1.0 Introduction Page
1.1 Purpose 5
1.2 Scope 5
1.3 Intended Users 5
1.4 References and Related Documents 5
2.0 General
2.1 Definitions 6
2.2 Principles and Concepts 6
2.3 Degrees of Freedom 6
2.4 Affinity Laws 7
2.5 Drivers 7
2.6 Data Quality 8
ATTACHMENTS
none
Page 2 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
List of Exhibits
Exh. No Title Page
2.1 The Affinity Laws 7
2.2 Simplified Schematic of CDU in an Oil Refinery 9
2.3 Raw PI Data for Crude Oil Flow rates 10
2.4 Calculated Yield Trends for Crude Oil Product 10
2.5 Schematic Diagram of Butane Vapor Recovery System 11
2.6 Measured PI Data for Butane Vapor Recovery System 11
2.7 Schematic Diagram of Oil Storage and Loading Facility 13
Page 3 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Page 4 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
1.0 Introduction
1.1 Purpose
Large industrial plants commonly use multiple parallel equipment trains for improved reliability.
Very often, installed equipment capacity far exceeds normal production requirements. This
excess capacity can be translated into energy cost savings through “optimum load
management”. The purpose of this New Best Practice is to describe ways in which energy
efficiency improvement can be achieved for different kinds of equipment.
1.2 Scope
Many types of equipment commonly used in Saudi Aramco plants are significant energy
consumers and amenable to operational optimization through Load Management, including:
• Pumps
• Compressors
• Fired Heaters (furnaces)
• Boilers – fired and unfired
• Process Coolers – air, water, refrigerant
• Steam turbines
• Gas turbines
This Best Practice manual focuses on methods to determine the optimum load management
policies for pumps and compressors only. The rest are covered in other complementary Best
Practice manuals.
This Best Practice manual is intended for use by the engineers working in Saudi Aramco
plants, who are responsible for efficient operation of their facility.
No conflict is expected between the optimum load management policy and other standard
Saudi Aramco operating practices with respect to reliability, safety, etc.
Page 5 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
2.0 General
2.1 Definitions
Best Practice: A process or method that, when correctly executed, leads to enhanced system
performance.
Load Management: An operating policy that distributes the load among multiple machines or
equipment installed as series-parallel networks in a way that minimizes their energy (fuel +
power) consumption, without compromising safety or reliability.
The first priority in any energy conservation program should be to capture the “Easy Pickings”,
that is, energy cost savings that can be achieved with little or no investment. Managing the
load on various items of energy-consuming equipment falls into this category. The
fundamental concept is to extract some operating cost savings in the form of reduced energy
consumption from the capital that has already been invested in equipment assets, but is not
being utilized for production capacity. The objective is to operate the equipment at the lowest
total cost while still meeting the process objective.
It must be recognized, though, that there is always a trade-off. The fewer the number of
parallel machines that are running at any given time, the less redundancy there will be, with
consequent loss of some operating flexibility. The analysis procedure outlined in this manual
will help establish the quantitative relationship between operating flexibility and energy costs,
thereby enabling the operating engineers and foremen to jointly make intelligent choices about
what the optimum operating policy should be.
Optimization implies that one has multiple choices to accomplish the desired objective, and the
only problem remaining is to choose the best option. The range of options available is limited
by constraints – which can be either “hard” or “soft”. A hard constraint is one which we cannot
or are unprepared to violate at any cost – e.g. the laws of physics, market realities, or the
directives of upper management. A soft constraint is one that we have imposed on ourselves,
and which could be relaxed at our discretion upon penalty of incurring some additional costs
Page 6 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
The range of options can be increased by introducing new Degrees of Freedom, which are
parameters or design features over which one has some control. For example, in an existing
pumping network, one can increase the range of options available for optimizing operating
policies by adding inter-connective piping (eg. “headers”) between parallel trains, retrofitting
fixed speed motors with variable frequency drives, etc.
Basically, one must keep an open mind. Think “out-of-the-box”. Do not accept the existing
plant configuration as inviolate; try to think of the ideal solution, and then systematically add
features to the existing design that will help to reach that ideal solution. Learn to recognize the
difference between hard and soft constraints.
2.5 Drivers
Pumps and compressors are usually driven by electric motors, but not always. Sometimes the
motive power is provided by steam turbines (usually in the 500-10,000 HP range) or by gas
turbines (usually >10,000 HP).
Electric motors generally operate at fixed speeds. For 60 Hz power supply, these are usually
around 1200, 1800, or 3600 rpm. For 50 Hz a/c power supply the corresponding speeds are
1000, 1500, or 3000 rpm. When speed variation is desired for either process reasons or for
power savings, they have to be fitted with some sort of a speed control, such as a belt & pulley
system (obsolete technology), a hydraulic clutch and gear box, or a variable frequency drive.
Page 7 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Steam and gas turbines, on the other hand, are inherently variable speed devices, and
elaborate controls are required to make them operate at constant speed.
The correct choice of driver – whether motor or turbine – depends on whether speed control
would be beneficial in that particular application, and on the size (power consumption) of the
pump or compressor. The overall site steam and power balance also has a considerable
influence on the economics of driver selection (especially for the larger sizes), and should not
be ignored.
A separate Saudi Aramco Engineering Procedure (still under development at the time of
writing) addresses the issue of how and when to select adjustable speed drives (ASDs).
Data quality refers to both the consistency and accuracy of measured values. Consistency is
necessary; accuracy (within the specified limits) is sufficient. {The terms necessary and
sufficient are used here in accordance with their strict mathematical definitions.}
It should be common sense that “bad” data will lead to the wrong decisions no matter how
brilliant the quality of the analysis. But how do we define “Bad” and “Good”? There is no such
thing as perfect accuracy. An acceptable level of error in data accuracy is that which will not
lead to the wrong process design or operating decision. As long as the correctness of the
decision is not affected, the data quality can be considered to be “Good”.
