You are on page 1of 26

Metode NCEER - NSPT

Kedalaman 2 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 18
D50 = 0,3
FC = 28,5
MAT = 1,1 m
γb = t/m3
γsat = 1,68 t/m3

Pemyelesaian
Tabel Nilai Gamma
kedalaman γb γsat
0,00 - 1,10 1,58 -
1,10 - 1,15 - 1,58
1,15 - 3,00 - 1,68
3,00 - 10,00 - 1,75
10,00 - 15,00 - 1,65
15,00 - 22,00 - 1,79
22,00 - 24,00 - 1,78

0m

1,1 m γb = 1,58 MAT = 1,1


γsat = 1,58
1,15 m

γsat = 1,68
3m

γsat = 1,75
10 m

γsat = 1,65
15 m

γsat = 1,78
22 m

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,68 t/m3

- 2
σ0 = (ybx1,1)+(γsat(1,15 -1,1))+(γsat(2-1,15))
= (1,58x1,1) + (1,58 x 0,05)+(1,68x0,85)

= 3,245
υ0 = γw x hw
= 1 x 0,85
= 0,85
σ0' = σ0 - υ0
= 2,395

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 2
= 0,9847
3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 3,245 x 0,9847


σ0' g 2,395

τav = 0,260
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 28,5 :
α = ,
α = 𝑒 4,600

hitung β (cek persyaratan)


β = 0,99 + (FC^1,5/1000)
β = 0,99 + (26,6^1,5/1000)
β = 1,1421

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 1,5325
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 2,395 t/m2
= 0,235517355 atm

CE, CB, CR, CS lihat tabel 6-4

safety hammer, CE = 0,7-1,2


ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB = 1,15


Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 2 x 1,5413 x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 2,51146389
(N1)60CS = α + β (N1)60
(N1)60cs = 14,421

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 14,421 + 50 + 1
19,5785 135 35309,1391 200

CRR7,5 0,1643

6. Tentukan MSF Untuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5 - 8,1 = 0,4


B2 = 8,5 - 8,0 = 0,5

x = H1-(B1/B2)X(H1-H2)
x = 0,72 - (0,4/0,5) x (0,72 - 0,84)
= 0,816
FSM = 0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,1643 : 0,196 0,816 )
FK = 0,684 < 1, Likuifaksi

Kedalaman 3 M
Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 2
D50 = 0,12
FC = 14,6
MAT = 1,1 m
γb = t/m3
γsat = 1,68 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,68 t/m3

- 3

σ0 = (yb x 1,1) + (γsat (1,15 - 1,1))+ (γsat (3-1,15))


= (1,58 x 1,1) + ( (1,58 - 0,05))+ (1,68 (1,85))
= 4,925
υ0 = γw x hw
= 1 x 1,9
= 1,9
σ0' = σ0 - υ0
= 3,025
2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 3
= 0,97705

3. Hitung NCSR
τav = 0,65 a max x υ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 4,925 x 0,9847


σ0' g 3,025

τav = 0,313
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 14,6 :
α = ,
α = 𝑒 2,384

hitung β (cek persyaratan)


β = 0,99 + (FC^1,5/1000)
β = 0,99 + (15,7^1,5/1000)
β = 1,0458

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 1,4691
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 3,025 t/m2
= 0,297469728 atm
CE, CB, CR, CS lihat tabel 6-4

safety hammer, CE = 0,7-1,2


ambil CE rata-rata = 0,95
Diameter Borehole 200 mm, CB 1,15
=
Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 3 x 1,3941 x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 3,611341786
(N1)60CS = α + β (N1)60
(N1)60cs = 12,385

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 12,385 + 50 + 1
21,6150 135 32930,4065 200

CRR7,5 0,1445

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,976
0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,1445 : 0,313 0,816 )
FK = 0,377 < 1, Likuifaksi

