You are on page 1of 14

REVISIONS

NUMBER DATE REMARKS

002 2020 08 18 ISSUED FOR TENDER

001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.

ATA ARCHITECTS
ATA ARCHITECTS INC.

OAKVILLE OFFICE:
SIM 211 LAKESHORE ROAD EAST,
1 OAKVILLE ONTARIO L6J 1H7
SECTION HEAD CJ CONTROL JOINT
TABLE OF CONTENTS
A101 T 905 849 6986 F 905 849 4369
AL ALUMINUM E admin@ataarchitectsinc.com
# SHEET NAME ISSUED FOR TENDER Ref www.ataarchitectsinc.ca
HM HOLLOW METAL
1
A0.1 COVERSHEET & DRAWING LIST X CALLOUT HEAD AN ANODIZED
AD-000
A0.2 OBC MATRIX, SPRINKLER PLAN X
A0.3 MATERIAL, EQUIPMENT, WALL & CEILING SCHEDULE AND PHASING PLAN X PT PAINT
A0.4 CONSTRUCTION PHASE A X DOOR TAG FIN FINISH SEALS
A0.5 CONSTRUCTION PHASE B X
A0.6 CONSTRUCTION PHASE C X ENTRY ARROW FR FIRE RATING
A1.1 DETAILED PLANS X GWG GEORGIAN WIRED GLASS
A2.1 SECTIONS X 1t FLOOR TAG
A2.3 SECTIONS X TEMP TEMPERED
A2.4 SECTIONS X WM POSSIBLE WATER METER LOCATION
A2.5 FEATURE WALL DETAILS X 0 GRID BUBBLE
A2.6 MILLWORK X RWL RAIN WATER LEADER
A3.1 DETAILS X GC GENERAL CONTRACTOR
A3.2 DETAILS X
KC KIOSK CONTRACTOR
? MATERIAL TAG
PROJECT TITLE

ROOF TAG
1t
HUMBER COLLEGE FOOD
KEY PLAN Room name ROOM NAME TAG SERVICE - PHASE 1B (TECH KIOSK)
101

150 SF WALL TAG 205 HUMBER COLLEGE BLVD, ETOBICOKE,


ON M9W 5L7
W00 WINDOW TAG
DRAWING TITLE

HUMBER COLLEGE FOOD SERVICE - PHASE 1B (TECH KIOSK)


1 Ref
COVERSHEET & DRAWING LIST

Ref

Ref
A101 ELEVATION MARKER
1 1 DRAWN BY

TENDER DRAWINGS
1 Ref MK, AP, MJD
SCALE

ANNOTATION LEGEND 1 : 50
205 HUMBER COLLEGE BLVD, ETOBICOKE, ON M9W 5L7 1 : 50
DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

GENERAL NOTES 2020 08 18


PROJECT NO. 20-1352 1. ALL CONSTRUCTION TO MEET THE 2012 ONTARIO BUILDING CODE AND ALL APPLICABLE CODES.
2. INSPECT SITE CONDITIONS PRIOR TO QUOTING ON NEW WORK AND REPORT ANY DISCREPANCIES.
3. ENSURE THAT ALL CONSTRUCTION, MATERIALS, METHODS OF INSTALLATION AND TEMPORARY BRACING, COMPLY
CHECKED BY

WITH REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION.


4. SITE VERIFY ALL DIMENSIONS AND MAKE MODIFICATIONS TO SUIT EXISTING SITE CONDITIONS. MJD
5. MAKE GOOD ALL AREAS DISTURBED OR DAMAGED DURING CONSTRUCTION WHETHER SHOWN ON DRAWINGS OR
MECHANICAL & ELECTRICAL ARCHITECTURAL NOT. PROJECT NUMBER
6. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ANY AND ALL STRUCTURAL, MECHANICAL, ELECTRICAL,
SITE SERVICING AND LANDSCAPE DRAWINGS. REFER TO THESE DRAWINGS FOR EXACT LOCATION OF FINISHED
THE HIDI GROUP ATA ARCHITECTS INC. FITTINGS. COORDINATE STRUCTURAL, MECHANICAL, ELECTRICAL & LANDSCAPE WORK TO ENSURE THAT THE PARTS OF
20-1352
155 GORDON BAKER ROAD 211 LAKSHORE ROAD EAST THE WORK COME TOGETHER PROPERLY.
7. REPORT ALL CONTEMPLATED DEVIATIONS FROM THE DRAWINGS PRIOR TO MAKING CHANGES.
TORONTO ONTARIO M2H 3N5 OAKVILLE ONTARIO L6J 1H7 8. PROVIDE CUTTING, PATCHING AND REMEDIAL WORK IN ORDER TO ENSURE PARTS OF THE WORK COME TOGETHER
DRAWING NUMBER
T 416-364-2100 T 905-849-6986 PROPERLY.
F 416-364-2276 F 905-849-4369 9. ARRANGE FOR INSPECTIONS REQUIRED BY LOCAL BUILDING, PLUMBING, HYDRO, GAS, ETC., AUTHORITIES DURING
CONSTRUCTION AND FOR OCCUPANCY.
10. PROVIDE STRAPPING FOR WALLS AND BLOCKING AS REQUIRED & AS DETAILED.
11. DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS LABELED, "FOR CONSTRUCTION."

A0.1
2020-08-19 9:08:18 AM
PROJECT SUMMARY: 3.14 WATER SERVICE / Yes No
3.2.5.7***.
THIS MATRIX IS FOR THE RENOVATION OF AN EXISTING COFFEE AND HOT-FOOD AREA (JAVA JAZZ) INTO A TECH KIOSK. COMMENCING IN ONTARIO WATER SUPPLY IS ADEQUATE
IN SEPTEMBER OF 2020. THE EXISTING SPACE IS AN A2 OCCUPANCY. SPRINKLERS WILL BE ADDED TO THE SPACE INDICATED ON THE DRAWINGS. THIS
MATRIX IS SOLELY FOR THE TECH KIOSK SPACE ONLY BUT REFLECTS THE OCCUPANCY AND SIZE OF THE ENTIRE CAMPUS. 3.15 CONSTRUCTION TYPE: 3.2.2.23
RESTRICTION: COMBUSTIBLE NON-COMBUSTIBLE 3.2.2.49
PERMITTED REQUIRED
ACTUAL: COMBUSTIBLE 3.2.2.57
CONSULTANT: ATA ARCHITECTS INC. NON-COMBUSTIBLE BOTH
211 LAKESHORE ROAD
OAKVILLE, ONTARIO L6J 1H7 HEAVY TIMBER CONSTRUCTION: YES NO
NAME OF PROJECT: HUMBER COLLEGE - NORTH CAMPUS - PHASE 1B RENOVATION (NEW TECH KIOSK)
3.16 IMPORTANCE CATEGORY: LOW LOW HUMAN POST-DISASTER 4.1.2.1.(3) &
LOCATION: 205 HUMBER COLLEGE BLVD, ETOBICOKE, ON M9W 5L7 OCCUPANCY SHELTER T4.1.2.1.B
NORMAL
3.00 ONTARIO BUILDING CODE OBC REFERENCE
DATA MATRIX PART 3 HIGH MINOR STORAGE EXPLOSIVE OR
REFERENCES ARE TO DIVISION B BUILDING HAZARDOUS
UNLESS NOTED [A] FOR DIVISION A POST-DISASTER SUBSTANCES
OR [C] FOR DIVISION C.
3.17 SEISMIC HAZARD INDEX: (IE Fa Sa (0.2))= # 4.1.2.1.(3)
4.1.8.18.(2)
3.01 PROJECT TYPE: ADDITION AND RENOVATION NEW PART 3 SEISMIC DESIGN REQUIRED FOR TABLE 4.1.1.18. ITEMS 6 TO 21:
CHANGE OF USE (IE Fa Sa (0.2)) > 0.35 PR POST -DISASTER) YES NO
ADDITION
1.1.2.[A] 3.18 OCCUPANT LOAD FLOOR OCCUPANCY BASED OCCUPANT 3.1.17.
ALTERATION
DESCRIPTION: ____________ LEVEL/AREA TYPE ON LOAD (PERSONS)
CURRENTLY THE CAMPUS HAS INDIVIDUAL BUILDINGS THAT
ARE CONNECTED. AS PER THE ARCHITECT AND CODE ENTIRE CAMPUS A2 AREA REMAINS AS IS
3.02 MAJOR OCCUPANCY(S) ENTIRE CAMPUS: GROUP A DIVISION 2 3.1.2.1.(1) CONSULTANT, EVERYTHING IS NOW ONE BUILDING. THE
INDIVIDUAL BUILDINGS WILL NOW BE TREATED AS SUITES
3.03 Superimposed YES NO 3.2.2.7. AND THE OCCUPANCY OF EACH SUITE WILL REMAIN AS IS.
Major Occupancies:
DESCRIPTION: ____________ 3.19 BARRIER-FREE DESIGN YES NO 3.8.

3.04 1.4.1.2[A]
BUILDING AREA (m2) ENTIRE CAMPUS EXISTING 53,617 m2 NEW 0 m2 TOTAL 53,617 m2 3.20 HAZARDOUS SUBSTANCES YES NO EXISTING ASBESTOS IN THE TECH KIOSK 3.3.1.2. &
CEILING MUST BE REMOVED PRIOR TO 3.3.1.19.
START OF CONSTRUCTION. REFER TO DSS
TOTAL BUILDING (ENTIRE CAMPUS) EXISTING 53,617 m2 NEW 0 m2 TOTAL 53,617 m2 REPORT FROM HUMBER COLLEGE.

3.21 REQUIRED FIRE HORIZONTAL ASSEMBLY RATING SUPPORTING NONCOMBUSTIBLE IN LIEU OF RATING 3.2.2.24
RESISTANCE RATING ASSEMBLY (H)
3.05 GROSS AREA (m2) 1.4.1.2[A]
ENTIRE CAMPUS EXISTING 150,833 m2 NEW 150,833 m2 TOTAL 150,833 m2
FLOORS OVER BASEMENT 1HR 1HR YES NO N/A
TOTAL BUILDING (ENTIRE CAMPUS) EXISTING 150,833 m2 NEW 150,833 m2 TOTAL 150,833 m2

FLOORS 1HR 1HR YES NO N/A


3.06 MEZZANINE AREA (m2) 3.2.1.1
TOTAL BUILDING 1 EXISTING N/A NEW N/A TOTAL N/A
MEZZANINE N/A N/A YES NO N/A
N/A EXISTING 0 NEW m2 TOTAL m2

3.07 BUILDING HEIGHT 6 STOREYS ABOVE GRADE 60 (m) ABOVE GRADE 1.4.1.2[A] & ROOF N/A N/A YES NO N/A
3.2.1.1.
# STOREYS BELOW GRADE
3.22 SPATIAL SEPARATION: WALL EBF L.D. L/H REQUIRED CONSTRUCTION CLADDING 3.2.3.
3.08 HIGH BUILDING Yes No 3.2.6. AREA (m) OR FRR (H) TYPE REQUIRED TYPE REQUIRED
(m2) H/L
3.09 NUMBER OF STREETS/FIRE FIGHTER ACCESS 1 STREET(S) 3.2.2.10. & NO CHANGE - INTERIOR RENOVATION
3.2.5. NONCOMBUSTIBLE NONCOMBUSTIBLE

3.10 BUILDING CLASSIFICATION GROUP A, DIVISION 2, UP TO 6 STOREYS, ANY AREA, SPRINKLERED 3.2.2.24 RATIO:
3.23 PLUMBING MALE :FEMALE = 50:50 EXCEPT AS NOTED OTHERWISE 3.7.4.
FIXTURE
REQUIREMENTS: FLOOR OCCUPANT OBC FIXTURES FIXTURES
3.11 SPRINKLER SYSTEM REQUIRED NOT REQUIRED 3.2.1.5. &
LEVEL/AREA LOAD REFERENCE REQUIRED PROVIDED
3.2.2.17.
PROPOSED: ENTIRE BUILDING SELECTED COMPARTMENT NO CHANGE ENTIRE CAMPUS # 0.0.0.0 # #

SELECTED FLOOR AREAS BASEMENT


3.24 ENERGY COMPLIANCE PATH: NO CHANGE TO EXTERIOR OF THE BUILDING
EFFICIENCY:
IN LIEU OF ROOF RATING NONE NO CHANGE TO EXTERIOR OF THE BUILDING
CLIMATIC ZONE:
3.12 STANDPIPE - REQUIRED NOT REQUIRED REQUIRED 3.2.9.
3.25 NOTES: SEE ATTACHED LETTER FROM THE CODE CONSULTANT, AND REFER TO THE SPRINKLER PLAN OF THE ENTIRE CAMPUS.
3.13 FIRE ALARM REQUIRED Yes No 3.2.4.

OBC - PART 3
1 : 10

THE ONTARIO BUILDING CODE | GROUP A, DIVISION 2, UP TO 6 STOREYS, ANY AREA, SPRINKLERED
3.2.2.24. Group A, Division 2, up to 6 Storeys, Any Area, Sprinklered

(1) A building classified as Group A, Division 2, that is not limited by building area, is permitted to conform to Sentence (2) provided,

(a) except as permitted by Sentence 3.2.2.7.(1), the building is sprinklered, and

(b) it is not more than 6 storeys in building height.

(2) Except as permitted by Article 3.2.2.16., the buildingreferred to in Sentence (1) shall be of noncombustible construction, and,
NON-SPRINKLERED AREA

(a) floor assemblies shall be fire separations with a fire-resistance rating not less than 1 h,
SPRINKLERED AREA
(b) mezzaninesshall have a fire-resistance rating not less than 1 h, and

(c) all loadbearingwalls, columns and arches shall have a fire-resistance rating not less than that required for the supported assembly. SPRINKLERING FOR
PHASE 1B

2 CODE REFERENCE
A0.2 1:5
TECH KIOSK

REVISIONS
STUDENT PATHWAYS

ACCESS
NUMBER DATE REMARKS

SPRINKLERED AREA
ACCESS

ACCESS
002 2020 08 18 ISSUED FOR TENDER
PROJECT SUMMARY: ACCESS 001 2020 08 04 TENDER
THIS MATRIX IS FOR THE RENOVATION OF AN EXISTING COFFEE AND HOT-FOOD AREA (JAVA JAZZ) INTO A TECH KIOSK. COMMENCING IN ONTARIO
IN SEPTEMBER OF 2020. THE EXISTING SPACE IS AN A2 OCCUPANCY. SPRINKLERS WILL BE ADDED TO THE SPACE INDICATED ON THE DRAWINGS. THIS CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
MATRIX IS SOLELY FOR THE TECH KIOSK SPACE ONLY BUT REFLECTS THE OCCUPANCY AND SIZE OF THE ENTIRE CAMPUS. ACCESS ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
CONSULTANT: ATA ARCHITECTS INC. ACCESS DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
211 LAKESHORE ROAD
OAKVILLE, ONTARIO L6J 1H7 ATA ARCHITECTS
NAME OF PROJECT: HUMBER COLLEGE - NORTH CAMPUS - PHASE 1B RENOVATION (NEW TECH KIOSK) ATA ARCHITECTS INC.

