TOTAL SOUTH PARS 11 LIMITED
TABLE OF CONTENTS
1 INTRODUCTION............................................................................................................. 7
1.1 Project Description ....................................................................................................... 7
1.2 Scope of the Investigation ........................................................................................... 7
1.3 Scope of the Report ...................................................................................................... 8
2 FIELDWORK ACTIVITIES.............................................................................................. 9
2.1 General........................................................................................................................... 9
2.2 Drilling and Sampling ................................................................................................... 9
2.3 Onboard Sample Treatment ....................................................................................... 10
2.4 Onboard Laboratory Testing...................................................................................... 10
4.1 General......................................................................................................................... 17
4.2 Results and Derived Parameters ............................................................................... 17
4.2.1 Net Cone Resistance (qnet)............................................................................................ 17
4.2.2 Friction Ratio (Rf) .......................................................................................................... 18
4.2.3 Pore Pressure Ratio (Bq)............................................................................................... 18
4.3 Interpretation of In Situ Test Results ........................................................................ 18
4.3.1 Undrained Shear Strength from PCPT Data ................................................................. 18
TABLES
GENERAL FIGURES
SPD12 FIGURES
SPD13 FIGURES
APPENDICES
RELATED DOCUMENTS
The following Client and/or NDGOS issued documents are also related to this project:
EXECUTIVE SUMMARY
Total South Pars 11 Limited (TOTAL) has contracted Noble Denton Geotechnical and Ocean
Services Limited (NDGOS), Dubai, UAE, to carry out a geotechnical site investigation for the
South Pars Phase 11 Field Development Project, in the Persian Gulf, offshore Iran.
This report presents the details of the offshore operations, the results of the offshore and
onshore laboratory testing and presents the geotechnical data for use in engineering design at
the SPD12 and SPD13 borehole locations, as requested by TOTAL under their contract TSP
11/PJ/006.
The geotechnical field investigation for the proposed South Pars complex, SPD12 and SPD13,
were performed between the 5th and 11th August and between 31st July and 5th August, 2005,
respectively. The field programme included the performance of drilling, soil sampling, coring and
in situ testing to maximum depths of 109.6 m and 111.0 m for the SPD12 and SPD13 locations,
respectively. The reduced water depths for the SPD12 and SPD13 sites are approximately 61.3
m and 71.5 m, respectively.
As anticipated, the soil conditions primarily consist of very silty carbonate clays, very soft near
the seabed and increasing in strength to become hard at depth. The boreholes reveal local
layers of cemented very weak to moderately weak siliceous calcarenite and variably cemented
clays and silts.
1 INTRODUCTION
Noble Denton Geotechnical & Ocean Services Ltd. (NDGOS) have been contracted by
Total South Pars 11 Limited (TOTAL) to perform a geotechnical site investigation in
connection with their South Pars Phase 11 Field Development Project, in the Persian
Gulf, offshore Iran.
• one sampling and one PCPT borehole at each of two offshore platform
locations (SPD12 and SPD13), with a target depth of 110m
• one sampling and one PCPT borehole at each of two condensate offloading
buoy locations (OB1 and OB2), with a target depth of 50m
• combined sampling, PCPT and rotary coring, as appropriate, at each of a flare
platform, a seawater intake facility and offloading jetty locations (E)
All drilling, sampling, coring and testing activities were carried out as per the
requirements of the Technical Specifications or, where appropriate, as otherwise
directed by the onboard Company (TOTAL) Representative.
A Vicinity Map, a General Borehole Location Plan, together with site specific location
plans for SPD12 and SPD13 sites, are presented in Figures 1 to 3, respectively.
The purpose of the investigation was to acquire detailed information on the soil
conditions and geotechnical properties to enable engineering analyses to be performed
for:
(a) foundation piles and conductor pipes for the SPD12 and SPD13 platforms;
(b) anchors for the condensate offloading buoys at the OB1 and OB2 locations;
(c) foundation piles for the flare platform, seawater intake facility and loading jetty.
A total of nineteen boreholes were drilled, sampled, cored and tested at seven
locations across the South Pars Phase 11 Field Development area:
The fieldwork was carried out between 31st July and 21st August 2005 from the OSV
“Relume” and is reported in detail in the NDGOS Field Report (NDGOS Document Ref.
WRE/8207/01/05/85/Rev01, dated 28th August 2005).
This report specifically presents the detailed data associated with the SPD12 and
SPD13 locations. In accordance with the TOTAL specification, the data presented
includes:
2 FIELDWORK ACTIVITIES
2.1 General
Fieldwork was carried out between 31st July 2005 and 21st August 2005. The specific
phase of the fieldwork at the SPD12 and SPD13 locations was performed between 31st
July and 11th August 2005.
A summary of the fieldwork activities follows. Full details of this phase of the works can
be found in the NDGOS Field Report, as referenced in the ‘related documents’ section
of this report.
The DP2 vessel OSV “Relume”, owned and operated by Middle Eastern Navigational
Aids Service (MENAS), was used to perform the fieldwork. The vessel has an overall
length of 82.6 m and a beam of 16.5 m.
The coordinates of the target and actual borehole locations are given in Table T1, and
the latter plotted on Figure 3.
Water depths were determined by direct measurement of the drillstring at seabed level
and at regular intervals during drilling operations by means of a dual-frequency echo-
sounder.
Water depths recorded at the location have been reduced to Lowest Astronomical Tide
(LAT) using the Simplified Method of Tidal Prediction (co-tidal atlas for the Persian
Gulf, NP214); these values are included in Table T1.
The boreholes were drilled using NDGOS’s fully heave-motion compensated offshore
drilling spread “Noble One”, which was installed on the vessel such that the rig was
cantilevered over the side on a purpose-built rig base.
Drilling was carried out using a standard 127 mm (5 inch) API drill pipe fitted with an
open-centre drag bit. Drilling mud, consisting of ‘Guar Gum’ mixed with seawater, was
used as required to provide a flushing medium and to stabilise the sides of the
borehole.
Hydraulic push samples were obtained in ‘Shelby’ tubes using the WISON system
incorporated in the drilling spread. In instances where push sampling was unsuccessful
due to the nature of the materials being sampled, percussion samples were obtained in
split-spoon samplers fitted to a wireline sliding hammer.
Where material was sufficiently cemented, coring was performed using a double-tube
wireline core barrel deployed within the main drillstring.
The Borehole Logs (Appendix A2) detail the sampling/testing methods employed within
each borehole and present the generalised stratigraphy, soils data and averaged
reduced water depth at the location.
All recovered samples were extracted from the sample tube/core barrel, inspected and
logged onboard in the purpose-built laboratory facility incorporated in the drilling
spread.
Onboard laboratory testing was carried out on selected portions of the recovered
samples/cores. Other sections were preserved and stored as appropriate for
subsequent testing onshore.
Full details of the sample handling procedures are contained within the Project Quality
Plan (PQP) reference in the ‘related documents’ section of this report.
Laboratory testing was performed in the purpose-built onboard laboratory facility and in
accordance with the relevant NDGOS procedures.
A summary of the results of the onboard tests are provided, along with those of the
subsequent onshore tests, in Appendix A4. Appendix A5 presents the detailed test
results, where appropriate.
3.1 General
The onshore laboratory test schedule was submitted to TOTAL for review and approval
following completion of the fieldwork.
Onshore testing in accordance with the approved laboratory test schedule was carried
out at Geolab Services PTE’s laboratory, Singapore.
The scope of onshore laboratory testing was selected in order to provide confirmation
of the onboard test results and to complement the onboard testing with additional tests
not normally carried out offshore.
The results of the tests are summarised in Appendix A4 with the actual test results
presented in Appendix A5, as appropriate.
Table T3 presents a listing of the laboratory tests performed during the present
geotechnical investigation, together with the relevant standards and/or procedures
followed in performing the tests.
3.3.1 General
The following classification and index tests are performed to characterise the materials
for engineering purposes.
In the field, immediately upon recovery, soil samples are extruded and classified
visually and by texture in accordance with BS 5930. The detailed soil descriptions are
recorded on individual soil sample description sheets, and include the following:
Water (or moisture) contents (w) are determined from measured total and dry weights
of specimens taken from soil samples recovered from the borehole. Measurements
are performed in accordance with the procedures described in BS 1377. Water content
measurements are performed on all samples to be used for advanced tests, and also
on other selected samples to provide sufficient data points to establish a natural water
content profile with depth in the borehole.
The liquid (wl) and plastic (wp) limits are determined for cohesive samples to assist soil
classification using the test procedures described in BS 1377.
The measurements of total (γt) and dry (γd) unit weight of the recovered soil samples
are determined in accordance with BS 1377. The unit weight values are reported in
units of Mg/m3.
The submerged unit weight (γ’) of each soil layer has been derived from the measured
bulk densities using the following relationship:
γ‘ = (ρb – ρw) . g
where:
Specific gravity (Gs) measurements of the soil particles are performed according to the
procedure detailed in BS 1377.
Sieve analyses are performed on selected samples to determine their grain size
distribution. Results for grain size distribution analyses are presented on a semi-
logarithmic plot with grain size (log) versus percentage passing by weight finer than the
grain size. Sieve analyses are performed in accordance with the procedures described
in BS 1377.
The proportion of fines (silt and clay) in a specimen is determined by washing the
material through the 63 μm sieve, and computing the percentage passing.
The hydrometer test is used to determine the grain size distribution of fine-grained
materials by a sedimentation method. The test procedures adopted are described in
detail in BS 1377.
The maximum and minimum density values that a material can achieve, without
particle crushing, are determined using the procedure described in BS 1377.
3.4.1 General
Soil shear strength is investigated in the laboratory using a variety of methods. For
cohesive materials, peak and remoulded undrained shear strengths are determined
using unconsolidated-undrained triaxial compression (UU) and laboratory miniature
vane (MV) tests.
Pocket penetrometer tests are performed to provide an estimate of the undrained shear
strength of cohesive materials. The undrained shear strength is derived from the force
required to push a steel rod, or an adapter, a given distance into a cohesive soil
sample. Adapters with different diameters are mounted on the steel rod penetrometer
to accommodate a range of undrained shear strength values. The penetration of the
rod or adapter should be such that it is equal to the rod or adapter diameter. The
resistance to penetration is recorded by a spring mounted inside the penetrometer.
The resistance is calibrated to read the undrained shear strength of the soil based on
spring compression. At least three readings are taken on each specimen, and an
average value is used.
3.4.3 Torvane
Torvane tests are used to estimate the undrained shear strength of cohesive soil
samples. Torvane blades are first pushed into the soil, and then rotated until the soil
fails. The device provides an estimate of undrained shear strength based on the
resistance to the rotation measured by a torsion spring.
