PROJECT TITLE: PROPOSED BUNGALOW RESIDENTIAL BUILDING

LOCATION: BARANGAY OF FERIA, SAN FELIPE, ZAMBALES

BILL OF MATERIALS
CLEARING AND GRABBING
LENGTH WITDTH AREA((SQ.M.) M/COST L.COST(40%)
7.83 12 93.96 TOTAL: 6,577.20 2,630.88

EXCAVATION:
STRUCTURE DIMENSION PIECES VOLUME U-COST M/COST L.COST(40%)
Length Width Height cu.m pesos pesos
Site Excavation Footings 81.4 0.5 0.6 1 24.42 400.00 9,768.00
1.2 1.2 1.7 16 39.17 400.00 15,667.20
TOTAL: 25,435.20 10,174.08

CONCRETE WORKS
STRUCTURE DIMENSION PIECES VOLUME
Length Width Height pcs. cu.m
Footing 1.20 1.20 0.30 16 6.91
Columns 0.30 0.30 3.90 16 5.62
Beams 60.50 0.20 0.30 1 3.63
Wall Footing 81.40 0.50 0.20 1 8.14
Flooring 12.00 7.83 0.15 1 14.09
TOTAL = 42.23

DESCRIPTION RATIO PIECES U-COST M/COST L.COST(40%)


Cement 1 331.82 bags 225.00 74,658.73
Sand 2 18.58 cu.m 350.00 6,503.60
Gravel 4 37.16 cu.m 1000.00 37,163.46
TOTAL: 118,325.79 47,330.32

REINFORCING STEEL BARS


BAR BAR TOTAL
NO. OF
LOCATION DIA. BAR LENGT WEIGH WEIGHT NO. M/COST L.COST(40%)
BARS
H T ( Kg)
COLUMN 12mm 6 3.9 0.888 20.78 16 16,623.36
COLUMN 10mm 6 3 0.616 11.09 16 8,870.40
BEAM 12mm 6 20 0.888 106.56 1 5,328.00
BEAM 10mm 6 50 0.616 184.80 1 9,240.00
SLAB 10mm 6 312 0.616 1153.15 1 57,657.60
CHB BARS 10mm 6 63 0.616 232.85 1 11,642.40
TOTAL 109,361.76 43,744.70

MASONRY
STRUCTURE DIMENSION OPENINGS AREA VOLUME
Walls Length Height Width sq.m sq.m. cu.m
Exterior 38 3.1 0.15 14.89 102.91 15.44
Exterior 9.5 0.6 0.15 0 5.7 0.86
Interior 22.3 2.5 0.1 9.24 46.51 4.65
TOTAL: 155.12 20.94
STRUCTURE DIMENSION OPENINGSAREA QUANTITY U-COST M/COST L.COST(40%)
House Walls Length Height sq.m sq.m. pcs. pesos pesos
Exterior 6"CHB 38.00 3.90 14.89 133.31 3554.93 15.00 53,324.00
Exterior 6"CHB 9.50 0.60 0.00 5.70 152.00 15.00 2,280.00
Interior 4"CHB 22.30 3.10 9.24 59.89 1597.07 12.00 19,164.80
TOTAL: 74,768.80 29,907.52

DESCRIPTION RATIO PIECES U-COST M/COST L.COST(40%)


Cement 1 191.97 bags 300.00 57,591.88
Sand 2 10.75 cu.m 350.00 3,762.67
TOTAL: 61,354.54 24,541.82
TILE WORKS
LOCATION DIMENSION AREA TILE AR PIECES U-COST M/COST L.COST(40%)
Floor Length Width sq.m. sq.m pcs. pesos pesos
BATHROOM
Ceramic Tiles .2m x .2m x
1.50 1.50 2.25 0.04 56.25 50.00 2,812.50
6mm thk.
Ceramic Tiles .2m x .2m x
1.50 1.80 2.70 0.04 67.50 50.00 3,375.00
6mm thk.
Walls 1.50 1.50 2.25 0.04 56.25 50.00 2,812.50
Walls 1.80 1.50 2.70 0.04 67.50 50.00 3,375.00
Vinyl Tiles .3mx .3m 89.00 0.09 988.89 35.00 34,611.11
TOTAL: 46,986.11 18,794.44
PAINTING WORKS
LOCATION AREA COAT SQ.M U-COST M/COST L.COST(40%)
Exterior wall 104.28 x 2 Coats 208.56 160.00 33,369.60
Interior wall 177.98 x 2 Coats 355.96 200.00 71,192.00
Ceiling 94.00 x 2 Coats 188 160.00 30,080.00
TOTAL: 134,641.60 53,856.64
DOORS AND WINDOWS
DESCRIPTION DIMENSION PIECES AREA U-COST M/COST L.COST(40%)
Length Width sq.m. pesos pesos
Flush Doors 6mm marine
2.10 0.80 3 5.04 3,000.00 9,000.00
plywood
Sliding Door 2.10 0.90 1 1.89 10,000.00 10,000.00
Pvc Doors 1.20 0.60 2 1.44 1,500.00 3,000.00
CASEMENT WINDOW
Window 1 1.60 1.30 6 12.48 3,500.00 21,000.00
Window 2 1.00 0.60 1 0.60 2,500.00 2,500.00
Window 3 0.40 0.40 2 0.32 1,000.00 2,000.00
TOTAL: 47,500.00 19,000.00
FENCING WORKS
STRUCTURE DIMENSION OPENINGSAREA QUANTITY U-COST M/COST L.COST(40%)
GATE Walls Length Height sq.m sq.m. pcs. pesos pesos
Exterior 6"CHB 9.50 0.80 0.00 7.60 202.67 15.00 3,040.00 1,216.00
Exterior 6"CHB 48.29 2.50 0.00 120.73 3219.33 15.00 48,290.00 19,316.00

