Inspection & Test Plan: Disciplin REV Legend H: Steel Structure B W: SW: KE: NO Description Inspection Methode
Inspection & Test Plan: Disciplin REV Legend H: Steel Structure B W: SW: KE: NO Description Inspection Methode
INSP
Legend
DISCIPLIN
REV H :
W :
STEEL STRUCTURE B SW :
KE :
STEEL STRUCTURE
1 Material Inspection N/A
2 Procedure/Methode of Instalation N/A
3 Initial Preparation For Column Insallation
a.
Check Hole Diameter Of Column And Leveling Inspect
Adjuster Level Of Each Column Location
b. Welding (If Any) Inspect
- WPS & PQR Inspect
-WPQ
4 Foundation Check
a. Centerline, Elevation, Anchor Bolt Location Inspect
b. Padding Level Check Inspect
5. Erection
a.
Check Structure For Line, Level & Dimension As Inspect
Required
b. Welding Fit Up Inspect
c.
Inspect
Visual Inspection (Before, During, After Welding)
d. NDT Inspect
e. Plumbness / Vertically Check Inspect
f. Bolt Tightening Check Inspect
6 Painting / Touch Up
a. Check Paint Spec, Type, Cover, Etc Inspect
b.
Inspect
Check Equipment & Tool For Painting Application
c.
Inspect
Check Surface Confition Before Applied Paint
d.
Visual Check After Paint / Touch Up Paint Inspect
Completion
e. DFT Check Inspect
7 Grouting Work
a. Material Inpection Inspect
b. Mixing Proportion Inspect
c. Form-Work Inspect
d. Anchor Bolt / Embeded N/A
e. Cleaning Prior to Placing Inspect
f. Placing of Grouting Inspect
g. Apprearance of surface after from removal Inspect
h.
Mortar Finishing (Level, Chamfer, Crack, and Inspect
Mortar Proportion)
8 Steel Structure Instalation Acceptance
a. Final Punch List Inspect
b.
All Inspection as per ITP has been done and Inspect
report already been generated and sign
c. All NCR or any Deviation already Closed Inspect
d.
All Drawing Changes already updated in as build Inspect
Drawing
Project Name : Blas Furnance Krakatau Steel Project
Project No : -
Main Contractor : PT KRAKATAU Engineering Date
Sub-Contractor : PT. PUSAKA GEMILANG TEKNINDO Report No.
Project Owner : KRAKATAU STEEL (PERSERO) TBK Page.
Document No. : PGT ITP KE
Monitoring
Prepare
Information
Third Party Inspection
RESPONSIBILITY
KE AMYTHAS KS
W SW W
R A A
P&W R/W R
P&W R/W A
P&W R/W A
R/W A A
W A A
W W A
W A A
W W A
W A A
W A A
W A A
W A A
W W A
W A A
W A A
W W A
W W A
W SW W
W SW SW
W W SW
- -
W SW SW
W W W
SW SW SW
W W W
R&W R/W R
R&W R/W R
R&W R/W R
R&W R/W A
KoP INSPECTION & TE
Project : Blast Furnace PT Krakatau Steel Legend :
KS :
KE :
Job No : 3703 S/C :
Client : PT Krakatau Steel X :
Scope of Inspecti
No Inspection & Test ( Activity )
S/C
Document Reviewed
1 Design Drawing & Data -
2 Engineering Design
- Compiling, Understanding, Clarification -
3 Detail Drawing -
4 QA/QC Procedure I
- Compiling, Understanding, Clarification I
5 Approval
- Reviewed Subcontractor ITP -
- Submited Qualified Welder Procedure I
- Submited Welder Qualifications I
- Prepared weld procedure and Welder Qualification Register I
6 Inspection Material
- Quantities I
- Conformance to Requirement I
- Dimensional I
- Visual check I
- Material Certificate I
7 Material Preparation
- Check Material type and Identification I
- Mark Number Identification I
- Quantity Identification I
8 Steel Work Fabrication and Erection
- Approved WPS PQR and Work Instruction Available I
- Check Material Identification I
- Calculate NDT Required Per Facility I
- Consumable Welding Check I
- Check Fit Up, Configuration, Dimension and Orientation I
- Welder Qualification Check I
- Welder Parameter Check I
- Final Dimension Check I
- Levelness Check I
- Vertically Check I
- Straigthness Check I
- Bolt Tigtened Check I
- Completion Part, Bold and Nut Check I
9 Final Inspection and Testing I
- Visual Welding Quality I
- Dimensional I
- Check for Distortion I