LOCATION: 205 HUMBER COLLEGE BLVD, ETOBICOKE, ON M9W 5L7 OAKVILLE OFFICE:
211 LAKESHORE ROAD EAST,
OBC REFERENCE OAKVILLE ONTARIO L6J 1H7
ITEM ONTARIO'S 2012 BUILDING CODE
DATA MATRIX - PART 11 - RENOVATION OF EXISTING BUILDING
UNSPRINKLERED T 905 849 6986 F 905 849 4369
PHASE 2A
AREA E admin@ataarchitectsinc.com
ACCESS www.ataarchitectsinc.ca

IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ALL STUDENT PATHWAYS


PHASE 2B PHASE 2B PHASE 1A THROUGHOUT THE CONSTRUCTION. CONSTRUCTION HOARDING MUST BE
11.1 EXISTING BUILDING DESCRIBE EXISTING USE: COFFEE KIOSK (JAVA JAZZ) 11.2.1 DESIGNED AND IMPLEMENTED IN A MANNER IN WHICH TO KEEP THE PUBLIC
CLASSIFICATION T 11.2.1.1A SAFE AND TO MAINTAIN SAFE ACCESSIBILITY TO ALL HUMBER FACILITIES. THE SPACE
BLUE AREA IS WILL REMAIN OPEN DURING CONSTRUCTION.
SEALS
CONSTRUCTION INDEX: T 11.2.1.1B TO N PHASE 1B
RETAIL HUB
A2.X PLANS
SCOPE OF WORK (1B)
HAZARD INDEX: UNSPRINKLERED
AREA
NEW TECH KIOSK, NEW
NOT APPLICABLE (NO CHANGE SPRINKLERS, FLOOR AND CEILING.

ACCESS

ACCESS

AC
OF MAJOR OCCUPANCY

C
ES
S
ACCESS
11.2 ALTERATION TO EXISTING BASIC RENOVATION 11.3.3.1 SPRINKLERED AREA
BUILDING IS: 11.3.3.2
EXTENSIVE RENOVATION

ACCESS
11.3 REDUCTION IN STRUCTURAL NO YES 11.4.2.1
PERFORMANCE LEVEL BY INCREASE IN OCCUPANCY NO YES 11.4.2.2 ACCESS PROJECT TITLE

S
NO YES 11.4.2.3

ES
BY CHANGE OF MAJOR OCCUPANCY

C
NO YES 11.4.2.4

AC
PLUMBING
SEWAGE SYSTEM
NO YES 11.4.2.5
HUMBER COLLEGE FOOD

AC
C
ES
11.4 COMPENSATING STRUCTURAL YES 11.4.3.2 SERVICE - PHASE 1B (TECH KIOSK)

S
NO
CONSTRUCTION: (EXPLAIN)
UNSPRINKLERED
AREA
205 HUMBER COLLEGE BLVD, ETOBICOKE,
ON M9W 5L7

S
ES
INCREASE IN OCCUPANY LOAD YES 11.4.3.3

C
NO

AC
(EXPLAIN)
DRAWING TITLE
ACCESS OBC MATRIX, SPRINKLER PLAN

AC
CE
ACCESS

SS
CHANGE OF MAJOR OCCUPANCY NO YES 11.4.3.4 DRAWN BY
(EXPLAIN)
AREA OF WORK
MK, AP, MJD
SCALE
PLUMBING NO YES 11.4.3.5
(EXPLAIN) As indicated
REMOVAL OF ANY PLUMBING FIXTURES FROM THE EXISTING JAVA JAZZ. NEW
TECH KIOSK'S PLUMBING SCOPE IS LIMITED TO THE SPRINKLER ADDITON. DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

YES
2020 08 18
SEWAGE SYSTEM NO 11.4.3.6
(EXPLAIN) CHECKED BY
NO PROPOSED SEWAGE SYSTEM IN THE NEW TECH KIOSK DESIGN
MJD
PROJECT NUMBER

11.5 COMPLIANCE
NO REFER TO OBC MATRIX PART 3 11.5.1
ALTERNATIVES 20-1352
PROPOSED:
YES (EXPLAIN)
DRAWING NUMBER

11.6 ALTERNATIVE MEASURES


NO REFER TO OBC MATRIX PART 3 11.5.2
PROPOSED:
YES (EXPLAIN)

A0.2
2020-08-19 9:08:24 AM

OBC - PART 11 1 CAMPUS SPRINKLER PLAN


1 : 10 A0.2 1 : 1000
1052 1900
1938
547 MATERIAL SCHEDULE
950 38 950 457
950 950 950 FLOOR TILES:
HOLD OPEN DEVICES HOLD OPEN DEVICES N101 - HEXAGONAL WALL & FLOOR TILE - CENTURA - MIKI TECHNO MBU-xx/1X - BLACK - 1" TILE (2.3X2.6CM) - UNGLAZED MOSAIC - GROUT: DARK GREY
N102 - WHITE FLOOR TILE - CENTURA - SUPER WHITE - #SUWH1224P - 30X60CM - POLISHED - GROUT: DARK GREY
N103 - BLACK STORAGE ROOM FLOOR TILE - CENTURA - BLACK NU-STONE MATTE - #GMR97M1224N - 30X30CM - MATTE - GROUT: DARK GREY
N104 - SLATE CORRIDOR FLOOR TILE - COBY SLATE NATURAL CLEFT - 30X60CM - GROUT: DARK GREY
DOOR CLOSER DOOR CLOSER DOOR CLOSER DOOR CLOSER DOOR CLOSER N110 - SCHLUTER RENO-U SMOOTH TRANSITION STRIP - STAINLESS STEEL
ON PUSH SIDE N111 - SCHLUTER SCHIENE RADIUS - STAINLESS STEEL
(DOOR OPENING
PAINT DOOR AND WALL TILES/ CLADDING:
180 DEGREES) PAINT DOOR
FRAME COLOUR N201 - STAINLESS STEEL CORRIDOR COLUMN CLADDING - NELSON INDUSTRIAL INC. - #4 BRUSHED
FL01 - TECH KIOSK BLACK FLOOR FINISH FL02 - TECH KIOSK WHITE FLOOR FINISH FL03 - STORAGE ROOM FLOOR FINISH AND FRAME
SUPPLIED N202 - HEXAGONAL WALL AND COLUMN TILE - CENTURA - MIKI TECHNO MBU-xx/1X - BLACK - 1" TILE (2.3X2.6CM) - UNGLAZED MOSAIC - GROUT: DARK GREY
- NEW PORCELAIN TILE - NEW PORCELAIN TILE - NEW PORCELAIN TILE COLOUR
EX EXIST - EXISTING FLOOR FL01 FL02 FL03 BY ARCHITECT N210 - NEW PAINT (COLOUR TO BE SELECTED BY THE ARCHITECT)
- REFER TO FLOOR PLANS AND SPECIFICATIONS - REFER TO FLOOR PLANS AND SPECIFICATIONS - REFER TO FLOOR PLANS AND SPECIFICATIONS SUPPLIED
- N101 - BLACK HEXAGONAL FLOOR TILE - N102 - WHITE TILE - N103 - BLACK PORCELAIN TILE FIRE LITE GLASS FIRE LITE GLASS FIRE LITE GLASS FIRE LITE GLASS
BY ARCHITECT
NOTE: ALL GROUT IS TO BE DARK GREY - ARCHITECT IS TO PICK FINAL COLOUR DURING CONSTRUCTION

2172
2172

2134

2128
2134
2121

2083
2083
CEILING:
N301 - TECH KIOSK AND FEATURE WALL CEILING - ARKTURA - VAPOR PANEL CEILING (SOLID PANEL) 2'-0" x 4'-0" - BLACK IS BLACK - MIRROR FINISH
HINGE FOR N302 - STORAGE ROOM AND CORRIDOR CEILING - ARMSTRONG - FINE FISSURED SQUARE TILE (1830) - 24" X 24" - INFINITY ENGINEERED PERIMETER TRIM WHITE.
DEADBOLT PANIC AND LATCH PANIC AND PANIC AND DEADBOLT
180 DEGREE CEILING GRID TO BE ARMSTRONG 15/16 PRELUDE XL AS PER HUMBER COLLEGE STANDARD SPECIFICATIONS.
& LATCH LATCH ON PUSH &
OPENING
LATCH HM DOOR FRAME ON PUSH SIDE OF SIDE OF DOOR LATCH
CORIAN:
DOOR (REFER TO
N401 - CIRCUITS FOR TECH KIOSK - CORIAN - DESIGNER WHITE - 19MM THICK PANELS
A0.6) HM DOOR
HM DOOR
FRAME FEATURE WALL:
N501 - FEATURE WALL PERFORATED PANEL - ARKTURA - CUSTOM VAPOR PANEL (VAPOR CLUSTER SPARSE) - 2'-0" x 4'-0" - ARKTURA WHITE
HM DOOR N502 - FEATURE WALL METAL PANEL - ARKTURA - VAPOR PANEL CEILING (SOLID PANEL) - 2'-0" x 4'-0" - BLACK IS BLACK - MIRROR FINISH

FL04 - CORRIDOR FLOOR FINISH COUNTERTOP / GLASS:


- NEW PORCELAIN TILE DR01 DR02 DR03 DR04
FL04 N601 - OMNIFY LIGHTING COUNTERTOP - OMNIFY OMNIFROST - PART NUMBER 121914. SERIES LLP - 1" THICK PANEL , COVER WITH 25MM CLEAR TEMPERED GLASS,
- REFER TO FLOOR PLANS AND SPECIFICATIONS WITH A CLEAR 3M FILM FOR PROTECTION.
- N104 - HUMBER STANDARD SLATE TILE TYPICAL NOTE: HM DOOR W/ CLOSER, LEVER HARDWARE HM DOORS AND FRAMES WITH 1 HR RATING W/ CLOSER, HM DOORS, FRAMES, AND CENTRE POST WITH 1 HR
ANY DOOR RECEIVING A MODECO AND DEADBOLT - INCLUDE WALL BASED LEVER HARDWARE AND ELECTRONIC HOLD OPEN RATING W/ CLOSER, LEVER HARDWARE AND ELECTRONIC N602 - CLEAR TEMPERED GLASS PANELS - TEMPERED GLASS - CLEAR
CYLINDER IS TO BE INSTALLED BY TYCO. STOPS DEVICES - INCLUDE WALL BASED STOPS HOLD OPEN DEVICES - INCLUDE WALL BASED STOPS N603 - YELLOW TEMPERED GLASS PANELS - TEMPERED GLASS - YELLOW

N701 - RED STEEL HSS


N702 - BLOCKING
N703 - 19MM PLYWOOD
1 FLOOR TYPES 6 DOOR SCHEDULE N704 - CURVED PLYWOOD
A0.3 1 : 25 A0.3 1 : 25 N705 - CURVED STAINLESS STEEL - BRUSHED #4 FINISH
N706 - SHELF

MATERIAL SCHEDULE - PHASE 1B


1 : 50

C01 - NEW TECH KIOSK & FEATURE WALL METAL CEILING


C02 - NEW ACT CEILING (TO REPLACE REMOVAL OF ALL EXISTING ACT CEILING) DOOR SCHEDULE HUMBER 1B - EQUIPMENT SCHEDULE
- ARMSTRONG FINE FISSURED SQUARE TILE - 2' x 2'
- ARKTURA VAPOR PANEL CEILING (SOLID PANEL) - 2' x 4'
- COLOR: INFINITY ENGINEERED PERIMETER TRIM WHITE NOMINAL DOORS FRAME GLAZING HARDWARE EQUIPMENT
- COLOR: BLACK IS BLACK (MIRROR FINISH)
EXIS - HUMBER'S STANDARD CEILING TILE

THERMALLY BROKEN
EXISTING STRUCTURE ABOVE - HUNG FROM EXISTING STRUCTURE TYPE DESCRIPTION QUANTITY TO BE SUPPLIED BY
- HUNG FROM EXISTING STRUCTURE
- N301 - ARKTURA VAPOR PANEL CEILING

PRIVACY LOCK
LEVER HANDLE

PANIC DEVICE
- N302 - ARMSTRONG CEILING TILE

DOOR SWEEP

CENTRE POST
-MATCHING BLACK CEILING GRID E101 STORAGE ROOM - TABLE CHARGING CART - EXISTING AND WILL BE PROVIDED BY HUMBER 2 SUPPLIED BY HUMBER

DOOR STOP

COMMENTS
PUSH / PULL
THRESHOLD
-WHITE CEILING GRID

KICK PLATE
OPERATOR

DEADBOLT
HLD OPEN
E102 STORAGE ROOM - ULINE - DOUBLE TIER LOCKERS INDUSTRIAL (6 LOCKERS) - MODEL NO. H-1225GR - COLOR: GREY 1 SUPPLIED BY GC, INSTALLED BY GC

CLOSER
FIRELITE
HEIGHT

WIDTH
E103 STORAGE ROOM - FLAT SCREEN CART - EXISTING AND WILL BE PROVIDED BY HUMBER 1 SUPPLIED BY HUMBER

TEMP
MAT

MAT
FIN

FIN
DOOR# FLOOR F.R. E104 STORAGE ROOM - TELEVISION - EXISTING AND WILL BE PROVIDED BY HUMBER. 1 SUPPLIED BY HUMBER
E105 STORAGE ROOM - SUSTEMA - F-500 INTEGRATED TECH BENCH WORK STATION - 96" x 30" TABLE WITH INTEGRATED SHELVING AND POWER - SUSTEMA TO PROVIDE SHOP DRAWINGS FOR REVIEW 1 SUPPLIED BY GC, INSTALLED BY GC
01 - MAIN FLOOR E106 STORAGE ROOM - ULINE - SOLID STAINLESS STEEL SHELVING - MODEL NO. H-5469 1 SUPPLIED BY GC, INSTALLED BY GC
DR01 01 - MAIN FLOOR 2134 950 HM PT HM PT X X X X X E107 STORAGE ROOM - HP - PLOTTER - HP PAGEWIDE XL 5100 PRINTER SERIES - EXISTING AND WILL BE PROVIDED BY HUMBER 1 SUPPLIED BY HUMBER
DR02 01 - MAIN FLOOR 2134 1900 HM PT HM PT 1 HR X X X X X X X E201 TECH KIOSK - POP-UP ELECTRICAL OUTLET WITH USB AND QI CHARGING - MODEL NO. PUR15-RWT-2USB-QI - COLOR: WHITE 11 SUPPLIED BY GC, INSTALLED BY GC
DR03 01 - MAIN FLOOR 2134 1938 HM PT HM PT 1 HR X X X X X X X X DOUBLE-EGRESS PAIR E202 TECH KIOSK - CEILING FEATURE "CAPACATOR" - ARMSTRONG - AXIOM PAIRED CURVED - MODEL NO. AX6CUR - 6" AXIOM CLASSIC TRIM (CURVED) WITH A 5/8" REVEAL - COLOR: BLIZZARD WHITE 12 SUPPLIED BY GC, INSTALLED BY GC
DR04 01 - MAIN FLOOR 2083 457 HM PT HM PT X X X X E301 FEATURE WALL - TELEVISION - SAMSUNG - 85" 4K UHD HRD QLED TIZEN SMART TV - MODEL NO. QN85Q70TAFXZC - COLOR: BLACK 1 SUPPLIED BY HUMBER, INSTALLED BY HUMBER IT/AV
C03 - FRAMED BULKHEAD (COORDINATE WITH GC OR KC)
- METAL STUD FRAMING
-16MM TYPE X DRYWALL CEILING

