You are on page 1of 4

ferri yanto

PPIC DEPT. HEAD(4 thn)


ORIGA MULIA FRP (ORI GROUP)
Telah melamar:19 Oct 2020 Terakhir diperbarui:6bulan Terakhir aktif:6bulan

IDR 15,000,000 Sarjana (S1) Tangerang,Banten

Mengapa merekrut Saya?


"Having several experiences ( planning, continuous improvement/ CI, Production etc ) from reputable and
multinational company will be make your company step forward with continuous improvement and making big
contribution on the future"

Pengalaman

21 Tahun total pengalaman

May 2017-Sekarang PPIC DEPT. HEAD


3 tahun 9 bulan ORIGA MULIA FRP (ORI GROUP)|Banten,Indonesia

Industri Polymer/Plastik/Karet/Ban
Spesialisasi Manufaktur/Operasi Produksi
Bidang Pekerjaan Manajemen
Tingkat Jabatan Manajer/Asisten Manajer
Gaji Bulanan IDR 1,500,000

1. Making/Measure of Cycle time/SMV (standard Production Minutes) from ( Ftackle


/export, Local/tank/customized, pultrusion and roofing also packing/logistic to
measure/making report performance every process (operator/ dept).
2. Making and analysis for Master schedulling ( section Ftackle /export,
Local/tank/customized, pultrusion and roofing ) per section for 1 and 3 month ( weekly basis
) and brain storming with Marketing/sales, purchasing team also operational team
(production).
3. Analysis & controlling to Provide management material from planning and schedulling
dept. requirements, All material such as Resin, Mat(roving,tissue etc) Assesories & packing
type of tank, product etc.
4. Controlling & Responsible for material supply from the warehouse for production, such
checking the the total material per plan and material description which are being used for
the plan.
5. Material status: Controlling & Checking (minimun & maximum) for up dates and total
incoming for all materials (Material Resin, Mat, roving, tissue (direct), Accessories etc
(indirect) and consumable material etc ) based on PPIC or Material Planning Requirement
(MPR)
6. To Following Planning & Controlling for daily issues during production such preparation,
which has caused material consumption exceed the allowance being provided -
( achievement Plan vs Actual).
7. Preparing data for manhours and worker needed all dept. for a Weekly and month
forward.
8. Planning & estimate ( Loadability, Capacity etc ) for preparing from packing and due date
for export.

Jul 2013-Oct 2016 Industrial engineering head & Clay Plan (schedulling)
3 tahun 4 bulan PT Doulton|Banten,Indonesia
Industri Manufaktur/Produksi
Spesialisasi Teknik - Industri
Bidang Pekerjaan Teknisi Industri/Produksi
Tingkat Jabatan Manajer/Asisten Manajer
Gaji Bulanan IDR 11,000,000

Measure and making cycle time for all area from Clay (9 dept. --> Cup cast., pressure cast.,
flat shop, bench cast., etc). --> verified and save data on database company.

Making report performance per individu /operator for overall dept. and meeting every week
with dept. which not achieve target ( performance target 95%). --> control manual display in
every dept. performance board.

Making report productivity per line/section for 1week achievement. brainstorming with
operational (production) every 2 week for advantage, challenge (SWOT - Strength,
weakness, opportunity, threats) and report for bonus achievement target every month
(assessment every 3 month) --> (productivity, quality and absenteeism)

Making clay plan (master plan for all dept.) based on planning from PPIC and meeting with
operation and PPIC for working hours ( reguler time/ overtime ) and manning ( operator
usage ) for effectively and efficient on production).

Measure cycle time ( standard productive time) to make report performance individual and
dept.

To make sure all dept. Operational getting well in efficient and effectiveness

Controlling manning in every dept to achieve good productivity.

Making planning and scheduling working hours based plan PPIC to control working standard
hours base on Qty order. Need OT or not

making report productivity and OEE (machine) to ensure all dept reach great performance.