Selected samples tested in their undisturbed state are remoulded and tested again in
the triaxial apparatus under the same conditions. Comparison of the shear strengths
determined from both the undisturbed and remoulded tests provides an indication of
soil sensitivity. Procedures for performing remoulded tests are also described in BS
1377.
Laboratory miniature vane tests are used to measure the undrained shear strength of
cohesive materials immediately following their recovery, and prior to extrusion from the
sample tube. Vane blades are pushed into the centre of the soil in the sampling tube
until fully embedded. Torque is applied to the vane through a calibrated spring
activated by a motorised pulley and belt system, causing the vane to rotate at a fixed
rate until soil shear failure occurs. A calibration factor is applied to the measured
torque to determine the undrained shear strength. Detailed testing procedures for the
miniature vane test are described in BS 1377.
4.1 General
Pertinent soil parameters can be derived from PCPT data in order assist in the layering
of the soil units and in selecting parameter profiles.
During each test, the cone resistance (qc), the sleeve friction (fs) and the pore water
pressure (u) are continuously measured. The measured data are shown on the
Borehole Logs in Appendix A2 and on the PCPT plots provided in Appendix A3.
The parameters which can be derived from the raw results are:
The methods for the derivation of these parameters are presented below and the
results are presented on the PCPT derived data plots also given in Appendix A3.
The net cone resistance (qnet) is computed by correcting measured cone resistance (qc)
for pore water pressure effects on the net areas of the cone face and behind the
shoulder of the cone (Lunne et al., 1985). Effects of overburden pressure are also
removed to standardise the cone resistance as a function of depth.
where:
The friction ratio (Rf) is the ratio of the sleeve friction to total cone resistance. The ratio
can be used for soil classification (Schmertmann, 1978). Sand typically gives a friction
ratio of less than 2 percent, while the friction ratio of clays is normally in excess of 2 to
5 percent, depending on cone resistance.
The pore pressure ratio (Bq) is the ratio of the excess pore water pressure to the net
cone resistance (Sennesset et al., 1982).
BqB = Δu / qnet
where:
Undrained shear strength, su, can be estimated from piezocone penetrometer tests
using the following equation:
su = qnet / Nkt
where
A preliminary assessment of the Nkt values has been undertaken for this report
primarily using the results of unconsolidated-undrained triaxial tests as the reference
strength.
This preliminary assessment indicates that for the SPD12 location, Nkt factors of
between 14 and 34 are generally considered applicable. This represents a relatively
large range in values for Nkt. The lower bound value of Nkt is in general agreement with
published correlations; the upper bound, however, is higher than may normally be
expected, possibly due to the influences of cementation and high silt content on cone
resistance.
5 GEOLOGICAL SETTING
The Persian Gulf, within which the South Pars Field is located, is a marginal sea
measuring some 1000km in length and 200 to 300km in width and covers an area of
approximately 226,000km2. The average water depth is close to 35m, approaching
100m towards the Straits of Hormuz.
The area represents a shallow tectonic depression, formed in the late Tertiary Period
(approximately 7 million years ago) by warping down of the earth’s crust. At this time
the sea reached a maximum elevation of 150m above present levels, with subsequent
deposition of typical ‘shallow carbonate shelf sea’ materials including limestone, marls,
clastics and evaporites.
Global cooling and the onset of glacial conditions in higher latitudes marked the
beginning of the Flandrian period, some 18,000 years ago. During this time the sea
reached a minimum elevation of approximately 120m below its current level, exposing
the previously deposited marine sediments to sub-aerial and fluvial weathering
processes.
As the climate steadily moderated towards the end of this period and into the beginning
of the Holocene (approximately 10,000 years ago), the Gulf gradually became
inundated once again. However, this process was far from regular and large zones of
the region experienced irregular periods of sub-aerial and marine sedimentation. Post
glacial sedimentation included shelly sands in the shallower zones, clean, carbonate
muds in deeper depressions and impure carbonate muds, or marls, along the axis of
the Gulf.
The presence of gypsum and carbonate cementation in Persian Gulf soils is typical.
Gypsum is encountered either in massive form, as relatively thin layers, or as
disseminated crystals. When high temperatures, low rainfall and frequent winds
combine to produce very high evaporation rates of lagoonal water and seawater, the
resulting high salinities can cause evaporate materials to be deposited. Gypsum is one
of the less soluble of these salts and is therefore precipitated in relatively large
amounts and in various forms, for example:
• Thin crusts of gypsum, usually interbedded with the prevailing sediments, may be
precipitated from standing water in highly restricted lagoons.
Cementation may also occur under hot, arid subaerial and super-saline lagoonal
conditions, similar to those imposed during the sea recessions in the Persian Gulf
which was associated with the glacial periods. Upward movement of the saline
groundwater, induced by high evaporation rates at ground level, transports salts to the
surface were they are precipitated, binding loose sediments to form a hard, cemented
layer of duricrust.
Groundwater movement through, and therefore cementation of, fine grained sediments
is relatively restricted, however, an additional effect of the period in which these soils
were subaerialy exposed was the imposition of over-consolidation characteristics by
the processes of desiccation and the removal of overburden by erosion.
In conclusion, as a result of the depositional history of Persian Gulf sediments, the soils
and their subsequent digenesis can be extremely variable. In particular the distribution
and occurrence of the predominantly carbonate materials commonly encountered in
the top 100m of the sediment column tend to be laterally and vertically variable.
Occasionally this lateral variability can occur over relatively short distances with
attendant significance for offshore foundation design.
6 SOIL STRATIGRAPHY
6.1 General
Based on the borehole sampling, laboratory testing and PCPT results, a simplified
stratigraphy has been determined for the purpose of geotechnical design at the each of
the SPD12 and SPD13 borehole locations.
The general soil conditions primarily consist of very silty carbonate clays, very soft near
the seabed and increasing in strength to become hard at depth. The boreholes reveal
local layers of cemented very weak to moderately weak siliceous calcarenite and
variably cemented clays and silts.
The general stratigraphy for the SPD12 and SPD13 locations are presented in Tables
T2.1 and T2.2, respectively. More detailed lithology is presented in the Borehole Logs
in Appendix A2.
The soil conditions are generally consistent with our knowledge and experience of the
area.
6.1.1 SPD12
The soil conditions disclosed by the boreholes performed at the SPD12 location
predominantly comprise very silty carbonate clays with varying degrees of cementation
and cemented inclusions. Between 24.0 and 26.0 metres, a layer of weak to
moderately weak calcarenite was encountered. The materials are generally moderately
overconsolidated in the top 25 m, becoming lightly overconsolidated with depth. The
undrained shear strength profile increases from very soft at the seabed to very hard at
the terminal depth of the borehole. The materials encountered are, in the main,
carbonate in nature (carbonate content greater than 50%).
The clay materials are generally of intermediate to high plasticity, although plotting
close to the A-line reflecting the very high silt contents, a characteristic that is further
supported by the results of the grain size distribution tests. The trend of reducing
liquidity index with depth is consistent with what would be expected for the soil
conditions encountered. The near surface materials exhibit water contents between
approximately 40% and 60%, which is consistent with the very soft consistency of the
materials and the relatively low bulk densities of 1.6 to 1.7 Mg/m3 observed. With
depth, the measured water contents are lower, in the range of approximately 20% to
35%, and shear strength generally increases.
The undrained shear strength measurements show reasonably consistent trends. The
index strength tests (torvane and pocket penetrometer) show some wider scatter which
is commonly observed for these test types, particularly in clays with significant
secondary constituents and where variable degrees of cementation is encountered.
The laboratory vane tests show some divergence from the UU triaxial measured
values, particularly between 9.1 and 24.0 metres, possibly due to the influences of high
silt content and cementation. Below approximately 48 metres, a number of layers
exhibit varying degrees of cementation and cemented inclusions, which is reflected in a
broader scatter of shear strength data.
The values of sensitivity determined from the results of the UU triaxial tests indicate
that the materials are generally of low to medium sensitivity, broadly consistent with
values that would be expected for the materials encountered. However, the values of
remoulded undrained shear strength measured using the laboratory vane are very low,
possibly due to a number of factors, including the scale of the test and the influences of
cementation and particle size distribution. These values are considered to be
unreliable.
6.1.2 SPD13
The soil conditions disclosed by the boreholes performed at the SPD13 location
predominantly comprise very silty carbonate clays with varying degrees of cementation
and cemented inclusions. The SPD13 location is characterised by a number of variably
cemented layers of clay, silt and sand of varying thickness. A very weakly cemented
sand layer was observed between approximately 38.4 and 39.3 m and a weakly
cemented silt layer between 66.4 and 67.5 m. The materials are generally moderately
overconsolidated in the top 20 m, becoming lightly overconsolidated with depth. The
undrained shear strength profile increases from very soft at the seabed to very hard at
the terminal depth of the borehole. The materials encountered are, in the main,
carbonate in nature (carbonate content greater than 50%).
The clay materials are generally of intermediate to high plasticity, although plotting
close to the A-line reflecting the very high silt contents. The trend of reducing liquidity
index with depth is consistent with what woulded expected for the soil conditions
encountered. The very near surface materials exhibit water contents between
approximately 40% and 60%, which is consistent with the very soft consistency of the
materials and the relatively low bulk densities of 1.75 to 1.95 Mg/m3. With depth, the
measured water contents are lower, in the range of approximately 20% to 35%, and
shear strength generally increases.
The undrained shear strength measurements show reasonably consistent trends. The
index strength tests (torvane and pocket penetrometer) show some wider scatter which
is commonly observed for these test types, particularly in clays with significant
secondary constituents and where variable degrees of cementation is encountered.
The laboratory vane tests show broadly consistent results with the UU triaxial
measured values. Particularly below approximately 38 metres, a number of layers
exhibit varying degrees of cementation and cemented inclusions, which is reflected in a
broader scatter of shear strength data.
The values of sensitivity determined from the results of the UU triaxial tests indicate
that the materials are generally of low to medium sensitivity, broadly consistent with
values that would be expected for the materials encountered. However, the values of
remoulded undrained shear strength measured using the laboratory vane are very low,
possibly due to a number of factors, including the scale of the test and the influences of
cementation and particle size distribution.
The reports present the interpreted soil conditions from the results of the seismic
surveys and the near-surface soil conditions revealed by samples recovered from drop
cores.
The results of geophysical survey programmes broadly agree with soil conditions
revealed by the geotechnical site investigation, and are briefly summarised below for
comparison. Where soil sampling was performed across the surveyed area, those
points closest to the borehole locations are considered.
