PROJECT MANAGER'S

REPRESENTATIVE
CLIENT DESIGN AND BUILD CONTRACTOR

Stirling

PROJECT: BUWEKULA JINJA BPIT


Test Reference No. Lab. Reference No. Date Sampled Date Tested Technician

Location: IM DEEP 31/Dec/19 3/Jan/20 Lab team

Material description: NEAT GRAVEL Natural moisture (%) : 5.4

TEST DATA
Weight of rammer (Kg) No. of blows per layer No of layers Height of drop (mm) Diameter of mould(mm) Volume of mould (cm3)
4.5 62 5 457 152 2,305
MOISTURE CONTENT DATA
Test No.
1 2 3 4 5
Tin No. A A A A A
Water Added cm 3
220 320 420 520 620
Mass of Compacted soil + mould gm 10,023 10,391 10,693 10,568 10,395
Mass of Mould gm 5,051 5,051 5,051 5,051 5,051

Mass of Compacted soil gm 4972 5340 5642 5517 5344


Volume of mould cm 3
2,305 2,305 2,305 2,305 2,305
Wet density of soil g/cm3 2.157 2.317 2.448 2.393 2.318
DATA FOR PROCTOR CURVE

Container No. XZM HED BBC MU FDC


Mass of wet soil + Container gm 3,480.0 2,924.0 2,562.0 2,884.0 2,872.0
Mass of dry soil + container gm 3,320.0 2,755.0 2,395.0 2,651.0 2,608.0
Mass of container gm 809.0 783.0 809.0 807.0 808.0
Mass of water added gm
160 169 167 233 264
Mass of dry soil gm
2511 1972 1586 1844 1800
Moisture content %
6.4 8.6 10.5 12.6 14.7
Dry density g/cm3 2.028 2.134 2.215 2.125 2.022

Maximum dry density (gm/cm ) 3 2.215 Optimum moisture content (%) 10.5

2
Dry Density (gm/cm3)

2.22

2.17 0 2.215 0 10.5

10.5 2.215 2.215 10.5

2.12

2.07

2.02
6 7 8 9 10
Moisture Content (%) 11 12 13 14 15

Remarks:

FOR CONTRACTOR PROJECT MANAGER'S REPRESENTATIVE

_______________ ______________ ____________ _____________


Lab Technician Materials Engineer Lab Technician Materials Engineer