An Experienced and Skilled Individual Whose Main Job Is to Focus on Plans, Direct and Coordinate the Production
Performance and Maintenance Of Equipment’s As well As Other Machinery Found In Industrial Plants: Management
And planning Of Scheduling Of Maintenance To Regularly Checks Pristine Working Conditions Of Machinery. Seeking
assignments In Operations & Maintenance with a Growth Oriented Organization of Global Presence To augment My
Skills and Be a Value Addition to the firm as Well.
KEY COMPETENCIES / SKILL SETS

 Self-Motivated and Hard work.


 Able to Manage Multiple Task.
 Preparing Job History Card for Production.
 Effective Supervision of Bottling Operation.
 Monitoring Performance of Bottling Equipment viz; Carousal, VLD. OLD, sealing. Machines Daily basis.
 Eliminate Idle Running of Equipment and Wastage of Power and Water.
 Record Maintenance.
 Monitoring of Minimum Spares Required for Maintenance activities.
 Preparing Daily/Weekly Preventive Maintenance for All Filling Shed, Equipment And DG, Air Compressor,
LPG Pump, Compressor, Fire Engine.
 Effective Cost Control Measure Through Nil Cost Time.
 Effective Power Saving, Innovative ideas.
 Vessel Line Up for Bulk Decantation and Filling.
Utilization Of available manpower
 SAP.

EXPERIENCE

COMPANY DESIGNATION YEARS


Aegis Gas (LPG) Private Limited Plant-Engineer From June 2023 -
Nagpur (M.H.) India.

 Shift Supervision, Planning, The Loads as Per Market Requirements.


 Quality Control Checks on LPG Cylinder Valves Regulators & Other Consumables.
 Exposure In SAP (Product Development, MM&PM, invoicing, Billing, PO, Nc/ Surrender Etc.)
 Daily Monitoring of Stock Loss of Bulk LPG.
 MIS (Management information System), Preparation of Monthly Plant Operations Report in Coordination
with Other Departments and Forwarding to RO.
 Man Management- Hr. activities of Company Workers.
 Inventory Management & Reconciliation (LPG Cylinder, Valves, Regulators, & Other Consumables.)
 Upkeeping & Periodic Maintenance of Safety Equipment’s Consisting of Fire Engines, Safety Relieve Valves
Remote Operated Valve, Unloading Arms for Decanting, HLA for Pressure Vessel, PPes, Sprinklers Fire
Extinguishers, Hydrant Point DV, Safety Management Mock Drill Plan.
 Stock Report, OPS MIS Report Final, Filling Plant Overhead Report & Client Bill Report prepared on a
Monthly Basis.
 Meeting Required of OISD Standards, ISO Standards for Plant Quality, Environments &Safety Management
System.
 To carry out all Health & Safety “Management” and productivity related activities in LPG bottling plant
updates is on SAP Database.
 Induction and routine inspection of TT’s. Ensuring proper and correct lineup for loading and unloading
Of TT’s.
 To ensure reporting & investigation of all incidents, Near Miss report, Observations Discussing same with
team members and take necessary corrective action. Ensuring that people are adhered to all Health &
Safety requirements.
 Conduct Daily toolbox talk with team members and share feedback, observation develop H&S culture at
plants.
 Implementation of PPE, Work permit System As per Requirements. Carry out audits for the same to check
the effectiveness of implementation.
 Conduct location safety Committee meetings, Audits internal & External Mock Drills Training and other
activities as per safety management Plan.
EXPERIENCE

COMPANY DESIGNATION YEARS


Bharat petroleum corp. Ltd (LPG Operation From December-
Bottling Plant) Indore (India) Officer (G.E.) 2018. To Sept-
(In a Contract – payroll) 2022

 Monitor of Cylinder Inventory.


 Inspection of Market Return Cylinder / Recommendation for Credit.
 Preparing Proper Co-ordination with Planning Officer for Production.
 Carry Out Statistical Quality Control and Do Analysis for In House Rejection /Deviation and Market
Defect.
 Cap Repair, Valve salvaging, Stay Plate Repair, Dpt Listing.
 Understand the contractual terms and conditions.
 Supervision of In-House Hydro Testing of Dpt Cylinder.
 Preparing for Purging Virgin New / DPT Cylinder and Filling Lpg in It.
 Maintain All Safety Tripping of Entire Filling Shed.
 Monitoring The Washing Unit for all LPG Cylinder Who’s the Incoming Cylinder with Multiple Force Jet of
Water to Remove Mud Dirt Properly.
 Checking pre-Filling and post Filling of LPG Cylinders and Maintaining Records.
 Monitoring All the Driving unit Gear Box, Chain Conveyor, Telescopic Conveyor.
 Ensuring That No Undesirable Material Is Present in The Plant, Which Can Produce a Spark.
 Attending conference and industry events.

