PND Construction (PVT) LTD Rehabilitation & Improvements To Kalugamuwa-Wilakatupotha Road
PND Construction (PVT) LTD Rehabilitation & Improvements To Kalugamuwa-Wilakatupotha Road
Date: 20-11-2013
Date: 20-11-2013
No: DWP001
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Excavation & Concrete grade 15 - Screed Culvert 2/2 8.30 13.00 RHS
2 Excavation & Concrete grade 15 - Screed Culvert 3/1 9.00 14.00 RHS
3 Excavation & Concrete grade 15 - Screed Culvert 3/2 10.00 16.00 RHS
4 Excavation & Concrete grade 15 - Screed Culvert 3/5 11.00 17.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 21-11-2013
Date: 21-11-2013
No: DWP002
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Reinforcement & Form work preperation - Bace Culvert 2/2 8.00 10.00 RHS
2 Reinforcement & Form work preperation - Bace Culvert 3/1 8.00 10.00 RHS
3 Reinforcement & Form work preperation - Bace Culvert 3/2 8.00 10.00 RHS
4 Reinforcement & Form work preperation - Bace Culvert 3/5 8.00 10.00 RHS
5 Concrete grade 30 - Base Culvert 2/2 10.00 14.00 RHS
6 Concrete grade 30 - Base Culvert 3/1 10.30 15.00 RHS
7 Concrete grade 30 - Base Culvert 3/2 10.00 14.30 RHS
8 Concrete grade 30 - Base Culvert 3/5 10.30 16.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 22-11-2013
Date: 22-11-2013
No: DWP003
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Form work preperation - Wall 1 Culvert 2/2 8.00 14.00 RHS
2 Form work preperation - Wall 1 Culvert 3/1 8.00 15.00 RHS
3 Form work preperation - Wall 1 Culvert 3/2 8.00 15.00 RHS
4 Form work preperation - Wall 1 Culvert 3/5 8.00 14.30 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 23-11-2013
Date: 23-11-2013
No: DWP004
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 1 Culvert 2/2 8.00 12.00 RHS
2 Concrete grade 15 - Wall 1 Culvert 3/1 8.00 12.00 RHS
3 Concrete grade 15 - Wall 1 Culvert 3/2 8.00 12.00 RHS
4 Concrete grade 15 - Wall 1 Culvert 3/5 8.00 12.00 RHS
5 Form work preperation - Wall 2 Culvert 2/2 13.00 17.00 RHS
6 Form work preperation - Wall 2 Culvert 3/1 13.00 17.00 RHS
7 Form work preperation - Wall 2 Culvert 3/2 13.00 17.00 RHS
8 Form work preperation - Wall 2 Culvert 3/5 13.00 17.00 RHS
Date: 24-11-2013
Date: 24-11-2013
No: DWP005
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 2 Culvert 2/2 8.00 12.00 RHS
2 Concrete grade 15 - Wall 2 Culvert 3/1 10.00 11.00 RHS
3 Concrete grade 15 - Wall 2 Culvert 3/2 8.00 12.00 RHS
4 Concrete grade 15 - Wall 2 Culvert 3/5 11.00 11.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 25-11-2013
Date: 25-11-2013
No: DWP006
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Reinforcement & Form work preperation - Capping Culvert 2/2 8.00 10.00 RHS
2 Reinforcement & Form work preperation - Capping Culvert 3/1 8.00 10.00 RHS
3 Reinforcement & Form work preperation - Capping Culvert 3/2 8.00 10.00 RHS
4 Reinforcement & Form work preperation - Capping Culvert 3/5 8.00 10.00 RHS
5 Concrete grade 30 - Capping beam Culvert 2/2 10.00 13.00 RHS
6 Concrete grade 30 - Capping beam Culvert 3/1 10.30 14.00 RHS
7 Concrete grade 30 - Capping beam Culvert 3/2 10.00 15.00 RHS
8 Concrete grade 30 - Capping beam Culvert 3/5 10.00 14.30 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 26-11-2013
Date: 26-11-2013
No: DWP007
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Reinforcement & Form work preperation - Deck Culvert 2/2 8.00 17.00 RHS
2 Reinforcement & Form work preperation - Deck Culvert 3/1 8.00 17.00 RHS