Data Validation is the process of checking the various related values measured and recorded
in the DCS/PI systems against independent sources and found to be in agreement. In
general, we need to ensure the measured data are consistent of with the laws of mass and
energy conservation, and with known physical and thermodynamic properties. The
methodology is best explained using illustrative examples.
Consider the Crude Distillation Unit shown in Exhibit 2-2, with the following measured data.
Page 8 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
CRUDE OIL P1
DISTILLATION
UNIT
P2
Feed P3
P4
Would it be right to conclude that the data are consistent? No, because what is conserved is
mass, not volume. This is a common mistake that should be avoided.
Sum of product flows on mass basis = 510.4 + 1458.3 +2296.9 +2078.1 = 6343.7 Klb/h.
It is not possible for the flow out to be more than the flow in. So strictly speaking the measured
data should be considered to be inconsistent. However, if we look at the magnitude of the
error, it is 146 Klb/h, or 2.4% of the feed rate, which is within the accuracy of the meters, and
so we would accept the data as being acceptable despite being inconsistent; in effect we
deem the data to have acceptable consistency. If, on the other hand, the error was found to
be greater than the meter accuracy, then the data would be determined to be unacceptable,
and some action would be required to reconcile the discrepancies before analysis can begin.
Let us say that we want to check the quality of flow data for the AM and AH product shipment
pumps from one of the GOSPs. Sample raw data from the PI system are shown in Exhibit 2-3,
columns 4 and 5. How can we check for consistency?
One way is to calculate the “yield”, which we shall define as the ratio of product flow to feed
flow. Because a certain (variable) amount of vapor flashes off in the wet crude receiving tank,
the yield is expected to be less than 100%. The computed values shown in columns 6 and 7
reveal that the yield for AM crude is fairly steady throughout the year at around 94%, indicating
the data are consistent. The computed values of yield for AH crude, on the other hand are
often in excess of 100%, and occasionally in excess of even 200% (see circled areas in
Exhibit 2-4).
Page 9 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
200 AH Crude
AM Crude
Dry/Wet Yield, %
150
100
50
0
1 31 61 91 121 151 181 211 241 271 301 331 361
Page 10 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Since it is impossible for the yield to be higher than 100% (see numbers highlighted in brown
in Exhibit 2-3), we conclude that the measured data for AH crude feed and product flow rates
are inconsistent with each other, and there was obviously some problem with the metering
system for the first 5 months that appears to have been fixed subsequently.
Consider the product recovery system in Exhibit 2-5, in which vapor from a liquid-butane
storage tank is compressed and condensed against air before being returned to storage.
P2 T2
Air Cooler
Compr
Sat. Butane
Vapor
P3
T3 Receiver
P1 T1
Let us examine whether the measured pressures and temperatures make sense. The first
thing to do is list the equilibrium temperatures and pressures for the measured pressures and
temperatures.
Page 11 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
For point 1, which is known to be a saturated vapor, the measured temperature of 30°F is 4.5°
higher that the equilibrium (or saturation) temperature of 25.5°F . This is too great a
discrepancy. So either the temperature or pressure measurement must be wrong. Of course,
it is also possible that they are both wrong. Generally temperature measurements are more
reliable, so we would probably choose T=30° and P=14.3 psia for point 1 as the reconciled
values.
For point 2, which is known to be a superheated vapor, the measured temperature would be
expected to be higher than the saturation temperature, which is in fact the case. So we would
accept the data for point 2 as being consistent.
For point 3, which is known to be a saturated vapor, there is once again a discrepancy
between the measured pressure and temperature. If we assume, as for point 1, that the
temperature reading is more reliable, we get a pressure value in the receiver of 116.7 psia,
which is more than the measured value of P2. Since that is not possible, we choose P3=107
and T3=153°F. This gives the following reconciled values:
Accuracy means that the measured values are equal to the true values. Checking for
accuracy is much more difficult than for consistency. Consider this example of an oil storage
and loading station, depicted schematically in Exhibit 2-7.
The flow is 10,000 gpm for 2 hours. The meter has been calibrated recently and certified as
accurate by the maintenance department. The same pump is used for both loading (filling)
and unloading a fuel storage tank, according to the following operating policy:
Valve A Valve B
Filling open closed
Unloading closed open
According to the meter, the amounts of oil that flow in and out are each 1,200,000 gallons
(28,571 barrels). So the data are consistent. But are they accurate?
Page 12 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
FI B
Level 2
A Level 1
A
Truck or Ship
Let us say that the tank is a vertical cylindrical type with a diameter D = 80ft. Let us say that
the difference between the initial and final level in the tank (after filling) is 30 ft. Then, the
volume of oil pumped in is
This is 6% less than what the meter reading shows, and so would be considered inaccurate,
because the standard of accuracy for custody transfer meters is usually less than 0.5%.
Page 13 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
The methodology used for estimating savings potential will be described for a single
representative pumping system only (see Exhibit 3-1), as all systems can be evaluated in an
identical manner.
Page 14 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
First and foremost, we have to develop a histogram of the load profile from raw PI data, as in
Exhibits 3-2 and 3-3. PI data should be recorded as daily averages for a period of at least 12
months to capture seasonal variations.
