Trafic Diversion Plan

KEEP LEFT/RIGHT

DEEP EXCAVATION

PROPOSED 132KV CABLE


POLICY PLAN/R.O.W MEN AT WORK
CONCRETE BARRIER
PLASTIC BARRIER
FLASHING LIGHT DIRECTION OF TRAFFIC WORK END
End
SIGN POST

THIS SUBMISSION IS DECLARED TO BE SIGNATURE:


STRICTLY IN ACCORDANCE WITH THE PHASE-13
REQUIREMENTS OF THE CONTRACT

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 13 - SUBSTATIONS


PACKAGE S-10
CONTRACTNo.GTC/735E/2015
CONSULTANT :

P.O. BOX 4769, Doha, Qatar


Tel.: 44478571 Fax.:44478572

SUBSTATION NAME : PROJECT DRAWING NUMBER :

AL WAJBAH 2 S/S BBC-735E-TDP-LO-RC2

0 - 22.02.2021 ISSUED FOR COMMENTS RRK RVP BA

REV STAT. DATE MODIFICATION DRAWN CHECKED APPROVED


SUBCONTRACTOR NAME: CONTRACTOR NAME:

POWER LINKS QATAR L.L.C


P. O. Box. 31970, OFFICE # 2004,20 th FLOOR ,
PALM TOWER " B" ,AL DAFNA AREA,
Doha, State Of Qatar.
DOHA ,QATAR
Tel : (974) 44319463
Fax : (974) 436 4855
MANUFACTURERS DRAWING NO: DRAWING/DOCUMENT TITLE:

TRAFFIC DIVERSION PLAN


FOR RC - 2 FEDEER - 1 SECTION - 2( LOOP OUT)
DATE NAME SIGNATURE
AT AL WAJBA -2

DRAWN 31.01.2021 RRK

CHECKED 31.01.2021 AS SIZE SCALE NTS REV

APPROVED 31.01.2021 A1 SHEET 01 0F 01 0


LEGEND:-

N
RC
- 0
1/
OP
T EN F2
L= YPE CUT
15 ' H
.40 '
m
E2
N 189 To
39 4
42 5.6 NOTES:-
64 9
.21 AW
-2
AC To 235 C4
-02 GS .00 0
F / W m
L= B DU F2
T NE A

AD
S/

RO
E
WID
E2
S

5m
N 190 W

C4 C 10
10 CT PA
(4.0 NT
RY
X 2.5M

39 1
.30
)

0 20
STA

42 5.9
IR

JB
CAS
E-
2

m 25 63

C
.97
FUT
URE
CAP
PAN
EL
8
6F
2 To J
RTC
C PAN
EL

HVA
C SHA
FT

168 B5A APPROVAL DOC. REFERENCE:


132 / 11 k V STA

.00 -F2

AD
IR
CAS
E -1

E RO
HVA
C SHA

WID
FT

7m
AL WAJBAH 2
SUBSTATION
E2
N 189
39 0
41 7.4
93 51
.94 AC-01/F1
1
FTB DUCT
To
JB
L=14.80m
168 6-F DETAIL OF CABLE CIRCUIT
To
AW .00 2
2S m N
To /S EW
A E2
N 189
AW JB
225 -2 C3
39 7
41 7.7
55 3 5A
.7
.00 0 F2 To
.00 - F2

m N J
AC
-03 EW 420 B5-F
.00 2
/S
320 W2

FT /F
m

SS
L =1
B DU 1 JB m
A

0.3 CT 6F
AW
0m
F2 To

1 To J
To

178 B5A
.00 -F1
m
1
JB

To
W

JB

.00 - F1
NE

178 6-F
.00 1

300 W2
2

m N REFERENCE DRAWINGS
-F

m
1 To A EW
8A

DRAWING TITLE DRAWING NO.


m

JB
.00

5
JB

AF T
318

1 o JB
To

1F

417 5-F
.0
0m 1
JB
W
NE
S
S/

F2
1
2

F
AW

6-
A-
m
To

B
.00
JB

i.J
300

Ex
To

Ex
i.J
B
6-
F1

THIS SUBMISSION IS DECLARED TO BE SIGNATURE:


STRICTLY IN ACCORDANCE WITH THE PHASE-13
REQUIREMENTS OF THE CONTRACT

QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 13 - SUBSTATIONS


PACKAGE S-10
Exi.JB 7-F2 CONTRACTNo.GTC/735E/2015
RC-02/F1 CONSULTANT :
OPEN CUT
TYPE ' H ' P.O. BOX 4769, Doha, Qatar
L=09.40m
Tel.: 44478571 Fax.:44478572
Exi.JB 8-F2

Exi.JB 8-F1 SUBSTATION NAME : PROJECT DRAWING NUMBER :


To JB 8- F2

132 / 11 kV AL WAJBAH 2 S/S PH13-5E-50-83-0101


NEW JB 2 F2 318.00m

To JB 8- F1
LB

NEW JB 2 F1 300.00m
F.
O

LB
Exi.JB 7-F1
F.O
A - 27.12.2020 ISSUED FOR CONSTRUCTION ASE RVP BA
2 B 26.11.2020 RE-ISSUED FOR APPROVAL ASE RVP BA

1 C 18.05.2020 ISSUED FOR APPROVAL ASE RVP BA

0 G 13.05.2020 ISSUED FOR COMMENTS ASE RVP BA

REV STAT. DATE MODIFICATION DRAWN CHECKED APPROVED


SUBCONTRACTOR NAME: CONTRACTOR NAME:
POWER LINKS QATAR L.L.C
To JB 9- F2

P. O. Box. 31970, OFFICE # 2004,20th FLOOR ,


318.00

To JB 9- F1

Doha, State Of Qatar.


290.00m

PALM TOWER " B" ,AL DAFNA AREA,


Tel : (974) 44319463 DOHA ,QATAR
Fax : (974) 436 4855

MANUFACTURERS DRAWING NO: DRAWING/DOCUMENT TITLE:


KEYPLAN
CABLE ROUTE KEY PLAN FOR DIVERSION OF
DATE NAME SIGNATURE EXISTING 132KV 1C 2000sqmm,250 MVA,CU,XLPE
2xF.O CABLE ROUTE BETWEEN AL WAJBAH SUPER S/S
DRAWN 27.12.2020 ASE AND GHARAFA SW S/S INTO AL WAJBAH 2 S/S

CHECKED 27.12.2020 RVP SIZE SCALE 1:1300 REV

APPROVED 27.12.2020 BA A1 SHEET 01 0F 01 A