3 Reinforcement & Form work preperation - Deck Culvert 3/2 8.00 17.00 RHS
4 Reinforcement & Form work preperation - Deck Culvert 3/5 8.00 17.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 27-11-2013
Date: 27-11-2013
No: DWP008
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Deck Culvert 2/2 8.00 13.00 RHS
2 Concrete grade 30 - Deck Culvert 3/1 8.00 14.00 RHS
3 Concrete grade 30 - Deck Culvert 3/2 8.00 13.00 RHS
4 Concrete grade 30 - Deck Culvert 3/5 8.00 14.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 28-11-2013
Date: 28-11-2013
No: DWP009
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Excavation & Concrete grade 15 - Screed Culvert 3/3 8.30 13.00 RHS
2 Excavation & Concrete grade 15 - Screed Culvert 3/6 9.00 14.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 29-11-2013
Date: 29-11-2013
No: DWP010
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Reinforcement & Form work preperation - Bace Culvert 3/3 8.00 14.00 RHS
2 Reinforcement & Form work preperation - Bace Culvert 3/6 8.00 15.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 30-11-2013
Date: 30-11-2013
No: DWP011
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Base Culvert 3/3 8.00 12.00 RHS
2 Concrete grade 30 - Base Culvert 3/6 8.00 13.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 01-12-2013
Date: 1/12/2013
No: DWP012
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Form work preperation - Wall 1 Culvert 3/3 8.00 14.00 RHS
2 Form work preperation - Wall 1 Culvert 3/6 8.00 15.00 RHS
Date: 02-12-2013
Date: 2/12/2013
No: DWP013
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 1 Culvert 3/3 8.00 11.00 RHS
2 Concrete grade 15 - Wall 1 Culvert 3/6 8.00 11.30 RHS
3 Form work preperation - Wall 2 Culvert 3/3 13.00 16.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 03-12-2013
Date: 3/12/2013
No: DWP014
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 2 Culvert 3/3 8.00 11.00 RHS
2 Reinforcement & Form work preperation - Capping Culvert 3/3 13.00 17.00 RHS
3 Excavation & Concrete grade 15 - Screed Culvert 4/1 9.00 14.00 LHS
Date: 04-12-2013
Date: 4/12/2013
No: DWP015
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Capping beam Culvert 3/3 8.00 11.00 RHS
2 Reinforcement & Form work preperation - Base Culvert 4/1 8.00 16.00 LHS
3 Excavation & Concrete grade 15 - Screed Culvert 4/6 9.00 14.00 LHS
Date: 05-12-2013
Date: 5/12/2013
No: DWP016
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Base Culvert 4/1 8.00 11.00 LHS
2 Reinforcement & Form work preperation - Deck Culvert 3/3 8.00 17.00 RHS
3 Reinforcement & Form work preperation - Base Culvert 4/6 8.00 12.00 LHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 06-12-2013
Date: 6/12/2013
No: DWP017
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Deck Culvert 3/3 8.00 11.00 LHS
2 Concrete grade 30 - Base Culvert 4/6 8.00 12.00 RHS
3 Form work preperation - Wall 2 Culvert 3/6 8.00 15.00 RHS
4 Excavation & Concrete grade 15 - Screed Culvert 1/5 8.00 15.00 RHS
5 Excavation & Concrete grade 15 - Screed Culvert 5/1 9.00 14.00 LHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 07-12-2013
Date: 07-12-2013
No: DWP018
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Screed Culvert 1/5 8.30 11.30 RHS
2 Concrete grade 15 - wall 2 Culvert 3/6 8.30 13.30 RHS
3 Concrete grade 15 - screed Culvert 5/1 8.30 10.00 LHS
4 Reinforcement & Form work preperation - Base Culvert 5/1 11.00 15.00 LHS
