You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

2928
This lay-out has been prepared based on the information supplied to us by or on the behalf
80 of the customer. However, it is the client's responsibility to check and verify that we have
714 1500 714 correctly interpreted. The requirements, information and all loading in accordance with
A
Broken Soldier Top UPN 8cm Broken Soldier UNISTEEL Equiptment Data Sheets, FORMWORK A Guide to Good Practice 2nd Edition, Ciria
Report 108 Concrete Pressure on Formwork.
84

150
80 This drawing is an exclusive property of UNITED STEEL INDUSTRIES COMPANY LIMITED.
4 Any unauthorized use of this drawing is Not Valid Unless Signed and Stamp by our
Technical Department. UNISTEEL reserve the right to amend drawing details and materials
subject to stock availability.
C.CH.01

100
380
250 Loads on forms and falsework have been analyzed in accordance with Guide for Formwork
90 and/or Codes of Practice for Falsework. As a result, the structure detailed on this drawing
has been designed to support the following imposed loads only :
Loads are assumed uniformly distributed

138
B
Side Strip 100 kN/m²

150
All timber formwork and bearers are to be provided by the contractor or client. Timber


10
should have been calculated using the design parameter detailed on this drawing sheet.

250
The Customer is responsible for ensuring that all structure are adequately tied and/or braced
to carry the load and ensure stability as indicated on the drawing. No ties or braces be
removed without the authority of UNISTEEL. All legs must be erected plumb and loaded
concentrically.
This drawing has been prepared using the safe working loads of UNISTEEL equiptment no
modification to components, assembly, loading or any other aspects must be without
authority from Technical Dept. of UNISTEEL. No responsibilty accepted by UNISTEEL for the

Pt.02
design or permormance of materials not supplied by UNISTEEL.

250
1141
Unless otherwise noted, no soleplates or other means of spreading the imposed loads are
supplied by UNISTEEL. The customer must ensure that the foundations provided are
C
adequate, where UNISTEEL is supported, suspended, anchored or tied to a structure or
ground is adequate to safety support the additional imposed loads.

Unless specially stated, It is assumed that any other working platforms ( for erection or
dismantling purposes) will be designed, supplied and fitted by the customer. It is the client's

250
responsibility to ensure that working platforms or means of access necessary for safe
access are provided whether shown on this drawing or not.

The Customer is responsible for ensuring that all structure are adequately tied and/or braced
to carry the load and ensure stability as indicated on the drawing. No ties or braces be
removed without the authority of UNISTEEL.

Spacer tube Back propping may be required. Back propping is the responsibility of the customer.

250
THE DESIGN OF BRACING AND HORIZONTAL BUTTING RESTRAINT FORCE REQUIRED TO
D C.CH.02 BE TRANSMITTED THROUGH THE BRACES IS SPECIFIED IN BS 5975 " FALSEWORK ". THE
CODE SPECIFIES A MINIMUM LATERAL STABILITY CRITERIA EQUIVALENT TO THE
GREATER OF EITHER 2.5% OF THE VERTICAL LOAD IN THE STANDARD (POST) ACTING
HORIZONTALLY AT THE POINT OF APPLICATION THE LOAD, OR HORIZONTAL FORCES

45
FROM WIND, ERECTION TOLERANCES, NON-VERTICALLY, CONCRETE PRESSURES AND
OTHER FORCES ACTING AS DESCRIBED IN THE CODE.

20
THE CONTRACTOR TO ENSURE THAT THE GROUND IS CAPABLE OF WITHSTANDING

250
THESE LEG LOADS!. IN CASE WHERE COMPACTED SOIL USED AS A FOUNDATION
UNDER STANDARDS IT IS RECOMMENDED TO USE MUDSILL WHICH IS CONTINUOUS

Bott. UPN 8cm UNDER THE STANDARDS LINE.

8
REFSHT1 SHEETNO.00
70 DRAWING TITLE DRAWING NUMBER
275 300 75
E 2925 REFERENCE DRAWING BASED TO PREPARE THIS SCHEME :
650

Typical Broken Panel ,Qty =10/ Mold DESCRIPTION

Elevation Side View CONTRACTOR

F
Riyadh Branch:
E-mail : info@unisteel.com.sa
website : www.unisteel.com.sa Dammam Branch:
Universal Access No.
Jeddah Branch:
9 20 0 00 864

A member of Al-Fozan Group of Companies

CLIENT:
G

PROJECT TITLE :

H DRAWING TITLE :

DRAWI NG NUM BER

A1 DOC NO.

1 2 3 4 5 6 10 11 12 13 14 15

You might also like