Appendix A4 presents summary tables of the soil sample descriptions and undrained
shear strength data taken from Fugro’s Preliminary Field Reports for the drop cores.
The engineering reports present and discuss the results of tests performed as part of
the geophysical survey in greater detail.
~ Depth (m)
Technique Reference Soil Description
From To
Sidescan - Seabed - Very soft silty CLAY/very soft slightly
sonar sandy CLAY
Soil sampling SPD12-EK-GC-01 0.0 - Very soft, greenish grey, slightly sandy
(Piston core) CLAY
2.1 - Soft to firm, light grey CLAY with few shell
fragments up to 40 mm diameter
SPD12-EK-GC-01A 0.0 - Soft, dark greenish grey, slightly sandy
(Piston core) CLAY with few shell fragments up to 2.5
cm less than 10%
2.16 - Firm, cohesive/plastic, medium grey,
slightly gravelly silty CLAY. Gravel fraction
is 100%; shell fragment up to 4 cm
Boomer - 0.0 2.0 Very soft to soft silty CLAY
2.0 4.8 Interbedded sandy CLAY and silty CLAY
4.8 14.1 Soft to firm silty sandy CLAY (possible
local cemented sandy layer at 18 m)
14.1 - Firm to stiff CLAY/SAND (slightly
cemented)
~ Depth (m)
Technique Reference Soil Description
From To
Sidescan - Seabed - Very soft slightly sandy SILT
sonar
Soil sampling SPD13-EK-GC-04 0.0 - Very soft, cohesive, greenish grey, slightly
(Piston core) sandy SILT, becoming pale olive. Note:
shell fragments up to 2 mm, less than 5%
0.4 - Pale olive, very gravelly SILT
SPD13-EK-GC-04A 0.0 - Very soft to soft, cohesive, greenish grey,
(Piston core) slightly sandy SILT. Note: shell fragments
up to 2 mm, less than 5%
0.5 - Pale olive, very gravelly SILT. Gravel
fraction is 60% shell fragments up to 25
mm, 40% clastics
Boomer - 0.0 2.0 Very soft to soft sandy SILT overlying very
gravelly sandy SILT
2.0 7.7 Sandy gravelly CLAY and silty CLAY
7.7 16.7 Soft to firm slightly sandy CLAY (possible
cemented sandy layer at 12 m)
16.7 - Firm to stiff CLAY/slightly cemented
SAND
REFERENCES
[1] British Standards Institute (1990), BS 1377 : Parts 1 - 9, “Soils for Civil Engineering
Purposes”.
[2] Fugro Survey (Middle East) Limited (2005), “Preliminary Field Report for Geophysical
Survey Services, Geophysical Survey of SP Phase 11 Offshore and Nearshore Facilities
Locations, Proposed Site “SPD12”, Report No. MP52-REP-00 (SPD12).
[3] Fugro Survey (Middle East) Limited (2005), “Preliminary Field Report for Geophysical
Survey Services, Geophysical Survey of SP Phase 11 Offshore and Nearshore Facilities
Locations, Proposed Site “SPD13”, Report No. MP52-REP-00 (SPD13).
[4] Head, K. H. (1980), “Manual of Soil Laboratory Testing”, Pentech Press, Plymouth.
[5] Lunne, T., Christoffersen, H.P., and Tjelta, T.I., (1985), “Engineering Use of Piezocone
Data in North Sea Clays”, Proceedings, XI ICSMFE, San Francisco, Vol. 2, pp.907-912.
[6] Rad, N.S, and Lunne, T., (1988), “Direct Correlations between Piezocone Test Results
and Undrained Shear Strength of Clay”, Proc. Int. Symp. On Penetration Testing, ISOPT-
1, Orlando, Balkema.
[7] Schmertmann, J.H., (1978), “Guidelines for CPT: performance and design.” Report
FHWA-TS-78-209, Federal Highway Administration, Washington DC.
[8] Sennesset, K. Janbu, N., Sva, G., (1982). “Strength and Deformation Parameters from
Cone Penetration Tests”, Proc. ESOPT II. Ámsterdam.
TABLES
GENERAL FIGURES
E Locations
OB1
3,060,000 OB2
Legend
3,040,000 E Locations
OB Locations
SPD Locations
3,020,000
Northings (m)
3,000,000
2,980,000
2,960,000
SPD12
2,940,000
SPD13
2,920,000
580,000 600,000 620,000 640,000 660,000 680,000
Eastings (m)
SPD12-1
2,942,000 SPD12-2
2,940,000
Northings (m)
2,938,000
2,936,000
SPD13-1
SPD13-2
2,934,000
622,000 624,000 626,000 628,000 630,000 632,000
Eastings (m)
2,942,320 2,935,360
SPD13-EK-GC-04A
2,942,310 2,935,350
Northings (m)
Northings (m)
SPD13-1
SPD12-1
SPD13-EK-GC-04
SPD12-EK-GC-01A SPD13-2
2,942,300 2,935,340
SPD12-EK-GC-01
SPD12-2
2,942,290 2,935,330
628,130 628,140 628,150 628,160 627,200 627,210 627,220 627,230
Eastings (m) Eastings (m)
Legend
Actual borehole locations
Position of adjacent
geophysical dropcores
SPD12 FIGURES
0 10 20 30 40 50 60 70 80 90 100
0
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 10 20 30 40 50 60 70 80 90 100
0
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2
0
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115 LEGEND
Bulk Density
Dry Density
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 2 4 6 8 10 12 14 16
0
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
LEGEND
115 Measured - Calculated from Bulk Density
Theoretical - Calculated from Gs and w
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
4
4.30
6
Depth Below Seafloor (m)
7 7.10
9 9.10
10
11
12
13
14
15 15.00
16
17
18
19
20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 50 100 150 200 250 300 350 400 450 500 550 600
0
LEGEND
Torvane
Torvane 4.30
5 Pocket
PocketPenetrometer
Penetrometer
Miniature
MiniatureVane
Vane 7.10
UU Triaxial 9.10
10 Nkt = 34
UU
Nkt =
Triaxial
14
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
727.9
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
0
LEGEND
Remoulded Miniature Vane 4.30
5 Remoulded UU Triaxial
7.10
Remoulded Miniature Vane 9.10
10 Remoulded UU Triaxial
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 2 4 6 8 10 12 14 16 18 20
0
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115 LEGEND
UU Sensitivity
MV Sensitivity
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 1 2 3 4 5 6 7 8 9 10
0
4.30
5
7.10
9.10
10
15 15.00
20
24.00
25 26.00
30
35
37.10
Depth Below Seafloor (m)
40
45
48.00
50 50.50
55
59.40
60
63.30
65
70
71.50
75 75.60
78.80
80
85 85.00
90
95
98.00
100
105
109.58
110
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
SPD13 FIGURES
0 10 20 30 40 50 60 70 80 90 100
0
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 10 20 30 40 50 60 70 80 90 100
0
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2
0
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115 LEGEND
Bulk Density
Dry Density
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 2 4 6 8 10 12 14 16
0
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
LEGEND
115 Measured - Calculated from Bulk Density
Theoretical - Calculated from Gs and w
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
6 6.00
Depth Below Seafloor (m)
7
7.50
10
11
12 12.00
13
14
15 15.10
16
17
18
18.90
19
20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 50 100 150 200 250 300 350 400 450 500 550 600
0
LEGEND
Torvane
Torvane
5 Pocket
PocketPenetrometer
Penetrometer 6.00
Miniature
MiniatureVane
Vane 7.50
UU Triaxial
10 Nkt = 34
UU
Nkt =
Triaxial
14
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300
0
LEGEND
Remoulded Miniature Vane
5 Remoulded UU Triaxial 6.00
7.50
Remoulded Miniature Vane
10 Remoulded UU Triaxial
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
306.6
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 2 4 6 8 10 12 14 16 18 20
0
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115 LEGEND
UU Sensitivity
MV Sensitivity
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0 1 2 3 4 5 6 7 8 9 10
0
5 6.00
7.50
10
12.00
15 15.10
18.90
20
25
30
35
38.40
Depth Below Seafloor (m)
39.30
40
45
48.60
50
52.30
55
56.50
60
63.50
65
66.40
67.50
70
75
78.00
80
85
87.50
90
92.80
95
100
105
110 111.00
115
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
APPENDIX A1
TIMELOG OF OFFSHORE WORK
NDGOS
TIME LOG OF OFFSHORE WORK
Date: 07.12.2005
South Pars Phase 11 Development Project Report No.: WRE/8207/03/05/85
Offshore Iran By: LC Checked: GT Approved: WR
Start From To Duration Accumulate
Reference file Item Description End (date)
(date) (hrs) (hrs) (hrs) (hrs)
170805/WPR8207/DPR/021 64 Operational. 17-08-05 00:00 01:15 1.25 479.05
65 Complete continuous PCPT at E8-2 01:15 16:30 15.25 494.30
66 Operational. 16:30 18:30 2.00 496.30
67 Transit to E8-1 18:30 18:45 0.25 496.55
68 Start continuous sampling at E8-1 17-08-05 18:45 24:00 5.25 501.80
180805/WPR8207/DPR/022 69 Finish continuous sampling at E8-1 18-08-05 00:00 03:30 3.30 505.10
70 Operational. 03:30 04:45 1.25 506.35
71 Transit to E9 04:45 05:00 0.25 506.60
72 Operational. 05:00 08:00 3.00 509.60
73 Start continuous PCPT at E9 18-08-05 08:00 24:00 16.00 525.60
190805/WPR8207/DPR/023 74 Complete continuous PCPT at E9 19-08-05 00:00 08:30 8.50 534.10
75 Operational. 08:30 09:15 0.75 534.85
76 Transit to E7 09:15 09:30 0.25 535.10
77 Operational. 09:30 11:30 2.00 537.10
78 Complete continuous PCPT at E7 11:30 22:30 11.00 548.10
79 Operational. 19-08-05 22:30 24:00 1.50 549.60
200805/WPR8207/DPR/024 80 Transit to E1 20-08-05 00:00 00:15 0.25 549.85