Exhibits 3-2a and b: Fluid Flow Historical Data (sample only). Note:
1200
Design
1000 capacity
Flow , MBD
800
600
400
200
A M Crude
0
1/1
2/1
3/1
4/1
5/1
6/1
7/1
8/1
9/1
10/1
11/1
12/1
DATE
Page 15 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
120
100
D ays per year
80
60
40
20
0
550 600 650 700 750 800 850 900 950
Flow, MBD
HELP NOTE
For those of you using Microsoft Excel®, there is a useful feature that enables you to generate
histograms easily from tabular data. However, this feature is not part of the basic installation
of MS Office®, and must be loaded manually. If you do not see Data Analysis on the Tools
menu, you will need to load the Add-In as follows:
Click on Tools > Add-Ins
Check the box named Analysis ToolPak
After a few seconds, you should see Data Analysis on the Tools menu. Click on that, select
Histogram, and follow the instructions.
Page 16 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
One of the biggest sources of energy savings is to minimize the number of pump trains being
operated in parallel. This section describes the criteria for determining this number, and
developing an operating policy that balances energy savings versus equipment integrity,
operating flexibility, and reliability. Two important considerations must be kept in mind:
(a) There is a certain minimum flow required through each pump below which cavitation
could occur and damage the pump. This type of cavitation (as opposed to the type
caused by inadequate NPSH) is due to eddy formation in the pump suction/discharge
nozzles at low flows, and generally begins when the flow falls below 60% of flow at the
best efficiency point. Short term episodes of low flow are not a problem; damage occurs
only if low-flow operation is sustained for several weeks or months. However, if the pump
flow falls below 30% of the “best-efficiency” flow, the fluid could overheat due to low pump
efficiency, and reach its bubble point inside the pump casing. If this happens, the pump
will seize, and stop working altogether due to internal mechanical damage. The recycle
line is designed to prevent these types of problems.
(b) In general, the flow achievable by using N pumps in parallel will be less than N times the
flow through a single pump. This is because there is a non-linear relationship between
flow and number of pumps, which is determined by the intersection between the system
curve and the composite pump characteristic curve.
As a matter of principle, we should never operate more than the minimum number of trains
needed to satisfy the production target set by the corporate dispatching department. On the
other hand, if the required throughput is bordering between the capacities of one pump and
two, or between 2 pumps and 3, it is not good practice to frequently start and stop the “extra”
pump.
1800
1600
1400
Head, ft of oil
1200
1000
system hd, 3 p/l
800
system hd, 2 p/l
600
1 train
400 2 trains
200 3 trains
0
0 500 1000 1500 2000 2500 3000
Total Flow , MBD
Page 17 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
The fractional load at which we make the switch between N and N+1 pumps has been named
the “Trigger Point”. Numerically, the Trigger Point is expressed as the ratio (%) of actual flow
at which the switch is made to the “ideal” flow at which the switch should be made. The flow
rate at which we should ideally switch from N pumps to N+1, and vice versa, is when the
composite characteristic curve for the pump network intersects the system curve (inclusive of
required minimum control valve ∆P), as in Exhibit 3-4. This corresponds to a Trigger Point of
100%.
The pump characteristic curve is obtained from the data sheets, and verified against operating
data in the PI (plant data historian) system. For pumping networks consisting of multiple
pumps connected in series and/or parallel, we have to construct a composite characteristic
curve from the individual pump curves, according to the procedure explained in section 3.6.
For pumps connected in series, we must add the individual heads at a given flow rate. For
pumps connected in parallel, we must add the flows at a given head.
The system curve can either be determined from the data sheets, or from PI data, as
illustrated in section 3.7. One should keep in mind that the design manual and data sheets are
usually based on new pipe, for which the pressure drop per linear foot is less than for old pipe,
and make the necessary adjustments. Another potential complicating factor is that sometimes
there could be more than one pipeline available for use. In the case of the AM and AH crudes,
there are several pipelines that could be used interchangeably. For AM crude either 2 or 3
pipelines are normally used, depending on the flow rate.
The “ideal” operating policy at a Trigger Point of 100% as derived from intersection of the
system curves with the pump composite curves in Exhibit 3-4 is shown in Exhibit 3-5.
Exhibit 3-5: Ideal Operating Policy for AM Shipper Pumps (at Trigger Point = 100%)
Unfortunately following the “ideal” policy runs the risk of having to throttle back production
during the time it takes to get the extra pump/train up and running. In practice, therefore, it is
safer to start up the N+1th pump a little bit before it is needed, and to keep it running a bit
longer after it is no longer needed. In effect, therefore, the optimum Trigger Point for fixed
speed motors drives is somewhat less than 100% (see Exhibit 3-6).
The approximate relationship between Trigger Point and reliability (measured in terms of lost
production during the switchover period) is shown semi-quantitatively in Exhibit 3-6. The
optimum operating zone is around the sharp bend in the curve, when reliability falls off rapidly
for small increases in Trigger Point. For fixed speed motors the optimum range of Trigger
Page 18 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Points centers around 95%, which is the number recommended, and is the basis for
estimating the energy savings potential compared to existing operations.
Significantly greater power savings can be realized if the Trigger Point is raised from 95% to
100% or 105%. This can be achieved if the pump driver has over-speed capacity, eg. if the
motor is fitted with a variable frequency drive (VFD), or the driver is a steam- or gas turbine.
100
80
Reliability Index
Optimum
Zone
60
40
f ixed spd motor
0
0 20 40 60 80 100 120
Trigger Point, %
To calculate the energy savings potential, one has to compare the cost of the current
operating practice versus the cost of following the optimum policy. The energy consumption
and cost of actual operation can be obtained either from the power meters (if the pumps have
them), or by following the methodology described below.