PHASING SUMMARY

PHASE IA - MAY 2020 - AUG 2020


JAVA JAZZ IS CONSTRUCTED IN A NEW PROPOSED LOCATION (EXISTING JAVA JAZZ TO REMAIN UNTIL NEW
JAVA JAZZ IS FULLY COMPLETE, AT WHICH POINT EXISTING JAVA JAZZ IS TO BE DEMOLISHED IN NEXT PHASE
2 CEILING TYPES
A0.3 1 : 25

SCOPE OF WORK IS PHASE IB - SEPT 2020 - AUG 2021


FOR PHASE 1B ONLY EXISTING JAVA JAZZ IS DEMOLISHED
NOTE: WALL MEMBRANES ARE LISTED FROM LEFT TO
RIGHT - SEE WALL MEMBRANES IN SCHEDULE
NEW TECH KIOSK IS IMPLEMENTED IN PLACE OF EXISTING JAVA JAZZ
PHASE 02A - MAY 2021 - AUG 2022
NEW BOOK STORE IS CREATED
NEW SUBWAY IS CREATED
EX-1 P01 P02 P03 PHASE 02B - SEPT 2022 - AUG 2023
BOOKSTORE SPACE REDEVELOPED INTO THE TOWNSQUARE / RETAIL HUB CONCEPT
BACKEND OF BOOKSTORE IS CREATED

P01 - NEW STUD WALL


P03 - NEW STUD WALL PHASE 03 - SEPT 2023 - AUG 2024
P02 - NEW FURRING WALL - FEATURE WALL - 16MM DRYWALL
- 16MM DRYWALL
12.7MM DRYWALL - 152MM STEEL STUD & SAFB INSULATION EXISTING KITCHEN IS RENOVATED AND UPDATED
- 152MM STEEL STUD & SAFB INSULATION
89MM STEEL STUD - 16MM CEMENT BOARD
- 16MM DRYWALL
- NEW TILE - SEE MATERIAL SCHEDULE FOOD STREET CONCEPT IS IMPLEMENTED

CONSTRUCT AS PER ULC


W-453 - 1 HOUR RATING

*WHERE TILE IS SPECIFIED, REPLACE DRYWALL


WITH 16MM CEMENT BOARD 4

N301 E202
N301 CEILING & BULKHEAD IS TO BE INSTALLED
BY KIOSK MANUFACTURER
3 WALL TYPES
A0.3 1 : 25

MATERIALS FLOOR TILE


MATERIAL TAG N101 N102 N103 N104 N401
REVISIONS

NUMBER DATE REMARKS


DESCRIPTION OF MATERIAL TECH KIOSK BLACK TILE TECH KIOSK WHITE TILE STORAGE ROOM TILE CORRIDOR FLOOR TILE N602
• MANUFACTURER • CENTURA • STONETILE - • CENTURA • SLATE TILE BY ACME SLATE
• COLOR & MATERIAL NAME • MIKI TECHNO MBU-xx/1X - BLACK • CHROMATICA (PORCELAIN) - ICE COLOR • BLACK NU-STONE MATTE - #GMR97M1224N • COBY SLATE NATURAL CLEFT
N401
• SIZE (IF APPLICABLE) • 1" TILE (2.3cm X 2.6cm) • 15cm X 120cm • 30cm X 30cm • 30cm X 60cm
• FINISH (IF APPLICABLE) • UNGLAZED MOSAIC, GROUT TO BE DARK GREY • MATTE, GROUT TO BE DARK GREY • MATTE, GROUT TO BE DARK GREY • STANDARD FINISH, GROUT TO BE DARK GREY
• GROUT COLOR (IF APPLICABLE) • BY GC • BY GC • BY GC • BY GC

N705

N603 STRUCTURE IS TO BE
SELF-SUPPORTING AND IS TO KIOSK COMPANY TO SUPPLY AND INSTALL ALL
BE AFFIXED TO THE SLAB ELEMENTS SHOWN HERE. EVERYTHING NOT
SHOWN WILL BE SUPPLIED BY THE GC. GC IS TO
N705 PROVIDE ROUGH-IN FOR ALL KIOSK
CONTRACTOR ELEMENTS

5 TECH KIOSK - KIOSK MANUFACTURER SCOPE OF WORK 002 2020 08 18 ISSUED FOR TENDER
MATERIAL SAMPLE TILE A0.3 SCOPE OF WORK BREAKDOWN (THIS IS A BREAKDOWN OF THE INDIVIDUALIZED SCOPE OF WORK FOR THE GENERAL CONTRACTOR AND THE
WORK FOR THE KIOSK CONTRACTOR) 001 2020 08 04 TENDER

- A KIOSK CONTRACTOR (KC) WILL BE TAKING ON THE SUPPLY AND INSTALLATION OF THE TECH KIOSK AND THE FEATURE WALL (DISPLAY WALL) CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
UNDER AN ALLOWANCE. ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
- GC IS TO COORDINATE ALL WORK ON SITE, WITH ALL CONSULTANTS AND KIOSK CONTRACTOR. BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
- REFER TO THE CONSTRUCTION PHASING PLANS.
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND
KIOSK MANUFACTURER SCOPE OF WORK: SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
- SUPPLY AND INSTALLATION OF "CORIAN CIRCUITS" AND ALL MILLWORK, STRUCTURE, STORAGE, AND GLASS PANELS IN THE TECH KIOSK DESIGN. DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
- SUPPLY AND INSTALLATION OF THE FEATURE WALL, WITH INTEGRATED LIGHTING, CONTROLS, AND MATERIALS.
- LIGHTING INSIDE OF THE KIOSK AND WITHIN THE FEATURE WALL. ATA ARCHITECTS
- COORDINATE WITH GC TO INSTALL THE TELEVISION INSIDE OF THE FEATURE WALL. ATA ARCHITECTS INC.
KIOSK COMPANY TO SUPPLY AND INSTALL - SUPPLY AND INSTALLATION OF THE DISPLAY AREA WITH A LIGHT-UP SHELF.
THE FEATURE WALL. REFER TO FEATURE WALL OAKVILLE OFFICE:

COLUMNS CEILING CORIAN DRAWINGS FOR DETAILS. COORDINATE GENERAL CONTRACTOR'S SCOPE OF WORK: 211 LAKESHORE ROAD EAST,
WITH GC AND ARCHITECT. -GC IS RESPONSIBLE FOR ALL PROJECT WORK, OTHER THAN WHAT IS PROVIDED BY THE KIOSK CONTRACTOR. OAKVILLE ONTARIO L6J 1H7
-THIS INCLUDES: DEMOLITION WORK. ALL CEILING TILES, FLOOR TILES, NEW WALLS, NEW DOORS, SPRINKLER COORDINATION, ELECTRICAL
ROUGH-IN AND COORDINATION. T 905 849 6986 F 905 849 4369
E admin@ataarchitectsinc.com

N201 N301 N302 N401 8 FEATURE WALL - KIOSK MANUFACTURER SCOPE OF WORK
www.ataarchitectsinc.ca

A0.3

CORRIDOR COLUMN CLADDING TECH KIOSK & FEATURE WALL CEILING STORAGE ROOM & CORRIDOR CEILING CIRCUITS - TECH KIOSK
• ARKTURA VAPOR PANEL CEILING (SOLID PANEL) SEALS
• SEE DETAILS & ALTERNATES • 2'-0" x 4'-0" • ARMSTRONG, FINE FISSURED SQUARE TILE • CORIAN
• BY GC • BLACK IS BLACK (MIRROR FINISH), BLACK CEILING • 24" X 24" INFINITY ENGINEERED PERIMETER TRIM • DESIGNER WHITE
GRID (1830) WHITE • 19mm THICK PANELS (SEAMLESS)
• BY KC • BY GC • BY KC

DEMOLITION AND INSTALLATION OF


ALL NEW TILE TO BE DONE BY THE
GC
PROJECT TITLE
1 2 3
HUMBER COLLEGE FOOD
SERVICE - PHASE 1B (TECH KIOSK)
P01

205 HUMBER COLLEGE BLVD, ETOBICOKE,


ON M9W 5L7

DRAWING TITLE
A
MATERIAL, EQUIPMENT, WALL & CEILING
FEATURE WALL COUNTERTOP/GLASS DRAWN BY
SCHEDULE AND PHASING PLAN

N501 N502 N601 N602 N603 MK, AP, MJD

FEATURE WALL - PERFORATED PANEL FEATURE WALL - METAL PANELS OMNIFY LIGHTING - COUNTERTOP TEMPERED GLASS PANELS (CLEAR) TEMPERED GLASS PANELS (YELLOW) SCALE
• OMNIFY - OMNIFROST
• ARKTURA • ARKTURA • PART NUMBER - 121914. SERIES LLP; 1" THICK PANEL • TEMPERED GLASS • TEMPERED GLASS
• CUSTOM VAPOR PANEL (VAPOR CLUSTER SPARSE) • VAPOR PANEL CEILING (SOLID PANEL) • KIOSK MANUFACTURER IS TO PROVIDE AN • BY KC • BY KC As indicated
• 2'-0" x 4'-0" ARKTURA WHITE • 2'-0" x 4'-0" BLACK IS BLACK (MIRROR FINISH) ALTERNATE PRICE TO EXCHANGE N601 WITH WHITE
• BY KC • BY KC CORIAN BY KC DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

2020 08 18
B CHECKED BY

MJD
ALL MILLWORK, INCLUDING THE PROJECT NUMBER
CIRCUIT BOARD DESIGN AND THE
FEATURE WALL IS TO BE SUPPLIED
AND INSTALLED BY THE KIOSK 20-1352
MANUFACTURER
C DRAWING NUMBER

A0.3
2020-08-19 9:08:39 AM

1 2 3 4

7 MATERIAL SCHEDULE 4 GC'S AND KIOSK CONTRACTOR'S SCOPE OF WORK


A0.3 1:1 A0.3 1 : 125
EXISTING JAVA JAZZ (CORRIDOR) FRONT VIEW EXISTING JAVA JAZZ (CORRIDOR) REAR VIEW EXISTING RAMP AND STAIRCASE EXISTING CORRIDOR (ON THE BOOKSTORE SIDE) EXISTING CORRIDOR (UNDER EXISTING CORRIDOR (UNDER
ABATEMENT) ABATEMENT)
- ALL CEILING TILES HAVE BEEN REMOVED IN THIS CORRIDOR FOR THE INSTALLATION OF SPRINKLERS IN THE NEXT - ALL FURNITURE TO BE RELOCATED. EXISTING BULKHEADS ARE PARTIALLY TO BE DEMOLISHED AS - DURING PHASE A (CEILING DEMOLITION). 2, FIRE-RATED DOUBLE DOORS ARE TO BE ADDED AT THE END OF THE RAMP AND STAIRCASE (REFER TO - DURING PHASE A (CEILING DEMOLITION). 2, FIRE-RATED DOUBLE DOORS ARE TO BE ADDED AT THE END OF THE RAMP AND STAIRCASE (REFER
PHASE. PER ARCHITECTURAL DRAWINGS. PHASING DRAWING/PLANS FOR DETAILS). - ALL CEILING TILES HAVE BEEN REMOVED IN THIS CORRIDOR FOR THE INSTALLATION OF SPRINKLERS IN THE NEXT TO PHASING DRAWING/PLANS FOR DETAILS). ALL CEILING TILES ARE TO BE REMOVED FOR THE INSTALLATION OF SPRINKLERS IN THE NEXT PHASE - CEILING TILES ARE TO STAY - CEILING TILES ARE TO STAY
PHASE. REMOVED UNTIL THE INSTALLATION REMOVED UNTIL THE INSTALLATION
OF ALL SPRINKLERS HAS BE OF ALL SPRINKLERS HAS BE
COMPLETED COMPLETED

EXISTING WOMEN'S WASHROOM AND RATED DOUBLE DOOR


EXISTING CORRIDOR BETWEEN NEW JAVA JAZZ AND LRC CORRIDOR
- ALL WALLS ARE TO BE DEMOLISHED. ALL CEILING TILES HAVE BEEN REMOVED IN THIS CORRIDOR FOR THE INSTALLATION OF SPRINKLERS IN THE NEXT PHASE.
- AT THE END OF THIS CORRIDOR, AT 2 LOCATIONS WILL BE THE INSTALLATION OF FIRE RATED
DOORS (REFER TO DRAWINGS FOR LOCATIONS AND SIZES OF DOORS). ALL CEILING TILES AND
BULKHEADS ARE TO BE REMOVED FOR THE INSTALLATION OF SPRINKLERS

EXISTING JAVA JAZZ INTERIOR VIEW EXISTING CORRIDOR (BETWEEN NEW JAVA JAZZ AND NEW TECH KIOSK LOCATION OF ONE OF THE FIRE RATED DOORS LOCATION OF ONE OF THE FIRE RATED DOORS EXISTING JAVA JAZZ (REAR CORRIDOR) JOINING THE SPRINKLERED AREA EXISTING CORRIDOR (UNDER
TO THE RIGHT ABATEMENT)
- ALL CEILING TILES AND BULKHEADS ARE TO BE TOTALLY REMOVED FOR - ALL CEILING TILES HAVE BEEN REMOVED IN THIS CORRIDOR FOR THE - SEE PLAN FOR DETAILS - SEE PLAN FOR DETAILS
THE INSTALLATION OF SPRINKLERS IN THE NEXT PHASE INSTALLATION OF SPRINKLERS IN THE NEXT PHASE. - THE AREA TO THE RIGHT OF JAVA JAZZ IS CURRENTLY SPRINKLERED, - CEILING TILES ARE TO STAY REMOVED
ONCE ALL THE SPRINKLERS SHOWN IN THE PHASING AND SPRINKLER PLAN UNTIL THE INSTALLATION OF ALL
HAVE BEEN INSTALLED. THE DEMOLITION OF THE JAVA JAZZ CAN BEGIN SPRINKLERS HAS BE COMPLETED

11
A3.1
3 4
DR03 4

P01

EXISTING WALL MUST BE CONSTRUCTED TO UNDERSIDE


SPRINKLERED AREA OF DECK
OUTSIDE OF EXISTING
INSTALLATION OF NEW PROJECT SCOPE NEW WALLS, HOLLOW SPRINKLERED AREA
SPRINKLER SYSTEM IS TO TAKE METAL
PLACE AFTER HOURS FRAMES & DOOR ON
HOLD-OPEN DEVICE