81 Operational. 00:15 01:30 1.25 551.10
82 Complete continuous PCPT at E1 01:30 11:15 9.75 560.85
83 Operational. 11:15 12:00 0.75 561.60
84 Transit to E5 12:00 12:15 0.25 561.85
85 Operational. 12:15 13:15 1.00 562.85
86 Complete continuous sampling at E5 13:15 19:00 5.75 568.60
87 Operational. 19:00 20:00 1.00 569.60
88 Transit to E4 20:00 20:15 0.25 569.85
89 Operational. 20:15 21:15 1.00 570.85
90 Complete continuous PCPT at E4 21:15 23:30 2.25 573.10
91 Operational. 20-08-05 23:30 24:00 0.50 573.60
210805/WPR8207/DPR/025 92 Operational. 21-08-05 00:00 01:00 1.00 574.60
93 Demob 21-08-05 01:00 24:00 23.00 597.60
220805/WPR8207/DPR/026 94 Complete Demob 22-08-05 00:00 09:30 9.30 606.90
95 Standby 22-08-05 09:30 24:00 14.50 621.40
NDGOS
TIME LOG OF OFFSHORE WORK
Date: 07.12.2005
South Pars Phase 11 Development Project Report No.: WRE/8207/03/05/85
Offshore Iran By: LC Checked: GT Approved: WR
ID Task Name Duration Start Finish 31 Jul '05 07 Aug '05 14 Aug '05 21 Aug '05
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 Start Mob 0 days Thu 28/07/05 Thu 28/07/05 28/07 Start Mob
2 Mob 24 hrs Thu 28/07/05 Fri 29/07/05 Mob
3 Mob 24 hrs Fri 29/07/05 Sat 30/07/05 Mob
4 Mob 1 day? Sat 30/07/05 Sun 31/07/05 Mob
5 Transit 0.25 hrs Sun 31/07/05 Sun 31/07/05 Transit
6 Standing by (Client) 3 hrs Sun 31/07/05 Sun 31/07/05 Standing by (Client)
7 End Mob 1 day? Sun 31/07/05 Mon 01/08/05 End Mob
8 Start continuous sampling of SPD13-1 7.25 hrs Mon 01/08/05 Mon 01/08/05 Start continuous sampling of SPD13-1
9 Stand by & downtime 2 hrs Mon 01/08/05 Mon 01/08/05 Stand by & downtime
10 Stand by & downtime 6 hrs Mon 01/08/05 Tue 02/08/05 Stand by & downtime
11 Continuous sampling 18 hrs Tue 02/08/05 Tue 02/08/05 Continuous sampling
12 Continuous sampling 24 hrs Tue 02/08/05 Wed 03/08/05 Continuous sampling
13 End continuous sampling of SPD13-1 6 hrs Wed 03/08/05 Thu 04/08/05 End continuous sampling of SPD13-1
14 Operational & shift position to SPD13-2 6.5 hrs Thu 04/08/05 Thu 04/08/05 Operational & shift position to SPD13-2
15 Operational 2.25 hrs Thu 04/08/05 Thu 04/08/05 Operational
16 Start continuous PCPT of SPD13-2 10.25 hrs Thu 04/08/05 Thu 04/08/05 Start continuous PCPT of SPD13-2
17 Continuous PCPT 24 hrs Thu 04/08/05 Fri 05/08/05 Continuous PCPT
18 End continuous PCPT of SPD13-2 1.25 hrs Fri 05/08/05 Fri 05/08/05 End continuous PCPT of SPD13-2
19 Operational 3.25 hrs Fri 05/08/05 Sat 06/08/05 Operational
20 Transit to SPD12-1 2 hrs Sat 06/08/05 Sat 06/08/05 Transit to SPD12-1
21 Operational 2 hrs Sat 06/08/05 Sat 06/08/05 Operational
22 Start continuous sampling of SPD12-1 15.5 hrs Sat 06/08/05 Sat 06/08/05 Start continuous sampling of SPD12-1
23 Continuous sampling 24 hrs Sat 06/08/05 Sun 07/08/05 Continuous sampling
24 End continuous sampling of SPD12-1 10.7 hrs Sun 07/08/05 Mon 08/08/05 End continuous sampling of SPD12-1
25 Operational 3 hrs Mon 08/08/05 Mon 08/08/05 Operational
26 Standby for weather 10.25 hrs Mon 08/08/05 Mon 08/08/05 Standby for weather
27 Standby for weather 24 hrs Mon 08/08/05 Tue 09/08/05 Standby for weather
28 Standby for weather 18.3 hrs Tue 09/08/05 Wed 10/08/05 Standby for weather
29 Operational 1.25 hrs Wed 10/08/05 Wed 10/08/05 Operational
30 Operational & shift position to SPD12-2 0.25 hrs Wed 10/08/05 Wed 10/08/05 Operational & shift position to SPD12-2
31 Operational 3.5 hrs Wed 10/08/05 Wed 10/08/05 Operational
32 Start continuous PCPT of SPD12-2 0.5 hrs Wed 10/08/05 Wed 10/08/05 Start continuous PCPT of SPD12-2
33 Continuous PCPT 24 hrs Wed 10/08/05 Thu 11/08/05 Continuous PCPT
34 End continuous PCPT of SPD12-2 1 hr Thu 11/08/05 Thu 11/08/05 End continuous PCPT of SPD12-2
35 Operational 5.5 hrs Thu 11/08/05 Fri 12/08/05 Operational
36 Transit to OB1-1 7.25 hrs Fri 12/08/05 Fri 12/08/05 Transit to OB1-1
37 Operational 4 hrs Fri 12/08/05 Fri 12/08/05 Operational
38 Start continuous sampling of OB1-1 6.25 hrs Fri 12/08/05 Fri 12/08/05 Start continuous sampling of OB1-1
39 Stand by & downtime 4 hrs Fri 12/08/05 Sat 13/08/05 Stand by & downtime
40 End continuous sampling of OB1-1 20 hrs Sat 13/08/05 Sat 13/08/05 End continuous sampling of OB1-1
41 Operational & shift position to OB1-2 2.75 hrs Sat 13/08/05 Sun 14/08/05 Operational & shift position to OB1-2
42 Complete continuous PCPT at OB1-2 7.75 hrs Sun 14/08/05 Sun 14/08/05 Complete continuous PCPT at OB1-2
43 Operational 1.75 hrs Sun 14/08/05 Sun 14/08/05 Operational
44 Transit to OB2-2 1 hr Sun 14/08/05 Sun 14/08/05 Transit to OB2-2
45 Complete continuous PCPT of OB2-2 8.75 hrs Sun 14/08/05 Sun 14/08/05 Complete continuous PCPT of OB2-2
46 Operational 2 hrs Sun 14/08/05 Sun 14/08/05 Operational
47 Complete continuous sampling of OB2-1 16 hrs Sun 14/08/05 Mon 15/08/05 Complete continuous sampling of OB2-1
48 Operational. 1.5 hrs Mon 15/08/05 Mon 15/08/05 Operational.
APPENDIX A2
BOREHOLE LOGS
NDGOS
Discontinuities
No recovery
Parting Horizontal inclusion of different soil type less than
3 mm thick.
Seam Horizontal inclusion of different soil type 3 mm to
Sampling Method 75 mm thick.
(Shown in Sample No. Column) Layer Horizontal inclusion of different soil type greater than
75 mm thick.
P Push Pocket Inclusion of different soil type that is smaller than the
H Hammer diameter of the soil sample.
PT Piston
Density of Coarse Grained Soils
Soil Types
Density Relative Density (%)
Made Ground
SILT Very Loose < 15
Clay Loose 15 - 35
Medium Dense 35 - 65
Silt Dense 65 - 85
Very Dense > 85
Sand
CLAY
SPD12
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P1 Very soft greenish grey (5GY-5/1) sandy very silty carbonate CLAY
with numerous shell fragments
1 C1 - very sandy at mudline
P2
C2
2 P3
P3A
C3
3
P4
4 4.3
P5
Firm greenish grey (5GY-5/1) very silty carbonate CLAY with light
P6 brown staining
5
C4
P7
6
P8 - stiff at 6.8 m
7 7.1
Stiff greenish grey (5GY-5/1) very silty carbonate CLAY with shells
P9 and shell fragments and light brown staining
8 P10 - slightly sandy at 8.0 m
C5
9 P11 9.1
Stiff to very stiff greenish grey (10GY-5/1) very silty carbonate CLAY
with occasional shells and shell fragments and with silt partings
10 P12
11 P13
P14 C6
12
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
C7 15.0
15 P17
Stiff greenish grey (10GY-5/1) very silty carbonate CLAY with
occasional shell fragments
16 P18
17 P19
- with olive brown (2.5Y-4/4) very clayey silt / very silty clay between
17.2 and 18.5 m
C8
18 P20
- with yellowish brown mottling between 18.5 and 19.7 m
19 P21
P22 C9
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 & SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 1 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
Stiff greenish grey (10GY-5/1) very silty CLAY with occasional shell
fragments
21 P23
P24 C10
22
P25
23
P26 24.0
24
Weak to moderately weak light greenish grey (10GY-7/1) siliceous
P27 C11 50/5 CALCARENITE
25 H27A - with sand and gravel and numerous shell fragments and gypsum at
50/10
RC1 25.0 m
H28
26.0
26 H29 50/30 Stiff to very stiff greenish grey (10GY-5/1) very silty carbonate CLAY
- light greenish grey slightly sandy with shell fragments and
27 P30 cemented pockets between 26.0 and 26.8 m
- dark greenish grey and with shell fragments between 26.8 and 28.4
m
28 P31
C12
29 P32
30 P33
31 P34
C13
32 P35
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
33 P36
- with occasional shell fragments below 33.5 m
34 P37
C14 - becoming very stiff to hard below 34.5 m
35 P38
36 P39
- with a layer of very weakly cemented clayey carbonate sand with
numerous shells and shell fragments between 36.3 and 37.1 m
37 P40 37.1
C15 Very stiff to hard greenish grey (10GY-5/1) very silty carbonate CLAY
P41 with brown mottling to 44.5 m
38
P42
39
P43
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 & SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 2 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
C16 Very stiff to hard greenish grey (10GY-5/1) very silty carbonate CLAY
with brown mottling to 44.5 m
41 P44
P45
42
43 P46
C17
P47
44
P48
45
- with occasional shell fragments below 45.5 m
46 P49
C18
47 P50
- with weakly cemented pockets below 47.5 m
P51 48.0
48
Interbedded light greenish grey (5GY-7/1) hard very silty carbonate
CLAY and weakly cemented sandy carbonate SILT
49 P52
C19 - with dark organic staining below 49.5 m
50 P53
50.5
P54 Hard greenish grey (5GY-5/1) very silty carbonate CLAY with light
51 brown and brown staining
P55
52 - with numerous shells and shell fragments at 52.1 m
C20
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
P57
54