Page 19 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
From the PI system, determine the on/off status (and flow rate if ON) of the pumps at the mid
point of the selected period. For example, if the year is divided into 365 24-hour periods, and
the periods are counted from midnight to midnight, then you would check the on/off status at
noon every day. If the period is elected to be a shift, and the shift timings are 6 am – 2 pm, 2
pm – 10 pm, and 10 pm – 6 am, then the mid-points of the periods would be 10 am, 6 pm, and
2 am. The selection of sampling interval can be important, and is discussed in detail at the
end of this section. Sample output from the PI system for the AM Booster/Shipper pumps at
Safaniya is shown in Exhibit 3-8 for illustration.
Exhibit 3-8: Pump Operating Status and Flow Data (from PI system)
Page 20 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
From the pump flow data and the ideal operating policy table (Exhibit 3-5), calculate the
number of pump trains required during each selected period for a range of Trigger Points (eg.
85% to 105%, in increments of 5%). The computational logic is as follows:
Let number of parallel trains required = NP, and assumed Trigger Point (%) = TP.
Let the minimum required flow through a pump to avoid cavitation or seizure be FM.
Then,
For FM < Flow < 825*TP, NP = 1
For 825*TP < Flow < 960*TP, NP = 2
For Flow > 960*TP, NP = 3
The power savings are estimated assuming that each excess pump will be operating for
exactly one full interval. While this is not strictly true, it is not a bad approximation, as there
will be some intervals during which an excess pump may be operating part of the time but
does not get recorded because it happened to be off at the sampling moment, and these
discrepancies should cancel one another on average.
Page 21 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
It is helpful to also plot the “fractional” number of pump trains required against actual number
of trains in operation (as in exhibit 3-8) to get a visual feel for how much of the time excess
trains are being operated.
2.0
1.5
1.0
0.5
No . trains needed
No . Trains Running
0.0
12/10 1/29 3/20 5/9 6/28 8/17 10/6 11/25 1/14 3/4
Date, 2003
AM Booster/Shipper Pumps
1200
1000
800
Savings, K$/yr
600
400
200
0
80% 85% 90% 95% 100% 105% 110%
Trigger Point
It can be seen that savings can be substantially higher for pumping systems with adjustable
speed (variable frequency) drives on the motors. In the case of the AM Booster/Shipper
pumps at Safaniya Onshore Plants, an additional $520-760 K/yr of savings could be realized
by fitting the fixed speed motors with VFDs, and operating at a higher Trigger Point. The
economics of installing VFDs are very attractive because it is possible to design a control
system such that only one VFD is needed for any number of parallel trains. For other types of
adjustable speed drives, eg. hydraulic gears, this is not the case.
Page 22 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
When evaluating the existing load management practices of a set of parallel equipment it is
important to ensure that the data sampling technique is an accurate representation of reality,
because in order to have an accurate estimate of savings potential, we need to get the closest
correlation possible between the average flow rate over the sampling period, and the on/off
status of the pumps (which is an instantaneous measurement) and the average flow rate
during the interval. This would argue for the shortest possible interval, say 15 minutes.
However, since it normally takes at least 2 hours to get a pump fully operational from a cold
start, there is unlikely to be a disconnect between average flow rate and pump status for
sampling intervals less than 2 hours. In order to reduce the computational effort, we can limit
the number of samples to 365 by making the assumption that average flow rates over the
sampling period are representative of the average flow rates for the whole day, and calculate
estimated savings accordingly. The relationship between sampling time interval and calculated
savings is shown in Exhibit 3-12, which confirms that for savings from optimizing the number
of running pumps, the sampling period does not have a statistically significant impact on the
results.
Exhibit 3-12: Impact of Sampling Interval on Calc’d Savings from Minimizing Excess Pumps
128
127
Savings, K$/yr
126
125
124
123
122
0 4 8 12 16 20 24
Sampling Interval, hr
Flow control can be achieved in many different ways – by throttling the main discharge line, by
running the pump at full throttle and recirculating the excess flow, or by using an adjustable
speed drive. Flow recirculation is also employed for protecting the pump against mechanical
damage that could occur at low-flow conditions, as explained at the beginning of section 3.1.2.
A typical pump installation showing the piping and control scheme is illustrated in Exhibit 3-13.
Page 23 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Pump power consumption is a function of flow (Exhibit 3-14). Recirculation through the
bypass line increases flow rate and wastes energy; therefore it should only be employed when
the net process flow falls below the minimum flow requirement of the pump. The opportunity
for energy savings arises when some flow is being recirculated through the by-pass line even
when it is not needed. This usually happens when the pumps are grossly oversized for the
required service, a consequence of excessive conservatism during the project planning and
design phase.
800 Total
PV pow er
700
Pw r to Heat
600
Power, BHP
500
400
300
200
100
0
0 200 400 600 800 1000 1200 1400 1600
Flow , gpm
Page 24 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
“PV” power is the useful energy absorbed into the process for increasing pressure or driving
the fluid. However, a certain amount of input power is lost to heat due to friction. Observe that
the pump efficiency (useful energy divided by input power) is not constant but in fact goes
through a maximum over the pump’s operating range, falling off to near zero at extremely low
flow rates.
600
Power, BHP
400 SAVINGS
200
RECYCLE
0
0 200 400 600 800 1000 1200 1400 1600
Flow , gpm
600
UNAVOIDABLE
Power, BHP
RECYCLE
400 SAVINGS
200
∆ RECYCLE
0
0 200 400 600 800 1000 1200 1400 1600
Flow , gpm
Page 25 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Consider Exhibit 3-15, which shows the power-flow curve for a typical pumping system. Let us
adopt the following nomenclature:
Parameters: F =Flow, HP= Power
Subscripts: A=Actual, R=Required, M=Minimum
Then the potential power savings for a given time interval are:
∆HP = HPA – max ( HPR, HPM )
To calculate the power consumption for each case (actual, required, minimum), use the
average flow rate and head for that time interval. Pump efficiencies at the relevant flow rates
should be obtained either from the pump manufacturer’s data sheet/curve or from the
efficiency data generated during the most recent pump performance test.