INSTALLATION OF NEW SPRINKLER


NOT IN SCOPE SYSTEM
WALL MUST BE CONSTRUCTED
TO UNDERSIDE
OF DECK

P01

DR02 NEW WALLS, HOLLOW


METAL
FRAMES & DOORS ON
HOLD-OPEN DEVICES

INSTALLATION OF NEW SPRINKLER SYSTEM REVISIONS


INSTALLATION OF NEW
SPRINKLER SYSTEM IS TO NUMBER DATE REMARKS
TAKE PLACE AFTER HOURS

EX
INSTALLATION OF SPRINKLERS
IN THIS AREA IS TO TAKE
PLACE AFTER
HOURS

INSTALLATION OF SPRINKLERS
IN THIS AREA IS TO TAKE
CEILING TO REMAIN PHASE A PLACE AFTER
002 2020 08 18 ISSUED FOR TENDER
REMOVE CEILING HOURS
TILES TO INSTALL • INSTALLATION OF NEW RATED WALL 001 2020 08 04 TENDER
SPRINKLERS (TO TAKE SYSTEMS & HOLD OPEN RATED DOORS
INSTALLATION OF NEW INSTALLATION OF NEW SPRINKLER SYSTEM
PLACE AFTER • ABATEMENT WORK REQUIRED WITHIN THE CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
SPRINKLER SYSTEM IS TO
NOT IN SCOPE HOURS) JAVA JAZZ SPACE ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
TAKE PLACE AFTER HOURS
• CEILING TILES AND GRID ARE TO BE BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
REMOVED IN THE CORRIDOR AND IN THE
JAVA JAZZ SPACE CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND
• EXISTING EXPOSED STEEL STRUCTURE IN SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
ORIGINAL JAVA JAZZ ARE TO BE FIRE- DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
PROOFED TO A 1-HOUR RATING
• NEW SPRINKLERS ARE TO BE ADDED AND ATA ARCHITECTS
TO BE OPERATIONAL ATA ARCHITECTS INC.
INSTALLATION OF NEW SPRINKLER SYSTEM
OAKVILLE OFFICE:
TYPICAL NOTE:
INSTALLATION OF NEW GENERAL NOTES 211 LAKESHORE ROAD EAST,
SPRINKLER SYSTEM IS TO OAKVILLE ONTARIO L6J 1H7
ALL CEILING WORK, AND INSTALLATION WORK OF SPRINKLERS IS CEILING TO REMAIN
TO BE DONE DURUING THE NIGHT (AFTER HOURS). TAKE PLACE AFTER HOURS • STUDENT PATHWAYS OF TRAVEL ARE TO
REMOVE CEILING TILES REMAIN OPEN DURING ENTIRE PROJECT. T 905 849 6986 F 905 849 4369
TO INSTALL IT IS THE GENERAL CONTRACTOR’S E admin@ataarchitectsinc.com
NEW WALLS, HOLLOW METAL www.ataarchitectsinc.ca
SPRINKLERS (TO TAKE RESPONSIBILITY TO DESIGN, SUPPLY AND
FRAMES & DOORS ON HOLD-OPEN
PLACE AFTER HOURS) INSTALL ALL PROTECTION HOARDING TO
DEVICES
ALLOW THE BUILDING TO REMAIN COMPLETED PHASE 1A
1 2 REMOVE WINDOW TO NEAREST OCCUPIED BY THE STUDENTS DURING THE
MULLION CONSTRUCTION
AND REPLACE WITH RATED P01 WALL. 1 2 3 SEALS
WALL MUST BE CONSTRUCTED TO
UNDERSIDE OF DECK

EX EX EX
INSTALLATION OF NEW P01
NOT IN SCOPE NOT IN SCOPE INSTALLATION OF NEW SPRINKLER SYSTEM
SPRINKLER SYSTEM IS TO

INSTALLATION OF NEW SPRINKLER SYSTEM


TAKE PLACE AFTER HOURS
P01 INSTALLATION OF
INSTALLATION OF NEW SPRINKLER SYSTEM

SPRINKLERS
INSTALLATION OF NEW SPRINKLER SYSTEM

INSTALLATION OF NEW SPRINKLER SYSTEM


UP IN THIS AREA IS TO TAKE

INSTALLATION OF NEW SPRINKLER SYSTEM


DR02
SPRINKLER SYSTEM IS TO TAKE

SPRINKLER SYSTEM IS TO TAKE

SPRINKLER SYSTEM IS TO TAKE

SPRINKLER SYSTEM IS TO TAKE

CEILING TILE HAS ALREADY PLACE AFTER

INSTALLATION OF NEW SPRINKLER SYSTEM


INSTALLATION OF NEW

INSTALLATION OF NEW

INSTALLATION OF NEW

INSTALLATION OF NEW

HOURS
PLACE AFTER HOURS

PLACE AFTER HOURS

PLACE AFTER HOURS

PLACE AFTER HOURS

BEEN REMOVED
EX
A A A
2565 mm A.F.F. PROJECT TITLE
EX

EXISTING ATM'S ARE TO BE


HUMBER COLLEGE FOOD
REMOVED AND RELOCATED.
REFER TO PHASE C PLAN EX
EXISTING RAMP
EX SERVICE - PHASE 1B (TECH KIOSK)
DR02
2565 mm A.F.F.
P01 EX EX
EX
EX 205 HUMBER COLLEGE BLVD, ETOBICOKE,
ABATEMENT ABOVE JAVA JAZZ EX EXISTING JAVA JAZZ
TO TAKE PLACE AT THIS PHASE
EX ON M9W 5L7
EX STRUCTURAL STEEL SUPPORTING CEILING ABOVE
EX
HUMBER IS TO REMOVE ALL FOOD IS TO BE FIREPROOFED
CEILING TO BE REMOVED AND EX
EXISTING STAIRCASE SERVICE EQUIPMENT PRIOR DRAWING TITLE
ABATED EXISTING STAIRCASE
(SPRINKLERED) TO THIS STAGE
(SPRINKLERED) ABATEMENT ABOVE JAVA JAZZ
TO TAKE PLACE AT THIS PHASE EX CONSTRUCTION PHASE A

B B UP
DRAWN BY
5'-10 1/2"

MK, AP, MJD


1785

REMOVE DRYWALL AND CEILING TILE


UP TO THIS POINT EX
EX SCALE
EXISTING SPRINKLERS (REFER TO FIRE EXISTING SPRINKLERS (REFER TO FIRE
3167 mm A.F.F. PROTECTION DRAWINGS) NOT IN SCOPE PROTECTION DRAWINGS)
EX
EX CEILINGS ON THIS SIDE TO REMAIN
2438 mm A.F.F. 1 : 125
3167 mm A.F.F. EX
C 3167 mm A.F.F.
C C DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

EX EX
3167 mm A.F.F. 2438 mm A.F.F. 2020 08 18
CHECKED BY

1 2 3 4 MJD
EX
3167 mm A.F.F. PROJECT NUMBER
1 2 3 4
20-1352
DRAWING NUMBER

A0.4
2020-08-19 9:08:46 AM

2 CONSTRUCTION PHASING A (CEILING DEMOLITION) 1 CONSTRUCTION PHASING A (SPRINKLER INSTALLATION)


A0.4 1 : 125 A0.4 1 : 125
EXISTING JAVA JAZZ (FRONT) EXISTING RAMP AND STAIRCASE EXISTING STORAGE ROOM AND WOMEN'S WASHROOM DOOR EXISTING RAMP AND STAIRCASE EXISTING RAMP AND STAIRCASE

- ALL ORANGE FLOOR TILE TO BE REMOVED. JAVA JAZZ IS TO BE COMPLETELY DEMOLISHED - ALL ORANGE TILE AND BASEBOARDS ARE TO BE REMOVED - ALL ORANGE FLOOR TILE AND BASEBOARDS TO BE REMOVED. STORAGE ROOM, AND WOMEN'S WASHROOM TO BE DEMOLISHED - ALL ORANGE TILE AND BASEBOARDS ARE TO BE REMOVED - ALL ORANGE TILE AND BASEBOARDS ARE TO BE REMOVED

EXISTING CORRIDOR BETWEEN NEW JAVA JAZZ AND LRC CORRIDOR EXISTING STORAGE ROOM AND WOMEN'S WASHROOM DOOR EXISTING CORRIDOR BETWEEN NEW JAVA JAZZ AND LEADING TOWARDS THE LRC CORRIDOR INTERIOR SHOT OF THE EXISTING WOMEN'S WASHROOM INTERIOR SHOT OF THE EXISTING JAVA JAZZ INTERIOR SHOT OF THE EXISTING JAVA JAZZ INTERIOR SHOT OF THE EXISTING JAVA JAZZ

- ALL SQUARE SLATE TILES AND BASEBOARDS ARE TO BE DEMOLISHED AS PART OF THIS PHASE'S - ALL ORANGE FLOOR TILE AND BASEBOARDS TO BE REMOVED. STORAGE ROOM, AND - ALL ORANGE FLOOR TILES, AND SQUARE SLATE TILES AND BASEBOARDS ARE TO BE - ENTIRE WOMEN'S WASHROOM IS TO BE REMOVED WITH THE EXCEPTION OF THE BACK WALL. REFER TO - THE ENTIRE JAVA JAZZ IS TO BE DEMOLISHED. - THE ENTIRE JAVA JAZZ IS TO BE DEMOLISHED. - THE ENTIRE JAVA JAZZ IS TO BE DEMOLISHED.
CONSTRUCTION. BASEBOARDS AROUND THE EXISTING COLUMNS ARE TO BE REMOVED AS WELL. WOMEN'S WASHROOM TO BE DEMOLISHED DEMOLISHED AS PART OF THIS PHASE'S CONSTRUCTION. BASEBOARDS AROUND THE EXISTING PLANS FOR DETAILS
COLUMNS ARE TO BE REMOVED AS WELL.

EXISTING JAVA JAZZ CORRIDOR

- ALL ORANGE FLOOR TILES ARE TO BE REMOVED.


JAVA JAZZ IS TO BE COMPLETELY DEMOLISHED

DR03

EXISTING JAVA JAZZ CORRIDOR EXISTING JAVA JAZZ CORRIDOR BETWEEN THE DENTAL OFFICE

- ALL ORANGE FLOOR TILES ARE TO BE REMOVED. - ALL ORANGE FLOOR TILES ARE TO BE REMOVED. DOORS ARE TO REMAIN

REVISIONS

NUMBER DATE REMARKS


DR02

RECTANGULAR GREY
SLATE TILE IN THIS AREA
IS TO STAY

EX

002 2020 08 18 ISSUED FOR TENDER

001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
EXISTING SPACE
TO REMAIN ATA ARCHITECTS
ATA ARCHITECTS INC.

OAKVILLE OFFICE:
PHASE B 211 LAKESHORE ROAD EAST,
EX EX OAKVILLE ONTARIO L6J 1H7
• REMOVAL OF ALL FLOOR TILE IN JAVA
JAZZ AND IN THE CORRIDOR AREA
T 905 849 6986 F 905 849 4369
• DEMOLITION OF JAVA JAZZ E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca
GENERAL NOTES:
• STUDENT PATHWAYS OF TRAVEL ARE TO SQUARE GREY SLATE TILE
REMAIN OPEN DURING ENTIRE PROJECT. IN THIS AREA IS TO STAY
IT IS THE GENERAL CONTRACTOR’S
RESPONSIBILITY TO DESIGN, SUPPLY AND SEALS
INSTALL ALL PROTECTION HOARDING TO
ALLOW THE BUILDING TO REMAIN
OCCUPIED BY THE STUDENTS DURING THE
CONSTRUCTION
EXISTING SPACE
TO REMAIN

1 2 3

EX EX EX

PROJECT TITLE
THIS PORTION OF THE
DR02 EXISTING ORANGE TILE IN EXISTING SQUARE SLATE TILE
IS TO BE DEMOLISHED
HUMBER COLLEGE FOOD
CORRIDOR TO BE DEMOLISHED EXISTING ORANGE TILE IN CORRIDOR
TO BE DEMOLISHED SERVICE - PHASE 1B (TECH KIOSK)
A
REMOVE TILES ON STAIRS
AND RAMP JAVA JAZZ FLOOR FINISH EXISTING TILE COLUMNS TO BE
TO BE DEMOLISHED DEMOLISHED 205 HUMBER COLLEGE BLVD, ETOBICOKE,
EXISTING FIRE SHUTTER TO BE
DEMOLISHED EXISTING DOORS TO BE
ON M9W 5L7
EXISTING CURTAIN WALL TO
BE DEMOLISHED DEMOLISHED
EXISTING DOOR TO BE WOMEN'S WASHROOM TO EX
DR02 EXISTING RAMP DRAWING TITLE
DEMOLISHED BE DEMOLISHED

EX EX
EX
ALL COUNTERS, MILLWORK TO BE EXISTING FIRE EX
REFER TO
CONSTRUCTION PHASE B
EX
DEMOLISHED SHUTTER TO BE EX MECHANICAL
DEMOLISHED EX
EX DRAWN BY
EX

EX
MK, AP, MJD
EX
SCALE
EX
B
1 : 125
DATE
EXISTING WALL TO
EX
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

EXISTING RUBBER FLOOR IN EXISTING COLUMN TO EXISTING CURTAIN WALL TO EXISTING COLUMN TO EXISTING WALLS TO BE REMAIN
CORRIDOR TO BE DEMOLISHED REMAIN BE DEMOLISHED REMAIN DEMOLISHED
UP UNTIL THIS LINE 2020 08 18
EX
EXISTING RUBBER FLOOR IN CHECKED BY
CORRIDOR TO REMAIN
C
MJD
EX EX
PROJECT NUMBER

20-1352
DRAWING NUMBER

1 2 3 4

A0.5
2020-08-19 9:08:52 AM

1 CONSTRUCTION PHASING B (DEMOLITION OF JAVA JAZZ)


A0.5 1 : 125
N104

AMP
OF R
TOP ISH
RFIN
90 0 OOOOR
INFFLL
MEAW
N
103

N201

N101 N104

N101
N210
N102

N104
EX

3 ATA - 3D SHOT
A0.6

4
4 4
A2.4

4
A2.4 REPAINT EXISTING WALL, AND MAKE
GOOD ON ANY WORK TO THE TILES,
OR BASEBOARD AROUND THIS AREA

DR03

C02
3167 mm A.F.F.

REPAINT EXISTING WALL, AND MAKE


GOOD ON ANY WORK TO THE TILES,

EXISTING RECTANGULAR SLATE


OR BASEBOARD AROUND THIS AREA

TILE HERE IS TO REMAIN


DR02 REVISIONS

NUMBER DATE REMARKS

EX

EX

EX
002 2020 08 18 ISSUED FOR TENDER

001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


3
ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
A3.1 EXISTING CEILING BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


7 PHASE C SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
A3.1 DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
• INSTALLATION OF NEW WALLS,
FLOORING, CEILINGS, MECHANICAL ATA ARCHITECTS
AND ELECTRICAL ELEMENTS
ATA ARCHITECTS INC.
• INSTALLATION OF NEW KIOSK & DISPLAY
AREA OAKVILLE OFFICE:

EXISTING SQUARE SLATE TILE HERE


• INSTALLATION OF COLUMN COVERS 211 LAKESHORE ROAD EAST,
OAKVILLE ONTARIO L6J 1H7

IS TO REMAIN
GENERAL NOTES: T 905 849 6986 F 905 849 4369
• STUDENT PATHWAYS OF TRAVEL ARE TO E admin@ataarchitectsinc.com
REMAIN OPEN DURING ENTIRE PROJECT. www.ataarchitectsinc.ca
IT IS THE GENERAL CONTRACTOR’S
RESPONSIBILITY TO DESIGN, SUPPLY AND
INSTALL ALL PROTECTION HOARDING TO
ALLOW THE BUILDING TO REMAIN
EXISTING CEILING OCCUPIED BY THE STUDENTS DURING THE SEALS
1 2 NEW 2' x 2' ACT (REFER TO CEILING
3 CONSTRUCTION
SCHEDULE FOR DETAILS) EXISTING

1 2 3
5
1
A3.2
A3.2 EX EX EX
P01

NEW PAINT, NEW TILE NEW PAINT, NEW TILE SCHLUTER RENO-U
DR02 STAINLESS STEEL (REFER TO PROJECT TITLE
UP AND TILE BASEBOARD AND TILE BASEBOARD
N104 IN COORIDOR IN ALL IN COORIDOR IN ALL DETAILS TYP.)
C02
3167 mm A.F.F.
AREAS SHOWN WITH
N104
AREAS SHOWN WITH
N104 N104 HUMBER COLLEGE FOOD
A A A N111
N201 SERVICE - PHASE 1B (TECH KIOSK)
NEW PAINT, NEW TILE
1 AND TILE BASEBOARD
A1.1 IN COORIDOR IN ALL
AREAS SHOWN WITH 205 HUMBER COLLEGE BLVD, ETOBICOKE,
DR02 EXISTING RAMP N104
3 3 N104
N103 N101
EX ON M9W 5L7
A2.4 A2.4 UP

EX EX DR01
N104
DRAWING TITLE
DR04

N101 N102 CONSTRUCTION PHASE C


EX N101
C01 DR01 N102 DRAWN BY
C01
3167 mm A.F.F. EX A2.1 6
2855 mm A.F.F. N102 EX
C02 N104
EX EX MK, AP, MJD
2438 mm A.F.F. N101
B B 8
N103 SCALE
N104
C01 C03
3167 mm A.F.F. 2437 mm A.F.F.
C03 EX
1 : 125
EX
3167 mm A.F.F. DATE
EX N102 N101
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

ATM TO BE RELOCATED HERE


3167 mm A.F.F. 3
A1.1 2020 08 18
C C C CHECKED BY
EX EX
1 3167 mm A.F.F. EX 2438 mm A.F.F.
MJD
2 3 3167 mm A.F.F.
4
PROJECT NUMBER

EX
EX
2438 mm A.F.F.
20-1352
3167 mm A.F.F.
DRAWING NUMBER
1 2 3 4

ARKTURA METAL PANEL CEILING TO WRAP EX


AROUND BULKHEAD. 2438 mm A.F.F.