- with occasional shell fragments below 54.5 m
P58
55
C21
P59
56
P60
57
- interbedded with very weakly cemented layers and with pockets of
P61 sand and gypsum below 57.5 m
58
C22
59 P62
59.4
Very weakly cemented greenish grey (5GY-5/1) very silty carbonate
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 & SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 3 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P63 CLAY with shell fragments
- dark greenish grey at 59.5 m
61 P64
C23
62 P65
63 P66 63.3
Hard greenish grey (5GY-5/1) silty carbonate CLAY
P67
64 - with occasional dark staining at 63.5 m
C24
65 P68
66 P69
67 P70
C25
68 P71
69 P72
P73
70
C26
71 P74
71.5
Very stiff to hard greenish grey (10GY-5/1) very silty calcareous
72 P75 CLAY
- with silt and sand pockets and partings and seams between 71.5
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
P82 78.8
79 Hard greenish grey (10GY-6/1) very silty carbonate CLAY with
C29 numerous cemented pockets
- with occasional shell fragments between 78.8 and 82.4 m
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 & SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 4 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P83 Hard greenish grey (10GY-6/1) very silty carbonate CLAY with
numerous cemented pockets
81 P84 - with gypsum and numerous cemented pockets below 80.5 m
82 P85 C30
83 P86
P87
84
P88 85.0
85
C31 Hard greenish grey (10GY-5/1) very silty carbonate CLAY
P89
86
P90
87
88 P91
C32
89 P92
P93
90
P94
91
C33 - with gypsum at 91.5 m
P95
92
- with occasional dark staining at 92.5 m
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
93 P96
- with occasional shell fragments at 93.5 m
94 P97
C34
P98 - very weakly cemented and with shell fragments at 95.0 m
95
- interbedded with fine silty sand below 95.5 m
P99
96
P100
97 - with a cemented layer between 97.2 and 98.0 m
C35
P101 C36
P101A 98.0
98
H101 Hard greyish brown (2.5Y-5/2) and greenish grey (5GY-5/1) very silty
P102 carbonate CLAY with partings and seams of yellowish brown silty fine
99 sand
P103
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 & SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 5 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P104 Hard greyish brown (2.5Y-5/2) and greenish grey (5GY-5/1) very silty
C37 carbonate CLAY with partings and seams of yellowish brown silty fine
101 sand
P105 - with brown staining below 101.0 m
102
P106
103 - very weakly cemented and with shell fragments and pockets of
P107 gypsum between 103.0 and 104.3 m
C38
104
P108
105
P109
111
112
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 & SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
SPD13
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P1 Very soft greenish grey (10GY-5/1) sandy very silty carbonate CLAY
with numerous shells and shell fragments and seams of cemented
P2 C2 shells
1
- with slight organic odour between 0.0 and 0.5 m
P4 C4
3
4 P5
5 P6
- with gypsum below 5.5 m
P7 C5 6.0
6
Interbedded very weakly cemented GYPSUM and firm greenish grey
(10GY-5/1) silty calcareous CLAY
7 P8
7.5
Firm greenish grey (10GY-6/1) and olive grey (5Y-6/2) very silty
8 P9 carbonate CLAY with shells and shell fragments and with brown
staining
C6 - with pockets of very soft clay at 8.0 m
9 P10
- sandy below 9.5 m
P11
10
11 P12 - with very weakly cemented seams between 10.9 and 11.4 m
C7 12.0
12 P13
Stiff greenish grey (10GY-5/1) very silty carbonate CLAY with
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
14 P15
- with dark staining and pockets of sand below 14.5 m
C8
15 P16 15.1
Very weakly cemented and firm to stiff light greenish grey (5GY-7/1)
P17 sandy silty carbonate CLAY with gypsum and shells and shell
16 fragments
P18
17 P19 C9
P20 30/10
18 P20A
H20 50/10
C10
P21 18.9
19 H21
C11 Stiff to very stiff greenish grey (10GY-5/1) very silty carbonate CLAY
P22
- with very occasional shell fragments between 19.5 and 20.3 m
P23
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 & SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 1 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
Stiff to very stiff greenish grey (10GY-5/1) very silty carbonate CLAY
21 P24
22 P25
C12
23 P26
24 P27
25 P28
C13
26 P29
- with gypsum between 26.5 and 27.1 m
P30
27
- light greenish grey sandy and with very weakly to weakly cemented
P31 pockets and with shells and shell fragments between 27.5 and 29.0
28 m
C14
- with a weak to moderately weak cemented layer at 28.0 m
29 P32 - with brown staining between 29.0 and 32.4 m
30 P33
31 P34
C15
32 P35
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
33 P36
34 P37
C16
35 P38
36 P39
37 P40
C17 - sandy and with gravel and shell fragments below 37.5 m
38 P41 - with cemented pockets below 38.0 m
38.4
Very weakly cemented light olive grey (5Y-6/2) fine to coarse slightly
P42 gravelly very silty carbonate SAND with numerous shells and shell39.3
39
fragments
Very stiff to hard greenish grey (10GY-5/1) very silty carbonate CLAY
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 & SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 2 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P43 C18 Very stiff to hard greenish grey (10GY-5/1) very silty carbonate CLAY
- slightly sandy and with cemented pockets between 39.3 and 40.4 m
P44 - with occasional shell fragments at 40.2 m
41
- with yellow staining between 41.5 and 45.2 m
P45
42
P46
43 C19
- with occasional shell fragments below 43.5 m
P47
44
45 P48
P49
46
C20
P50
47 - with dark organic staining below 47.1 m
48 P51
48.6
P52 Interbedded weakly cemented and stiff to very stiff greenish grey
49 C21 (10GY-6/1) slightly sandy very silty carbonate CLAY
50 P53
51 P54
P55
52 52.3
C22
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
P56 Very stiff to hard greenish grey (5GY-6/1) very silty carbonate CLAY
53
P57
54 P58
P58A
55 P59
C23
- with occasional shell fragments below 55.5 m
56 P60
56.5
P61 Very stiff to hard and very weakly cemented greenish grey (5GY-6/1)
57 silty carbonate CLAY with occasional pockets of gypsum
P62 - with a layer of sand and gravel with shell fragments and gypsum
P63 between 57.5 and 58.0 m
58 C24 - with pockets and partings of sand and brown staining between 57.9
and 60.5 m
P64
59
P65
C26
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 & SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 3 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P66 Very stiff to hard and very weakly cemented greenish grey (5GY-6/1)
silty carbonate CLAY with occasional pockets of gypsum
P67
61
P68
62
C27
63 P69
63.5
Stiff to very stiff greenish grey (5GY-5/1) very silty carbonate CLAY
64 P70 with very weakly cemented pockets and seams
65 P71
- with occasional shell fragments between 65.5 and 66.3 m
C28
66 P72
66.4
P73 Very weakly cemented greenish grey (5GY-5/1) slightly sandy clayey
67 C29 carbonate SILT with numerous shell fragments
67.5
Hard greenish grey (5GY-6/1) very silty carbonate CLAY
68 P74 - with light yellow staining between 67.5 and 68.3 m
- with occasional shell fragments below 68.5
69 P75
- stiff and with gypsum between 69.5 and 70.4 m
70 P76
C30
71 P77
- with pockets and veins of gypsum and with silt partings between
P78 71.5 and 74.1 m
72
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
73 P79
C31
P80
74
P81
75
76 P82
C32
P83
77
P84 78.0
78
Hard brown (7.5Y-4/3) very silty carbonate CLAY with pockets
P85 partings and seams of silt
79 - slightly sandy at 78.2 m
C33 - with very weakly cemented pockets between 78.5 and 80.0 m
P86
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 & SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 4 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
P88
82 C34
P89
83
P90
84
P91
85
C35
86 P92
- with a layer of sand at 86.5 m
P93
87 C36
87.5
P94 Hard to very hard greenish grey (10GY-5/1) very silty carbonate
88 CLAY
- with pockets and partings of silt between 87.5 and 88.1 m
89 P95
P96
90
C37
P97 - sandy and with shell fragments between 90.8 and 92.0 m
91
P98
92
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
P99 92.8
93 Hard to very hard greyish brown (2.5Y-5/2) very silty carbonate CLAY
C38 with pockets and partings and seams of silt and gypsum
P100
94
P101 C39
95
- slightly sandy below 95.5 m
P102
96
- with occasional shell fragments below 96.5 m
P103 - greenish grey between 96.5 and 97.6 m
97
P104
C40
98
P105
99
P106 C41
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 & SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 5 of 6
BOREHOLE LOG
UNDRAINED SHEAR STRENGTH CONE
(kPa) RESISTANCE
Torvane
SAMPLE TYPE / No.