5 Form work preperation - Wall 1 Culvert 4/1 8.00 12.00 LHS
6 Reinforcement & Form work preperation - Base Culvert 1/5 13.00 16.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 08-12-2013
Date: 08-12-2013
No: DWP019
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Temporary by pass roads for culverts Culvert 1/3 8.30 11.00 RHS
2 Concrete grade 15 - wall 1 Culvert 4/1 8.30 13.00 LHS
3 Concrete grade 30 - base Culvert 5/1 9.00 12.00 LHS
4 Concrete grade 30 - base Culvert 1/5 9.00 12.00 RHS
5 Form work preperation - Wall 1 Culvert 1/5 13.00 15.00 RHS
6 Reinforcement & Form work preperation - Capping Culvert 3/6 8.00 15.00 RHS
7 Excavation & Concrete grade 15 - Screed Culvert 1/3 8.00 15.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 09-12-2013
Date: 09-12-2013
No: DWP020
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - screed Culvert 1/3 8.30 10.00 RHS
2 Concrete grade 15 - Wall 1 Culvert 1/5 8.30 13.00 LHS
3 Concrete grade 30 - Capping Culvert 3/6 8.00 12.00 RHS
4 Reinforcement & Form work preperation - Base Culvert 1/3 11.00 15.00 RHS
5 Form work preperation - Wall 2 Culvert 4/6 8.00 12.00 LHS
Date: 10-12-2013
Date: 10-12-2013
No: DWP021
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Base Culvert 1/3 8.30 11.30 RHS
2 Form work preparation - Wall 2 Culvert 1/5 8.00 13.00 RHS
3 Concrete grade 15 - Wall 2 Culvert 4/6 8.00 12.00 LHS
4 Reinforcement & formwork preparation - capping beam Culvert 4/6 13.00 17.00 LHS
5 Reinforcement & formwork preparation - Deck Culvert 3/6 8.00 15.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 11-12-2013
Date: 11-12-2013
No: DWP022
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 2 Culvert 1/5 8.00 11.00 RHS
2 Concrete grade 30 - Deck Culvert 3/6 8.00 13.00 RHS
3 Concrete grade 30 - Capping Beam Culvert 4/6 8.30 13.00 LHS
4 formwork preparation - Wall 1 Culvert 5/1 8.00 11.00 LHS
5 formwork preparation - Wall 2 Culvert 4/1 8.00 11.00 LHS
6 Reinforcement & Form work preperation - Capping Culvert 1/5 13.00 17.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 12-12-2013
Date: 12-12-2013
No: DWP023
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Capping Culvert 1/5 8.00 10.00 RHS
2 Concrete grade 15 - Wall 2 Culvert 4/1 9.00 14.00 LHS
3 Concrete grade 15 - Wall 1 Culvert 5/1 8.00 13.00 LHS
4 Reinforcement & formwork preparation - Capping Beam Culvert 4/1 8.00 17.00 LHS
5 Form work preparation - Wall 2 Culvert 5/1 14.00 16.00 LHS
6 Reinforcement & formwork preparation - Deck Culvert 1/5 11.00 17.00 RHS
Time
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 13-12-2013
Date: 13-12-2013
No: DWP024
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Capping Beam Culvert 4/1 8.00 12.00 LHS
2 Concrete grade 15 - Wall 2 Culvert 5/1 9.00 14.00 LHS
3 Concrete grade 30 - Deck Culvert 1/5 14.00 17.00 RHS
Date: 18-12-2013
Date: 18-12-2013
No: DWP025
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Reinorcement &Formwork preparation - Deck Culvert 4/6 8.30 12.30 RHS
2 Aggregate backfill Culvert 2/2 9.30 14.30 RHS
3 Reinforcement &Formwork preparation - Deck Culvert 4/1 9.00 13.00 LHS
4 Reinforcement &Formwork preparation - Capping Culvert 5/1 8.00 13.00 LHS
5 Excavation & Concrete grade 15 - Screed Culvert 6/4 9.00 14.00 LHS
Date: 19-12-2013
Date: 19-12-2013
No: DWP026
Expected Expected
No. Activity Location Commencin Finishing Remarks
g Time Time
1 Concrete grade 30 - Deck Culvert 4/1 8.00 12.00 LHS
2 Concrete grade 30 - Capping Culvert 5/1 9.00 13.00 LHS