A0.6
2020-08-19 9:09:07 AM

2 NEW CEILINGS 1 CONSTRUCTION PHASING C NEW FLOORING


A0.6 1 : 125 A0.6 1 : 125
1 2 3 4
7
4
A2.1
A2.4

C02
4 3
3167 mm A.F.F.
2
A2.1 A2.1
3 A2.1

A2.4
1
5
A2.1
A2.1

1
A2.4

4
C03
A2.3
2437 mm A.F.F.
2
A2.3 C02
3167 mm A.F.F.

C01
A2.1 6 3167 mm A.F.F. C01
C02
2855 mm A.F.F.
2438 mm A.F.F.
8 2
A2.4
A2.5
1
B A2.3 4 B
3
A2.3

C03
3167 mm A.F.F. EX
C03
2438 mm A.F.F.
3167 mm A.F.F.
EX EX EX EX EX EX
3167 mm A.F.F. 3167 mm A.F.F. 3167 mm A.F.F. 3167 mm A.F.F. 2438 mm A.F.F. 3167 mm A.F.F.

4 KIOSK CEILINGS
A1.1 1 : 50

7 4 3
4
1 A2.1 2 A2.1
3 A2.4 4 A2.1

5 2 1
A2.1 A2.1 A2.1

CIRCUITS ARE COMPLETELY SELF


SUPPORTING P02

COLUMN LOCATION TO BE SITE VERIFIED

1 E202
P03 INTEGRATED TAPE LIGHTING WITHIN EACH
A2.4 P03
CAPACATOR. TO BE SEEN THROUGH THE
REVEAL IN THE AXIOM PAIRED MODEL. REFER
TO ELECTRICAL FOR DETAILS
4
P03
A2.3 P02
2
A2.3 10
A3.1 P02
P03
P02 P02
P02

A2.1 6
P02
BULKHEAD
8 2
A2.4
A2.5
1
B A2.3 4 B
REVISIONS
3 NUMBER DATE REMARKS
A2.3

P03

P02

P02
BULKHEAD

002 2020 08 18 ISSUED FOR TENDER

001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.

ATA ARCHITECTS
3 KIOSK DETAILED CEILING CIRCUITS ATA ARCHITECTS INC.
A1.1 1 : 50
OAKVILLE OFFICE:
211 LAKESHORE ROAD EAST,
OAKVILLE ONTARIO L6J 1H7

T 905 849 6986 F 905 849 4369


E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca

1 2 3 4 4 3
4 2 1
5 A2.4 A2.1 SEALS
7 A2.1 A2.1 A2.1
A2.1
A2.1

E201 N401 N101 N102 N101 N102


N103 N101 N601 P03 N101 N101 N601 E201

5'-0 1/2" 11'-4" 12'-10" 22'-5" W-COLUMN - FIRE RATE WITH


1531 3459 3918 6828
SPRAY FIREPROOFING TO 1 HOUR

N104
150
6"

EX DR01 12'-4" N111


3760
1 N601
E201 E201 PROJECT TITLE
1'-11"
1'-11"

3'-1"
586

940

588

DR04
1'-3 1/2"

5'-5"
2'-5"
738

396

A2.4 1648

HUMBER COLLEGE FOOD


152
6"

10'-9 1/2" N401 N104


3289
ACCESSIBLE 5
1'-11"
3'-1"
940

586

COUNTER 4 N101
SERVICE - PHASE 1B (TECH KIOSK)
2947
9'-8"

P03 E107 N603 A2.6


A2.3
152

6
6"

2
2366
7'-9"

A2.5
1'-11"
586

A2.3 10'-6" 3'-1" 10'-4" 11'-9 1/2"


3202 940 3156 3593
N102 N101 N101
N102 205 HUMBER COLLEGE BLVD, ETOBICOKE,
N601 ON M9W 5L7
152
6"

E101 E101 N103 DR01


N102 N101
135 DRAWING TITLE
A2.1 6
0

.00°
0
10

10
152

N103
6"
ø1

ø1

1'-0" DETAILED PLANS


1930
1'-0"

6'-4"
300
16'-2"
4929

300 N401 N603


8 2 E201
E102 14'-10 1/2" 7'-1 1/2" 3'-4 1/2" 3'-1" 3'-7 1/2" 3'-1" 14'-11 1/2" 6"
4'-11"
1495

4536 2174 1028 940 A2.4 1102 940 4555 152


N101 DRAWN BY
2'-6"
762 E201 N101 N102 N603 A2.5
P03 N201 N401 N201 PROVIDE FINISHED EDGE TO
1 DRYWALL AND INSTALL MK, AP, MJD
B B
152

4
6"

N102
2668
8'-9"

A2.3 CORNER GUARD


2822
9'-3"

00

E104 E103 N111


2438
8'-0"

P02 SCALE
11

1'-11"

E105
586

E201 E201 2'-0 1/2" 6" 13'-9"


ø

4'-0" 3 619 154 4195


1219
152
6"

A2.3 10'-9 1/2"


3289
N401 N104
1 : 50
2'-1 1/2"

1'-11"

E106
3'-1"
940

586
642

P03 DUCT SPACE


N603 DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

152
6"

P02 P02 EX-1


N401 N603 N110 2020 08 18
EX
P03 P03 N102 N101 N401 N601 EXISTING RUBBER SHEET FLOOR RELOCATED ATM
CHECKED BY

7'-9" 15'-4" 7'-1 1/2" 16'-9 1/2" 11'-9 1/2"


3594
MJD
2360 4669 2174 5123

PROJECT NUMBER

20-1352
DRAWING NUMBER

A1.1
2020-08-19 9:09:14 AM

1 KIOSK DETAILED PLANS


A1.1 1 : 50
REFER TO RCP AND ARKTURA CEILING IS TO WRAP COMPLETELY
B C ELECTRICAL DRAWINGS B AROUND THE NEW FIRE RATED BULKHEAD
P02 P03
EX P02 C03 EXISTING C02 EX C03 C01
NEW BULKHEAD REFER TO RCP AND
BEAM E202
2438 mm A.F.F. 2437 mm A.F.F. ELECTRICAL DRAWINGS 3167 mm A.F.F. 2800 mm A.F.F. 3167 mm A.F.F. 3167 mm A.F.F. E202 E202 E202 E202 "CAPACATOR" CEILING FEATURE WITH
1 HR FIRE INTEGRATED TAPE LIGHTING (REFER TO
PROOFING ELECTRICAL)
N401 N401
N101

N401 N401
P02
1'-7" 6" 4'-4"
478 152 1324
REFER TO FIRE PROTECTION "CAPACATOR" CEILING FEATURE WITH INTEGRATED
DRAWINGS FOR SPRINKLER TAPE LIGHTING (REFER TO ELECTRICAL)
10'-1 1/2" 6" 1'-11" 6" 2'-2" 4'-2" 6" 4'-4" 6" 1'-11" 6" 1'-11" 6"
LOCATIONS 3083 152 586 152 663 1266 152 1324 152 586 152 586 152
15'-2 1/2"
4636

EXISTING BULKHEAD TO REMAIN. EXISTING COLUMN TO BE WRAPPED IN STAINLESS STEEL


6" 1'-11" 6" 1'-11" 6" 6'-4" 6" 1'-11" 6" 1'-11" 6" 1'-11" 6"
REFER TO PHASING PLAN AND 152 586 152 586 152 1930 152 586 152 586 153 585 152 FINISH. REFER TO MATERIAL SCHEDULE FOR DETAILS
RCP
N201
N101
REFER TO RCP AND P03
ELECTRICAL DRAWINGS N401 N201
M311 N401

N401 N401 DR01 N401 N401 N401 N401 N401 N401 N401
POP-UP ELECTRICAL OUTLETS ARE TO

7'-11 1/2"
2426
N602 BE INSTALLED IN THE MILLWORK.
COUNTERTOP TO BE CUT AT DR01 REFER TO MILLWORK PLANS FOR
N401

7'-5 1/2"

7'-5 1/2"

7'-5 1/2"
E201 LOCATIONS FOR THESE OUTLETS DETAILS

2267

2267

2267
N401 E201 E201 E201 E201 E201
N603 1'-6 1/2" 1'-6 1/2"
470 470
N601 N201
N705
N101 NEW FLOOR FINISH. REFER TO
DETAILED PLANS AND MATERIAL REFER TO MILLWORK PLANS FOR ?
SCHLUTER RENO-U STAINLESS SCHEDULE FOR DETAILS N201 DETAILS
STEEL
3'-0"

3'-0"

3'-0"

3'-0"

3'-0"
919

919

919

919

919
2'-10"

2'-10"
SCHLUTER RENO-U STAINLESS STEEL

869

869
Sim REFER TO DETAILED PLANS AND
MATERIAL SCHEDULE FOR FLOOR
N104 4
4 N104 FINISH DETAILS
A3.1
A3.1

N705
ACCESSIBLE COUNTER
EXISTING RUBBER FLOOR TILE TO REMAIN. REFER TO EX N102 N101 REFER TO MILLWORK PLANS FOR DETAILS
EX N101 N603 N401 N401 N603 N705 PHASING PLANS FOR AREA OF THE TILE THAT IS TO BE
EXISTING COLUMN TO BE WRAPPED IN N102 N101 N102 N104
STAINLESS STEEL FINISH. REFER TO REMOVED AND AREA THAT IS TO REMAIN ACCESSIBLE COUNTER
MATERIAL SCHEDULE FOR DETAILS

1 SECTION A 2 SECTION B
A2.1 1 : 25 A2.1 1 : 25

1
ARKTURA CEILING IS TO WRAP COMPLETELY "CAPACATOR" CEILING FEATURE
EX A3.1 C03 C01
EX B C01 C03 AROUND THE NEW FIRE RATED BULKHEAD WITH INTEGRATED TAPE LIGHTING
2438 mm A.F.F.
REFER TO FIRE PROTECTION
2855 mm A.F.F.
P02
2437 mm A.F.F.
P02 C 2800 mm A.F.F. 3167 mm A.F.F. 3167 mm A.F.F. B (REFER TO ELECTRICAL)
DRAWINGS FOR DETAILS
E202 E202 E202
N101

C02
3167 mm A.F.F.
C01
3167 mm A.F.F.
N602
N201
N210
10'-1 1/2" 6" 4'-7" 4'-2" 6" 4'-4" 6" 1'-11" 6" 1'-11" 6"
3083 152 1401 1266 152 1324 152 586 152 586 152
REFER TO RCP AND ELECTRICAL NEW BULKHEAD
DRAWINGS

EXISTING COLUMN TO BE WRAPPED


IN STAINLESS STEEL FINISH. REFER TO EXISTING COLUMN TO BE WRAPPED IN STAINLESS P03
1
MATERIAL SCHEDULE FOR DETAILS STEEL FINISH. REFER TO MATERIAL SCHEDULE FOR
A2.5 DETAILS N201
SEMI-PRIVATE AREA
TELEVISION - SEE ELECTRICAL
E301 EMBEDDED IN WALL

8'-11 1/2"
2731
FEATURE WALL ASSEMBLY IS TO BE INSTALLED AS HUMBER TO SUPPLY AND N101

7'-11 1/2"
PER MANUFACTURER'S INSTALLATION INSTALL BRACKET TO HOLD TV

2426
N703 N702 DR01 E201
GUIDELINES 4'-11" ACCESSIBLE COUNTER
1500
EXISTING WALL TO REMAIN

FEATURE WALL (REFER TO ?


N401
FEATURE WALL PLANS FOR
DETAILS) 1'-11"
586
3'-1 1/2"

3'-3"
985
955

3'-0"
919
2'-10"
869
Sim
N201
4 REFER TO MILLWORK PLANS FOR
N102
A3.1 DETAILS

N104 N111 N104 N601 N705 N705 N704 N101 N101 N705 N401
EX EX-1 N101 N102 EX N101 N102 N101
REFER TO MILLWORK PLANS FOR
DETAILS

3 SECTION C 4 SECTION D
A2.1 1 : 25 A2.1 1 : 25

"CAPACATOR" CEILING FEATURE B


WITH INTEGRATED TAPE LIGHTING REFER TO RCP AND ELECTRICAL
C B (REFER TO ELECTRICAL) C02 C02 DRAWINGS C03
EX C01 3167 mm A.F.F. 2438 mm A.F.F. 3167 mm A.F.F.
ARKTURA CEILING IS TO WRAP REFER TO RCP AND ELECTRICAL
2566 mm A.F.F. 3167 mm A.F.F. COMPLETELY AROUND THE NEW DRAWINGS REFER TO FIRE PROTECTION EXISTING BEAM REVISIONS
FIRE RATED BULKHEAD DRAWINGS 1 HR FIRE PROOFING
P03 P03 P03 NUMBER DATE REMARKS
N101 E202 N101 N401

LIGHTING INSIDE OF THE DISPLAY


AREA. REFER TO RCP AND
N401 ELECTRICAL DRAWINGS

N603 N401

6" 8'-9" 6" 4'-4" M311 6" 1'-11" 6" 1'-11" 6"
152 2668 152 1324 152 586 152 586 152

16'-2"
4929
N101
N210
002 2020 08 18 ISSUED FOR TENDER

001 2020 08 04 TENDER


DISPLAY
STORAGE ROOM
EXISTING TO REMAIN SEMI-PRIVATE AREA AREA CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
N401
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND
N401 LIGHT-UP SHELVING UNIT SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
1'-3 1/2" DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
N603 DR01 E201 N602 396
1'-6 1/2"
470
1'-6 1/2"
470
E107 DR01 ATA ARCHITECTS
N401
N601 ATA ARCHITECTS INC.