Jan 2010-Jun 2013 Industrial Engineer


3 tahun 6 bulan PT. PANCAPRIMA EKABROTHERS|Banten,Indonesia

Industri Pakaian
Spesialisasi Teknik - Industri
Bidang Pekerjaan Teknisi Industri/Produksi
Tingkat Jabatan Manajer/Asisten Manajer
Gaji Bulanan IDR 8,000,000

1. Making/collect Improvement everymonth every day and report to Buyer ( Adidas ) and
Nike every month (KPI) (WIP (inventory), Leadtime, RFT, Kaizen/improvement etc ) and
presentation for factory meeting every month for progress from factory adidas group and 3
month to Nike (NOS).
2. Making lean system at all dept. of production and office to achieve lean manufacturing
(6S, Eliminate 8 Waste, TPM (Total Productive Maintenance), QCO, Lay Out & LOB (Line
of Balancing), Improvement/kaizen etc ) At all factory.
3. Training and socialization for all implementing lean system in factory to all employee.
4. Controlling and analysis for productivity, Quality and Lead time with KPI ( Key
performance Index ) for all factory ( W/H, Cutting, Vendor/Supplier, Stitching,
2nd process/Artwork (Bonding & heattransfer, Embroidary & quilting, Printing, &
Finishgood).
5. Preparing all element Lean manufacturing audit with schedule 3 month per once (Nike)
and 6 month for Adidas also other buyer (TNF, Salomon etc) .
Mar 2007-Oct 2009 ASSISTANT MANAGER PPIC
2 tahun 8 bulan PT HOMEWARE INT' INDONESIA|Indonesia

Industri Manufaktur/Produksi
Spesialisasi Teknik - Lain-lain
Bidang Pekerjaan Manajemen
Tingkat Jabatan Manajer/Asisten Manajer

MRS ( MATERIAL REQUEST STATUS) ARRANGEMENT


PLANNING FOR DAILY, WEEKLY AND MONTLY
SCHEDULING FOR BATCHING STYLE
CONTROLLING PACKING AND FINISHING
SCHEDULING EXPORT

Oct 2006-Feb 2007 ASSISTANT MANAGER IE


5 bulan PT POONG WON INDONESIA|Indonesia

Industri Manufaktur/Produksi
Spesialisasi Teknik - Lain-lain
Bidang Pekerjaan Manajemen
Tingkat Jabatan Manajer/Asisten Manajer

IMPLEMENT LEAN MANUFACTURING


TRAINING LEAN TO ALL EMPLOYEES
ARRANGE AUDIT FROM ADIDAS
CONTINUOUS IMPROVEMENT

Nov 2001-Oct 2006 Industrial Engineering


5 tahun PT. KMK Global Sports|Tidak Spesifik

Industri Manufaktur/Produksi
Spesialisasi Teknik - Industri
Tingkat Jabatan Supervisor/Koordinator
Gaji Bulanan IDR 2,500,000

To coordinate at Cell :
1. Making time study & Line balancing
2. Check main problem at Cell and making kaizen.
3. Check and audit 6 S and 8 Waste at Cell.

Pendidikan

Jun 1999 STMI


Sarjana (S1)dalamTeknik (Industri)|Indonesia

Jurusan Technical Industry


Tingkat Teknik (Industri)

Keterampilan
Menengah project management,Managerial & Skill Controlling
Bahasa
Tingkat kemampuan: 0 - Buruk, 10 - Sempurna

Bahasa Bicara Menulis

English 7 7

Penilaian Bahasa Inggris JobStreet (JELA)

Nilai 4/40

Informasi tambahan
Gaji yang diharapkan IDR 15,000,000

Preferensi Lokasi Kerja Banten,Jakarta Raya,Jawa Barat

Tentang Saya
Jenis Kelamin Laki-laki

Umur 46

Rincian kontak  085847571002 (+62) 021-59407348  ferrikomalasari_ie@yahoo.co.id

Alamat Citra raya Graha pesona Jl. Widara 15, Blok W 33 No. 11, Tangerang, 15710,
Banten, Indonesia

Kewarganegaraan Indonesia

You might also like