The power savings for each time interval must be added up for all intervals during the year to
get the total annual savings. It is recommended to use either 365 intervals of 1-day each, or
730 intervals of 12 hours each.
The pump flow profile histogram is a very good indicator of whether there is significant cost
saving potential from elimination or minimization of recycle.
80
60
40
20
0
550 600 650 700 750 800 850 900 950 1000 1050
Flow , gpm
Page 26 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Specific steps to be taken are listed below and illustrated in Exhibit 3-17.
(a) Develop correlation for pump characteristic curve (from factory test or data sheet)
(b) Develop correlation for pump efficiency curve (from factory test or data sheet)
(c) Establish minimum flow requirement per pump (if not specified on pump data sheet,
assume 35% of flow at “best efficiency” point)
(d) Gather PI data for net process flow and actual flow through pump (= process flow +
recycle flow)
(e) Calculate power consumption and potential savings from recycle flow elimination or
minimization using the formulas given above
Operating data:
Minimum flow (surge point) 571 gpm
liquid sp gr 0.86 Head (from char curve) 1706 feet
Cost of power 26.7 $/MWH Efficiency, % 68.3 %
Interval duration 24 hours Power consumption 309 HP
Page 27 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
The efficiency of pumps is a function of flow rate. Sometimes, the efficiency can be
significantly lower at flow rates beyond the “best efficiency” point, and one has to check to
make sure that minimizing the number of operating pumps will in fact minimize power
consumption. The procedure for doing so is illustrated in Exhibit 3-18. If this is not the case,
then the operating policy developed for minimizing pump trains in operation (as recommended
in section 3.2) must be revisited and revised as necessary. Real efficiency curves are seldom
as extreme as the one shown in Exhibit 3-18, but it makes the point.
Efficiency, %
Head, feet 1449 1635
Efficiency, % 57.7 75.7
800 40 BHP per pump 735 421
Total power, HP 1471 1264
normal best eff
Head
400 20
Efficiency
0 0
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Flow, gpm
Page 28 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
1600 80
Head (ft), or Power (HP)
1200 60
Efficiency, %
800 40
Head
400 Power 20
Efficiency
0 0
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Flow , gpm
So far we have assumed that all pumps in parallel are identical, and have identical efficiencies.
In fact, this can never be strictly true; at best, it can only be approximately true. In some
cases, it may not even be approximately true, eg. if one machine suffers mechanical
deterioration at a faster rate than another.
The appropriate operating policy, when we have parallel machines of unequal efficiency, is
both simple and obvious:
The calculation procedure is straight-forward. Consider the case of three equal-sized pumps
of varying efficiency of which only two are normally operated in parallel (see Exhibit 3-20).
The best combination is pumps 1+3, while the worst is pumps 2+3. The savings potential
between best and worst combinations is $1039 - $996 = $42K per year. While this may not be
very great compared to some of the other savings, it can be achieved easily with zero capital
investment.
Page 29 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
n
In general, the number of combinations to be evaluated is Cm, calculated using factorials as
follows:
Consider the series/parallel network shown in Exhibit 3-21, with individual pump characteristic
curves as shown in Exhibit 3-22.
Page 30 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
to Process
Wet Crude
Storage Tank
Storage Tank Pump 2
Pump 3
Pump 1
Pump 1
1600 Pump 2
Pump 3
Head, feet
1200
800
400
0
0 500 1000 1500 2000 2500 3000 3500 4000
Flow, gpm
The construction procedure for the composite characteristic curve is illustrated in Exhibits 3-23
to 3-26.
Step 1: Develop quadratic correlation (use curve fitting utility within Excel) for each
pump curve in the form h (ft) = a + bQ - cQ^2, where Q = gpm/100.
It should be noted that the quadratic formulation is a good fit only for heads less than
95% of the shut-off value. In the very low flow region, when head is between 95 and
100% of the shut-off value, the relationship is more accurately correlated as a linear
function: h = a - dQ. (The shut-off head is the value at zero flow)
Page 31 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Step 2: Add the a, b, c and d parameters of the pumps connected in series (#2 and
3 in the example) to get the composite values for the two together.
Exhibit 3-24: Composite Characteristic Curve for Pumps 2 & 3 in Series, and Pump 1 by itself
1600
1200
Head, feet
800
400 Pump #1
Pumps 2/3
0
0 500 1000 1500 2000 2500 3000 3500 4000
Flow , gpm
Step 3: Construct a new table showing the flow for pump 1 and the 2/3 combination
at the same head. Then add the two flows together at each value of head, which gives
the composite characteristic curve for the whole network.
Page 32 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Exhibit 3-25: Characteristic Curve Data for Pumps 1 and 2 & 3 (in Series) in Parallel
Flow, gpm
Pumps 2/3
Head, ft Pump 1 in series 1 + 2/3
1550 0 0 0
1545 0 147 147
1540 0 294 294
1520 0 882 882
1500 0 1338 1338
1495 250 1360 1610
1485 750 1402 2152
1450 1212 1536 2749
1400 1477 1701 3178
1300 1870 1975 3845
1100 2440 2407 4846
800 3076 2911 5987
1600
1400
1200
Head, feet
1000
800
600
P ump 1
400 P umps 2/3
Co mpo site
200
0
0 1000 2000 3000 4000 5000 6000 7000
Flow, gpm
Observe that if system head is greater than the shut-off head for Pump 1 (= 1500 ft), it will not
be able to contribute any flow, and the combined network flow will be equal to the flow from
Pumps 2/3 (in series) only. Both parallel lines can contribute flow only when the system head
falls below the shut-off head for the lower one of the two.
