SHOP DRAWING SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt

Test
Others Submitted Returned by Revision Returned by Revision Returned by
Acion Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant Submission Consultant

R00 R01 R02


SHOP DRAWING SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt

Test
Others Submitted Returned by Revision Returned by Revision Returned by
Acion Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant Submission Consultant

MECHANICAL
SD-ME-01 13th Floor - Fire Fighting Systems Shop Drawings x 30-Dec-20 30-Dec-20 C Requires Civil Defence Approval
SD-ME-02 13th Floor - Public Health Services Shop Drawings x 30-Dec-20 6-Jan-21 C Submittal disregarded
SD-ME-03 13th Floor - Mechanical Services Shop Drawings x 30-Dec-20 4-Jan-21 C Submittal disregarded
SD-ME-04 Standard Details & General Notes (Fire Fighting Services) x 30-Dec-20 30-Dec-20 C
SD-ME-05 Standard Details & General Notes (Mechanical Services) x 30-Dec-20 4-Jan-21 C
SD-ME-06 Standard Details & General Notes (Public Health Services) x 30-Dec-20 6-Jan-21 B Approved as noted
SD-ME-07 13th Floor - Air Conditioning Layout & Equipment Schedule x 14-Jan-21 19-Jan-21 C
SD-ME-08 13th Floor - Chilled Water Layout x 14-Jan-21 21-Jan-21 C Need Approval for HAP Calculations
SD-ME-09 13th Floor - Ventilation Layout x 14-Jan-21 20-Jan-21 C 2-Feb-21 6-Feb-21 C 7-Feb-21 Waiting for response
SD-ME-10 13th Floor - Drainage Layout x 14-Jan-21 Waiting for response
SD-ME-11 13th Floor - Water Supply Layout x 14-Jan-21 Waiting for response
SD-ME-12 14th Floor - Drainage Layout x 20-Jan-21 Waiting for response
SD-ME-13 14th Floor - Water Supply Layout x 20-Jan-21 Waiting for response
SD-ME-14 13th Floor - Zoning Layout with Calculations x 24-Jan-21 27-Jan-21 C 3-Feb-21 6-Feb-21 C 7-Feb-21 Partially Approved, waiting for HAP approval
SD-ME-15 14th Floor - Zoning Layout with Calculations x 24-Jan-21 27-Jan-21 C 3-Feb-21 Partially Approved waiting for HAP approval
SD-ME-16 15th Floor - Zoning Layout x 28-Jan-21 31-Jan-21 A Approved
SD-ME-17 16th Floor - Zoning Layout x 28-Jan-21 31-Jan-21 A Approved
SD-ME-18 15th Floor - Fresh Air Calculations x 28-Jan-21 1-Feb-21 B Approved as noted
SD-ME-19 16th Floor - Fresh Air Calculations x 28-Jan-21 1-Feb-21 C
SD-ME-20 15th Floor - Water Supply Layout x 1-Feb-21 Waiting for response
SD-ME-21 15th Floor - Drainage Layout x 1-Feb-21 Waiting for response
SD-ME-22 16th Floor - Drainage Layout x 1-Feb-21 Waiting for response
SD-ME-23 15th Floor - HAP Calculations with Documents x 3-Feb-21 Waiting for response
MATERIAL SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

R00 R01
MATERIAL SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

MECHANICAL
MA-ME-01 FCU Alternative Selection Package X 24-Dec-20 4-Jan-21 C 12-Jan-21 21-Jan-21 C
MA-ME-02 Sabic - Duct Sheet TSD & Sample X X 27-Dec-20 3-Jan-21 C 2-Feb-21
MA-ME-03 Afico - Fibre Glass Insulation - TSD & Sample X X 27-Dec-20 4-Jan-21 C
MA-ME-04 Foster - Duct Sealant - TSD & Sample X X 27-Dec-20 3-Jan-21 A
MA-ME-05 Abro - Ducting Tape - TSD & Sample X X 27-Dec-20 3-Jan-21 C
MA-ME-06 Armaflex - Acoustic Insulation - TSD & Sample X X 27-Dec-20 3-Jan-21 D
MA-ME-07 Rabie Altakyeef - Grille, VAV, Diffusers, Dampers & Accessories - TSD X 27-Dec-20 4-Jan-21 C
MA-ME-08 PurAir - Air Cleaner Units - TSD X 27-Dec-20 4-Jan-21 A
MA-ME-09 Interpipe - Chilled Water Pipe - TSD X 27-Dec-20 4-Jan-21 C
MA-ME-10 Interpipe - Fire Fighting Pipe - TSD X 27-Dec-20 6-Jan-21 C
MA-ME-11 Sappco - Drainage Pipes - TSD & Sample X X 27-Dec-20 6-Jan-21 C 11-Jan-21
MA-ME-12 Neproplast - Drainage Pipe Fittings - TSD & Sample X X 27-Dec-20 6-Jan-21 C
MA-ME-13 Sffeco - Fire Extinguisher Dry Chemical Powder & CO2 - TSD X 27-Dec-20 6-Jan-21 C
MA-ME-14 Tahweel - Water Supply Pipes & Fittings - TSD X 27-Dec-20 6-Jan-21 C 11-Jan-21
MA-ME-15 Tyco Sprinklers - Fire Fighting system - TSD X 6-Jan-21
MA-ME-16 Sffeco - Clean Agent Fire Suppression System - TSD X 12-Jan-21 13-Jan-21 C 17-Jan-21
MA-ME-17 Crane - Valves - TSD X 31-Jan-21
MA-ME-18 Saudi Ceramic - Electric Water Heater - TSD X 31-Jan-21
MA-ME-19 Trox - Control Air Volume - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-20 Trox - Grilles - TSD X 31-Jan-21
MA-ME-21 Trox - Diffusers - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-22 Trox - Dampers - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-23 Trox - VAV - TSD X 31-Jan-21 2-Feb-21 B
MA-ME-24 Trox - Crosstalk Attenuators - TSD X 31-Jan-21 2-Feb-21 B
MATERIAL SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity Remarks
or BOQ Page R = Disapproved
Asbuilt