3 Form work Preperation - Wall 1 Culvert 1/3 9.00 13.00 RHS
4 Form work Preperation - Base Culvert 6/4 9.00 13.00 LHS
5 Reinorcement &Formwork preparation - Deck Culvert 5/1 13.00 17.00 LHS
6 Backfilling Culvert 2/2 8.00 9.30 RHS
7 Backfilling Culvert 3/1 9.30 11.00 RHS
8 Backfilling Culvert 3/2 11.00 12.30 RHS
9 Backfilling Culvert 3/3 12.30 14.00 RHS
10 Backfilling Culvert 3/5 14.00 15.30 RHS
Date: 20-12-2013
Date: 20-12-2013
No: DWP027
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 1 Culvert 1/3 8.00 12.00 RHS
2 Concrete grade 30 - Base Culvert 6/4 8.00 12.00 LHS
3 Form work Preperation - Wall 2 Culvert 1/3 13.00 17.00 RHS
4 Form work Preperation - Wall 1 Culvert 6/4 13.00 17.00 LHS
5 Reinorcement &Formwork preparation - Deck Culvert 5/1 8.00 17.00 LHS
6 Reinorcement &Formwork preparation - Deck Culvert 4/6 8.00 17.00 LHS
Date: 21-12-2013
Date: 21-12-2013
No: DWP028
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 15 - Wall 2 Culvert 1/3 9.00 12.00 RHS
2 Concrete grade 30 - Deck Culvert 5/1 13.00 17.00 LHS
3 Concrete grade 30 - Deck Culvert 4/6 9.00 13.00 LHS
4 Concrete grade 15 - Screed Culvert 7/4 9.00 11.00 LHS
5 Reinorcement & Formwork preparation - Capping Culvert 1/3 13.00 17.00 RHS
6 Reinorcement & Formwork preparation - Base Culvert 7/4 13.00 11.00 LHS
7 Ariggate Backfilling Culvert 3/3 8.00 13.00 RHS
8 Ariggate Backfilling Culvert 3/2 8.00 11.00 RHS
9 Backfilling Culvert 3/6 8.00 17.00 RHS
10 Excavation Culvert 5/2 11.00 13.00 LHS
11 Excavation Culvert 6/1 13.00 15.00 LHS
12 Excavation Culvert 10/1 10.00 15.00 RHS
Date: 22-12-2013
Date: 22-12-2013
No: DWP029
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Capping Culvert 1/3 8.00 11.00 RHS
2 Concrete grade 15 - Screed Culvert 5/3 13.00 15.00 LHS
3 Concrete grade 15 - Screed Culvert 5/2 13.00 15.00 LHS
4 Concrete grade 15 - Wall 1 Culvert 6/4 9.00 12.00 LHS
5 Excavation & Concrete grade 15 - Screed Culvert 6/4 9.00 14.00 LHS
6 Excavation Culvert 5/2 9.00 11.00 LHS
7 Backfilling Culvert 3/2 8.00 17.00 RHS
8 Form work & Reinorcement work - Deck Culvert 1/3 11.00 17.00 RHS
9 Reinorcement & Formwork preparation - Base Culvert 7/4 8.00 17.00 LHS
10 Formwork preparation - Wall 2 Culvert 6/4 12.00 15.00 LHS
Date: 23-12-2013
Date: 23-12-2013
No: DWP030
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Concrete grade 30 - Deck Culvert 1/3 14.00 17.00 RHS
2 Concrete grade 30 - Base Culvert 7/4 8.00 11.00 LHS
3 Concrete grade 15 - Wall 2 Culvert 6/4 8.00 11.00 LHS
4 Backfilling Culvert 3/2 8.00 17.00 RHS
5 Reinorcement &Formwork preparation - Base Culvert 5/2 8.00 17.00 LHS
5 Reinorcement &Formwork preparation - Capping Culvert 6/4 11.00 17.00 LHS
6 Form work preparation - Wall 1 Culvert 7/4 11.00 17.00 LHS
Date: 24-12-2013
Date: 24-12-2013
No: DWP031
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Identyfication of House Access 0+000 - 5+000 9.00 12.00 Both Side
2 Concrete grade 30 - Base Culvert 5/2 9.00 11.00 LHS
4 Concrete grade 30 - Capping beam Culvert 6/4 9.00 12.00 LHS
5 Concrete grade 15 - Wall 1 Culvert 7/4 9.00 11.00 LHS
6 Concrete grade 15 - Screed Culvert 10/1 9.00 10.00 RHS
7 Excavation Culvert 7/2 10.00 12.00 LHS
8 Excavation Culvert 9/2 10.00 15.00 RHS
9 Back filling Culvert 2/2 8.00 17.00 RHS
10 Back filling Culvert 3/1 8.00 17.00 RHS
11 Back filling Culvert 3/2 8.00 17.00 RHS
12 Form work preperation - Wall 1 Culvert 5/2 11.00 15.00 LHS
13 Form work preperation - Wall 1 Culvert 6/4 11.00 15.00 LHS