Page 33 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
System head is the total head that the pump must overcome at any given flow. It has two
principal components – static and dynamic. The static head consists primarily of the potential
energy difference between the suction and discharge points. The dynamic head consists
primarily of kinetic energy (fluid momentum) differences and frictional losses in the piping
network.
P2
P1
It should be recognized that the “static” head is not necessarily constant. It will fluctuate
somewhat as a consequence of variations in vessel pressure at the suction and discharge
ends, as well as due to fluctuations in liquid level. If frictional losses dominate the system,
then the static head may be considered to be approximately constant, but if not, then
variations in static head would have to be taken into account in the analysis.
In normal industrial piping systems, the kinetic energy (V2/2g) term is generally small, and can
be safely neglected. Strictly speaking, the frictional term in the Bernoulli equation includes
pressure losses in the piping, equipment, instruments and the pump itself (bearings, seals,
etc). It is common practice, however, to separate pump losses from piping/equipment losses.
Internal losses within the pump are accounted for as pump efficiency, and only the piping,
equipment and instrument losses are included in the dynamic head component of system ∆P.
Page 34 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Frictional pressure drop in turbulent flow (Reynolds numbers > 10,000) can be very closely
estimated by the equations
∆P = 2ρ f LV2 / gD
and
f = 0.0029 (ρDV/µ)-0.2
Because the “Moody” friction factor f is itself a function of velocity, the net proportionality
between frictional pressure drop and pump flow works out to be approximately
∆P α Q1.8
With a proper understanding of these basic principles, it becomes easy to develop the system
curve from available data.
If the engineering design contractor and the procurement group have done their jobs right, the
static and dynamic heads at the design condition will be recorded on the pump documentation
supplied by the manufacturer. Only four items of information are needed – design flow rate,
liquid density, static head, and piping/equipment frictional drop at design flow – to calculate the
system curve over its entire range of operation:
1.8
(∆Pf ) d Q
H = HS + ,
ρ Qd
where subscript “d” refers to Design conditions.
A more accurate method is to obtain this same information from PI data over a suitably wide
flow range. Unfortunately, there is seldom sufficient instrumentation installed to enable
disaggregation of the control valve drop and the frictional drop. The appropriate procedure in
such instances is to estimate the piping and equipment frictional drops (using the equations
and methods described in most engineering handbooks and college-level textbooks on fluid
mechanics).
The first step is to list the pump data (from drawings and design manuals or plant data), as in
Exhibit 3-28. The next step is to calculate the static and dynamic heads according to the
equations provided above, as in Exhibit 3-29.
Page 35 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Exhibit 3-29: Calculation of Static and Dynamic Head at Design & Maximum Flow
Design Maximum
Flow, gpm 825 1070
Liquid density (specific gravity) 0.8605 0.8605
Static head, ft 100 100
Dynamic head, ft 884 1419
System head, ft 984 1519
Delivered head, ft 1656 1576
Control valve DP, ft 672 58
, psi 250 21
, % of TDH. 41% 4%
The control valve drop is the difference between the TDH of the pump and the system head.
For good control, this should generally be about 1/3 of the total pump delivered head. Even in
the fully open position, the control valve incurs some pressure drop, equal to 21 psi (58 ft) in
the illustrative example, which defines the maximum flow possible from the pump and piping
system. The maximum flow must be found by trial and error until the system head + control
valve drop (in fully open position) equal the delivered head.
Exhibit 3-30 shows the system curve in relation to the pump characteristic curve.
2000
Pump Curve
System Curve
1600
Control
Head, feet of oil
1200 Valve ∆P
800
Dynamic head
(frictional ∆ P)
400
Static head
0
0 500 1000 1500 2000
Flow, gpm
Page 36 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
For effective operation of pumping networks, it is important that they be controlled properly.
The control scheme shown in Exhibit 3-1 (section 3.0) is typical of Saudi Aramco facilities, but
is not optimal for effective load management. A superior control scheme, which works equally
well for both identical and non-identical pumps, is shown in Exhibit 3-31. [ Ref. Bela G. Liptak,
Optimization of Industrial Unit Processes, 2nd ed, CRC Press, Boca Raton, Florida, USA
(1999), pp 394-401.] There is no sacrifice in operating reliability; in fact the illustrated scheme
features improved flexibility.
The combined total flow may be set on either flow control (shown) or level control (not shown),
depending on process requirements. If the stream is a process feed, we would normally prefer
flow control, as this makes for better operating stability. If on the other hand, it is a product
stream going to a pipeline or bulk storage facility, we may prefer to use level control.
The flow controller output signal passes through a hand switch, controlled by the operator,
which is routed to one of the three control valves in the individual pump discharge lines. Only
one of the valves should be controlled at any given time; the other two would be either fully
open or fully closed, depending on whether the pump is running or not. The valves should be
set to the “fail-open” mode. Check valves, block valves, bleed valves, pressure gages, and
other details of standard piping and instrumentation are not shown.
Page 37 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
(a) Gases are compressible while liquids, for all practical purposes, are incompressible.
Physical properties such as specific heat and compressibility can vary significantly at
high compression ratios, affecting power consumption.
(b) Density variations (due to composition and suction pressure drift) are more prevalent.
(c) Compressors are generally more difficult to startup and shut down (normal startup
period is on the order of 4 hours vs less than 1 hour for even very large pumps) partly
because they usually operate between their first and second critical speeds, and partly
because they have to be properly purged every time when compressing flammable
hydrocarbon gases.