Major Project Handling


 In BPCL Plant, We Did Three Bullet Hydro-Testing in A Capacity Of 150 Mt Of Each.
 In a Bullet Hydro-testing We maintain all the safety Pattern Like, Safety Cap and Shoes, Hand Gloves,
Boiler Suit, Safety Belt, Face Mask.
 Preparing Of all The Hydro-Testing Equipment Like; Pressure Gauge, Hydro-Pump, Blind Flange, N.R.V.,
Flow Meter, Ball Valve, Gasket (Metallic and Paper), Emery Papers, Tool Kits, Spanner Etc.
 In 150 Mt Capacity of three Bullet, We Did Care Fully Inspection With Tools are; Ultra-Sonic Thickness
Gauge, MPTI, Dye Penetrant Kit, Paint Thickness Gauge, Dip Gauge, Measuring Tape, Inspector Hammer,
Safety Torch, Hardness Gauge, Radio-Grapy Equipment, Lamp, water finding Paste, Magnetic Yoke (Have
02 Pole North /South)
 Performing an Overnight Chicken Test Inside the Bullet to observe Oxygen Concentration Levels.
 LPG Pipe- Line Hydro-Testing From, Filling Shed, Tank lorry, LPG Storage Area.
EXPERIENCE

COMPANY DESIGNATION YEARS


Automotive Stampings and Assemblies GET (Production December-2015
Limited (a TATA Enterprises) Chakan )& toDecember-2016
Pune (India) (Press Shop & Feb-2017 to Sept-2017
Trainee)

Worked as a Graduate Engineer on Tata Auto-Comp We Learned and Saw Automotive Stampings and Assemblies Limited
Has Extensive Manufacturing Quality, Capability, To the Present and Future demand Of large Segment Of The Automotive
and Non-Automotive Industry.

 Multiple project execution with Our Client Are, Tata Motors, Piaggio, JCB, General Motors, Fiat, Ashok-
Leyland to Supply Different Types Of products.
 Preparing Job History Card for Each Parts.
 Product Supply Co-ordinations on Powder Coated Or, Painted, Natural Finish Condition and Autophoretic
Coating.
 Planning and overseeing new market initiatives
 Preparing For Managing Sheet Metal with Oil solution, To Supply on Press Machine.
 Implementation and Monitoring with Range of Press Machine Like Hydraulic and Mechanical Single
Acting and Double Action.
 For Sheet Metal Cutting Different Stampings Press Machine Are 1000 Ton Double Action press, 600 Ton
Single Press Machine, 1000 Ton hydraulic Press Machine, 630 Ton Single Press Machine.
 Adjusting The Dye According to The Product Parts for The Stampings Press Machine.
 Proper Co-ordination with Manpower to Use Safety shoes, Safety Helmet, When Oil Fallen to the Press
Machine
 Preparing For Proper Segregation of Scrap During Cutting of Sheet Metal.
 Products are Manufactured are Skin Panels, Cabin Floor, Roof, Side Panel, Front Mudguard, Front Door
Panel, Face Slide for Truck and Bus, Bonnet Outer Parts, Body in White Structural Parts, Fuel Tanks,
Chassis And Suspension, Oil Sumps.

ACHIEVEMENTS AND EXTRACURRICULAR:

 Awarded 1st Rank In Inter School Level Sports And cricket Championship
 Involved In Various Cultural Activities Held At School And College.
 Community Service
 Peer tutoring
 Volunteering
 Sports Crickets.
ACADEMICS

Degree Institute Board/ Aggregate (%) Year


University

B.E.(Mech) Chhattisgarh Engineering College Durg. Chhattisgarh 72.65% 2015


(India) Swami
Vivekananda
Technical
University, Bhilai
(India)

H.S.C Mata Karma Higher Secondary School CGBSE 74% 2010


Patewa Rajim. (India) Raipur
S.S.C Govt High School Khola Abhanpur (India) CGBSE 74.66% 2008
Raipur

VOCATIONAL TRAINING

Organization : Bhilai Steel Plant, (SAIL) Durg.


Duration : 15 Days.

ACADEMIC PROJECT

Project Title : Electrical Power Steering System.


Description : Electrical power Steering System Eliminate the Need for A Pump, Hoses and A Drive Belt
Connected to The Engine Using Variable Account Power. The Configuration of EPS System Can
Allow the Entire Power Assist System to Be packaged On the Rack and Pinion Steering Gear.
Duration : 12 months

IT SKILLS

IT skills: SAP, MS Office, Windows and Internet Application, MS Power point.


PERSONAL SYNOPSIS

Date of Birth : 25th April 1993


Languages known : English and Hindi (Read, Write & Speak)
Hobbies : Playing Cricket, Listening Songs, Gardening
Marital Status : Married

DECLARATION

I hereby declare that the above written particulars are true to the best of my knowledge and belief.

THANK YOU

DATE:
PLACE: VIKAS MESHRAM

You might also like