Professional Documents
Culture Documents
From:
VIPULKUMAR NARSINHBHAI NAVIK
At : Madhav Nagar, Vill : Bhimpore,
Post : Dumas, Tal : Choryasi,
Dist : Surat – 395007
Gujarat State, INDIA
Work No. +97474494301
Mobile no: + 91 – 9998307981
E-mail: vipulkumar_navik@yahoo.com
Dear Sir,
Enclosed please find attached my detailed Curriculum Vitae for your kind Attention and
Consideration for the Subject Position In your Esteemed Organization.
I have 13 Years experience (both India and Overseas) as a MECHANICAL
COMMISSIONING TECHNICIAN in different phases of projects namely, pre
commissioning, commissioning, start up and normal operations. Mechanical
field, During My overseas employment I have been worked for various States owned
International companies major Oil & Gas, petrochemical industries. I have worked for different
process Refineries, LNG Gas Plants, Fertilizers, Petrochemicals Plants, & HRSG Power plants
etc.
If you give me an opportunity to work under your kind control, I will discharge my duties
to the entire satisfaction of my superiors.
If you need further details please feel free to contact to my above address.
Thanking you,
Yours faithfully
VIPUL N. NAVIK
ACADEMIC QUALIFICATION:
Vinay Vidhyalay High School, Surat (S.S.C).
TECHNICAL QUALFICATION:
DIPLOMA IN MECHANICAL ENGINEERING
Page 1 of 5
Experience Summary
≥ Carried out overhauling, repairing preventive, breakdown, and shutdown maintenance, trouble
shooting, condition monitoring, alignments, and hydro testing, of rotating & static equipments, using
measuring tools.
≥ Control the manpower and completion the job within schedule, receiving permit from operation
and accept job side supervisor completed job with safely and timely, Repairing, and installing
equipments make report daily activities After completing the job hand over to process and test runs
the equipments.
≥ Erection Commissioning and maintenance activities Coordinate and participate in the preventive,
corrective and troubleshooting maintenance activities of the plant equipment at the assigned location
and conducted Toolbox meetings with subordinates for discussing safety and methods of completing
job tasks.
≥ Overhauling, preventive, breakdown like pumps, compressors, fin fans blowers, heat exchangers,
column, and using all type of measuring tools like micrometer, Verneer caliper depth gauge etc.
≥ Erection, alignments, installing, of rotating and static equipments, like boiler feed pumps, FD
Fans, air preheated, and heat exchangers, vessels, and columns.
≥commissioning experience of Reliance Petrochemical Company in VCM, PVC, Polyethylene, Gas
Cracker plant, and Jamnagar Refinery Aromatic tran1, 2, and 3 and CCR HNNU,
OFFSHORE TRAINING
≥ I have attended and qualified for HSE, HSE-MS Tools & Skills, H2S, Permit -to-Work (PTW
Holder) Safety Leader ship, (SLS) Gas taster, Course
≥ I have trained for the H2S/SCBA Fire fight, Course
≥ HSE Course Permit to Work course basic and intermediate permit performing party
Authorization
≥ Attended basic and advanced Fire Fighting Course, health and Safety training Course
≥ Attended confined space and fire fighting, HSE course, etc.
Page 2 of 5
WORK OF EXPERIENCE IN INDIA AND ABROA
Period
No Name of Company Designation
From To
TECNIMONT AL DABIYYA SURFACE Mechanical
1. FACILITIES PHASE III,AT ABU Commissioning 09/12/2018 11/04/2019
DHABI Technician
Mechanical
SCHLUMBERGER ,AT KUWAIT
2. Commissioning 07/05/2018 03/11/2018
(KOC)
Technician
Mechanical
SAMSUNG C&T COMPANY, AT AL
3. Commissioning 22/8/2016 28/2/2018
WAKRAH, QATAR (NES GLOBAL)
Technician
STAR SERVICES THOUGH GASCO Mechanical
4. ASAB Commissioning 29/1/2016 23/4/2016
COMPANY, AT ABU DHABI Technician
Mechanical
QATAR KENTZ THROUGH RASGAS
5. Commissioning 15/10/2013 31/01/2015
OFFSHORE COMPANY, AT DOHA QATAR
Technician
Mechanical
ADMA OPCO THROUGH GISCO
6. Commissioning 13/12/2011 19/08/12
COMPANY, AT DAS ISLAND, ABU DHABI
Technician
SBM OFFSHORE CONTRACTORS INC. Mechanical
7. THOUGH SPIE OIL & SERVICES MIDDLE Commissioning 10/03/2011 12/04/2011
EAST L.L.C., AT ABU DHABI Technician
SBM OFFSHORE CONTRACTORS INC. Mechanical
8. THOUGH SPIE OIL & SERVICES MIDDLE Commissioning 04/12/2010 01/03/2011
EAST L.L.C., AT ABU DHABI Technician
SBM OFFSHORE CONTRACTORS INC. Mechanical
9. THOUGH SPIE OIL & SERVICES MIDDLE Commissioning 13/06/2010 27/10/2010
EAST L.L.C., AT ABU DHABI Technician
KETAN ENGINEEING SERVICE PVT. LTD.,
Mechanical
10. THOUGH RELIANCE INDUSTRIES LTD., AT 12/12/2009 23/10/2010
HAZIRA, SURAT Technician
Page 3 of 5
Mechanical
12. KBR, INC. IRAQ Maintenance 14/03/2005 02/12/2007
Technician
SAGAR CONSTRUCTION THOUGH OIL &
Mill Wright
13. NATURAL GAS CORPORATION LTD., AT 10/02/2002 08/01/2005
HAZIRA, SURAT Fitter
≥ During my job I had worked on various static & rotating equipments details of which are given below:
PUMPS:
≥ worked in single and multi stage centrifugal and reciprocating pumps with following activities.