LOCATION dia.bar bar(L) no. bar bar T.wt (kg) no. M/COST L.COST(40%)
CHB BAR 12mm 6 73.24 0.888 390.22 1 19,511.14 7,804.45
DESCRIPTION RATIO PIECES U-COST M/COST L.COST(40%)
Cement 1 352.89 bags 300.00 105,868.13
Sand 2 19.76 cu.m 350.00 6,916.72
Masonry Volume = 19.2488 TOTAL: 112,784.84 45,113.94

DESCRIPTION meter no. U-COST M/COST L.COST(40%) T/TOTAL


Baluster 8 8.00 2000 16,000.00 6,400.00
Gate 2.5 1.00 10000 10,000.00 4,000.00
Gate Fence 9.5 9.60 2000 19,200.00 7,680.00

CARPENTRYWORKS
DESCRIPTION DIMENSION AREAPROD.AREA PIECES U-COST M/COST L.COST(40%)
Length Width sq.m sq.m pcs. pesos pesos
Ceiling Gypsum board
7.00 12.00 84.00 2.88 29.17 500.00 14,583.33
1.2m x 2.4m x 12mm thk
2.00 5.00 10.00 2.88 3.47 500.00 1,736.11

Internal & External Ceiling


94.00 500 30,680.56
(Board & Joist)

TOTAL: 47,000.00 18,800.00

PLUMBING FIXTURES
DESCRIPTION QUANTITUNIT U-COST M/COST M/TOTAL L.COST(40%)
pesos pesos
Water Closets 2 set 5000 10000
Kitchen sink 1 set 3000 3000
Lavatory Faucet 2 set 500 1000
Lavatory 1 set 2500 2500
Shower heads 2 set 2500 5000
Faucet 4 pcs. 250 1000
Floor drain 3 pcs. 250 750 TOTAL: 23,250.00 9,300.00

PLUMBING WORKS ** Roughing-In TOTAL: 25,000.00 10,000.00

PLUMBING FIXTURES
DESCRIPTION QUANTITUNIT U-COST M/COST M/TOTAL L.COST(40%)
pesos pesos
Convenience Outlet (Duplex Universal) 9 set 70 630
Aircon Outlet (Single) 2 set 90 180
Lighting (2 gang switch with LED) 2 set 80 160
Lighting (1 gang switch with LED) 4 set 50 200
Ceiling Receptacle 8 set 15 120
Electrical Flexible Hose (100 meters) 1 set 850 850
Wire and Cables 1 lot 3000 3000
Electrical Panel Board (Delta brand) 1 set 370 370
Safety Breaker 3 set 370 1110 TOTAL: 6,620.00 2,648.00

ELECTRICAL WORKS *** Roughing-In TOTAL: 30,000.00 12,000.00

ROOF FRAMING WORKS


DESCRIPTION PRODUCT DIMENSION AREAROOF AREA PIECES U-COST M/COST L.COST(40%)
Width Length sq.m sq.m / m pcs pesos pesos
Long Span
sheet 1.2m x 1.20 6.00 4.80 232.07 48.35 500.00 24,173.96
4m
Truss Steel 6.00 242.98 40.50 450.00 18,223.50
Other Expense 50,000.00
TOTAL: 92,397.46 36,958.98
GRAND TOTAL:
T/TOTAL
9,208.08

T/TOTAL

35,609.28

T/TOTAL

165,656.11

T/TOTAL

153,106.46
T/TOTAL

104,676.32

T/TOTAL

85,896.36

T/TOTAL

65,780.56

T/TOTAL

188,498.24

T/TOTAL

66,500.00

T/TOTAL

4,256.00
67,606.00

T/TOTAL
27,315.59
T/TOTAL

157,898.78

T/TOTAL
22,400.00
14,000.00
26,880.00

T/TOTAL

65,800.00

T/TOTAL

32,550.00

35,000.00

T/TOTAL

9,268.00

42,000.00
T/TOTAL

129,356.44
1,509,262.22