Professional Documents
Culture Documents
Kaitlin Villaverde
Kaitlin Villaverde
Wilcon Depo
N
ARCHITECTURAL
Lto Antipolo C. Law
is Street 2
N.6
6 .
°40
'W
Super Metro Victory Park and Shop
Antipolo Cathedral 1
Puregold Antipolo
Or
tig Town Plaza .
as
ex
t.
Antipolo City Hall Hall of Justice
General Luna
M. Santos St.
M. Santos St.
M. Santos St.
St.
Ynares Center
TOWN PROPER
Sto
.
Niño
t
Marville Park II Stree
ulong
J. Sum
Stre
STRUCTURAL
e
De Lasalle College
t
.
N.05°49'W
S.66°40'E
Land Bank To Teresa Rizal
Unciano Medical Center
ELECTRICAL
.
VICINITY MAP
SANITARY
4
l e
i r
C
l
25'E r i a
3° o
S.0
e m
M
g
o n
3
u l MECHANICAL
u m
S
L .
DN
+2.90m
SECOND FLOOR LEVEL
+2.90m
SECOND FLOOR LEVEL
DRAWN BY : D.R.DATUIN
ARCHITECT: PROJECT TITLE OWNER SHEET CONTENTS REVISIONS SHEET NO.
DATE :
DESIGNED BY :
DATE : -
PROPOSED AS BUILT A-2
CHECKED BY : -
AT SUPPORT AT MIDSPAN
6"CHB
3-10mmØ H.B.
WITH 10MMØ TIES
@ 0.30 M.O.C.
DRAWN BY : D.R.DATUIN
CIVIL ENGINEER: PROJECT TITLE OWNER SHEET CONTENTS REVISIONS SHEET NO.
DATE :
DESIGNED BY :
DATE : -
PROPOSED AS BUILT S-1
CHECKED BY : -
2 4
RANGE
UP
UP
DN
DN
6
2
4
2 AC
LEGEND :
RANGE
1 GROUND FLOOR LIGHTING LAYOUT 2 SECOND FLOOR LIGHTING LAYOUT 3 GROUND FLOOR POWER LAYOUT 4 SECOND FLOOR POWER LAYOUT
SCALE 1:20 M SCALE 1:20 M
E-1 SCALE 1:20 M
E-1 SCALE 1:20 M
E-1 E-1
DRAWN BY : D.R.DATUIN
ELECTRICAL ENGINEER: PROJECT TITLE OWNER SHEET CONTENTS REVISIONS SHEET NO.
DATE :
DESIGNED BY :
DATE : -
PROPOSED AS BUILT E-1
CHECKED BY : -
3' PVC DS
WC
WC SEPTIC
TANK
3''Ø PVC DS 3''Ø PVC DS
3' PVC DS
LAV CBLAV CB
KS KS
IC
PT
SE ANK
T CB
FC
O KS
WC
CB
LAV
UP UP
3' PVC DS
UP
3' PVC DS
CB CB
L INE
ER
EW
I NS
MA
P TO
TA
INE
RL
E WE
NS
CB OM
AI
3''Ø PVC DS TA
PT
3 ISOMETRIC DIAGRAM
SCALE 1:100 M
P-1
25Ø CV
25Ø WM
25Ø GV
CB
1 GROUND FLOOR WATERLINE LAYOUT 2 GROUND FLOOR SANITARY & STORMDRAIN LAYOUT
P-1 SCALE 1:40 M SCALE 1:40 M
P-1
PLAN SECTION
PLAN SECTION
6 CATCHBASIN DETAIL
N T S
4 DETAIL OF SEPTIC VAULT P-1
SCALE 1:20 M
P-1
DRAWN BY : D.R.DATUIN
MASTER PLUMBER: PROJECT TITLE OWNER SHEET CONTENTS REVISIONS SHEET NO.
DATE :
DESIGNED BY :
DATE : -
PROPOSED AS BUILT P-1
CHECKED BY : -