Fire All vehicules must be equiped by flame hider
Classified area: nearby Pipeline
HC/Pressure of piping ( Gas line)
Rollover of Truck Ensure rotating beacon and handbrake are working.
Accidents Make sure handbrake is applied when stopped
Crushing Plan trip to make sure load will pass under any building
Fire projections
Collision Operator to ensure safe distance behind vehicles in front
Check that fire extinguisher is on truck, easily accessible
and is full.
Engine to be turned off before refueling
Check that fuel cap is in place and not damaged.
Visual check for any oil or fuel leaks before travel
Operator to be vigilant. Arrange for an observer if
possible when backing or tipping
No-one to get between cab and truck tray while engine is
Sand transportation using dumper running
truck Ensure all areas around truck tray are clear before raising
or lowering of tip tray
Operators to check truck daily and ensure no overloading
and tyre pressures are OK.
Care to be taken when lowering tailgate of tray sides
Ensure tray tailgate and sides are fully secured before
travel
Do not exceed rated truck capacity
No bare feet or thongs
Operators to be verified as competent
Assess ground conditions before tipping and no persons
are near the truck
Ground to be level and solid before carrying out tipping
Arrange for an observer if possible.
backfilling
HE manipulation. Restricted area set and delimited with hard barricades.
Page 1 of 4
Visibility obstruction. Designated access to the excavation prepared and free
Personnel close to HE in operation. from obstruction.
Dust generating. Backfilling tuff shall be discharged at a safe distance
Particles projection in the eyes. from the excavation and pushed by the front loader.
Equipment fall into the excavation Ensure a safe operating distance from the excavation
Slip, trip & fall edges.
TBT.
Supervision.
PPE.
Slip, trip & fall • Training for good work practices to be held on site
Waste • TBT in place before job, housekeeping issue to be
mentioned in all TBT
Poor stationnement • Personnel to end the day by cleaning, inspecting
equipment and good housekeeping.
Cleaning &Housekeeping • Waste management plan is in force during project
• Waste to be removed in time as per CONTRACTOR waste
management plan
• Personnel to perform cleaning and housekeeping without
abuse to their bodies
PPE / SYSTEMS /STANDARDS / PROCEDURES REQUIRED TO DO THE JOB
Standard PPE Additional PPE Specific procedures / Other systems
Standards:
Hard hat Face shield Fall protection barrier
Safety boots /shoes Chemical Warning barrier
Coverall resistant apron Warning signs
Standard work gloves Chemical Lockout/tagout
resistant gloves
Safety glasses Work permit required
Chemical
Goggles Hot work permit
resistant boots
Ear plug Confined space
Respiratory permit
Ear muffs protection Cold work permit
Dielectric gloves
Body harness fall
protection
Fire extinguisher
Others