You are on page 1of 2

~ --

11111
Hill International JABAL OMAR DEVELOPMENT PROJECT
./
DOCUMENT TRANSMITTAL FORM {DTF)
Contract No: 883 IWork Package: CN12
TO: MIS. EHAF Consulting Engineers TRANS. N0:883-4-Z04-W04Z-C-CN 12-RCC-ECE-TRN-NA-06 15
FROM: Ruwad Civil Construction (RCC) DATE: 28-Sept-2014
ATTN: Mr. Ahmed Atta (CRE) C/REF:

WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN:


~ Documents ~ Approval 0 A -Approved

D Drawings/Sketch Review & Comments 0 0 B -Approved as noted,


Incorporate Comments

~~~~----------~~~--~----------~
0 Report 0 As Requested 0 C- Approved with Comments,
Revise & Re-subm it
0 Change Order 0 lnfonnation I Records Only
0 Letter 0 For Necessary Action 0 D- Rejected
0 Invoice D Other: 0 N- Noted
0 BOQ/Speciflcation &£NT VIA: D R- Reviewed as Compliant

~
Other: Method Statement & t8J Attached 0 S- Reviewed as Noted,
Inspection and Test Plan Incorporate comments
0 Separate Cover
0 T- Reviewed w ith comments,
Revise & Re-submit

Item Subotftta1 or Document No. Rev. Date Description of Submittal or Copies


No. No. Document Title
Method Statement. Inspection & Test
883-4-Z04-W04Z-C-CN12-
1 00 28-Sept-1ll Plan for Construction of Tunnel 3 Hard
RCC-SBT -C0-0361
~-,,,,~ RetaininQ Wall.
2 Soft

As per Attached list

*Approval Status*:

Item
No.
t-.:::.'"1 " { ~ ..
I------+---------·--········-··-----------+---+------+--------·-----H-~-4l
-'!.:::-H-.U..-_.~\ll-=--,-lr..l-1..,..,f-!.i~---
t-·--·-J+--------+--+I------!----------------------ll+~~...~~.~-\-~\~~-,
• .JI!..- -)-1-,).-.•~.....u.------

.L!_-_-_-_-_-_---..L+-i======~----~-----~--------_-:_-_-_-_----~_,_,~t._,-:~!...j'
r-----=-1_._-_-_-_-_-_-_-_-_-_-_-_-_-_-_:!-_-_-_.. .,!!- ..~ira-.
,..rt----';;77¥----r'-----
sender Name: Engr. Nabil Abdul Samad
r--::
~;
~- - w:
_,.
=
y--><->
Designation: ~-~-:-~~-.:;:s~~~!~~ Ma~age!_~y ~ned by S~der

Received By Recipient Date Title

Copy Distribution
0 Jabal Omar Development Co [gl Hill International 0 0

*Legends: A - Approved B- Approved As Noted, Incorporate Comments C - Approved With Comments, Revise & Resubmit D- Rejected
R- Reviewed As Com liant S-Reviewed As Noted, Incorporate Comments T -Reviewed with comments, Revise & Resubmit N- Noted
Page 1 of 1 Doc./Form No: PSA-883-PP-02-05-FM Rev.O
Revision Date: 0
Ifil l
Hill International JABAL OMAR DEVELOPMENT PROJECT

DOCUMENT SUBMITTAL FORM- CONSTRUCTION CONTRACTORS


Contract No: 883 I Work Package: CN12
TITLE: Method Statement, Inspectio n & Test
SUBMITTAL NO: 883-4-Z04-S09 -C-CN12-RCC-SBT-C0-0361
Plan
TO: EHAF Consulting Engineers REV. No.: 00
FROM: Ruwad Civil Construction (RCC) DATE: 28-09-2014
ATTN: Mr. Ahmed Atta (CRE) ORIG. REF: -

TYPE OF SUBMITTAL 0 PQD - Pre-Qualification


0 SDS - Shop Drawing Schedule 0 SMP - Samples 0 OMM - Operating & Maintenance Manuals
0 SCE - Program I Schedule 0 SHD - Shop Drawings 0 QPP - Quality Plans & Procedures -
[81 ITP - Inspection & Test Plan 0 MUP - Mock Ups & QC Panels 0 INC - Insurance Certificates
[81 MST - Method Statement 0 TST - Test reports 0 PBW - Bonds, Guarantees, Warranties

0 MPD - Product & Materials Data


0 ABO - As Built Drawings
0 OTH -Dthers-
SUBMITTAL DISCIPLINE & DESCRIPTION
[81 C-Civil 0 S-Structuraf 0 A-Architectural 0 E-Efectrical O M-Mechanical 0 G-General 0 0 -Coordination
0 1-lnterior Design 0 T-Sections 0 U-Urban I Master Planning
_!VI~d Stateme~~ pection_ & Test P I~ for Con~~~~!!~~!!i_!lj_~JL"Y.~--

[8:1 A-Approval D R-Review & Comments Q-As Requested D !-Information I Records Only D N-Action D 0-0thers
Engr. Nabil Abdul Samad
Submitted By Contractor's Rep.: (Sr. Construction Manager)

PROJECT MANAGEMENT CONSULTANT'S REVIEW

Signature:
Name:
-------------------- Date: ----------
CLIENT'S COMMENTS (optional)

Name: Signature: Date:


---------
SUPERVISION CONSULT ANT'S COMMENTS
D A -Approved 0 B - Approved As Noted, Wor1<. May 0 C- Approved With Comments, 0 D- Rejected 0 N -Noted
Proceed - Incorporate Comments Wor1<. May Not Proceed,
& Resubmit Within ...... Days Revise & Resubmit

D R -Reviewed As Compliant D S- Reviewed As Noted, lncorp. Comments D T- Reviewed With Comments, Revise I Resubmit

For & On behalf


Name: Signature: Date:

Page 1 of 1 Doc./Form No: PSA-883-PP-02-06-FM Rev.2


Revision Date: 15-Mar-2011

You might also like