14 Reinforcement & Form work preperation - Base Culvert 10/1 11.00 15.00 RHS
Date: 25-12-2013
Date: 25-12-2013
No: DWP032
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Identyfication of House Access 0+000 - 5+000 9.00 12.00 Both Side
2 Concrete grade 30 - Capping beam Culvert 6/4 11.00 14.00 LHS
3 Concrete grade 30 - Base Culvert 10/1 15.00 18.00 RHS
4 Concrete grade 15 - Wall 1 Culvert 6/1 9.00 12.00 LHS
5 Concrete grade 15 - Wall 1 (Wariyapola end) Culvert 7/4 15.00 17.00 LHS
6 Concrete grade 15 - Wall 2 (Kalugamuwa end) Culvert 7/4 15.00 17.00 LHS
7 Excavation (for Culvert Widning) Culvert 8/3 10.00 12.00 Both Side
8 Back filling Culvert 2/2 8.00 17.00 RHS
9 Back filling Culvert 3/1 8.00 17.00 RHS
10 Back filling Culvert 3/2 8.00 17.00 RHS
11 Back filling Culvert 3/3 8.00 17.00 RHS
12 Form work Preperation - Wall 2 Culvert 6/2 13.00 17.00 LHS
Date: 26-12-2013
Date: 26-12-2013
No: DWP033
Expected Expected
No. Activity Location Commencing Finishing Remarks
Time Time
1 Reinforcement & Form work preperation - Deck Culvert 6/4 8.00 17.00 LHS
2 Form work preperation - Wall 1 Culvert 10/1 8.00 13.00 RHS
3 Form work preperation - Wall 2 (Wariyapola end) Culvert 7/4 8.00 11.00 LHS
4 Reinorcement & Form work preparation - Capping Culvert 7/4 8.00 15.00 LHS
5 Concrete grade 15 - Wall 1 Culvert 10/1 14.00 17.00 RHS
6 Concrete grade 15 - Wall 2 Culvert 6/2 9.00 12.00 LHS
7 Concrete grade 15 - Wall 2 (Wariyapola end) Culvert 7/4 11.00 13.00 LHS
8 Concrete grade 30 - Capping Culvert 7/4 15.00 17.00 LHS
9 Concrete grade 15 - Screed Culvert 8/3 10.00 14.00 Both Side
10 Back filling Culvert 2/2 8.00 17.00 RHS
11 Back filling Culvert 3/1 8.00 17.00 RHS
13 Back filling Culvert 3/3 8.00 17.00 RHS
14 Reinorcement & Form work preparation - Capping Culvert 6/1 13.00 17.00 LHS
15 Reinforcement & Form work preperation - Base Culvert 8/3 10.00 14.00 Both Side
16 Roadway excavation for edge widning 2+500 - 3+000 8.00 17.00 RHS
17 Sub grade compaction & Com.Testing 2+500 - 3+000 9.00 18.00 RHS
18 Emankment & Sub base laying for edge widning 2+500 - 3+000 10.00 18.00 RHS
19 Emankment & Sub base Compaction testing 2+500 - 3+000 11.00 18.00 RHS
Date: 27-12-2013
Date: 27-12-2013
No: DWP034
Expected
No. Activity Location Commencing
Time
1 Concrete grade 30 - Capping Culvert 6/1 9.00
2 Concrete grade 30 - Deck Culvert 6/4 13.00
3 Concrete grade 15 - Wall 2 Culvert 7/4 10.00
4 Concrete grade 15 - Screed Culvert 9/2 8.00
5 Reinforcement & Form work preperation - Base Culvert 9/2 10.00
6 Concrete grade 30 - Base Culvert 9/2 14.00
7 Concrete grade 30 - Base Culvert 10/1 11.00
8 Excavation Culvert 6/3 11.00
9 Excavation Culvert 7/2 8.00
10 Concrete grade 15 - Screed Culvert 7/2 14.00
11 Excavation Culvert 8/3 10.00
12 Back filling Culvert 2/2 8.00
13 Back filling Culvert 3/1 8.00
14 Back filling Culvert 3/3 8.00
15 Reinorcement & Form work preparation - Deck Culvert 6/1 13.00
16 Reinforcement & Form work preperation -Capping Culvert 7/4 14.00
17 Form work Preperation - Wall 1 Culvert 10/1 15.00
18 Roadway excavation for edge widning 2+600 - 2+700 8.00
19 Sub grade compaction & Com.Testing 2+600 - 2+700 13.00
20 Joint Survey of Sub grade 2+600 - 2+700 14.00
21 Emankment Filling of edge widning 2+600 - 2+700 15.00
22 Emankment Compaction testing 2+600 - 2+700 17.00
23 Soil test for materials (MDD,UMC,CBR,LL,PL,PI) 0+000 Stock pile 10.00
Submited by: Certified by:
Name: ……………………………………. Name: …………………………………….
