Scope of QS Services

1 Preparation of cost estimates (required in the Bid Document)


2 Preparation of cost breakdown (BQ) based on Tenderer's Proposal (required in
3 Managing Tender Addendums
4 Attending Tender Interview
5 Tender Rationalisations
6 Compilation of Contract Document
7 Assessment of / Managing Variation Works including P.C and Provisional Sums
a) Between D&B Contractor and DBKL
b) Between D&B Contractor and its domestic
8 Monthly Interim Valuation/Certifications
a) Between D&B Contractor and DBKL
b) Between D&B Contractor and its domestic
9 Preliminary Review of contractual claim (e.g. EOT & Loss/Expense Validity only
a) Between D&B Contractor and DBKL
b) Between D&B Contractor and its domestic
10 Detail Assessment of contractual claim (e.g. EOT & Loss/Expense)
11 Preparation of Final Account
Verification
Pricing /
Documentation/F
Taking off QS In
inal Compilation
Charge
Jamie

Bid Document) ZL PMCC PMCC PMCC


Tenderer's Proposal (required in the Bid Docum ZL PMCC PMCC PMCC
ZL PMCC PMCC
ZL/PMCC
ZL PMCC PMCC PMCC
PMCC
luding P.C and Provisional Sums
ZL PMCC PMCC ZL/PMCC
Excluded from PMCC Scope

PMCC PMCC
Excluded from PMCC Scope
EOT & Loss/Expense Validity only)
ZL/PMCC
Excluded from PMCC Scope
OT & Loss/Expense) Excluded from QS Scope
ZL PMCC PMCC ZL/PMCC
Verification

Naz