OAKVILLE OFFICE:
N601 211 LAKESHORE ROAD EAST,
OAKVILLE ONTARIO L6J 1H7
N401

1090
3'-7"
3'-0"
919

Sim T 905 849 6986 F 905 849 4369


4 E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca
A3.1 N102

N101 N101 N102 N401 N101 SEALS


NEW RUBBER BASEBOARD. REFER TO N102 N101 N102 REFER TO MILLWORK DRAWINGS E105 N103 E103 E104
DETAILS (TYP.) NEW RUBBER BASEBOARD. REFER TO NEW RUBBER BASEBOARD. REFER TO
DETAILS (TYP.) DETAILS (TYP.)

5 SECTION E 6 SECTION F
A2.1 1 : 25 A2.1 1 : 25

1
NEW FIRE-RATED DOORS TO BE INSTALLED IN PROJECT TITLE
C B CONSTRUCTION PHASE A (REFER TO PHASING A C01 C02
PLANS) 3167 mm A.F.F. 2438 mm A.F.F. REFER TO RCP AND ELECTRICAL

EX C03 C02 EXISTING BEAM C02 REFER TO FIRE PROTECTION NEW FIRE-RATED DOORS TO BE
DRAWINGS HUMBER COLLEGE FOOD
N101
3167 mm A.F.F. 3167 mm A.F.F.
P03
2438 mm A.F.F.
1 HR FIRE PROOFING P02 P03
3167 mm A.F.F.
DRAWINGS EX INSTALLED IN CONSTRUCTION PHASE A
(REFER TO PHASING PLANS) P03 P03
EXISTING BEAM
1 HR FIRE PROOFING
REFER TO FIRE
PROTECTION DRAWINGS P02 EX
SERVICE - PHASE 1B (TECH KIOSK)
28'-5"
8661
N210 N210
205 HUMBER COLLEGE BLVD, ETOBICOKE,
ON M9W 5L7

DRAWING TITLE

SECTIONS

16'-2"
4929
DRAWN BY
14'-10 1/2"
4536

E106 MK, AP, MJD


DR02 DR02 E106
P02
SCALE
STORAGE ROOM
E102
EXISTING TO REMAIN STORAGE ROOM
1 : 25
DATE
8'-11 1/2"
2731
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

DR04
E107
N401
E104 E102 2020 08 18
E104 E105
CHECKED BY
N601

E103 E101 MJD


E103
PROJECT NUMBER

20-1352
DRAWING NUMBER
N201

N104 NEW TILE TO BE INSTALLED ON EXISTING WALL EXISTING COLUMNS TO BE N104 NEW TILE TO BE INSTALLED ON NEW RUBBER BASEBOARD. N103 NEW RUBBER BASEBOARD.
REFER TO DETAILS (TYP.) REFER TO DETAILS (TYP.)

A2.1
EX N103 THE EXISTING RAMP. SEE TO REMAIN WRAPPED IN STAINLESS STEEL FINISH. THE EXISTING STAIRCASE. SEE
NEW RUBBER BASEBOARD. NEW RUBBER BASEBOARD. 6 RAILINGS AND STAIRS DETAILS REFER TO MATERIAL SCHEDULE FOR RAILINGS AND STAIRS DETAILS
2020-08-19 9:09:26 AM

REFER TO DETAILS (TYP.) REFER TO DETAILS (TYP.) A3.1 DETAILS

7 SECTION G 8 SECTION H
A2.1 1 : 25 A2.1 1 : 25
1 2 3

REFER TO FIRE PROTECTION


DRAWINGS

REFER TO RCP AND ELECTRICAL EXISTING COLUMNS TO BE WRAPPED IN ARKTURA CEILING IS TO WRAP
DRAWINGS FOR DETAILS STAINLESS STEEL FINISH. REFER TO MATERIAL COMPLETELY AROUND THE NEW FIRE
C02 SCHEDULE FOR DETAILS RATED BULKHEAD
EX EX P02 N210 EXISTING BEAM
P03 C03
2438 mm A.F.F.
P02
2437 mm A.F.F.

14'-10 1/2" 6" 4'-7 1/2" 1'-6 1/2" 6" 5'-8 1/2" 6" 10'-7" 6" 10'-9 1/2" 6" 5'-3 1/2"
4536 152 1404 466 152 1744 152 3227 152 3289 152 1613

P03 EXISTING COLUMNS TO BE WRAPPED IN


STAINLESS STEEL FINISH. REFER TO MATERIAL
SCHEDULE FOR DETAILS
STORAGE ROOM
SEMI-PRIVATE AREA N401
5'-8 1/2"
1744
DR01 3'-1"
E201 E201 E201
3'-9" 1'-11 1/2"
940
1147 597 N401
2'-11"
3'-1"
890
E107 E201
940 1'-5 1/2" 1'-5 1/2" 1'-4 1/2" 8'-0 1/2" 1'-4 1/2"
N401 N601 445 445 416 2457 416
EX 2'-7 1/2" N401
796 N601
N601
E105 E201
E102 E101

3'-2 1/2"
982
N201

3'-0"
3'-0"

917
919
2'-10"
869
5 N201
P03 N103
A3.1

N603
NEW RUBBER BASEBOARD. NEW RUBBER BASEBOARD. N705 N401 N705 N705 N601 N101 N104
REFER TO DETAILS (TYP.) REFER TO DETAILS (TYP.)
REFER TO MILLWORK DRAWINGS REFER TO MILLWORK DRAWINGS

1 SECTION P
A2.3 1 : 25

1 2 3

REFER TO RCP AND ELECTRICAL C01 "CAPACATOR" CEILING FEATURE WITH E202 E202
12 DRAWINGS INTEGRATED TAPE LIGHTING (REFER TO
EX EX P02 P03 A3.1 P03 3167 mm A.F.F. ELECTRICAL)
N210

N210
C02
2438 mm A.F.F.

N201

14'-10 1/2" 5'-1 1/2" 7'-9" 6" 10'-7" 6" 10'-9 1/2" 6" 5'-3 1/2"
4536 1556 2362 152 3227 152 3289 152 1613

N201 EXISTING COLUMNS TO BE EXISTING COLUMNS TO BE WRAPPED IN


WRAPPED IN STAINLESS STEEL STAINLESS STEEL FINISH. REFER TO
STORAGE ROOM FINISH. REFER TO MATERIAL MATERIAL SCHEDULE FOR DETAILS
SCHEDULE FOR DETAILS
DR01

8'-11 1/2"
2728
3'-1" E201 E201 E201
940
2'-7 1/2" 10'-9 1/2"
EX E107 E201 E201 E201 796
N401 3289
1'-11 1/2" 4'-2 1/2" 4'-2 1/2" 1'-11 1/2" N401 1'-4 1/2" 4'-0 1/2" 4'-0 1/2" 1'-4 1/2"
602 1283 1283 597 416 1229 1229 416

N601

3'-0"
919
2'-10"
869
2
A3.1

N705 N705 N705 N401 N705 N101


N103 P03
NEW RUBBER BASEBOARD. NEW RUBBER BASEBOARD. N104 N111 N201
N101 N102 N104
REFER TO DETAILS (TYP.) REFER TO DETAILS (TYP.)
REFER TO MILLWORK DRAWINGS REFER TO MILLWORK DRAWINGS

2 SECTION O
A2.3 1 : 25

3 4

C01 P02 P02 EX EX


C01 P02 REVISIONS
2855 mm A.F.F.
P02
3167 mm A.F.F. ARKTURA CEILING IS TO WRAP COMPLETELY NUMBER DATE REMARKS
AROUND THE NEW FIRE RATED BULKHEAD

EXISTING BEAM
TYPICAL NOTE - ALL STEEL IS
1 HR FIRE PROOFING
FIREPROOFED TO 1 HR RATING

EXISTING BEAM

002 2020 08 18 ISSUED FOR TENDER


REFER TO FIRE PROTECTION DRAWINGS REFER TO RCP AND ELECTRICAL DRAWINGS 001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
10'-7" 11'-3 1/2" LOCATION OF BEAM TO BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
3227 3441
3'-1" CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND
940
REFER TO MILLWORK REFER TO MILLWORK SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
2'-11" N401 DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
890
DRAWINGS DRAWINGS
E201 E201 E201
6" 3'-11" 6" 1'-11" 6" 3'-9" 6" 10'-9 1/2" 6" 5'-3 1/2" 21'-8 1/2" ATA ARCHITECTS
7'-11 1/2"

152 1199 152 586 152 1139 152 3289 152 1613 6613
2421

ATA ARCHITECTS INC.


1'-5 1/2" 1'-5 1/2" 1'-4 1/2" 4'-0 1/2" 4'-0 1/2" 1'-4 1/2"
445 445 416 1229 1229 416
EX OAKVILLE OFFICE:
N601 211 LAKESHORE ROAD EAST,
N601 N601
N401 OAKVILLE ONTARIO L6J 1H7
E201
N603
N401 T 905 849 6986 F 905 849 4369
N401 E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca
3'-2 1/2"
982

3'-0"
919

EXISTING COLUMN TO BE WRAPPED IN EXISTING COLUMN TO BE WRAPPED IN


STAINLESS STEEL FINISH. REFER TO MATERIAL STAINLESS STEEL FINISH. REFER TO MATERIAL
N201 SCHEDULE FOR DETAILS N201 SCHEDULE FOR DETAILS

SEALS

N603 N401 N603 N401 N401 N705 N101 N104 N111


N101 N102 N104 N104 N111

3 SECTION N
A2.3 1 : 25

?
3 4
PROJECT TITLE
C01 EXITING BEAM
P02 P02 P02 EX EX
2855 mm A.F.F.
HUMBER COLLEGE FOOD
C01
3167 mm A.F.F.
REFER TO RCP AND
ELECTRICAL DRAWINGS FOR
SERVICE - PHASE 1B (TECH KIOSK)
DETAILS
REFER TO FIRE PROTECTION DRAWINGS
E202 E202
205 HUMBER COLLEGE BLVD, ETOBICOKE,
ON M9W 5L7

DRAWING TITLE

SECTIONS
EXISTING BEAM
1 HR FIRE PROOFING
DRAWN BY

P02 MK, AP, MJD


P02
EXISTING COLUMN LOCATION SCALE
TO BE VERIFIED ON SITE

1 : 25
REFER TO MILLWORK DRAWINGS
DATE
N401
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

8'-11 1/2"
2731

E201 E201 E201


10'-9 1/2"
3289 2020 08 18
6" 1'-4 1/2" 4'-0 1/2" 4'-0 1/2" 1'-4 1/2" 6" 5'-3 1/2" 21'-8 1/2"
152 416 1229 1229 416 152 1613 6613
EX CHECKED BY

MJD
PROJECT NUMBER
3'-0"
917

N201 20-1352
N201
DRAWING NUMBER

A2.3
N101 N102 N104 N104 N111 N104
N704 N702 N705 N704 N702 N704 N101 N104
2020-08-19 9:09:33 AM

4 SECTION M
A2.3 1 : 25
3 2 1
P02 C02 P02
REFER TO RCP AND ELECTRICAL DRAWINGS "CAPACATOR" CEILING FEATURE WITH
3167 mm A.F.F. INTEGRATED TAPE LIGHTING (REFER TO
ELECTRICAL)
C01 P03 P02 EX EX
3167 mm A.F.F. E202 E202
ARKTURA CEILING IS TO WRAP COMPLETELY
AROUND THE NEW FIRE RATED BULKHEAD N101

N401

N401
DISPLAY AREA STORAGE ROOM
5'-3 1/2" 6" 1'-9 1/2" 6" 8'-6" 6" 16'-9 1/2" 6" 6'-1 1/2" 6"
1613 152 551 152 2586 152 5123 152 1869 152

REFER TO FIRE PROTECTION DRAWINGS


4'-6 1/2" E106
1386

2'-5 1/2"
E102

744
ACCESSIBLE COUNTER
EXISTING COLUMN TO BE WRAPPED IN
STAINLESS STEEL FINISH. REFER TO MATERIAL 1'-6 1/2" 1'-6 1/2"
SCHEDULE FOR DETAILS E201 N601 E201 E201 470 470 N601 E201 N703 E201 E201 5'-5"
1'-4 1/2" 4'-0 1/2" 4'-0 1/2" 1'-4 1/2" 6" 1'-11" 6" 1'-11 1/2" 4'-2 1/2" 4'-2 1/2" 1'-11 1/2" 1648
416 1229 1229 416 152 586 152 597 1283 1283 602
N401

N401 N603
E201
N601

E101 E101

3'-2 1/2"
972

3'-3"
986
3'-0"

3'-0"
919

919
2'-10"
869
N201

N111 N104 REFER TO MILLWORK DRAWINGS REFER TO MILLWORK DRAWINGS N704 N702 N705 N703 N705
N705 N110
N104 N102 N101

1 SECTION Q
A2.4 1 : 25

4 3 2
C01 C03 C02
EX P02 EX P02 P02 P02 P02
2855 mm A.F.F. 2437 mm A.F.F. 3167 mm A.F.F.

"CAPACATOR" CEILING FEATURE WITH


INTEGRATED TAPE LIGHTING (REFER TO
ELECTRICAL)

ARKTURA CEILING IS TO WRAP COMPLETELY


E202 N401 E202 E202
AROUND THE NEW FIRE RATED BULKHEAD

N401
N301

21'-8 1/2" 5'-3 1/2" 6" 1'-9 1/2" 6" 8'-6" 6" 16'-9 1/2" 6" 1'-6 1/2"
6613 1613 152 551 152 2586 152 5123 152 466

FEATURE WALL

E301 N603
EXISTING COLUMNS TO BE WRAPPED IN
STAINLESS STEEL FINISH. REFER TO MATERIAL 3'-1" N401
Sim 940
SCHEDULE FOR DETAILS
4 1'-6 1/2" 1'-6 1/2" EXISTING COLUMNS TO BE WRAPPED IN
N401
EX E201 E201 E201 470
2'-11"
470 STAINLESS STEEL FINISH. REFER TO MATERIAL
A2.5 N603 890 SCHEDULE FOR DETAILS
1'-4 1/2" 4'-0 1/2" 4'-0 1/2" 1'-4 1/2"
416 1229 1229 416 N601
N601 N201

N201 N401 E201


N705

3'-2 1/2"
N705

972
3'-0"
919
REFER TO FEATURE WALL DRAWINGS

N104 N111 N705 REFER TO MILLWORK DRAWINGS


N104 N102 N101

2 SECTION R
A2.4 1 : 25

REVISIONS

NUMBER DATE REMARKS

GC TO REPAINT ALL WALLS WITHIN THE SPACE A COLOUR GC TO REPAINT ALL WALLS WITHIN THE SPACE A COLOUR
SUPPLIED BY THE ARCHITECT EXISTING COLUMNS TO BE WRAPPED IN SUPPLIED BY THE ARCHITECT EXISTING COLUMNS TO BE WRAPPED IN
STAINLESS STEEL FINISH. REFER TO MATERIAL STAINLESS STEEL FINISH. REFER TO MATERIAL
TYPICAL TILE FINISH EDGE SCHLUTER QUADEC EDGE PROTECTION
4 N210
3 SCHEDULE FOR DETAILS
N401
2 N401 N401 N602
1 STAINLESS STEEL
SCHEDULE FOR DETAILS

002 2020 08 18 ISSUED FOR TENDER


NEW PAINT, NEW TILE AND TILE
BASEBOARD IN COORIDOR IN ALL 001 2020 08 04 TENDER
AREAS SHOWN WITH N104
CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS
ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
EX
REFER TO FEATURE WALL DRAWINGS DR01 EX BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
EX
CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND
N104
SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
N104 DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.

