–240


successfully
authenticated, if the door
is not open within the
preset Lock Close Delay,
the SMU locks the
electronic door lock
again.

Procedure
None.

Opening a lock on the WebUI

● Opening all door locks


Choose Monitoring > E-Lock Group > Running Control, set Open All locks
to Yes, and click Submit.
● Opening a single door lock
Choose Monitoring > E-Lock Group > Electronic Lock n > Running Control,
set Open lock to Yes, and click Submit.

Opening a lock using an access card

Step 1 Add access card information.

On the WebUI, choose System Settings > Electronic Lock and grant permission
to the access card in any of the following ways:

● Swiping the access card

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 72


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 8 Commissioning

Under Basic Parameters, set Access Card Authenticated to Yes, and place
the access card near the door lock. The SMU automatically reads information.
Set other information as required and confirm the settings.
NOTE

● If you add access card information by swiping the access card, any electronic door locks
monitored by the SMU cannot be opened during the adding process. Otherwise, Access
Card Authenticated will automatically change to No. If you need to continue to add
access cards for the electronic door lock, close the electronic door lock and perform the
operations again.
● To ensure device security, set Access Card Authenticated to No after recording the
information.
● After site deployment, delete the permission granted to the access card to avoid risks.
● Manually typing the card number
Under Electronic Lock Information, click Add and manually type access card
information. Set other information as required and confirm the settings.
NOTE

You can use this method if you know the access card number.

Step 2 Place the access card near the electronic door lock.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 73


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide 9 Subsequent Operations

9 Subsequent Operations

Procedure
Step 1 Reinstall the removed panel if any.
Step 2 Seal used cable holes with fireproof putty and seal unused cable holes with lids
delivered with the cabinet.
Step 3 Check whether the paint on the surface of the cabinet is intact. Repair any
damaged paint.
Step 4 Lock the cabinet door and hand over the key to the administrator.
Step 5 Ensure that the site is clean before you leave the site.

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 74


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3) A Associations Between UIM Dry Contacts and
Installation Guide Alarms

A Associations Between UIM Dry Contacts


and Alarms

Table A-1 Associations between dry contacts and alarms


Port Type Silk Screen Associated Alarm

Dry contact input DIN1 /


The default setting
DIN2 Inverter fault alarm
(closed: alarm;
open: normal) can DIN3 User-defined
be modified
DIN4 /

Dry contact output ALM1 Defined as DI


The default setting
ALM2 Defined as DI
(closed: alarm;
open: normal) can ALM3 Defined as DI
be modified.
ALM4 /

ALM5 No heater

ALM6 No heater

ALM7 Door status alarm

ALM8 /

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 75


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide B Preparing Terminals

B Preparing Terminals

Cut a cable of a proper length and install terminals.

Preparing a cord end terminal

Figure B-1 Preparing a cord end terminal

(1) Cable (2) Cord end terminal (3) Crimping tool

Preparing an OT terminal

Figure B-2 Preparing an OT terminal

(1) Cable (2) OT terminal (3) Heat shrink tubing

(4) Hydraulic pliers (5) Heat gun

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 76


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide C Installing Floating Nuts

C Installing Floating Nuts

This section describes the positions and procedures for installing floating nuts for
components of different heights.

Prerequisites
Required tools such as a flat-head screwdriver and protective gloves are available.

Procedure
Step 1 Determine the mounting holes for floating nuts based on the module height.

Figure C-1 Positions for installing floating nuts for a 1 U module

Figure C-2 Positions for installing floating nuts for a 2 U module

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 77


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide C Installing Floating Nuts

Figure C-3 Positions for installing floating nuts for a 3 U module

Figure C-4 Positions for installing floating nuts for a 4 U module

Step 2 Install floating nuts using a flat-head screwdriver.

NOTICE

When installing floating nuts, wear protective gloves and do not exert excessive
force. Otherwise, the flat-head screwdriver may hurt your hand or damage the
device.

Figure C-5 Installing a floating nut

----End

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 78


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide D Acronym and Abbreviation

D Acronym and Abbreviation

B
BBU baseband unit
BLVD battery low voltage disconnection

C
CAN control area network

D
DIN dry contact input
DO dry contact output

E
ESD electrostatic discharge
ESM energy storage module

F
FE fast Ethernet

I
ICC integrated controller and converter
IP Internet Protocol

L
LCD liquid crystal display
LLVD load low voltage disconnection

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 79


PowerCube 1000 (Saudi Electricity, ICC710-A1-C3)
Installation Guide D Acronym and Abbreviation

NetEco Network Ecosystem


NMS network management system

S
SIM subscriber identity module
SMU site monitoring unit

U
UIM user interface module

Issue 02 (2020-06-20) Copyright © Huawei Technologies Co., Ltd. 80