Tower Foundation AT CERTIFICATE


To be adopted for works of Tower Foundation and erection
under 4G Saturation Project

Circle/ Cluster TAslaaDs leugss laaSP


Site Name
Site ID
SATHAAlauDs BT 2|laasp Technical representative
UWTM2) Q092 Inspected by BSNL officer MfolwemAS
Drg No. hee oh Tea 'on Date of inspection
|1. Stage-l Tower foundation

ISNo Description of Item Observation


Check of site location as per existing norms (Attach approved
Layout Plan)
2 Check for availability of tower base plate and template at site &
check whether template and bolts spacing holes are as per pk,
approved tower drawing
3 Check for excavation work
4 Check for Soil Investigation report availability. If Yes, attach
report
5 Check for center of tower base as per approved layout of the
competent authority
checke
6 Check provision of adequate safety arangement and
protection tonearby structure
Check for reinforcement of foundation as per approve
drawing:
8 Check of stem reinforcement as per drawing and height of stem
as per drawing and NGL ok
Check of dimension of foundation castas per the drawing. Each JDne pet
dimension has to be cross checked
|Sre
Note (1) Before casting this has to be offered for AT team. The quality of steel and other material used
las per the standard code to be certified by the laaSP.

(2) As per the drawing and proper grade the laaSP willsubmit the concrete cube based reports from
NABLI Govt. Engineering College/ Govt. Polytechnic College / Recognized institutes/ approved lab
which will be verified by AT team

Signature :(láasp Rep.) Signature: (BSNL Rep.)


Name: V.mArkpcspAd Narne: m,sEVb)
Mobile No.: g-s böSOfe} Designation: EEch)
Mobile No. 444474932
epepu

(Hyderabad)
Vate

EXECUTIVE ENGINEER [Q
BSNL, CivilDivision
MADURA - 625 U2.