Section at A-A, 1:50

Cable Elevation, El1 = Gl + 0.30

Backfilling must be done


after cable hoisting in layers
of 30 cm thickness and good
Min. 30 Section Quantity Weight
Part No Working Drawing
compaction of each layers is [mm] [nos] Kg/pc total Kg
required
Ri-Bar φ 20
1 l = 2100
8
2100
5.19 41.52R

............
Stirrup φ 12
150 50 2 l = 3550
12
bend stirrups
80 x 80 cm
3.15 37.80R

5 Bulldog Grips 800


3
φ 26 mm Bulldog Bulldog Grip for Cable φ 26 mm
Trench excavation
required
3 Grip
φ 26
10 MS forged, according to ISI standard,
hot dip galvanized
1.10 11.00D

A = 90.32 kg. D = 11.00 kg. R = 79.32 kg.


............ El2 = El1 - 3.10 Total transportation Weight, D+R Bulldog Grips Reinforcement Steel
180 575

12 Nos. Stirrups 2x4 = 8 Nos. Ri-Bars 200 Standard Quantities


2 80x80 cm,φ 12 mm, 1
φ 20 mm, l = 2100
c/c ~ 30 Type of Construction [m3]
full surface to be
protected by
Concrete 1:2:4 9.45
drystone pitching
Concrete 1:3:6 0.51
Plan, 1:50
Broken Stone for Dry
2.20
Stone pitching

Total 12.16

4 Nos. Ri-Bars
1
φ 20 mm, l = 2100

Center Line of Bridge


A A
5 Bulldog Grips
3
for Cable φ 26 mm
HMG / Ministry of Local Development
DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
No: Bank: Span:
Steel & Construction Drawing :
12 Nos. Stirrups
2 Main Cable Deadman Anchor
φ 12 mm
for Suspension Bridges, 2 Main Cables φ 26 mm
for all Soil Types in Flat Ground
Direct Cable Connection, c/c1 = 2.50 m
7.55
Anchor Type DA 5
Date : July 15, 2002 Drawing No. 42/2Ncon