GOLDEN VALLEY RECONCILIATION OF ORDERS

100mm Slurry Pump Spares Order HRE09861


Bal
Item Description Order Qty Order Delivery to cust
Volute 5 5

Bottom Suction Cover 5 0 3 2

Impellors 5 0 3 2

150mm Slurry Pump Spares


Bal
Item Description Order Qty Order Delivery to cust
Volute 5 5

Bottom Suction Cover 5 0 3 2

Impellors 5 0 2 2 1

Order HRE10128
Bal
Item Description Order Qty Order Delivery to cust

1HD PUMP
Bearing Housing 4 4

Volute casing 6 6

Shafts 10 0 10

Gland follower 4 4

Open Impellors 10 0 10

2HD PUMP
Bearing Housing 4 4

Volute casing 6 6

Shafts 5 0 5

Gland follower 4 4

Open Impellors 10 0 5 5

3HD PUMP
Bearing Housing 5 5

Volute casing 6 4 2

Shafts 5 0 5

Gland follower 4 4

Open Impellors 10 0 10

Wear plates 6 0 6

Bal
Item Description - HRE10130 Order Qty Order Delivery to cust
80mm STGVA Impellor 5

Bal
Item Description - HRE10129 Order Qty Order Delivery to cust

100mm Pump Impellor Stub Shaft 5

BETA BRICKS HEX SHAFTS


BETA BRICKS 1/2 BEARINGS 2

GWEBI PROJECT

SANDBLAST MCHINE G?BOX

BRICK MOULDING Machine

CRANE

LEYLAND DAF

MIMOSA PIPES

SHAMVA GRANBY AXLES

GENERATOR

MR MUKUMBI VEHICLE

RUSTLER

CUPOLA DISCHARGE

STAFF BUS

RUFARO TOYOTA

OLD FORD RANGER


NEW FORD RANGER

MR SIBANDA ISUZU
M/shop
M/c at Metal component To Collect Friday 22nd Jan

Complete & invoiced

Complete & invoiced

M/shop
Complete for invoicing customer alerted for collection.

Complete & invoiced

Complete & invoiced

M/shop

Machining in progress Castings need Frettling

Casting sent back to the foundry for rework. Casting seem to have a casting defect/design problem which
needs to be attended to. Rectifying the pattern.

Complete & invoiced

2 ready for delivery 2 being machined complete today

Machining in progress in machineshop not machined

1 in machineshop. Rest returned to foundry after machining could not be drilled. Casting issues

Complete & invoiced

2 complete. 2 ready tomorrow

Complete & invoiced

Machining in progress

Castings seem to have a casting defect/design problem which needs to be attended to. Rework may be
required. Fettling

Complete & invoiced

Ready for Invoicing 4 complete

Complete & invoiced

Complete & invoiced

M/shop status

M/shop status

Machining now in progress .Two Completed to be taken for testing by client before doing the rest. (VM)

Material Ordered. Requisition with accounts.


Cast iron rods ordered. Will be ready 2/2/21.

Material ordered. Reqisitions with accounts for material to complete Project

Gearbox to be sent for repairs on broken gears. Machine working with one hoist.

Parts sent out for repair awaiting payment to collect and assemble.

Contracted a team to complete the job. They quoted USD500. The understanding is if we buy aal the
required parts the machine should run by this weekend. Will monitor progress in the next 2 days and
see if we can get value for money.

Multiple defects to be repaired and VID inspection done. Parts being ordered in batches to control cash flow

Had a problem with pump for testing. We have since repaired the pump and are testing the pipes
They should be ready by 4/2/2021

8 completed and ready for delivery. The two which came recently have been stripped and awaiting quotes
for the supply of spare parts. To be completed by 9/2/2021

Bluetek diognised faults on Heat sink and photo body.