ATA ARCHITECTS
ATA ARCHITECTS INC.
N705
OAKVILLE OFFICE:
211 LAKESHORE ROAD EAST,
NEW PAINT. REFER TO MATERIAL SCHEDULE (COLOR TO BE N201 NEW SLATE TILE. REFER TO A0.6 PHASING PLAN C AND NEW SLATE TILE. REFER TO A0.6 PHASING PLAN C AND OAKVILLE ONTARIO L6J 1H7
SELECTED BY THE ARCHITECT) MATERIAL SCHEDULE FOR DETAILS MATERIAL SCHEDULE FOR DETAILS
T 905 849 6986 F 905 849 4369
E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca

SEALS

3 SECTION T
A2.4 1 : 50

PROJECT TITLE

HUMBER COLLEGE FOOD


SERVICE - PHASE 1B (TECH KIOSK)
REPAINT EXISTING WALL, AND MAKE
B A GOOD ON ANY WORK TO THE TILES, OR 205 HUMBER COLLEGE BLVD, ETOBICOKE,
BASEBOARD AROUND THIS AREA
ON M9W 5L7
NEW WALL (REFER TO WALL
SCHEDULE FOR DETAILS)
C02 REPAINT EXISTING WALL, AND MAKE
EX P01 GOOD ON ANY WORK TO THE TILES, OR P01 DRAWING TITLE
GC TO REPAINT ALL WALLS WITHIN THE SPACE A COLOUR
3167 mm A.F.F. BASEBOARD AROUND THIS AREA NEW FIRE-RATED SINGLE DOOR
SUPPLIED BY THE ARCHITECT
SECTIONS

DRAWN BY

MK, AP, MJD


NEW WALL (REFER TO WALL SCHEDULE
FOR DETAILS) SCALE
EXISTING DOOR
NEW FIRE-RATED DOUBLE DOOR
EX As indicated
DR02 DR02 NEW PAINT, TILE TO REMAIN,
BASEBOARD TO REMAIN IN
NEW PAINT, TILE TO REMAIN, DATE
TO REMAIN BASEBOARD TO REMAIN IN
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

CORRIDOR. REFER TO PLANS FOR EX CORRIDOR


Sim EXTENT OF TILE TO REMAIN
DR03
EX 2020 08 18
4
DR02
A3.1 CHECKED BY
N104
N104

MJD
N401 N603 N401 N705 N104 PROJECT NUMBER

ATM'S TO BE 20-1352
N104
RELOCATED HERE
DRAWING NUMBER

A2.4
2020-08-19 9:09:40 AM

4 SECTION U
A2.4 1 : 50
N101 N102 EX

N502 N501 N703 N702

ARKTURA - VERTIKA
TRIM (TO BE INSTALLED
AS PER
MANUFACTURER'S
ARKTURA LIGHT PANELS (REFER TO
GC TO COORDINATE THE SPECIFICATIONS AND
ELECTRICAL AND MANUFACTURER'S
INSTALLATION OF THE TELEVISION INSTALLATION
SPECIFICATIONS)
WITH THE INSTALLATION OF THE GUIDELINES)
ARKTURA FEATURE WALL ASSEMBLY ARKTURA VAPOR CLUSTER SPARSE PANELS (2' x 4')
6" VERTIKA CHANNEL ATTACHMENT
152 TELEVISION - SEE ELECTRICAL EMBEDDED IN WALL
HUMBER TO SUPPLY AND INSTALL BRACKET TO HOLD TV CUSTOM CUT ARKTURA VAPOR PANELS NEW FURRING WALL

TELEVISION - SEE
ELECTRICAL
3'-10" 6'-7"E301 5'-6" EMBEDDED IN WALL
1172 2009 1677
HUMBER TO SUPPLY
3'-9 1/2" 6'-4 1/2" AND INSTALL BRACKET
1153 1947
TO HOLD TV
STAINLESS STEEL CAP 13'-7 1/2"
4147

BLOCKING P02 EX-1 THE EXACT PATTERN/LAYOUT OF THE CUSTOM CUT VAPOR
PANELS IS TO BE COORDINATED WITH THE ARCHITECT
AND ARKTURA WITH SHOP DRAWINGS ARKTURA VAPOR CLUSTER SPARSE PANEL (2' x
AXIOM TRIM BRACKET (AS PER EXISTING RUBBER FLOOR TO REMAIN 4') TO BE INSTALLED AS PER MANUFACTURER'S
MANUFACTURER'S INSTALLATION SPECIFICATIONS AND INSTALLATION E301 N502 N501
GUIDELINES) EX GUIDELINES

6 FEATURE WALL - ENLARGED 7 3D - FEAUTURE WALL


A2.5 1 : 10 A2.5

13'-7"
4140

TELEVISION - SEE ELECTRICAL EMBEDDED IN WALL


HUMBER TO SUPPLY AND INSTALL BRACKET TO
6'-4 1/2"
HOLD TV TV TO BE MOUNTED BEHIND
1947

ARKTURA - VERTIKA TRIM (TO BE


INSTALLED AS PER MANUFACTURER'S
SPECIFICATIONS AND INSTALLATION ARKTURA - VERTIKA TRIM (TO BE
GUIDELINES) INSTALLED AS PER MANUFACTURER'S
SPECIFICATIONS AND INSTALLATION
GUIDELINES)

E301

3'-8 1/2"
1135
E301

N502
THE EXACT PATTERN/LAYOUT OF THE
N501 CUSTOM CUT VAPOR PANELS IS TO
BE COORDINATED WITH THE
ARCHITECT AND ARKTURA WITH
SHOP DRAWINGS

THE EXACT PATTERN/LAYOUT OF THE CUSTOM


CUT VAPOR PANELS IS TO BE COORDINATED
WITH THE ARCHITECT AND ARKTURA WITH SHOP
DRAWINGS

N502

N501
ARKTURA VAPOR CLUSTER SPARSE PANEL (2' x 4')
TO BE INSTALLED AS PER MANUFACTURER'S
SPECIFICATIONS AND INSTALLATION GUIDELINES

ARKTURA VAPOR CLUSTER SPARSE


PANEL (2' x 4') TO BE INSTALLED AS REVISIONS
PER MANUFACTURER'S
SPECIFICATIONS AND
NUMBER DATE REMARKS
INSTALLATION GUIDELINES

4 FEATURE WALL - ELEVATION 5 FEATURE WALL OPTION 2


A2.5 1 : 10 A2.5 1 : 10 TRIM BRACKET AS PER MANUFACTURER'S
SPECIFICATIONS 002 2020 08 18 ISSUED FOR TENDER

001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


N703 N703 N702 N702
N703 ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
N502 BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.

ATA ARCHITECTS
ATA ARCHITECTS INC.

OAKVILLE OFFICE:
211 LAKESHORE ROAD EAST,
OAKVILLE ONTARIO L6J 1H7

T 905 849 6986 F 905 849 4369


E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca

P02

N703 SEALS

N502
N501
N703

E301

PROJECT TITLE
EX-1
E301
EX-1
HUMBER COLLEGE FOOD
SERVICE - PHASE 1B (TECH KIOSK)
E301
TELEVISION - SEE ELECTRICAL
EMBEDDED IN WALL
HUMBER TO SUPPLY AND INSTALL 205 HUMBER COLLEGE BLVD, ETOBICOKE,
BRACKET TO HOLD TV
ON M9W 5L7

TELEVISION - SEE ELECTRICAL GC TO COORDINATE THE INSTALLATION OF THE


EMBEDDED IN WALL TELEVISION WITH THE INSTALLATION OF THE
DRAWING TITLE
HUMBER TO SUPPLY AND INSTALL ARKTURA FEATURE WALL ASSEMBLY
BRACKET TO HOLD TV ARKTURA VAPOR CLUSTER SPARSE PANEL (2' x 4') TO
FEATURE WALL DETAILS
BE INSTALLED AS PER MANUFACTURER'S
SPECIFICATIONS AND INSTALLATION GUIDELINES
DRAWN BY

N703
MK, AP, MJD
FURRING WALL BEHIND (REFER
TO WALL SCHEDULE) N703
SCALE
N501

EXISTING WALL ARKTURA CUSTOM CUT METAL ARKTURA LIGHT PANEL (REFER TO 1 : 10
PANELS ELECTRICAL AND MANUFACTURER'S
N502 SPECIFICATIONS) DATE
N502
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

ARKTURA PERFORATED PANEL


2020 08 18
N501 CHECKED BY
3'-1 1/2"
955

N101 MJD
WOOD STUD PROJECT NUMBER

19mm PLYWOOD
20-1352
N703
DRAWING NUMBER
LIGHT PANELS (2' x 4') LIGHT PANELS

EX N101 N101

A2.5
2020-08-19 9:09:49 AM

1 FEATURE WALL - TV MOUNT 2 3D - TV MOUNT (FEATURE WALL) 3 FEATURE WALL CONSTRUCTION ARKTURA CUSTOM CUT METAL PANELS. EXACT
A2.5 1 : 10 A2.5 A2.5 PATTERN/LAYOUT TO BE COORDINATED WITH
ARCHITECT AND ARKTURA
7 9
A2.6 A2.6
3 8
A2.6 A2.6

E202
11'-9 1/2"
E202 3594

6" 10'-9 1/2" 6"


152 3289 152

E202
N601
N401
N401 5'-4 1/2" 4'-0 1/2" 1'-4 1/2"
1645 1229 416
E201 E201 E201 E201

N601

25
1"
N401
N401

150
6"
1 1/2"
34
N705

2'-4 1/2"
722
1'-4 1/2"
425
3'-0"
919

3 1/2"
87
53
2"
1'-4 1/2" 1'-4"
425 406
N401

197
8"
EQ EQ EQ EQ EQ EQ EQ EQ

5 1/2"
144
1'-11" N705
586
2'-11" STORAGE INSIDE - LOCKABLE CABINET DOORS
890

4 1 - TECH KIOSK - COUNTER 1 - BACK ELEVATION


A2.6 1 : 10

3 1 - TECH KIOSK - COUNTER 1 - SIDE ELEVATION


A2.6 1 : 10

N401
3 8

A2.6 A2.6
11'-9 1/2"
3594
10'-11 1/2" N101
E201 N101 3346
N102 N104
10'-9 1/2"
3289

N401
7
A2.6

25
1"
N401
N603 N102 N702
E201
N703

N601

N401

E201 E201 E201 N603


9

2'-1 1/2"

2'-11"
2'-2"

3'-1"
A2.6

662

649

940

890
N101
E201

N102 N601

N101

25
1"
N102
N101

N102
N401

N705 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1 1/2"
406 406 406 406 406 406 406 406 38

N101 N102

N101
5 1 - TECH KIOSK - COUNTER 1 - PLAN
A2.6 1 : 10
N101

N102 N401
8 3
N601
N101 A2.6 A2.6

N601

25
1"
N703
N703

150
N401 REVISIONS

6"
N401 N401 STEEL HSS STRUCTURE NUMBER DATE REMARKS

1 1B - TECH KIOSK COUNTER 1 - 3D N705


E201 E201 E201
A2.6 N704
1'-4 1/2" 4'-0 1/2" 5'-4 1/2"
416 1229 1645

N705 N401 N601


TAPERED CORIAN EDGES
N603
WRAP STEEL AROUND
OPENINGS

150
6"
1'-4 1/2"
N702 DOOR

415
002 2020 08 18 ISSUED FOR TENDER

3'-0"
919

2'-4 1/2"
722
001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS

1'-9 1/2"
546
3'-0"
919
ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
N703 BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

N702 CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
N705 DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.

N705 ATA ARCHITECTS

132
5"
N704 ATA ARCHITECTS INC.
N702
OAKVILLE OFFICE:

197

197
8"

8"
211 LAKESHORE ROAD EAST,
N401
OAKVILLE ONTARIO L6J 1H7

T 905 849 6986 F 905 849 4369


E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca
N702
197
8"

SEALS
N601
E201

6 1 - TECH KIOSK - COUNTER 1 - SECTION 2 DETAIL 7 1 - TECH KIOSK - COUNTER 1 - FRONT ELEVATION
N703 A2.6 1:5 A2.6 1 : 10

N702

N704

PROJECT TITLE

N702 8 3
HUMBER COLLEGE FOOD
N703
7 9 A2.6 A2.6 SERVICE - PHASE 1B (TECH KIOSK)
A2.6 A2.6

N701 205 HUMBER COLLEGE BLVD, ETOBICOKE,


E201 E201 E201
ON M9W 5L7
N401

N401 DRAWING TITLE

E201 MILLWORK
N601
N703
DRAWN BY
N702
N701

N401
MK, AP, MJD
N705

N705
SCALE

1'-10 1/2"
N401 6

572
2'-4 1/2"
722

As indicated

2'-2"
660
A2.6
N705 DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

N704 N702
2020 08 18
N706 N704 CHECKED BY

3 1/2"
N705

89
N702
MJD
53
2"

1'-5 1/2" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4"


445 406 406 406 406 406 406 406 PROJECT NUMBER
5 1/2"
144

20-1352
DRAWING NUMBER

A2.6
2020-08-19 9:09:56 AM

2 1 - TECH KIOSK - COUNTER 1 - EXPLODED 3D


A2.6 8 1 - TECH KIOSK - COUNTER 1 - SECTION 2 9 1 - TECH KIOSK - COUNTER 1 - SECTION 1
A2.6 1 : 10 A2.6 1 : 10
FIRECAULK TYPICAL NEW WALL TO UNDERSIDE
OF DECK

EXISTING STRUCTURE TO
REMAIN - ATTACH TO EXISTING SEE CEILING DRAWINGS
STRUCTURE AS REQUIRED

ATTACH TO
EXISTING INTERIOR
STRUCTURE
ABOVE AS
NEW WALL NEW TILE (REFER TO INTERIOR ELEVATIONS AND
NEEDED
MATERIAL SCHEDULE FOR DETAILS) NEW PROVIDE EDGE SUPPORT FOR 5/8" REVEAL HANGING BRACKET
DRYWALL ATTACHMENT
NEW CEMENT BOARD (TYPICAL - ALL TILE IS TO
HAVE CEMENT BOARD BACKING)
TYPICAL
NEW SS ARCHITECTURAL L BEAD W\ CAULKING INSIDE TILE
NEW 16MM CEMENT BOARD (TYP. FOR BOTH SIDES) CORNER
NEW GROUT - TO MATCH TILE (SCHLUTER SCHIENE SS TYPE 304 BRUSHED)
6
ø 42
NEW ACOUSTIC CEILING 6" AXIOM PAIRED CUREVED (AXCUR) ø 534
TILE

NEW GRID TEE NEW ARCHITECTURAL L BEAD w/ TYPICAL


CAULKING NEW SCHLUTER QUADEC EDGE OUTSIDE
(TYP. FOR BOTH SIDES) PROTECTION (TYPICAL) TILE
STAINLESS STEEL CORNER
E202
DOUBLE STUD AT
OPENING SCHLUTER QUADEC EDGE
PROTECTION (TYPICAL) NEW 16MM CEMENT BOARD
STAINLESS STEEL NEW GROUT - TO MATCH TILE
NEW HOLLOW METAL DOOR FRAME DOUBLE STUD AT OPENING
NEW HOLLOW METAL DOOR FRAME
- FILL FRAME WITH INSULATION - FILL WITH ACOUSTIC INSULATION NEW MOSAIC TILE (REFER TO INTERIOR ELEVATIONS
NEW GROUT - TO MATCH TILE
- FRAME WIDTH TO MATCH WALL WIDTH (PLEASE - DOOR WIDTH TO MATCH WALL WIDTH AND MATERIAL SCHEDULE FOR DETAILS)
REFER TO FLOOR PLANS AND SCHEDULES FOR (PLEASE REFER TO FLOOR PLANS AND 5/8" REVEAL WITH
WALL THICKNESS) NEW TILE (REFER TO INTERIOR ELEVATIONS AND INTEGRATED TAPE
SCHEDULES FOR WALL THICKNESS)
- DOOR TO BE INSTALLED WITH THE FRAME MATERIAL SCHEDULE FOR DETAILS) LIGHTING. REFER TO
- DOOR TO BE INSTALLED WITH THE FRAME
CENTERED ON THE WALL CENTERED ON THE WALL ELECTRICAL DRAWINGS
FOR DETAILS

INTERIOR INTERIOR INTERIOR

NOTE:
GENERAL CONTRACTOR TO PROPERLY ASSESS
THE CONDITIONS OF THE EXISTING STRUCTURE
ABOVE. EXISTING STRUCTURE IS CURRENTLY
UNKNOWN.