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant
OTHER SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

OT - 01 Landlord Coordination Documents X 26-Nov-20


OT - 02 HSE Required Documents X 26-Nov-20 8-Dec-20
OT - 03 Design Package X 29-Nov-20
OT - 04 List of Sub-contractors X 1-Dec-20
OT - 05 Submission Schedule of Shop Drawings X 2-Dec-20
OT - 06 Handover Package X 29-Nov-20
OT - 07 Performance Bond X 1-Dec-20 2-Dec-20 C 9-Dec-20 10-Dec-20 C
OT - 07 R2 Performance Bond X 22-Dec-20
OT - 08 Agreement for Assignment of Contract Proceeds X 2-Dec-20 7-Dec-20 C 17-Dec-20 22-Dec-20 D

OT - 09 Samples Tracker Update 01-12-20 X 3-Dec-20


OT - 10 Mobilisation Requirement Documents X 8-Dec-20
OT - 11 Project Contacts List X 9-Dec-20 10-Dec-20
OTHER SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

OT - 12 Artwork Selection X 9-Dec-20 12-Dec-20


OT - 13 Architectural Finishes Tracker X 13-Dec-20
OT - 14 Furniture Supply Tracker X 13-Dec-20
OT - 15 Samples Tracker X 13-Dec-20
OT - 16 Project Time Schedule X 15-Dec-20 16-Dec-20 C 16-Dec-20
OT - 17 Letter - Performance Bond Adjustment (Meeting Request) X 15-Dec-20
OT - 18 Ceiling Options with Data Sheets X 22-Dec-20 22-Dec-20 D

OT - 19 Advance Payment Claim X 22-Dec-20 22-Dec-20 C 23-Dec-20


OT - 20 Advance Payment Bond X 23-Dec-20
OT - 21 Project Insurance Policy X 28-Dec-20
OT - 22 Master List of Drawings X 6-Jan-21 6-Jan-21 A
OT - 23 MEP - O & M Manuals Content X 10-Jan-21 11-Jan-21 C
OT - 24 Method Statement Register X 10-Jan-21 11-Jan-21 C 13-Jan-21 13-Jan-21 B
OT - 24 R2 Method Statement Register X 1-Feb-21 2-Feb-21 D

OT - 25 Risk Management Plan X 11-Jan-21 11-Jan-21 B


OT - 26 ITP - Dry Wall Partitions Installation X 14-Jan-21 14-Jan-21 C
OT - 27 Method Statement - Dry Wall Partitions X 14-Jan-21 14-Jan-21 A
OT - 28 Risk Assessment - Dry Wall Partitions X 14-Jan-21 14-Jan-21 B 16-Jan-21 17-Jan-21 A
OT - 29 Risk Assessment - Electrical First Fix X 14-Jan-21 14-Jan-21 B 16-Jan-21 17-Jan-21 A
OT - 30 Method Statement - Electrical First & Second Fix X 14-Jan-21 14-Jan-21 A
OT - 31 Chain of Command for Inspection Test Reports X 14-Jan-21 15-Jan-21 A
OT - 32 ITP - Electrical First & Second Fix X 14-Jan-21 15-Jan-21 B 17-Jan-21 17-Jan-21 A
OT - 33 Method Statement & Risk Assessment (Waterproofing) X 17-Jan-21 18-Jan-21 A
OT - 34 ITP - Waterproofing Installation X 17-Jan-21 18-Jan-21 A
OT - 35 Method Statement & Risk Assessment (Raised Floor) X 17-Jan-21 18-Jan-21 A
OT - 36 ITP - Raised Floor Installation X 17-Jan-21 18-Jan-21 A
OT - 37 Mock Up Samples List X 18-Jan-21
OT - 38 Material Submittal Register X 18-Jan-21
OT - 39 Method Statement & Risk Assessment (Skirting) X 18-Jan-21 18-Jan-21 B 19-Jan-21 19-Jan-21 A
OT - 40 ITP - Skirting Installation X 18-Jan-21 18-Jan-21 A
OT - 41 ITP - Mechanical First & Second Fix X 18-Jan-21 18-Jan-21 C
OTHER SUBMITTALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