≥ Erection and leveling of base plate and alignment of driver shaft with highest degree of accuracy .
≥ overhauling of various makes pumps i.e.Sulzer, Worthington, Sun dyne, Khimline, Kirloskar, Ebara
Bwip, Gould’s, Etc.
≥ all types of Mechanical seal overhaul & replacement (i.e. single, double & cartridge seals).
≥ Preventive maintenance, condition monitoring, Trouble shooting, break down maintenance and shut
Down maintenance of all type of pumps.
COMPRESSORS:
≥ Worked on multistage centrifugal, reciprocating and screw compressors (various make i.e. Borsig,
Ingersoll-Rand, Nuovo Pig none, Hoyden UK, Elliot, Atlas Cop co, Jay Machinery, and Hitachi Four Stage
Refrigeration Compressors etc.
≥ Overhauling, carried out preventive maintenance, break down, and shut down maintenance, replacements of
rotor, bearings, labyrinth, centering of the rotor and seal oil & lube oil system of Centrifugal Compressors.
≥ Checking bearing clearances, web deflection and piston run out, stand out, pumping Clearance, Cross head
clearances, Testing of Suction and Discharge valves, replace of piston ring and rider rings of
Reciprocating Compressors etc.
≥ Alignment of compressors with various methods like Double dial method, Triple dial method and reverse
dial indicator method, and Lesser Alignments with Apt alignment, depending upon the vendor’s
requirement.
Steam Turbine:
≥ Worked on erection, commissioning, overhauling, preventive maintenance, over speed trip test, condensing
and non-condensing type such as throbbing, innersole rand, Nuovo pig none, dressarrand Mitsubishi and
Escoda etc.
≥ Checking bearing redial and axial clearance, labyrinth clearance, carbon seal clearance, nozzle clearance,
etc.
≥Replaced bearing, labyrinth, carbon seal, throttle valve etc.
Gas Turbine:
≥ Overhauling & running Maintenance Shut down Maintenance, preventing maintenance, and replaced de fog
and intake air filters,
Page 4 of 5
≥ Cleaning of Fuel burners in Combustion chamber, inspection of Bleed valves, Crank washing of Rotors,
changing of Gas generator & aligning with Power generator, Inspection, Checking clearance and changing
of Bearings and labyrinths seals Diagnosis fault finding in lube oil circuits.
For Catering the power requirement og HBI modules, captive power plant (C.P.P.) with 20.2
MW Frame – 9, General Electricl make Gas Turbine until was instlled and commissioned. Later
on, for best utilization of the heat energy content of hot exhaust gases from Gas Turbine, the
plant was converted to a combined cycle power generation unit by installation of Heat recovery
steam generator (Boiler) and 11.1 MW SKODA make steam turbine unit.
C.P.P is connected with the main 220 KV supply bus (GRID) through a 40 MVA transformer
located in 220 KV switchyard. Normally, CPP operates in synchronized condition with GRID to
have an alternate power source of 220 KV always available.
C.P.P. meets the complete power requirement of two modules of HBI units. With a 380 KVA
D.G. set, CPP has black start facility and suppliers emergency power at 6.6 KV through a 12.5
MVA transformer for STEEL-II as well as EpcL for their 6.6 KV Gas turbine start up motor.
C.P.P. has got the facility to start the unit independently without external power support, if the
fuel (natural gas / HSD and naphtha) is available.
FUNCTIONAL DESCRIPTION
Page 5 of 5
The 32 MW Captive power Plant is basically divided in three sub parts.
Gas Turbine Generator – 20.2 MW
50 TPH Heat Recovery Steam Generator (H.R.S.G.0
Steam Turbine Generator – 11 MW
Gas Turbine is having dual firing facility and can run with liquid fuel (naphtha/HSD) of gaseous
fuel or also with mix fuel of both.
PERSONAL PROFILE:
I wish to submit this application of mine for your kind perusal for the position of
MECHANAICL TECHNICIAN of maintenance, experience in Oil & Gas , Petroleum,
Fertilizer, Petrochemical and Refinery facilities, LNG Gas plants and Power plants seeking
challenging carrier. I would be happy if I am given a chance to meet you for further discussion.
Page 7 of 5