Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt
Test
Others Submitted Returned by Revision Returned by Revision Returned by
Acion Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant Submission Consultant
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt
Test
Others Submitted Returned by Revision Returned by Revision Returned by
Acion Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant Submission Consultant
MECHANICAL
SD-ME-01 13th Floor - Fire Fighting Systems Shop Drawings x 30-Dec-20 30-Dec-20 C Requires Civil Defence Approval
SD-ME-02 13th Floor - Public Health Services Shop Drawings x 30-Dec-20 6-Jan-21 C Submittal disregarded
SD-ME-03 13th Floor - Mechanical Services Shop Drawings x 30-Dec-20 4-Jan-21 C Submittal disregarded
SD-ME-04 Standard Details & General Notes (Fire Fighting Services) x 30-Dec-20 30-Dec-20 C
SD-ME-05 Standard Details & General Notes (Mechanical Services) x 30-Dec-20 4-Jan-21 C
SD-ME-06 Standard Details & General Notes (Public Health Services) x 30-Dec-20 6-Jan-21 B Approved as noted
SD-ME-07 13th Floor - Air Conditioning Layout & Equipment Schedule x 14-Jan-21 19-Jan-21 C
SD-ME-08 13th Floor - Chilled Water Layout x 14-Jan-21 21-Jan-21 C Need Approval for HAP Calculations
SD-ME-09 13th Floor - Ventilation Layout x 14-Jan-21 20-Jan-21 C 2-Feb-21 6-Feb-21 C 7-Feb-21 Waiting for response
SD-ME-10 13th Floor - Drainage Layout x 14-Jan-21 Waiting for response
SD-ME-11 13th Floor - Water Supply Layout x 14-Jan-21 Waiting for response
SD-ME-12 14th Floor - Drainage Layout x 20-Jan-21 Waiting for response
SD-ME-13 14th Floor - Water Supply Layout x 20-Jan-21 Waiting for response
SD-ME-14 13th Floor - Zoning Layout with Calculations x 24-Jan-21 27-Jan-21 C 3-Feb-21 6-Feb-21 C 7-Feb-21 Partially Approved, waiting for HAP approval
SD-ME-15 14th Floor - Zoning Layout with Calculations x 24-Jan-21 27-Jan-21 C 3-Feb-21 Partially Approved waiting for HAP approval
SD-ME-16 15th Floor - Zoning Layout x 28-Jan-21 31-Jan-21 A Approved
SD-ME-17 16th Floor - Zoning Layout x 28-Jan-21 31-Jan-21 A Approved
SD-ME-18 15th Floor - Fresh Air Calculations x 28-Jan-21 1-Feb-21 B Approved as noted
SD-ME-19 16th Floor - Fresh Air Calculations x 28-Jan-21 1-Feb-21 C
SD-ME-20 15th Floor - Water Supply Layout x 1-Feb-21 Waiting for response
SD-ME-21 15th Floor - Drainage Layout x 1-Feb-21 Waiting for response
SD-ME-22 16th Floor - Drainage Layout x 1-Feb-21 Waiting for response
SD-ME-23 15th Floor - HAP Calculations with Documents x 3-Feb-21 Waiting for response
MATERIAL SUBMITTALS
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
R00 R01
MATERIAL SUBMITTALS
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
MECHANICAL
MA-ME-01 FCU Alternative Selection Package X 24-Dec-20 4-Jan-21 C 12-Jan-21 21-Jan-21 C
MA-ME-02 Sabic - Duct Sheet TSD & Sample X X 27-Dec-20 3-Jan-21 C 2-Feb-21
MA-ME-03 Afico - Fibre Glass Insulation - TSD & Sample X X 27-Dec-20 4-Jan-21 C
MA-ME-04 Foster - Duct Sealant - TSD & Sample X X 27-Dec-20 3-Jan-21 A
MA-ME-05 Abro - Ducting Tape - TSD & Sample X X 27-Dec-20 3-Jan-21 C
MA-ME-06 Armaflex - Acoustic Insulation - TSD & Sample X X 27-Dec-20 3-Jan-21 D
MA-ME-07 Rabie Altakyeef - Grille, VAV, Diffusers, Dampers & Accessories - TSD X 27-Dec-20 4-Jan-21 C
MA-ME-08 PurAir - Air Cleaner Units - TSD X 27-Dec-20 4-Jan-21 A
MA-ME-09 Interpipe - Chilled Water Pipe - TSD X 27-Dec-20 4-Jan-21 C
MA-ME-10 Interpipe - Fire Fighting Pipe - TSD X 27-Dec-20 6-Jan-21 C