FRICTION RATIO
qc (MPa)
CLASSIFICATION TESTS Pocket Penetrometer
(%) Miniature Vane 4 8 12 16
cm penetration)
SOIL PROFILE
BLOW COUNT
BULK DENSITY
(No. of blows /
SOIL DESCRIPTION Remoulded Miniature Vane
(Mg/m3)
DEPTH (m)
Rf(%)
FRICTION
PL MC LL Nkt = 14 fs (MPa)
Nkt = 34
20 40 60 80 1.6 1.8 2.0 100 200 300 400 500 0.1 0.2 0.3 0.4 2 4 6
Hard to very hard greyish brown (2.5Y-5/2) very silty carbonate CLAY
P107 with pockets and partings and seams of silt and gypsum
101 - greenish grey between 100.0 and 103.3 m
- with numerous partings of sand below 100.0 m
P108
102
C42
103 P109
104 P110
- very weakly cemented and with numerous gypsum seams below
P111 104.5 m
105
C43
P112
106
P113
107
- with numerous partings and seams of sand below 107.5 m
P114 C44
108
C45
P115
109
P116
110
C46 111.0
111
End of borehole at 111.0 m
112
TOTAL SP SU600 27-10 HG WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 7/12/05
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 & SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
APPENDIX A3
PCPT DATA PLOTS
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
1 C1
C2
2
C3
3
5
C4
6
7
PENETRATION BELOW SEAFLOOR (m)
8
C5
9
10
11
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C6
12
13
14
C7
15
16
17
C8
18
19
C9
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
21
C10
22
23
24
C11
25
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C12
29
30
31
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C13
32
33
34
C14
35
36
37
C15
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
C16
41
42
43
C17
44
45
46
C18
47
PENETRATION BELOW SEAFLOOR (m)
48
49
C19
50
51
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
52
C20
53
54
55
C21
56
57
58
C22
59
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
61
C23
62
63
64
C24
65
66
67
PENETRATION BELOW SEAFLOOR (m)
C25
68
69
70
C26
71
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
72
73
C27
74
75
76
C28
77
78
79
C29
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
81
82 C30
83
84
85
C31
86
87
PENETRATION BELOW SEAFLOOR (m)
88 C32
89
90
91
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C33
92
93
94
C34
95
96
97
C35
C36
98
99
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
C37
101
102
103
C38
104
105
106
C39
107
PENETRATION BELOW SEAFLOOR (m)
108
109
C40
110
111
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
1 C1
C2
2
C3
3
5
C4
6
7
PENETRATION BELOW SEAFLOOR (m)
8
C5
9
10
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
11
C6
12
13
14
C7
15
16
17
C8
18
19
C9
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
21
C10
22
23
24
C11
25
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C12
29
30
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
31
C13
32
33
34
C14
35
36
37
C15
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
C16
41
42
43
C17
44
45
46
C18
47
PENETRATION BELOW SEAFLOOR (m)
48
49
C19
50
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
51
52
C20
53
54
55
C21
56
57
58
C22
59
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
61
C23
62
63
64
C24
65
66
67
PENETRATION BELOW SEAFLOOR (m)
C25
68
69
70
C26
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
71
72
73
C27
74
75
76
C28
77
78
79
C29
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
81
82 C30
83
84
85
C31
86
87
PENETRATION BELOW SEAFLOOR (m)
88 C32
89
90
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
91
C33
92
93
94
C34
95
96
97
C35
C36
98
99
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
C37
101
102
103
C38
104
105
106
C39
107
PENETRATION BELOW SEAFLOOR (m)
108
109
C40
110
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
111
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
1 C1
C2
2
C3
3
5
C4
6
7
PENETRATION BELOW SEAFLOOR (m)
8
C5
9
10
11
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C6
12
13
14
C7
15
16
17
C8
18
19
C9
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
21
C10
22
23
24
C11
25
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C12
29
30
31
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C13
32
33
34
C14
35
36
37
C15
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C16
41
42
43
C17
44
45
46
C18
47
PENETRATION BELOW SEAFLOOR (m)
48
49
C19
50
51
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
52
C20
53
54
55
C21
56
57
58
C22
59
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
61
C23
62
63
64
C24
65
66
67
PENETRATION BELOW SEAFLOOR (m)
C25
68
69
70
C26
71
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
72
73
C27
74
75
76
C28
77
78
79
C29
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
81
82 C30
83
84
85
C31
86
87
PENETRATION BELOW SEAFLOOR (m)
88 C32
89
90
91
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C33
92
93
94
C34
95
96
97
C35
C36
98
99
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C37
101
102
103
C38
104
105
106
C39
107
PENETRATION BELOW SEAFLOOR (m)
108
109
C40
110
111
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
1 C1
C2
2
C3
3
5
C4
6
7
PENETRATION BELOW SEAFLOOR (m)
8
C5
9
10
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
11
C6
12
13
14
C7
15
16
17
C8
18
19
C9
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
21
C10
22
23
24
C11
25
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C12
29
30
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
31
C13
32
33
34
C14
35
36
37
C15
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C16
41
42
43
C17
44
45
46
C18
47
PENETRATION BELOW SEAFLOOR (m)
48
49
C19
50
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
51
52
C20
53
54
55
C21
56
57
58
C22
59
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
61
C23
62
63
64
C24
65
66
67
PENETRATION BELOW SEAFLOOR (m)
C25
68
69
70
C26
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
71
72
73
C27
74
75
76
C28
77
78
79
C29
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
81
82 C30
83
84
85
C31
86
87
PENETRATION BELOW SEAFLOOR (m)
88 C32
89
90
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
91
C33
92
93
94
C34
95
96
97
C35
C36
98
99
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C37
101
102
103
C38
104
105
106
C39
107
PENETRATION BELOW SEAFLOOR (m)
108
109
C40
110
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
111
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 109.7 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.2 m (Chart Datum)
PCPT BH : E 628,150.3 m N 2,942,299.9 m Approved By: Date Sheet
Location : Offshore Iran Performed : 09/08/05 to 11/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
C2
1
2 C3
C4
3
6 C5
7
PENETRATION BELOW SEAFLOOR (m)
8
C6
9
10
11
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C7
12
13
14
C8
15
16
17 C9
18
C10
19 C11
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
21
22 C12
23
24
25
C13
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C14
29
30
31
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C15
32
33
34 C16
35
36
37
C17
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
C18
41
42
43 C19
44
45
46
C20
47
PENETRATION BELOW SEAFLOOR (m)
48
49 C21
50
51
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
52
C22
53
54
55
C23
56
57
58 C24
59
C26
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
61
62
C27
63
64
65
C28
66
67 C29
PENETRATION BELOW SEAFLOOR (m)
68
69
70 C30
71
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
72
73
C31
74
75
76
C32
77
78
79
C33
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
81
82 C34
83
84
85
C35
86
87 C36
PENETRATION BELOW SEAFLOOR (m)
88
89
90
C37
91
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
92
93
C38
94
C39
95
96
97
C40
98
99
C41
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
RAW PCPT DATA
0 2 4 6 8 10 12 14 16 18 20 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.500
101
102
C42
103
104
105
C43
106
107
PENETRATION BELOW SEAFLOOR (m)
C44
108
C45
109
110
111 C46
TOTAL RAW PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
C2
1
2 C3
C4
3
6 C5
7
PENETRATION BELOW SEAFLOOR (m)
8
C6
9
10
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
11
C7
12
13
14
C8
15
16
17 C9
18
C10
19 C11
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
21
22 C12
23
24
25
C13
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C14
29
30
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
31
C15
32
33
34 C16
35
36
37
C17
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
C18
41
42
43 C19
44
45
46
C20
47
PENETRATION BELOW SEAFLOOR (m)
48
49 C21
50
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
51
52
C22
53
54
55
C23
56
57
58 C24
59
C26
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
61
62
C27
63
64
65
C28
66
67 C29
PENETRATION BELOW SEAFLOOR (m)
68
69
70 C30
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
71
72
73
C31
74
75
76
C32
77
78
79
C33
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
81
82 C34
83
84
85
C35
86
87 C36
PENETRATION BELOW SEAFLOOR (m)
88
89
90
C37
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
91
92
93
C38
94
C39
95
96
97
C40
98
99
C41
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
RAW PCPT DATA
0 10 20 30 40 50 60 70 80 90 100 -3 -2 -1 0 1 2 3 4 5 6 7
0 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50
101
102
C42
103
104
105
C43
106
107
PENETRATION BELOW SEAFLOOR (m)
C44
108
C45
109
110
TOTAL RAW PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
111 C46
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C2
1
2 C3
C4
3
6 C5
7
PENETRATION BELOW SEAFLOOR (m)
8
C6
9
10
11
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C7
12
13
14
C8
15
16
17 C9
18
C10
19 C11
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
21
22 C12
23
24
25
C13
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C14
29
30
31
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
C15
32
33
34 C16
35
36
37
C17
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C18
41
42
43 C19
44
45
46
C20
47
PENETRATION BELOW SEAFLOOR (m)
48
49 C21
50
51
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
52
C22
53
54
55
C23
56
57
58 C24
59
C26
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
61
62
C27
63
64
65
C28
66
67 C29
PENETRATION BELOW SEAFLOOR (m)
68
69
70 C30
71
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
72
73
C31
74
75
76
C32
77
78
79
C33
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
81
82 C34
83
84
85
C35
86
87 C36
PENETRATION BELOW SEAFLOOR (m)
88
89
90
C37
91
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
92
93
C38
94
C39
95
96
97
C40
98
99
C41
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
101
102
C42
103
104
105
C43
106
107
PENETRATION BELOW SEAFLOOR (m)
C44
108
C45
109
110
111 C46
TOTAL DER PCPT 20MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C2
1
2 C3
C4
3
6 C5
7
PENETRATION BELOW SEAFLOOR (m)
8
C6
9
10
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
11
C7
12
13
14
C8
15
16
17 C9
18
C10
19 C11
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 1 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
21
22 C12
23
24
25
C13
26
27
PENETRATION BELOW SEAFLOOR (m)
28
C14
29
30
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