(d) The system curve is generally dominated by static head, as opposed to dynamic head
for most pump applications.
(e) The surge limit generally occurs at 50% of the design flow at the design speed.
k −1
ZW(T1 + 460) 1 k P2 k
BHP = − 1
1281.55 MW η ad k - 1 P1
where T1 = suction temperature, °F
P1 & P2 = suction and discharge pressures, psia or any other units
k = average specific heat ratio Cp/Cv
Z = average compressibility factor
W = gas mass flow, lb/hr
MW = molecular weight, lb/mole
ηad = adiabatic efficiency, usually in the range 0.75-0.85
Page 38 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
It is useful to know that Cp is usually about 7 Btu/lb-mole°R for most diatomic gases, and 5
Btu/lb-mole°R for ideal monatomic gases. For a gas mixture, Cp is evaluated as the weighted
mole fraction average. It is also useful to know that for ideal gases, Cv = Cp – R, so that k can
be approximated as
k = Cp/(Cp-R)
where n = polytropic constant, which is a function of gas properties only, and determined
experimentally from the equation PVn=constant, unique to each machine.
Generally n and ηp are provided by the compressor manufacturer, and can be found in the
data sheet supplied with the equipment at time of purchase. The adiabatic efficiency can be
back-calculated from this information:
k −1
n −1
P k
P2 n
η ad = 2 − 1 − 1
P1 P1
1
Page 39 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Adiabatic efficiency varies with compression ratio, whereas polytropic efficiency is independent
of the thermodynamic state of the gas, being a function of mechanical design only. The
reason is that gas properties are implicitly included in the polytropic constant itself. Polytropic
efficiency is therefore a better indicator of compressor mechanical condition and performance,
and so load allocation decisions should be made on the basis of polytropic, not adiabatic
efficiency.
Centrigugal Compressors
79.0 12000
78.5
10000
78.0
Nominal Speed, rpm
Polytropic Eff, %
8000
77.5
Efficiency
6000
Speed
77.0
4000
76.5
2000
76.0
75.5 0
0 10 20 30 40 50 60
Impeller diam, in
Page 40 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
For multi-stage compressors, the total power requirement is simply the sum of the power for
each individual stage. From a thermodynamic viewpoint, the defining characteristic of a
compression stage is that there should be no inter-cooling between successive impellers.
Thus a compressor casing containing multiple impellers without intermediate coolers would be
considered a single stage. Confusion often arises because some manufacturers and authors
of technical articles refer to each impeller as a “stage”. These are not thermodynamic stages
unless an intercooler is provided between each impeller. In order to keep the temperature rise
within reasonable limits, the single-stage compression ratio is normally limited to about 3.0.
When calculating the power consumption of the 2nd and later stages, one should take into
account the pressure drop in the interstage cooler and piping, the new suction inlet
temperature, and differences in gas properties at the new suction conditions.
In general, the head vs capacity curve (also called the “performance” curve) for a centrifugal
compressor operating at a fixed speed is quite flat, with the total head at the minimum
throughout (the surge point) typically being only 105-115% of the head at design throughput.
Similarly, the system curve is also relatively flat, because the static head usually dominates
frictional (dynamic) head. The operating point occurs at the intersection of the compressor
performance curve and the system curve.
30
28
Head, 1000 ft
Surge limit
26
24
Performance Curve
22 System Curve
20
0 1000 2000 3000 4000 5000 6000 7000 8000
Suction Flow, acfm
These characteristics are important considerations in selecting a control scheme that will result
in both stable and energy-efficient operation.
Page 41 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
For almost all compressor applications, some form of flow regulation is required, whether to
maintain a constant discharge pressure or a constant flow. Furthermore, the flow set point
could be in terms of volume or mass. The type of control scheme also depends on the type of
driver – whether fixed speed or variable speed. The optimal control scheme therefore varies
from case to case.
Speed control is considerably more efficient than throttling the flow with a valve (or even
worse, by employing flow recycle) at constant compressor speed, since the valve resistance
creates an unrecoverable power loss. Steam and gas turbines are inherently variable speed
machines, with speed control being easily achieved by regulating either the steam flow or
fuel/air flow. Compared to fixed speed drivers, variable speed drivers permit a much wider
range of control in a highly efficient manner.
Speed variation can be used to alter the position of the H-Q performance curve such that it
exactly intersects the system curve, as illustrated in Exhibit 4-3, with power consumption rising
and falling roughly in proportion to the process load. The performance curves at different
speeds are developed using the affinity laws.
R92-K151
33
31
29
System Curve
27 1780 rpm
Polytropic Head, 1000 ft
1767 rpm
25 1630 rpm
1484 rpm
1362 rpm
23
Current Compr
21
Flow Rate,
fixed speed
19
17
15
0 1000 2000 3000 4000 5000 6000 7000
Page 42 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Controlling two or more compressors operating in parallel and having identical characteristics
would be similar to the case of a single compressor. However, because of age, wear, or
design differences, no two compressors have identical performance characteristics. Slight
variations in flow can cause one compressor to be fully loaded and the other to fall below its
surge point, forcing needless recycle. The control scheme shown in Exhibit 4-4 overcomes
this problem. Typically, the suction valve that receives the lower flow is kept 100% open.
Exhibit 4-5 illustrates how two compressors can be proportionally loaded and unloaded, while
keeping their operating points at equal distance from the surge line. The lead compressor (31)
is selected either as the larger unit or the one that is closer to the surge line when the load
rises or further from it when the load falls. Improper load distribution is prevented by
measuring the total load, and assigning a variable percentage to each compressor adjusting
the set points of the flow ratio controllers. Each compressor must be provided with its own
independent surge protection system.