MA-ME-11 Sappco - Drainage Pipes - TSD & Sample X X 27-Dec-20 6-Jan-21 C 11-Jan-21
MA-ME-12 Neproplast - Drainage Pipe Fittings - TSD & Sample X X 27-Dec-20 6-Jan-21 C
MA-ME-13 Sffeco - Fire Extinguisher Dry Chemical Powder & CO2 - TSD X 27-Dec-20 6-Jan-21 C
MA-ME-14 Tahweel - Water Supply Pipes & Fittings - TSD X 27-Dec-20 6-Jan-21 C 11-Jan-21
MA-ME-15 Tyco Sprinklers - Fire Fighting system - TSD X 6-Jan-21
MA-ME-16 Sffeco - Clean Agent Fire Suppression System - TSD X 12-Jan-21 13-Jan-21 C 17-Jan-21
MA-ME-17 Crane - Valves - TSD X 31-Jan-21
MA-ME-18 Saudi Ceramic - Electric Water Heater - TSD X 31-Jan-21
MA-ME-19 Trox - Control Air Volume - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-20 Trox - Grilles - TSD X 31-Jan-21
MA-ME-21 Trox - Diffusers - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-22 Trox - Dampers - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-23 Trox - VAV - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-24 Trox - Crosstalk Attenuators - TSD X 31-Jan-21 2-Feb-21 B
MATERIAL SUBMITTALS
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
OTHER SUBMITTALS
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
OT - 42 Method Statement & Risk Assessment (Mechanical First & Second Fix) X 19-Jan-21 19-Jan-21 C
OT - 43 ITP - Gypsum Board Ceiling X 19-Jan-21 19-Jan-21 A
OT - 44 ITP - Gypsum Board Painting X 19-Jan-21 19-Jan-21 A
OT - 45 ITP - Carpet-Vinyl & Inset Rug X 19-Jan-21 19-Jan-21 A
OT - 46 ITP - Polished Plaster X 19-Jan-21 19-Jan-21 A
OT - 47 Method Statement & Risk Assessment (Gypsum Board Painting) X 19-Jan-21 19-Jan-21 B 20-Jan-21 20-Jan-21 A
OT - 48 Method Statement & Risk Assessment (Carpet, Vinyl & Inset Rug) X 19-Jan-21 20-Jan-21 B 20-Jan-21 20-Jan-21 A
OT - 49 Method Statement & Risk Assessment (Gypsum Board Ceiling) X 20-Jan-21 20-Jan-21 A
OT - 50 ITP - Glazing Partition Works X 20-Jan-21 20-Jan-21 B 20-Jan-21 20-Jan-21 A
OT - 51 Method Statement & Risk Assessment (Polished Plaster) X 20-Jan-21 20-Jan-21 A
OT - 52 ITP - Floor and Wall Tile Installation works (Porcelain Tiles, Ceramics etc.) X 21-Jan-21 24-Jan-21 A
OT - 53 ITP - Hunter Doglas Ceiling X 21-Jan-21 22-Jan-21 C
OT - 54 Method Statement & Risk Assessment (Glazing Works) X 21-Jan-21 24-Jan-21 C
OT - 55 Method Statement & Risk Assessment (Hunter Doglas) X 23-Jan-21 24-Jan-21 C
OT - 56 Method Statement - Fire Protection Services (First & Second Fix) X 24-Jan-21 25-Jan-21 A
OT - 57 Method Statement - HVAC System Services Services (First & Second Fix) X 24-Jan-21 25-Jan-21 C 29-Jan-21
OT - 58 Method Statement - Public Health Services (First & Second Fix) X 24-Jan-21 25-Jan-21 A
OT - 59 Risk Assessment - Mechanical works X 24-Jan-21 25-Jan-21 A
OT - 60 ITP - False Ceiling X 24-Jan-21 25-Jan-21 A
OT - 61 ITP - Wall Cladding X 25-Jan-21 26-Jan-21 B 26-Jan-21 27-Jan-21 A
OT - 62 Time Impact Letter X 27-Jan-21 1-Feb-21 R
OT - 63 Method Statement & Risk Assessment (Wall & Flooring Tiles) X 28-Jan-21 28-Jan-21 B 29-Jan-21 30-Jan-21 A
OT - 64 Method Statement - False Ceiling X 29-Jan-21 30-Jan-21 C 31-Jan-21 1-Feb-21 B
OT - 64 R2 Risk Assessment - False Ceiling X 2-Feb-21 3-Feb-21 A
OT - 65 Risk Assessment - Covid 19 X 29-Jan-21 30-Jan-21 D
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
MECHANICAL
REQUEST FOR INSPECTIONS AND APPROVALS
Type of Submittal
Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical
Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
MECHANICAL