31
C15
32
33
34 C16
35
36
37
C17
38
39
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 2 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
C18
41
42
43 C19
44
45
46
C20
47
PENETRATION BELOW SEAFLOOR (m)
48
49 C21
50
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
51
52
C22
53
54
55
C23
56
57
58 C24
59
C26
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 3 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
61
62
C27
63
64
65
C28
66
67 C29
PENETRATION BELOW SEAFLOOR (m)
68
69
70 C30
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
71
72
73
C31
74
75
76
C32
77
78
79
C33
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 4 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
81
82 C34
83
84
85
C35
86
87 C36
PENETRATION BELOW SEAFLOOR (m)
88
89
90
C37
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
91
92
93
C38
94
C39
95
96
97
C40
98
99
C41
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 5 of 6
DERIVED PCPT DATA
NET CONE RESISTANCE, qnet (MPa) FRICTION RATIO, Rf (%) PORE PRESSURE RATIO, Bq
101
102
C42
103
104
105
C43
106
107
PENETRATION BELOW SEAFLOOR (m)
C44
108
C45
109
110
C46
TOTAL DER PCPT 100MPA 18-10 WPR8207-ISIS.GPJ BLANK 14-10-05.GDT 30/10/05
111
112
113
114
115
116
117
118
119
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-2 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : Total South Pars 11 Limited Final Depth : 111.2 m
RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.4 m (Chart Datum)
PCPT BH : E 627,211.2 m N 2,935,343.8 m Approved By: Date Sheet
Location : Offshore Iran Performed : 03/08/05 to 05/08/05
Cone ID : 040626 WR 27/10/05 6 of 6
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
APPENDIX A4
SUMMARY OF LABORATORY TEST RESULTS
SPD12
0.50 B1 4.20 8
0.50 B2 4.30 20
0.50 B2 4.40 37 1.80 1.31 15
P6 4.50 0.60 B1 4.60 45 1.90 1.30 52 38
0.60 Q1 4.60 52 24 28 42 29
0.60 Q1 4.60 41 1.75
0.60 Q1 4.80 50 46
0.60 UU1 4.90 56
0.60 UU1 4.90 45 1.77 1.22
0.60 B2 5.00 45 1.85 1.28 78 78
P7 5.50 0.50 B1 5.60 43 1.75 1.22 36 43
0.50 B2 5.80 40 1.81 1.29 47 37
0.50 B2 6.00 44 58
P8 6.50 0.65 B1 6.50 28 46 21 25 2.8 66
0.65 B1 6.60 35 1.90 1.40
0.65 B1 6.70 74 63
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m RC
Sampling BH : E 628,156.2 m N 2,942,304.0 m
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 1 of 15
SUMMARY OF LABORATORY TEST RESULTS
0.85 Q2 9.00 35
0.85 B2 9.00 30 1.94 1.49
0.85 B2 9.10 90 96
0.85 UU1 9.20 140
0.85 UU1 9.20 28 1.94 1.51
P12 9.50 0.85 B1 9.50 29 44 22 22 52
0.85 B1 9.70 29 1.94 1.50 60 110
0.85 Q1 9.90 78 105
0.85 UU1 10.00 33 1.94 1.46
0.85 UU1 10.00 126
0.85 Q2 10.10 137 142
0.85 B2 10.30 31 1.90 1.45 137 195 164 12
P13 10.50 0.80 B1 10.70 32 1.94 1.46 100 129
0.80 Q1 10.90 125 133
0.80 UU1 11.00 104
0.80 UU1 11.00 32 1.72 1.30
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m RC
Sampling BH : E 628,156.2 m N 2,942,304.0 m
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 2 of 15
SUMMARY OF LABORATORY TEST RESULTS
0.60 B1 50.60 24
0.60 UU1 50.98 307
0.60 UU1 50.98 24 1.97 1.58
P55 51.50 0.60 B1 51.60 28
0.60 B2 51.90 27
P56 52.50 0.65 B1 52.60 26
0.65 UU1 52.85 304
0.65 UU1 52.85 27 1.94 1.53
0.65 Q1 52.95 26
P57 53.50 0.60 B1 53.60 27
0.60 Q1 53.60 29 1.93 1.50 2.75
0.60 B2 54.00 26
P58 54.50 0.65 B1 54.50 59
0.65 UU1 54.85 346
0.65 UU1 54.85 27 1.91 1.50
0.65 Q1 54.95 27
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m RC
Sampling BH : E 628,156.2 m N 2,942,304.0 m
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 9 of 15
SUMMARY OF LABORATORY TEST RESULTS
0.60 B2 70.00 45
P74 70.50 0.70 B1 70.70 19
0.70 B2 71.10 42
P75 71.50 0.80 B1 71.50 19 36 17 19
0.80 B1 71.70 20 2.07 1.72
0.80 UU1 72.20 299
0.80 UU1 72.20 20 1.80 1.50
P76 72.50 0.50 B1 72.70 25
0.50 B2 72.90 20
P77 73.50 0.45 B1 73.70 23 2.04 1.66
0.45 B2 73.90 18
P78 74.50 0.40 B1 74.60 19 192
0.40 UU1 74.60 20 46 26 20 1.97 1.63 36
0.40 UU1 74.70 141
0.40 B2 74.80 21 183
P79 75.50 0.60 B1 75.60 27
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m RC
Sampling BH : E 628,156.2 m N 2,942,304.0 m
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 11 of 15
SUMMARY OF LABORATORY TEST RESULTS
0.87 B2 101.80 27
P106 102.00 0.40 Q1 102.05 16
0.40 UU1 102.30 471
0.40 UU1 102.30 20 1.96 1.63
P107 103.00 0.78 B1 103.05 20
0.78 B3 103.40 23
P108 104.00 0.70 UU1 104.50 418
0.70 UU1 104.50 24 1.97 1.59
P109 105.00 0.45 B1 101.50 28
0.45 B1 105.15 17
0.45 Q1 105.25 41 21 20 56 556
0.45 Q1 105.25 23 2.09
P110 106.00 0.30 UU1 106.20 554
0.30 UU1 106.20 17 2.13 1.82
P111 107.00 0.25 UU1 107.15 728
0.25 UU1 107.15 19 2.10 1.76
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m RC
Sampling BH : E 628,156.2 m N 2,942,304.0 m
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 14 of 15
SUMMARY OF LABORATORY TEST RESULTS
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m RC
Sampling BH : E 628,156.2 m N 2,942,304.0 m
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 15 of 15
SUMMARY OF ADVANCED LABORATORY TEST RESULTS
UNCONFINED SHEAR STRENGTH OEDOMETER TESTS
COMPRESSIVE MAXIMUM MINIMUM
SAMPLE TEST MOISTURE BULK STRENGTH
SPECIMEN DRY DRY DEGREE
NUMBER DEPTH CONTENT DENSITY 2
(MN/m ) EFFECTIVE STRESS SIMPLE SHEAR INITIAL
NUMBER 3 DENSITY DENSITY TEST OF SAT- pc
(m) (%) (Mg/m ) 3 3 VOIDS Cc
(Mg/m ) (Mg/m ) TYPE DENSITY c' ' cDSS Failure Strain RATIO URATION (kPa)
UCS PLT (%)
(%) (kPa) (degrees) (kPa) (%)
P9 Q1 7.55 29 1.95 0.840 96.9 410 0.118
P18 Q1 16.00 31 1.90 0.919 94.7 480 0.132
P32 Q2 28.80 27 1.96 0.803 94.2 510 0.125
P42 Q1 38.75 25 2.00 0.724 96.8 780 0.197
P57 Q1 53.60 29 1.93 0.838 94.2 1070 0.108
P80 Q1 76.60 33 1.89 0.964 94.7 1900 0.159
P102 Q1 98.00 27 1.99 0.786 95.5 1800 0.169
TOTAL ADV LAB SUMMARY TABLE CW MC & BD WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 6/12/05
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD12-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 109.6 m
Sampling BH : E 628,156.2 m N 2,942,304.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 69.3 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 05/08/05 to 11/08/05
WR 07/12/05 1 of 1
Summary of Fugro Drop Cores – SPD12
(from Fugro Preliminary Field Report MP52-REP-00 (SPD12))
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
SPD13
0.55 Q1 58.85 24
P65 59.50 0.33 B1 59.60 29
0.33 B2 59.70 28
P66 60.00 0.44 B2 60.40 23
P67 60.50 0.60 Q2 60.70 55 24 31 206 208
0.60 Q2 60.70 26 2.01 1.60
0.60 Q1 60.90 20
P68 61.50 0.60 B1 61.80 25
0.60 UU1 61.90 26 1.98 1.58 227
0.60 UU1 61.90 26 1.98 1.58
P69 62.50 0.70 Q1 62.60 28
0.70 Q3 62.80 29 1.97 1.53 2.79
0.70 Q2 63.00 27
P70 63.50 0.87 B1 63.40 29
0.87 B1 63.50 72
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 11 of 15
SUMMARY OF LABORATORY TEST RESULTS
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 15 of 15
SUMMARY OF ADVANCED LABORATORY TEST RESULTS
UNCONFINED SHEAR STRENGTH OEDOMETER TESTS
COMPRESSIVE MAXIMUM MINIMUM
SAMPLE TEST MOISTURE BULK STRENGTH
SPECIMEN DRY DRY DEGREE
NUMBER DEPTH CONTENT DENSITY 2
(MN/m ) EFFECTIVE STRESS SIMPLE SHEAR INITIAL
NUMBER 3 DENSITY DENSITY TEST OF SAT- pc
(m) (%) (Mg/m ) 3 3 VOIDS Cc
(Mg/m ) (Mg/m ) TYPE DENSITY c' ' cDSS Failure Strain RATIO URATION (kPa)
UCS PLT (%)
(%) (kPa) (degrees) (kPa) (%)
P14 Q1 12.60 33 1.88 0.950 95.3 340 0.106
P24 Q1 20.80 28 1.96 0.801 97.1 730 0.188
P34 Q2 31.10 29 1.98 0.804 98.6 410 0.103
P47 Q1 43.55 32 1.91 0.925 96.3 970 0.146
P69 Q3 62.80 29 1.97 0.827 98.5 900 0.120
P92 Q1 85.80 21 2.01 0.677 86.1 1600 0.130
P116 Q1 109.80 25 2.05 0.702 98.9 2200 0.166
TOTAL ADV LAB SUMMARY TABLE CW MC & BD WPR8207-ISIS.GPJ WPR8207-ISIS.GPJ 6/12/05
Logged By:
Project Details Borehole Details
CPC
Project No. : WPR 8207 Name : SPD13-1 Coordinates
(International 1924, ED77 Datum, UTM Projection, CM 51 deg. E, Zone 39) Checked By:
Client : TOTAL South Pars 11 Limited Final Depth : 111.0 m
Sampling BH : E 627,216.6 m N 2,935,349.0 m RC
Project Name : South Pars Phase 11 Development Project Water Depth : 71.6 m (Chart Datum)
Approved By: Date Sheet
Location : Offshore Iran Performed : 31/07/05 to 05/08/05
WR 07/12/05 1 of 1
Summary of Fugro Drop Cores – SPD13
(from Fugro Preliminary Field Report MP52-REP-00 (SPD13))
Final Factual Report, SPD12 & SPD13 Locations NDGOS Project No: WPR 8207
South Pars Phase 11 Field Development Project Rev. 02
Offshore and Nearshore Geotechnical Survey
th
TOTAL South Pars 11 Limited (Contract Ref.: TSP 11/PJ/006) 7 December 2005
APPENDIX A5
LABORATORY TEST RESULTS
• Plasticity Charts
• Particle Size Distribution Test Results
• UU Triaxial Stress-Strain Plots
• One Dimensional Consolidation Test (Oedometer) Results
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P6-Q1 4.60 52 24 28
P8-B1 6.50 46 21 25
P10-B1 8.00 38 21 17
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P20-B2 18.30 29 16 13
P22-B1 19.50 47 22 25
P23-Q1 20.70 48 22 26
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P35-B1 31.50 48 23 25
P39-B1 35.50 58 26 32
P42-Q1 38.75 47 21 26
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P54-B1 50.50 45 22 23
P59-Q1 55.65 62 28 34
P64-B1 60.50 34 17 17
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P81-B1 77.50 60 27 33
P88-B1 84.50 45 27 18
P92-B1 88.50 60 27 33
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P105-B1 101.50 66 29 37
P109-Q1 105.25 41 21 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P10-B1 8.00 24 65 11 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P23-Q1 20.50 40 60 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P35-B1 31.50 28 72 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P46-B1 42.50 38 62 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P62-B2 58.50 31 69 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P88-B1 84.50 28 67 5 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P105-B1 101.00 51 49 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
110
100
90
80
Deviator Stress (kPa)
70
60
50
40
30
20
10
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
180
160
140
Deviator Stress (kPa)
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
280
260
240
220
200
Deviator Stress (kPa)
180
160
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
220
200
180
160
Deviator Stress (kPa)
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
140
120
100
Deviator Stress (kPa)
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
220
200
180
160
Deviator Stress (kPa)
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
250
200
Deviator Stress (kPa)
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
220
200
180
160
Deviator Stress (kPa)
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
300
250
Deviator Stress (kPa)
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
350
300
250
Deviator Stress (kPa)
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
350
300
250
Deviator Stress (kPa)
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
550
500
450
400
Deviator Stress (kPa)
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
500
450
400
350