12 TYPICAL NEW DOOR HEAD - STUD INTERIOR 11 TYPICAL SECTION THROUGH HM DOOR 10 TYPICAL INT & EXT TILE CORNERS 9 3D AXIOM 8 AXIOM PAIRED - PLAN
A3.1 1:5 A3.1 1:5 A3.1 1:5 A3.1 A3.1

16MM CEMENT BOARD


1'-3 1/2"
400

5 1/2"
140
ATTACH TO EXISTING STRUCTURE
ABOVE AS NEEDED
1" LUMIFROST DIFFUSED LED LIGHT PANELS

(4) - RICHELIEU TRIADE MAXI - CONCEALED MOUNTING


BRACKET
NEW SCHLUTER QUADEC EDGE
NON-RENOVATED
PROTECTION (TYPICAL)
EXISTING WALL AREA EXISTING WALL
STAINLESS STEEL
SEE DRAWINGS FOR TILE

NEW SLATE TILE BASEBOARD


NEW 100MM RUBBER BASE
NEW 3/4" DROP IN SCHLUTER RENO-U
ACOUSTIC CEILING TILE 16MM PLYWOOD BACKING NEW TILE (REFER TO INTERIOR STAINLESS STEEL
ELEVATIONS AND MATERIAL
SCHEDULE FOR DETAILS) NEW TILE NEW TILE
NEW TILE EXISTING RUBBER FLOOR
NEW 24mm WALL ANGLE NEW GRID TEE (REFER TO FLOOR PLAN FOR DETAILS)
SECTION

EXISTING WALL TO BE PAINTED (REFER TO FINISH


MATERIAL SAMPLE BOARD FOR DETAILS)

ANCHOR BOTTOM EXISTING/NEW FLOOR EXISTING INTERIOR EXISTING FLOOR STRUCTURE TO REMAIN
TRACK INTO CONC. (REFER TO FLOOR PLAN FOR DETAILS) (REFER TO FLOOR PLAN FOR DETAILS)
SLAB.

ANCHOR BOTTOM
TRACK INTO CONC.
SLAB.
NOTE:
REFER TO RCP FOR
INSTALLATION HEIGHT
AND GRID SPACING.

7 TYPICAL ACT CEILING AT EXISTING WALL 6 SECTION THROUGH DISPLAY SHELF


A3.1 1:5 A3.1 1 : 10 5 TYPICAL BASE OF WALL 4 TRANSITION BETWEEN RUBBER FLOOR AND NEW TILE 3 TYPICAL SLATE BASEBOARD
A3.1 1:5 A3.1 1:5 A3.1 1:5

REVISIONS

NUMBER DATE REMARKS

BLACK CEILING TILE T.

FIRE PROOF ALL EXPOSED STEEL - 1 HOUR

NON-RENOVATED TECH KIOSK STORAGE


AREA EXISTING WALL AREA
NEW 16MM DRYWALL
C01 002 2020 08 18 ISSUED FOR TENDER
NEW 100MM RUBBER BASE EXISTING CEILING 001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.
NEW TILE HSS STEEL BEAM SELF SUPPORTING
DESIGNED AND ENGINEERED BY THE CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND
KIOSK CONTRACTOR. SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.

19mm PLYWOOD ATA ARCHITECTS


ATA ARCHITECTS INC.
EXISTING STEEL STRUCTURE
CORIAN OAKVILLE OFFICE:
211 LAKESHORE ROAD EAST,
OAKVILLE ONTARIO L6J 1H7

T 905 849 6986 F 905 849 4369


ANCHOR NEW STUD INTO INTERIOR EXISTING FLOOR STRUCTURE TO REMAIN NEW SPRAY FIREPROOFING - 2 HOURS E admin@ataarchitectsinc.com
EXISTING WALL www.ataarchitectsinc.ca

ARKTURA VAPOUR CUSTOM BEAM COVER SEALS


MATCHING C01

1 SECTION THROUGH CEILING


2 TYPICAL NEW WALL @ BASE A3.1 1:5
A3.1 1:5

PROJECT TITLE

HUMBER COLLEGE FOOD


SERVICE - PHASE 1B (TECH KIOSK)

205 HUMBER COLLEGE BLVD, ETOBICOKE,


ON M9W 5L7

DRAWING TITLE

DETAILS

DRAWN BY

MK, AP, MJD


SCALE

As indicated
DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

2020 08 18
CHECKED BY

MJD
PROJECT NUMBER

20-1352
DRAWING NUMBER

A3.1
2020-08-19 9:10:05 AM
OPTION 2:
TACTILE WARNING SYSTEM ON TOP OF THE STAIR - OPTION 1:
N101 - HEXAGONAL TILE ON FLOOR AND
STARTING ONE TREAD DEPTH BACK - IN COMPLIANCE STAIR NOSING - M SERIES TILE NOSING N201 - STAINLESS STEEL CORRIDOR N104
N101 N111 WALL - CENTURA - MIKI TECHNO MBU-
WITH OBC SECTION 3.4.6.1 AND 3.8.3.18 BY KINESIK (CLEAR ANODIZED COLUMN CLADDING - NELSON INDUSTRIAL
xx/1X - BLACK - 1" TILE (2.3X2.6CM) -
ALUMINUM STANDARD - M4161.125 INC. - #4 BRUSHED
UNGLAZED MOSAIC - GROUT: DARK GREY
GREY NON-SLIP OR SIMILAR TO MATCH
TACTILE INDICATOR SYSTEM WIDTH OF 600mm IN
NEW TILE THICKNESS)
COMPLIANCE WITH OBC SECTION 3.4.6.1 AND
3.8.3.18

TACTILE INDICATOR SYSTEM BY KINESIK ALL HANDRAILS INSTALLED


(ADVANTAGE ONE PLATE TWSI - 316L MARINE GRADE AT LEAST 50mm FROM THE
ALIGN 12X12" STAINLESS STEEL STAINLESS STEEL - WITH CARBORUNDUM NON-SLIP WALL AS PER OBC
PLATES WITH ADJACENT TILES PLATE DOMES) SECTION 3.4.6.5

50
2"
1'-11 1/2"
600 SINGLE TREAD
DEPTH

3
A3.2

N104 N104 N104 N104 N104 N104 N104 N104

50
2"
6 8
A3.2 A3.2

VERTICAL SIDE OF THE RAMP TO


BE TILED WITH COBY SLATE
NATURAL CLEFT TILE SUPPLIED BY
HUMBER

HANDRAIL TO WRAP AROUND


CONTRAST STRIPS BY KINESIK (E 5 COLUMN CLADDING OPTION 1 - STAINLESS COVER PLAN DETAIL 7 COLUMN CLADDING OPTION 2 - TILE CLADDING PLAN DETAIL
SERIES - PHOTOLUMINESCENT
A3.2 1 : 10 A3.2 1 : 10
LEADING EDGE - GREY - E3061)

CONTRAST STRIPS BY KINESIK (E


SERIES - PHOTOLUMINESCENT
LEADING EDGE - GREY - E3061)

TACTILE INDICATOR N104 TACTILE INDICATOR SYSTEM


SYSTEM BY KINESIK BY KINESIK
(ADVANTAGE ONE PLATE (ADVANTAGE ONE PLATE
TWSI - 316L MARINE TWSI - 316L MARINE GRADE
50
2"

GRADE STAINLESS STEEL - STAINLESS STEEL - WITH


WITH CARBORUNDUM CARBORUNDUM NON-SLIP
NON-SLIP PLATE DOMES) PLATE DOMES)

U/S OF NEW CEILING 3160 U/S OF NEW CEILING 3160

2
ONE TILE WIDTH A3.2 ALIGN 12X12" STAINLESS STEEL
PLATES WITH ADJACENT TILES
ALIGN 12X12" STAINLESS STEEL
N104 N104 N210
PLATES WITH ADJACENT TILES
N104 N104 N104 OPTION 2:
N210 - PAINT TO BE SELECTED
BY THE ARCHITECT

COVER TO COME UP PAST THE


TAPER LINE TO REDUCE GAP
BETWEEN COLUMN AND
COVER
N201

N201
OPTION 2:
N101 - HEXAGONAL WALL TILE -
CENTURA - MIKI TECHNO MBU-
N101 OPTION 1: xx/1X - BLACK - 1" TILE
N201 - STAINLESS STEEL (2.3X2.6CM) - UNGLAZED MOSAIC -
CORRIDOR COLUMN GROUT: DARK GREY
CLADDING - NELSON
INDUSTRIAL INC. - #4 BRUSHED
N201

1 RAMP AND STAIRS PLAN


A3.2 1 : 25

REVISIONS

NUMBER DATE REMARKS

U/S OF NEW CEILING 3160


LA JOLLA SERIES STAINLESS WALL
MOUNTED HANDRAIL BRACKETS
BY CRL
(#4 BRUSHED STAINLESS STEEL
FINISH) RAILING TO EXTEND A MIN. OF
300mm PAST LEADING EDGE OF
THE RAMP IN COMPLIANCE
WITH OBC SECTION 3.8.3.4.
RAILING TO EXTEND A MIN. OF
300mm PAST LEADING EDGE 1 1/2" DIAMETER CIRCULAR
OF THE RAMP IN COMPLIANCE HANDRAIL AS PER OBC
WITH OBC SECTION 3.8.3.4. SECTION 3.4.6.5.
(PIPE RAIL TUBING - #4
1'-0" BRUSHED STAINLESS STEEL 002 2020 08 18 ISSUED FOR TENDER
300
FINISH BY CRL)
001 2020 08 04 TENDER

CONTRACTOR IS TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS


HANDRAIL 965mm IN HEIGHT ON THE PROJECT AND REPORT ANY DISCREPANCIES TO THE ARCHITECT
AS PER OBC SECTION 3.4.6.5. BEFORE PROCEEDING WITH THE WORK. DRAWINGS ARE NOT TO BE SCALED.

CONTRACT DOCUMENTS ARE THE COPYRIGHT OF THE CONSULTANTS AND


SHALL NOT BE USED OR REPRODUCED WITHOUT AUTHORIZATION.
DOCUMENTS ARE TO BE RETURNED UPON COMPLETION OF THE PROJECT.
1'-0"
309
ATA ARCHITECTS
TOP OF RAMP 900 ATA ARCHITECTS INC.

VERTICAL SIDE OF THE RAMP OAKVILLE OFFICE:


TO BE TILED WITH COBY SLATE 211 LAKESHORE ROAD EAST,
NATURAL CLEFT TILE SUPPLIED OAKVILLE ONTARIO L6J 1H7
BY HUMBER
NEW FLOOR FINISH 13 NEW FLOOR FINISH 13 T 905 849 6986 F 905 849 4369
E admin@ataarchitectsinc.com
www.ataarchitectsinc.ca

NEW FLOOR FINISH 13

01 - MAIN FLOOR 0
SEALS

2 RAMP SECTION 6 COLUMN CLADDING OPTION 1 - STAINLESS COVER SECTION 8 COLUMN CLADDING OPTION 2 - TILE CLADDING SECTION
A3.2 1 : 25 A3.2 1 : 10 A3.2 1 : 10

PROJECT TITLE
TACTILE WARNING SYSTEM ON TOP OF
THE STAIR - STARTING ONE TREAD DEPTH
BACK - IN COMPLIANCE WITH OBC
HUMBER COLLEGE FOOD
SECTION 3.4.6.1 AND 3.8.3.18
SERVICE - PHASE 1B (TECH KIOSK)
TACTILE INDICATOR SYSTEM BY KINESIK STAIR NOSING - M SERIES TILE NOSING BY
(ADVANTAGE ONE PLATE TWSI - 316L KINESIK (CLEAR ANODIZED ALUMINUM
MARINE GRADE STAINLESS STEEL - WITH STANDARD - M4161.125 GREY NON-SLIP OR 205 HUMBER COLLEGE BLVD, ETOBICOKE,
CARBORUNDUM NON-SLIP PLATE DOMES) SIMILAR TO MATCH NEW TILE THICKNESS)
TACTILE SURFACE RAILING TO EXTEND A HANDRAIL 965mm IN HEIGHT ON M9W 5L7
INDICATOR BY KINESIK MIN. OF 300mm PAST AS PER OBC SECTION 3.4.6.5.
THE LEADING EDGE

1 1/2" DIAMETER CIRCULAR HANDRAIL DRAWING TITLE


AS PER OBC SECTION 3.4.6.5.
(PIPE RAIL TUBING - #4 BRUSHED DETAILS
STAINLESS STEEL FINISH BY CRL)
? N104
LA JOLLA SERIES STAINLESS WALL
600mm TACTILE INDICATOR SYSTEM ONE TREAD DEPTH
DRAWN BY
1'-0" MOUNTED HANDRAIL BRACKETS BY CRL
300 2"
(#4 BRUSHED STAINLESS STEEL FINISH) 54
TOP OF RAMP 900 MK, AP, MJD
RAILING TO EXTEND A MIN. OF SCALE
NDITIONS
SUIT

300mm PAST THE LEADING EDGE


N104
TILE SIZE TO

AS PER OBC SECTION 3.4.6.5


EXISTING CO

As indicated
3'-2"
965

1'-0"
300 N104
DATE
BIM 360://20-1352 - Humber Phase 1B/20-1352 - Humber Food Phase 1B - WD_detached.rvt

TOP OF RAMP 900

2020 08 18
NDITIONS

STAIR NOSING - M SERIES TILE NOSING N104


EXISTING CO SUIT

4
BY KINESIK (CLEAR ANODIZED CHECKED BY
TILE SIZE TO

A3.2
ALUMINUM STANDARD - M4161.125
GREY NON-SLIP OR SIMILAR TO MATCH N104
NEW TILE THICKNESS) 10" MJD
257

DARK GREY GROUT AT PROJECT NUMBER


ALL TILE CONNECTIONS
NEW FLOOR FINISH 13
NDITIONS

AS REQUIRED
EXISTING CO SUIT

20-1352
TILE SIZE TO

01 - MAIN FLOOR 0 N104


N104 DRAWING NUMBER

A3.2
2020-08-19 9:10:07 AM

3 STAIRS SECTION 4 STAIRS SECTION - NOSING DETAIL


A3.2 1 : 25 A3.2 1:5

You might also like