STAGE – 2/2013/10
uthority
vt) Ltd
Expected
Finishing Remarks
Time
12.00 LHS
17.00 LHS
14.00 LHS
10.00 RHS
15.00 RHS
16.00 RHS
14.00 RHS
13.00 LHS
11.00 LHS
17.00 LHS
15.00 LHS
17.00 RHS
17.00 RHS
17.00 RHS
17.00 LHS
17.00 LHS
18.00 RHS
17.00 RHS
17.00 RHS
17.00 RHS
18.00 RHS
18.00 RHS
12.00 RHS
……………………………….
……………………………..
……………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 28-12-2013
Date: 28-12-2013
No: DWP035
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Screed Culvert 4/2 8.00
2 Reinforcement & Form work preperation - Base Culvert 4/2 11.00
3 Concrete grade 30 - Base Culvert 4/2 15.00
4 Excavation Culvert 4/3 8.00
5 Concrete grade 15 - Screed Culvert 4/3 13.00
6 Excavation Culvert 6/3 10.00
7 Concrete grade 30 - Deck Culvert 6/1 10.00
8 Concrete grade 30 - Base Culvert 7/2 (K/end) 10.00
9 Concrete grade 15 - Screed Culvert 7/2 (W/end) 14.00
10 Concrete grade 30 - Capping Culvert 7/4 11.00
11 Concrete grade 15 - Wall 1 Culvert 9/2 11.00
12 Concrete grade 30 - Base Culvert 10/1 14.00
13 Excavation Culvert 8/3 10.00
14 Back filling Culvert 4/1 8.00
15 Back filling Culvert 3/1 8.00
16 Back filling Culvert 3/3 8.00
17 Reinforcement & Form work preparation - Base Culvert 4/2 11.00
18 Reinforcement & Form work preparation - Base Culvert 4/3 16.00
19 Form work Preperation - Wall 1 Culvert 7/2 (K/end) 15.00
20 Reinforcement & Form work preparation - Deck Culvert 7/4 15.00
21 Roadway excavation for edge widning 2+700 - 2+800 8.00
22 Sub grade compaction & Com.Testing 2+700 - 2+800 11.00
23 Joint Survey of Sub grade 2+700 - 2+800 12.00
24 Embankment Filling of edge widning 2+600 - 2+800 13.00
25 Embankment Filling Compaction testing 2+600 - 2+800 17.00
Submited by: Certified by:
Name: ……………………………………. Name: …………………………………….
TAGE – 2/2013/10
hority
Ltd
Expected
Finishing Remarks
Time
10.00 LHS
14.30 LHS
17.00 LHS
10.00 LHS
15.00 LHS
13.00 LHS
15.00 LHS
14.00 LHS
17.00 LHS
15.00 LHS
15.00 RHS
17.00 RHS
13.00 B/Side
17.00 RHS
17.00 RHS
17.00 RHS
17.00 LHS
18.00 LHS
17.00 LHS
18.00 LHS
17.00 RHS
17.00 RHS
17.00 RHS
18.00 RHS
18.00 RHS
…………………………….
…………………………..