Kedalaman 5 M
Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 30
D50 = 0,23
FC = 15,27
MAT = 1,1 m
γb = t/m3
γsat = 1,75 t/m3
Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
V γb =
- 1,1 γsat = 1,75 t/m3

- 5

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(5-3))


= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x2)
= 8,425
υ0 = γw x hw
= 1x3
= 3,9
σ0' = σ0 - υ0
= 4,525

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 5
= 0,96175

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 8,425 x 0,96175


σ0' g 4,525

τav = 0,349
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)
Untuk FC = 18,4 :
α = ,
α = 𝑒 3,316

hitung β (cek persyaratan)


β = 0,99 + (FC^1,5/1000)
β = 0,99 + (18,4^1,5/1000)
β = 1,0689

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 1,3374
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 4,525 t/m2
= 0,444975378 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB 1,15


=
Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 5x 1,2691x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 5,479185356
(N1)60 = α + β (N1)60
(N1)60cs = 24,027

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 24,027 + 50 + 1
9,9734 135 47646,6636 200

CRR7,5 0,2843

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,976
0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,2843 : 0,349 0,816 )
FK = 0,664 < 1, Likuifaksi

Kedalaman 7 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 12
D50 = 0,17
FC = 12,2
MAT = 1,1 m
γb = t/m3
γsat = 1,75 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,75 t/m3

- 7

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(7-3))


= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x4)
= 11,925
υ0 = γw x hw
= 1 x 0,5
= 5,9
σ0' = σ0 - υ0
= 6,025

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 7
= 0,94645

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 11,925 x 0,94645


σ0' g 6,025

τav = 0,365
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 12,2 :
α = ,
α = 𝑒 1,622

hitung β (cek persyaratan)


β = 0,99 + (FC^1,5/1000)
β = 0,99 + (12,2^1,5/1000)
β = 1,0326

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 1,2273
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 6,025 t/m2
= 0,592481028 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB = 1,15


Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 7x 1,1696 x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 7,039614259
(N1)60 = α + β (N1)60
(N1)60cs = 18,685

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 18,685 + 50 + 1
15,3148 135 40558,0258 200

CRR7,5 0,2099

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,976
0,816
7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,2099 : 0,365 0,816 )
FK = 0,469 < 1, Likuifaksi

Kedalaman 10 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 16
D50 = 0,2
FC = 23
MAT = 1,1 m
γb = t/m3
γsat = 1,75 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,75 t/m3

- 10

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(10-3))


= (1,58x1,1)+(1,58x0,0,50)+(1,68x1,85)+(1,75x7)
= 17,175
υ0 = γw x hw
= 1 x 8,9
= 8,9
σ0' = σ0 - υ0
= 8,275

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 10
= 0,9235

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'
τav = 0,65 0,3 x 17,175 x 0,9235
σ0' g 8,275
τav = 0,374
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 23 :
α = ,
α = 𝑒 4,059

hitung β (cek persyaratan)


β = 0,99 + (FC^1,5/1000)
β = 0,99 + (22,9^1,5/1000)
β = 1,1003

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 1,0925
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 8,275 t/m2
= 0,813739503 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB = 1,15


Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 10x 1,0809x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 8,951629532
(N1)60 = α + β (N1)60
(N1)60cs = 46,180

5. hitung CRR7,5
CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 46,180 + 50 + 1
-12,1804 135 83138,5962 200
CRR7,5 0,2656

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816
FSM = 0,9760,816
7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,2656 : 0,374 0,816 )
FK = 0,580 < 1, Likuifaksi

Kedalaman 13 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 2
D50 = 0,18
FC = 25,6
MAT = 1,1 m
γb = t/m3
γsat = 1,65 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,65 t/m3

- 13

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(10-3))+(γsat(13-10))


= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x7)+(1,65x3)
= 22,125
υ0 = γw x hw
= 1 x 0,5
= 11,9
σ0' = σ0 - υ0
= 10,225