OT - 42 Method Statement & Risk Assessment (Mechanical First & Second Fix) X 19-Jan-21 19-Jan-21 C
OT - 43 ITP - Gypsum Board Ceiling X 19-Jan-21 19-Jan-21 A
OT - 44 ITP - Gypsum Board Painting X 19-Jan-21 19-Jan-21 A
OT - 45 ITP - Carpet-Vinyl & Inset Rug X 19-Jan-21 19-Jan-21 A
OT - 46 ITP - Polished Plaster X 19-Jan-21 19-Jan-21 A
OT - 47 Method Statement & Risk Assessment (Gypsum Board Painting) X 19-Jan-21 19-Jan-21 B 20-Jan-21 20-Jan-21 A
OT - 48 Method Statement & Risk Assessment (Carpet, Vinyl & Inset Rug) X 19-Jan-21 20-Jan-21 B 20-Jan-21 20-Jan-21 A
OT - 49 Method Statement & Risk Assessment (Gypsum Board Ceiling) X 20-Jan-21 20-Jan-21 A
OT - 50 ITP - Glazing Partition Works X 20-Jan-21 20-Jan-21 B 20-Jan-21 20-Jan-21 A
OT - 51 Method Statement & Risk Assessment (Polished Plaster) X 20-Jan-21 20-Jan-21 A
OT - 52 ITP - Floor and Wall Tile Installation works (Porcelain Tiles, Ceramics etc.) X 21-Jan-21 24-Jan-21 A
OT - 53 ITP - Hunter Doglas Ceiling X 21-Jan-21 22-Jan-21 C
OT - 54 Method Statement & Risk Assessment (Glazing Works) X 21-Jan-21 24-Jan-21 C
OT - 55 Method Statement & Risk Assessment (Hunter Doglas) X 23-Jan-21 24-Jan-21 C
OT - 56 Method Statement - Fire Protection Services (First & Second Fix) X 24-Jan-21 25-Jan-21 A
OT - 57 Method Statement - HVAC System Services Services (First & Second Fix) X 24-Jan-21 25-Jan-21 C 29-Jan-21
OT - 58 Method Statement - Public Health Services (First & Second Fix) X 24-Jan-21 25-Jan-21 A
OT - 59 Risk Assessment - Mechanical works X 24-Jan-21 25-Jan-21 A
OT - 60 ITP - False Ceiling X 24-Jan-21 25-Jan-21 A
OT - 61 ITP - Wall Cladding X 25-Jan-21 26-Jan-21 B 26-Jan-21 27-Jan-21 A
OT - 62 Time Impact Letter X 27-Jan-21 1-Feb-21 R
OT - 63 Method Statement & Risk Assessment (Wall & Flooring Tiles) X 28-Jan-21 28-Jan-21 B 29-Jan-21 30-Jan-21 A
OT - 64 Method Statement - False Ceiling X 29-Jan-21 30-Jan-21 C 31-Jan-21 1-Feb-21 B
OT - 64 R2 Risk Assessment - False Ceiling X 2-Feb-21 3-Feb-21 A
OT - 65 Risk Assessment - Covid 19 X 29-Jan-21 30-Jan-21 D

OT - 66 Staff Timing Schedule X 1-Feb-21 1-Feb-21 D 2-Feb-21 3-Feb-21 C


OT - 67 ITP Log Sheet X 1-Feb-21 2-Feb-21 D

OT - 68 ITP - Timber Doors X 2-Feb-21 3-Feb-21 C


OT - 69 ITP - Stone Cladding X 2-Feb-21 3-Feb-21 C
REQUEST FOR INFORMATION REQUESTS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

MECHANICAL
REQUEST FOR INSPECTIONS AND APPROVALS

Contractor: C1 - HISHAM NABIL ALIREZA TRADING LLC

Package: ROSHN REAL ESTATE COMPANY

Type of Submittal

Shop Drawing
Action Code :
Samples A = Approved as submitted
B = Approved as noted
Item Transmital Design Drrawing
Document C = Revise & Resubmit
Specifications No. No. Drawing No. Description Manufacturers Data D = For Information Due Date Activity D - Design
or BOQ Page R = Disapproved
Asbuilt T - Technical

Test
Others Submitted Returned by Revision Returned by
Acion Acion
SD SM DD MD AB TT OT By Contractor Consultant Submission Consultant

MECHANICAL