…………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 29-12-2013
Date: 29-12-2013
No: DWP036
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Wall 1 Culvert 4/2 9.00
2 Concrete grade 15 - Screed Culvert 4/3 9.00
3 Concrete grade 30 - Base Culvert 4/3 15.00
4 Concrete grade 15 - Wall 2 Culvert 5/2 9.00
5 Concrete grade 15 - Screed Culvert 6/3 9.00
6 Concrete grade 30 - Base Culvert 6/3 15.00
7 Concrete grade 30 - Base Culvert 7/2 9.00
8 Concrete grade 30 - Capping Culvert 7/4 10.00
9 Concrete grade 15 - Wall 2 Culvert 9/2 14.00
10 Concrete grade 30 - Base Culvert 10/1 14.00
11 Excavation Culvert 8/3 10.00
12 Back filling Culvert 4/1 8.00
13 Reinforcement & Form work preparation - Base Culvert 4/3 10.00
14 Reinforcement & Form work preparation - Base Culvert 6/3 10.00
15 Form work Preperation - Wall 2 Culvert 4/2 9.00
16 Reinforcement & Form work preparation - Capping Culvert 9/2 16.00
17 Roadway excavation for edge widning 2+700 - 3+000 8.00
18 Sub grade compaction & Com.Testing 2+700 - 3+000 11.00
19 Joint Survey of Sub grade 2+700 - 3+000 12.00
20 Embankment Filling of edge widning 2+600 - 2+800 13.00
21 Embankment Compation test 2+600 - 2+700 15.00
22 Joint Survey of Emankment top 2+600 - 2+700 16.00
TAGE – 2/2013/10
hority
Ltd
Expected
Finishing Remarks
Time
12.00 LHS
10.00 LHS
18.00 LHS
10.00 LHS
10.00 RHS
18.00 RHS
12.00 LHS
15.00 LHS
16.00 RHS
17.00 RHS
13.00 B/Side
17.00 RHS
15.00 LHS
15.00 RHS
12.00 LHS
18.00 RHS
17.00 RHS
17.00 RHS
17.00 RHS
18.00 RHS
16.00 RHS
17.00 RHS
…………………………….
…………………………..
…………………………..
PND CONSTRUCTION (PVT) LTD
Rehabilitation & Improvements to Kalugamuwa-Wilakatupotha Road
Date: 30-12-2013
Date: 30-12-2013
No: DWP037
Expected
No. Activity Location Commencing
Time
1 Concrete grade 15 - Wall 2 Culvert 4/2 9.00
2 Concrete grade 15 - Wall 1 Culvert 4/3 11.00
3 Concrete grade 30 - Capping Culvert 5/2 9.00
4 Concrete grade 15 - Wall 1 Culvert 6/3 11.00
5 Concrete grade 15 - Wall 1 Culvert 7/2 10.00
6 Concrete grade 15 - Screed Culvert 8/3 10.00
7 Concrete grade 30 - Capping Culvert 9/2 11.00
8 Concrete grade 15 - Wall 1 Culvert 10/1 14.00
9 Back filling Culvert 4/1 8.00
10 Reinforcement & Form work preparation - Deck Culvert 7/4 8.00
11 Reinforcement & Form work preparation - Capping Culvert 4/2 13.00
12 Form work Preperation - Wall 2 Culvert 4/3 16.00
13 Reinforcement & Form work preparation - Deck Culvert 5/2 14.00
14 Form work Preperation - Wall 2 Culvert 6/3 15.00
15 Form work Preperation - Wall 2 Culvert 7/2 13.00
16 Roadway excavation for edge widning 2+700 - 3+000 8.00
17 Sub grade compaction & Com.Testing 2+700 - 3+000 11.00
18 Joint Survey of Sub grade 2+700 - 3+000 11.30
19 Embankment Laying & Compaction 2+700 - 2+900 12.00
20 Embankment Compation test 2+600 - 2+700 15.00
21 Joint Survey of Emankment top 2+700 - 2+800 16.00
22 Sub Base Laying & Compaction 2+600 - 2+700 13.00
TAGE – 2/2013/10
hority
Ltd
Expected
Finishing Remarks
Time
12.00 LHS
15.00 LHS
13.00 LHS
14.00 RHS
12.00 LHS
13.00 B/Side
15.00 RHS
17.00 RHS
17.00 RHS
17.00 LHS
17.00 LHS
18.00 LHS
18.00 LHS
18.00 RHS
17.00 LHS
17.00 RHS
17.00 RHS
13.00 RHS
15.00 RHS
16.00 RHS
17.00 RHS
18.00 RHS
…………………………….
…………………………..
…………………………..