You are on page 1of 3

BOILER

Coal Consumed in a Average Generated No. Of Comparts in Condensate Feed Water


Checks Done as per Schedule Remarks
day (MT) (Ton/Hr) Running Received (m3) Consumption (m3)

COAL HANDLING PLANT


No. of hours Average Moisture Checks Done as per
Coal Received (MT) Coal Consumed (MT) Balance Stock (MT) Bunker Level Remarks
Operated Levels Schedule

BAG FILTER
Air Receiver Pressure Pulsing Air Pressure Convey Air Pressure Max. Flue Gas Differential Pressure Checks Done as per
Ash Unloaded at Remarks
(Kg/cm2) (Kg/cm2) (Kg/cm2) Temp. across Bag Filter Schedule

A B C
Water Parameters Colour
Limit Actual Limit Actual Limit Actual

pH

Feed Water TH

TDS

Blow Down pH
Water
Blow Down
Water TDS
pH

RO Water TH

TDS

You might also like