You are on page 1of 1

GENERAL NOTES

132500-0036-D-SY50E-22263

//

THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL INFORMATION OF FOSTER


WHEELER CANADA LIMITED AND IS TO BE USED, AND REPRODUCED, ONLY IN
ACCORDANCE WITH THE WRITTEN PERMISSION OF FOSTER WHEELER USA
CORPORATION, FOR THE AXION ENERGY REFINERY IN CAMPANA,
BUENOS AIRES, ARGENTINA.

1 3/17/16 REISSUED FOR CONSTRUCTION PSK AR JC


0 9/22/14 ISSUED FOR CONSTRUCTION KKK OA QI
F 2/28/14 ISSUED FOR DESIGN VERIFICATION MRS OR QI
E 12/16/13 ISSUED FOR DESIGN UPDATES AKS OR QI
D 9/24/13 ISSUED FOR DESIGN AV OR QI
REV. DATE DESCRIPTION DRW. CHK. APP.
BY BY BY
REVISIONS

(036) DELAYED COKER UNIT


PIPING AND INSTRUMENT DIAGRAM
COKE DRUM 036-R-102

CAMPANA ARGENTINA

THIS DRAWING IS THE PROPERTY OF THE

FOSTER WHEELER CANADA LTD.


CALGARY, ALBERTA
AND IS LENT WITHOUT CONSIDERATION OTHER THAN THE BORROWER'S AGREEMENT
THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT OR DISPOSED OF DIRECTLY OR
INDIRECTLY, NOR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS
SPECIFICALLY FURNISHED. THE APPARATUS SHOWN IN THE DRAWINGS IS
COVERED BY PATENTS.

DESIGNED BY: DATE: CHECKED BY: DATE:

DRAWN BY: DATE: APPROVED BY: DATE:

PROJECT No. SCALE


13-132500-02 NONE

CAD REV. DATE:


SINCLAIR DRAWING No. REV. No.
22263-D
AXION DRAWING No. 1
132500-0036-D-SY50E-22263

You might also like