2/12/20 Mini Project (50 Marks) Due date: one week before final
Problem Statement
Assume that a new expressway is proposed to be built along the west coast of Peninsular
Malaysia from Banting to Johor Bahru. Work is expected to commence next year. You company
is subcontracted to design a hot mix asphalt for the project. However, the difficult part is the
continued lockdown situation in Malaysia that is preventing any physical activities in any asphalt
laboratories in Malaysia. As such, the project consortium feels that it is timely to explore virtual
laboratory work to move forward and get prepared prior to the start of the project. This could
also be a kickstart to tailor the virtual work towards IR 4.0. Since there is no such established
protocol before, you are expected to work in your own group to plan a conceptual work flow and
execution in stages.
STAGE 1
Project: Package A
6-lane expressway
3.75 m lane width
Designed layer thickness
WC = 50 mm
BC = 60 mm
DBM = 100 mm
2
7. Sample Measurements
8. Volumetric Calculations
9. Carrying out Resilient Modulus and Stability Tests
10. Preparation of Marshall Mix Design Table
11. Plots for OAC
12. Plots for Final Mix Design Performance
13. Report Writing
R. Muniandy/Semester 2 2020