Page 43 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Exhibit 4-5: Proportional Loading of Parallel Compressors with ASDs [Ref. Liptak, op cit]
Various alternative control strategies for different conditions and scenarios are described in the
following excellent reference texts:
[1] “Optimization of Industrial Unit Processes”, 2nd ed, Bela G Liptak, CRC Press, Boca
Raton, Florida (1999), Chapter 4.
[2] “Compressor Handbook for the Hydrocarbon Processing Industries”, Gulf Publishing
Co, Houston, Texas (1979), pp 103-124.
In most Saudi Aramco plants, when the compressor is not turbine driven, the electric motor is
normally operated at fixed speed (although there are a few rare cases where variable speed
capability is provided either using a hydraulic gear box or a variable frequency drive). Since
variable speed operation is one of the ways to improve energy efficiency, it is worth noting that
this is a relatively easy retrofit that can have excellent economics when dealing with networks
of parallel compressors. The reason is that only one of the compressors needs to be fitted
with a VFD; the rest can be left on fixed speed, as illustrated in Exhibit 4-6 (surge protection
controls not shown). It is not necessary, as some mistakenly believe, to install a VFD on each
and every motor in the network.
Page 44 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Exhibit 4-6: Control of Parallel Compressors (One ASD and Rest Fixed Speed)
TI TI
FC
FI
PI PI
M M
TI
TI
SC
PC
FI FI
Whether the process objective is to maintain constant header pressure or constant flow, the
fixed speed compressors must be on flow control, which can be accomplished by either
suction throttling or discharge throttling. Butterfly valves are preferred because of their lower
pressure drop. The appropriate valve location depends on whether the goal is to deliver mass
flow (eg for most process applications, including sales gas compression) or volume flow (eg.
most utility applications such as plant or instrument air).
For equal mass flow rates, discharge throttling consumes less power, and therefore would be
preferred. However, for equal volume flows, the situation is reversed.
Consider the illustrative example in Exhibit 4-7, with suction and header pressures of 80 psia
and 230 psia respectively, a k value (= CP/CV) of 1.32, and a control valve drop of 10 psi at the
design flow. A comparison of the relative power consumption for the two cases clearly
demonstrates that appropriate placement of the control valve can save a significant amount of
energy.
Page 45 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
The final point to keep in mind is that the interaction of compressor operations with the rest of
the plant must be given due consideration in the design of the control system.
For example, if the process upstream of the compressors is under constant pressure control,
then the compressor control system must be designed (or modified) in such a way that starting
and stopping a compressor will not disturb the upstream process. In short, an integrated
control philosophy is needed.
The principal process parameters that affect compressor power consumption are mass flow
rate, suction (inlet) temperature, and the compression ratio, so anything we can do to reduce
these three parameters through process modifications will help to reduce power consumption.
Flow requirements are generally set by process conditions, but one should examine the overall
process flowsheet to look for opportunities to change the material balance in such a way that
the flow through the compressor is minimized.
Inlet temperature can obviously be reduced by installing a heat exchanger in the process
stream entering the compressor, but this seldom pays out, because the new cooler creates
additional pressure drop in the system that will increase the required compression ratio. The
increased power requirement from a higher compression ratio will almost always be more than
the reduction from lower inlet temperature. The solution, once again, is to examine the overall
process flowsheet, and look for places where the suction stream may be being heated.
Page 46 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
From Exhibit 4-8a, it can be seen that the suction stream to the Sales Gas compressor is
being used to cool the feed gas to the Gas Treating process. Effectively, we have a “heater” in
the compressor suction line; by bypassing it, as shown in Exhibit 4-8b, we can reduce not only
the suction temperature but also the compression ratio by eliminating the heater’s ∆P. The
process stream which was being cooled against compressor suction must now be cooled
against some other stream, with consequent net energy savings.
Page 47 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
Power consumption can also be reduced by minimizing the required discharge pressure. For
example most Aramco compressors have a fin-fan cooler in their discharge line, whose
cooling capacity varies with ambient temperature. One of the power conservation strategies
used by the operators is to shed power load on the fans during cooler weather (a laudable
attempt at thermal load management) once the temperature set point downstream of the
cooler is being met. However, maintaining a constant condenser temperature is the wrong
control objective if the compressor discharge stream is going to a condenser, because the
required pressure for condensation is not constant but varies with ambient temperature. In
such cases, even greater power savings could be obtained by following a different operating
policy – viz. to maximize the fin-fan cooling capacity but save even more power by minimizing
the discharge pressure (and therefore the compression ratio). A suggested control scheme is
shown in Exhibit 4-19, with the supporting calculations presented in Exhibit 4-10.
The tricky part is being able to determine when exactly we have achieved total condensation,
something very difficult to do. The proposed solution is to have two condensers in series. The
main condenser would condense only about 90-95% of the vapor, and the vent condenser
would condense the balance. The control system would be set up to maintain a fixed 10:1 or
20:1 flow ratio between the main flow and the vent flow.
Page 48 of 49
Document Responsibility: Energy Systems Unit, CSD SABP-A-002
Issue Date: 26 October 2005 Load Management for Energy
Next Planned Update: 1 November 2006 Efficiency: Pumps & Compressors
The required discharge pressure in Case 2 is found by successive iteration until the calculated
condenser surface area for cases 1 and 2 are identical.
Although process modifications cannot strictly be classified as Load Management, the subject
has been presented here because it is a way to introduce new degrees of freedom that enable
optimal load allocation between the different energy consumers in the overall system.
Revision Summary
26 October 2005 New Saudi Aramco Best Practice.
Page 49 of 49