- Missed Bold Hole I
- Correct Part Number I
10 Non Destructive Testing (NDT) if Required
- Magnetic Particle Test I
- Penetran Test I
- Ultrasonic Test I
- Radiographic Test I
11 Documentation
All documents required as per contract shall be collected and submit to
owner if :
All inspection as per this ITP has been done & inspection report has
already been generated and sign all NCR already closed and
documented, all drawing changes already update in as built or martk up
drawing
ITP No. :
ECTION & TEST PLAN Revision :
Date :
I :
PT Krakatau Steel W :
PT Krakatau Engineering (W) :
SUB-Contractor R :
Report, Record, Documents to be supplied by H :
vendor / Subcontractor
Third Party etc
X
R R R - Project Quality Plan, Company Specification, Technical Specification
R R R - Owner Speciication, Standard and Code
R R R
R R R
X
W - W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
R R R - Approved General Specification, Owner Specification, AFC Drawing
X
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
X
R R R - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
(W) (W) (W) - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
(W) (W) (W) - Approved General Specification, Owner Specification, AFC Drawing
(W) (W) (W) - Approved General Specification, Owner Specification, AFC Drawing
(W) (W) (W) - Approved General Specification, Owner Specification, AFC Drawing
X
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
W W W - Approved General Specification, Owner Specification, AFC Drawing
R R R X Approved General Specification, Owner Specification, AFC Drawing
- Contract Project
3703
A
41560
Do & Inspection required
Witness (Notification of Inspection required)
Random Witness
Review
Hold Point Notification required and activity shall not proceed
without prior instruction
ntract Project
KOP BBI
INSPECTION
Legend
DISCIPLIN
REV H :
W :
STEEL STRUCTURE 0 SW :
KE :
DUCTING/HOPPER FABRICATION
1 Design
Approval of Drawing and Design Calculation N/A
Material Certification & Material Identification Inspection
2 Welding Spesification
a WPS & PQR Inspection
b WPQ Inspection
3 Procedure Document / Preparation Inspection
a
Inspection
Edge Preparation Inspection (Incl. Back Chipping
b Fit-Up & Welding Inspection Inspection
c Visual and Dimensional Inspection Inspection
4 Surface Preparation of Painting
a Surface Preparation Inspection
b Wire Brush or Post Blasting Cleaning Inspection
c Visual after Wire Brushing or Sand Blasting Inspection
5 Painting Application of Fabrication Activity
a 1st Coating Inspection
b 2nd Coating Inspection
c Final Coating Inspection
d Visual & Dry Film Thickness Check Inspection
6 Manufacturer's Data Report
a. Manufacturer's Data Report Inspection
Project Name : Blast Furnance Krakatau Steel Project
Project No : -
Main Contractor : PT KRAKATAU Engineering Date
Sub-Contractor : PT. PUSAKA GEMILANG TEKNINDO Report No.
Project Owner : KRAKATAU STEEL (PERSERO) TBK Page.
Document No. : PGT ITP KE
Monitoring
Prepare
Information
Third Party Inspection
RESPONSIBILITY
PGT AMYTHAS
P SW/A
P SW/A
P A
P W/A
P R/A
P SW/A
P W/A
P SW/A
P SW/A
P W/A
P SW/A
P SW/A
P SW/A
P W/A
V/P R
Contract No :
Job No. : c 2002
Client : KRAKATAU ENGINEERING
Project : SINTER PLANT
Location : KRAKATAU STELL CILEGON BANTEN
Description :
NO ITEM ACTIVITIES
QA Manual / Code & Standard QA Manual / Code & Standard Approved Tech. Spec.
Sheet No.
Revision No
Date : 41883
Prepared By : Zainal A
INSPECTION APPROVAL
PT CEMARA SEMITAMA
MCC CERI PT. KE AMYTHAS PT.KS REPR.
CONST SIGN QA/QC SIGN
R R R R R/A
R R R R R
I I R R R
I I W W SW
I I W W SW
I I W W SW
I I R/V R/V R/V
I I R/V R/V R/V
R R R/V R/V R/A
I I R R R/A
R R R R R/A
V V R/V R/V R/A
V V R R R/A