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 13
= 0,90055

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 22,125 x 0,90055


σ0' g 10,225

τav = 0,380
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 25,6 :
α = ,
α = 𝑒 4,350
hitung β (cek persyaratan)
β = 0,99 + (FC^1,5/1000)
β = 0,99 + (26,6^1,5/1000)
β = 1,1195

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 0,9975
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 10,225 t/m2
= 1,005496848 atm
CE, CB, CR, CS lihat tabel 6-4
safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm,CB = 1,15


Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 13x 0,9908x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 10,62532691
(N1)60 = α + β (N1)60
(N1)60cs = 58,111

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 58,111 + 50 + 1
-24,1112 135 106319,2380 200

CRR7,5 0,3944

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,3944 : 0,380 0,816 )
FK = 0,847 < 1, Likuifaksi
Kedalaman 15 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 30
D50 = 0,23
FC = 27,6
MAT = 1,1 m
γb = t/m3
γsat = 1,65 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,65 t/m3

- 15

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(10-3))+(γsat(15-10))

= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x7)+(1,65x5)
= 25,425
υ0 = γw x hw
= 1 x 0,5
= 13,9
σ0' = σ0 - υ0
= 11,525

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 15
= 0,88525

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 25,425 x 0,88525


σ0' g 11,525

τav = 0,381
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 27,6 :
α = ,
α = 𝑒 4,529
hitung β (cek persyaratan)
β = 0,99 + (FC^1,5/1000)
β = 0,99 + (29,9^1,5/1000)
β = 1,1350

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 0,9429
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 11,525 t/m2
= 1,133335078 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB = 1,15


Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 15x 0,8853x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 11,58829491
(N1)60CS = α + β (N1)60
(N1)60cs = 65,640

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 65,640 + 50 + 1
-31,6401 135 122412,3121 200

CRR7,5 0,4600
6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,4600 : 0,381 0,816 )
FK = 0,986 < 1, Likuifaksi

Kedalaman 18 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 10
D50 = 0,44
FC = 24,6
MAT = 1,1 m
γb = t/m3
γsat = 1,79 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0
- 0 XXXXX
γb =
- 1,1 γsat = 1,79 t/m3

- 18
σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,1))+(γsat(10-3))+(γsat(15-10))+(γsat(18-15))

= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x7)+(1,65x5)+(1,79x3)
= 30,795
υ0 = γw x hw
= 1 x 0,5
= 16,9
σ0' = σ0 - υ0
= 13,90

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 18
= 0,8623

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 30,795 x 0,8623


σ0' g 13,895

τav = 0,373
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 24,6 :
α = ,
α = 𝑒 4,246
hitung β (cek persyaratan)
β = 0,99 + (FC^1,5/1000)
β = 0,99 + (24,5^1,5/1000)
β = 1,1120

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 0,8572
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 13,895 t/m2
= 1,366394005 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB = 1,15


Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 18x 0,8112x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 12,64312882
(N1)60 = α + β (N1)60
(N1)60cs = 67,745

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 67,745 + 50 + 1
-33,7450 135 127114,4564 200

CRR7,5 0,4776

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,4776 : 0,373 0,816 )
FK = 1,046 > 1, Tidak Likuifaksi
Kedalaman 22 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 28
D50 = 0,22
FC = 21,3
MAT = 1,1 m
γb = t/m3
γsat = 1,79 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,79 t/m3

- 22

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(10-3))+(γsat(15-10))+(γsat(22-15))

= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x7)+(1,65x5)+(1,79x7)
= 37,955
υ0 = γw x hw
= 1 x 0,5
= 20,9
σ0' = σ0 - υ0
= 17,055

2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 22
= 0,8317

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 37,955 x 0,8317


σ0' g 17,055

τav = 0,361
σ0'
4. Hitung (N1) 60cs
(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 21,3 :
α = ,
α = 𝑒 3,824
hitung β (cek persyaratan)
β = 0,99 + (FC^1,5/1000)
β = 0,99 + (23,8^1,5/1000)
β = 1,0883

