Professional Documents
Culture Documents
Status (√)
No Objek Inspeksi Standard Desain Aktual Toleransi Alat Inspeksi Remarks
G NG N/a
4 Surface Profile As Per Paint Manuf As Per Paint Manuf Profil Meter x Press o Film
14 Steel Temperature ISO 8502-4° Above 4°C from Dew point Above 3°C from Dew
Sketsa
Catatan :
Sign
CHECK SHEET PAINTING INSPEKSI
QC Insp
QUALITY CONTROL DEPARTMENT Tanggal : No. Dokumen : Tanggal
Hull No :
Sign
Project Name : Keterangan : : Diterima : Hasil Perbaikan
Nama Bagian : : Ditolak QC Eng
Blasting Material : G : Good Tanggal
Paint Manufacture : NG : Not Good Kesimpulan
TERIMA / TOLAK
Status (√)
No Objek Inspeksi Standard Desain Aktual Toleransi Alat Inspeksi Remarks
G NG N/a
1 DFT Measurement SSPC PA 2 As Per Paint Spec Average ,Min 80% DFT for Single spot, DFT Gauge
4 Sagging, Orange Peel As Per Paint Manuf Free Profil Meter x Press o Film
6 Burnmark Free
8 Flaking Free
11 Blister Free
19 Steel Temperature ISO 8502-4° Above 4°C from Dew point Above 3°C from Dew
Sketsa
Catatan :
Blasting Result 1st Coat 2nd coat
Bottom Flat 0%
Bottom Chine P
Bottom Chine S
Top Side P
Top Side S
5%