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 0,7646
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 17,055 t/m2
= 1,677139241 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB 1,15


=
Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 22x 0,7211x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 13,78374374
(N1)60CS = α + β (N1)60
(N1)60cs = 67,705

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 67,705 + 50 + 1
-33,7054 135 127025,1750 200
CRR7,5 0,4772
6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,4772 : 0,361 0,816 )
FK = 1,079 > 1, Tidak Likuifaksi

Kedalaman 24 M

Data :
amax = 300 gal = 0,3 g
Magnitude = 8,1
NSPT = 53
D50 = 0,52
FC = 21,3
MAT = 1,1 m
γb = t/m3
γsat = 1,78 t/m3

Penyelesaian :
1. Hitung σ0' dan σ0

- 0 XXXXX
γb =
- 1,1 γsat = 1,78 t/m3

- 24

σ0 = (ybx1,1)+(γsat (1,15 -1,1))+(γsat(3-1,15))+(γsat(10-3))+(γsat(15-10))+(γsat(22-15))+(γsat(24-22))

= (1,58x1,1)+(1,58x0,05)+(1,68x1,85)+(1,75x7)+(1,65x5)+(1,79x7)+(1,78x2)
= 41,515
υ0 = γw x hw
= 1 x 0,5
= 22,9
σ0' = σ0 - υ0
= 18,62
2. Hitung rd

rd = 1 - 0,00765z
= 1 - 0,00765 x 24
= 0,8164

3. Hitung NCSR
τav = 0,65 a max x σ0 x rd
σ0' g σ0'

τav = 0,65 0,3 x 41,515 x 0,8164


σ0' g 18,615

τav = 0,355
σ0'

4. Hitung (N1) 60cs


(N1)60cs = α + β (N1)60
hitung α (cek persyaratan)

Untuk FC = 21,3 :
α = ,
α = 𝑒 3,824
hitung β (cek persyaratan)
β = 0,99 + (FC^1,5/1000)
β = 0,99 + (23,8^1,5/1000)
β = 1,0883

(N1)60 = NmCNCECBCRCS
hitung (N1)60
CN 2,2
1,2 + σ0'
Pa
CN = 0,7259
Pa = 1 tm
1t/m2 = 0,0983371 atm
σ0' = 18,615 t/m2
= 1,830545117 atm

CE, CB, CR, CS lihat tabel 6-4


safety hammer, CE = 0,7-1,2
ambil CE rata-rata = 0,95

Diameter Borehole 200 mm, CB 1,15


=
Rod length 2 m, CR = 0,75
Metode Sampel Standar, CS = 1
(N1)60 = NmCNCECBCRCS
(N1)60 = 22x 0,7211x 0,95 x 1,15 x 0,75 x 1
(N1)60 = 13,08601208
(N1)60CS = α + β (N1)60
(N1)60cs = 64,278

5. hitung CRR7,5

CRR7,5 1 + (N1)60CS + 50 + 1
34-(N1)60CS 135 10((N1)60CS+45)^2 200

CRR7,5 1 + 64,278 + 50 + 1
-30,2782 135 119417,2569 200
CRR7,5 0,4485

6. Tentukan MSFUntuk M > 7,5 : direkomendasikan menggunakan MSF yang dianjurkan oleh
Idriss (Tabel 6.5, kolom 3).
Interpolasi
H1 = 0,72
H2 = 0,84

B1 = 8,5-8,1
= 0,4
B2 = 8,5-8,0
= 0,5

x = H1-(B1/B2)X(H1-H2)
X = 0,816

FSM = 0,816

7. Hitung FK
FK = (CRR7,5/CSR)MSF
FK = ( 0,4485 : 0,355 0,816 )
FK = 1,031 > 1, Tidak Likuifaksi