Deviator Stress (kPa)
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
550
500
450
400
Deviator Stress (kPa)
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
500
Deviator Stress (kPa)
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
300
250
Deviator Stress (kPa)
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
550
500
450
400
Deviator Stress (kPa)
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
800
700
600
Deviator Stress (kPa)
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
550
500
450
400
Deviator Stress (kPa)
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
650
600
550
500
450
Deviator Stress (kPa)
400
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
550
500
450
400
Deviator Stress (kPa)
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
900
800
700
Deviator Stress (kPa)
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
900
800
700
Deviator Stress (kPa)
600
500
400
300
200
P00
0
0 4 8 P2 P6 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
1,000
900
800
700
Deviator Stress (kPa)
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
700
600
500
Deviator Stress (kPa)
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
1,100
1,000
900
800
Deviator Stress (kPa)
700
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
1,400
1,200
1,000
Deviator Stress (kPa)
800
600
400
200
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
700
600
500
Deviator Stress (kPa)
400
300
200
100
0
0 4 8 12 16 20
* U - Undisturbed R - Remoulded
NOBLE UU TRIAXIAL DS WPR8207-ISIS.GPJ ISIS 25-10-05.GDT 6/12/05
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0.80
0.75
0.70
Void Ratio (-)
0.65
0.60
0.55
0.50
0.45
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 191.00 183.39
Wt. of Can + Dry Soil g = 164.37 164.37
Weight of Water g = 26.63 19.02
Weight of Container g = 73.79 73.79
Weight of Dry Soil g = 90.58 90.58
Water Content % = 29.4 21.0
Initial Final
Wt of Wet Soil + Mold g = 191.00 183.39
Weight of Mold g = 73.79 73.79
Weight of Wet Soil g = 117.21 109.60
Height of Sample cm = 1.900 1.626
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 51.51
Bulk Density Mg/m3 = 1.95 2.13
Dry Density Mg/m3 = 1.51 1.76
0.90
0.85
0.80
Void Ratio (-)
0.75
0.70
0.65
0.60
0.55
0.50
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 188.71 183.30
Wt. of Can + Dry Soil g = 161.42 161.42
Weight of Water g = 27.29 21.88
Weight of Container g = 74.23 74.23
Weight of Dry Soil g = 87.19 87.19
Water Content % = 31.3 25.1
Initial Final
Wt of Wet Soil + Mold g = 188.71 183.30
Weight of Mold g = 74.23 74.23
Weight of Wet Soil g = 114.48 109.07
Height of Sample cm = 1.900 1.710
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 54.15
Bulk Density Mg/m3 = 1.90 2.01
Dry Density Mg/m3 = 1.45 1.61
0.78
0.76
0.74
0.72
0.70
Void Ratio (-)
0.68
0.66
0.64
0.62
0.60
0.58
0.56
0.54
0.52
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 191.83 185.93
Wt. of Can + Dry Soil g = 166.59 166.59
Weight of Water g = 25.24 19.34
Weight of Container g = 73.81 73.81
Weight of Dry Soil g = 92.78 92.78
Water Content % = 27.2 20.8
Initial Final
Wt of Wet Soil + Mold g = 191.83 185.93
Weight of Mold g = 73.81 73.81
Weight of Wet Soil g = 118.02 112.12
Height of Sample cm = 1.900 1.736
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 54.99
Bulk Density Mg/m3 = 1.96 2.04
Dry Density Mg/m3 = 1.54 1.69
0.70
0.68
0.66
0.64
0.62
Void Ratio (-)
0.60
0.58
0.56
0.54
0.52
0.50
0.48
0.46
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 194.35 188.47
Wt. of Can + Dry Soil g = 169.88 169.88
Weight of Water g = 24.47 18.59
Weight of Container g = 73.90 73.90
Weight of Dry Soil g = 95.98 95.98
Water Content % = 25.5 19.4
Initial Final
Wt of Wet Soil + Mold g = 194.35 188.47
Weight of Mold g = 73.90 73.90
Weight of Wet Soil g = 120.45 114.57
Height of Sample cm = 1.900 1.763
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 55.83
Bulk Density Mg/m3 = 2.00 2.05
Dry Density Mg/m3 = 1.59 1.72
0.80
0.75
Void Ratio (-)
0.70
0.65
0.60
0.55
0.50
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 189.88 189.35
Wt. of Can + Dry Soil g = 164.03 164.03
Weight of Water g = 25.85 25.32
Weight of Container g = 73.97 73.97
Weight of Dry Soil g = 90.06 90.06
Water Content % = 28.7 28.1
Initial Final
Wt of Wet Soil + Mold g = 189.88 189.35
Weight of Mold g = 73.97 73.97
Weight of Wet Soil g = 115.91 115.38
Height of Sample cm = 1.900 1.758
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 55.68
Bulk Density Mg/m3 = 1.93 2.07
Dry Density Mg/m3 = 1.50 1.62
0.95
0.90
0.85
Void Ratio (-)
0.80
0.75
0.70
0.65
0.60
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 186.87 180.85
Wt. of Can + Dry Soil g = 158.91 158.91
Weight of Water g = 27.96 21.94
Weight of Container g = 73.42 73.42
Weight of Dry Soil g = 85.49 85.49
Water Content % = 32.7 25.7
Initial Final
Wt of Wet Soil + Mold g = 186.87 180.85
Weight of Mold g = 73.42 73.42
Weight of Wet Soil g = 113.45 107.43
Height of Sample cm = 1.900 1.781
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 56.39
Bulk Density Mg/m3 = 1.89 1.90
Dry Density Mg/m3 = 1.42 1.52
0.75
0.70
Void Ratio (-)
0.65
0.60
0.55
0.50
0.45
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 197.28 193.49
Wt. of Can + Dry Soil g = 172.00 172.00
Weight of Water g = 25.28 21.49
Weight of Container g = 77.30 77.30
Weight of Dry Soil g = 94.70 94.70
Water Content % = 26.7 22.7
Initial Final
Wt of Wet Soil + Mold g = 197.28 193.49
Weight of Mold g = 77.30 77.30
Weight of Wet Soil g = 119.98 116.19
Height of Sample cm = 1.900 1.776
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 56.25
Bulk Density Mg/m3 = 1.99 2.07
Dry Density Mg/m3 = 1.57 1.68
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P9-B1 7.50 51 22 29
P11-B1 9.50 34 17 17
P12-B3 11.30 35 17 18
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P28-B1 24.50 56 25 31
P34-Q2 31.10 49 21 28
P38-UU1 34.90 56 26 30
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P52-Q1 48.60 48 22 26
P54-Q1 51.25 29 18 11
P59-B2 54.90 61 28 33
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P73-B1 66.70 22 16 6
P75-Q1 68.70 40 20 20
P81-B1 74.60 61 28 33
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
P98-UU1 91.80 63 31 32
P103-Q1 96.65 44 21 23
P108-UU1 101.70 69 32 37
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
CV CE
60
50
Plasticity Index (%)
CH
ME
40
CI
A-Line
30 MV
CL
20
MH
10
ML MI
0
0 20 40 60 80 100 120
Key to Terms Used:
Liquid Limit (%)
Soil Types Plasticity
C - Clay L - Low
M - Silt I - Intermediate
H - High
V - Very high
E - Extremely high
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P7-B2 6.20 3 59 23 16
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P13-B3 11.50 34 62 4 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P34-Q2 30.50 37 63 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P43-B2 39.50 27 61 12 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P54-Q1 50.50 28 64 7 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P72-Q1 65.50 33 63 4 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P81-B1 74.50 39 61 0 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P98-UU1 91.50 36 56 8 0
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
P112-Q1 105.50 12 31 50 7
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
Percent Finer by Weight
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10 100
* Where an hydrometer test was not carried out, this figure represents the total fines content, i.e. particles less than 63 microns in diameter
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
70
60
50
Deviator Stress (kPa)
40
30
20
10
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
110
100
90
80
Deviator Stress (kPa)
70
60
50
40
30
20
10
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
100
90
80
70
Deviator Stress (kPa)
60
50
40
30
20
10
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
200
180
160
140
Deviator Stress (kPa)
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
200
180
160
140
Deviator Stress (kPa)
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
220
200
180
160
Deviator Stress (kPa)
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
240
220
200
180
160
Deviator Stress (kPa)
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
260
240
220
200
180
Deviator Stress (kPa)
160
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
350
300
250
Deviator Stress (kPa)
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
260
240
220
200
180
Deviator Stress (kPa)
160
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
240
220
200
180
160
Deviator Stress (kPa)
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
250
200
Deviator Stress (kPa)
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
260
240
220
200
180
Deviator Stress (kPa)
160
140
120
100
80
60
40
20
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
400
350
300
Deviator Stress (kPa)
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
450
400
350
Deviator Stress (kPa)
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
500
450
400
350
Deviator Stress (kPa)
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
400
350
300
Deviator Stress (kPa)
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
450
400
350
Deviator Stress (kPa)
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
550
500
450
400
Deviator Stress (kPa)
350
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
450
400
350
Deviator Stress (kPa)
300
250
200
150
100
50
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
900
800
700
Deviator Stress (kPa)
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
500
Deviator Stress (kPa)
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
600
500
Deviator Stress (kPa)
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
700
600
500
Deviator Stress (kPa)
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
800
700
600
Deviator Stress (kPa)
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
1,100
1,000
900
800
Deviator Stress (kPa)
700
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
1,100
1,000
900
800
Deviator Stress (kPa)
700
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
900
800
700
Deviator Stress (kPa)
600
500
400
300
200
100
0
0 4 8 12 16 20
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
0.90
0.85
Void Ratio (-)
0.80
0.75
0.70
0.65
0.60
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 189.77 183.69
Wt. of Can + Dry Soil g = 161.84 161.84
Weight of Water g = 27.93 21.85
Weight of Container g = 76.67 76.67
Weight of Dry Soil g = 85.17 85.17
Water Content % = 32.8 25.7
Initial Final
Wt of Wet Soil + Mold g = 189.77 183.69
Weight of Mold g = 76.67 76.67
Weight of Wet Soil g = 113.10 107.02
Height of Sample cm = 1.900 1.731
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 54.82
Bulk Density Mg/m3 = 1.88 1.95
Dry Density Mg/m3 = 1.42 1.55
0.75
0.70
Void Ratio (-)
0.65
0.60
0.55
0.50
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 194.38 187.69
Wt. of Can + Dry Soil g = 168.38 168.38
Weight of Water g = 26.00 19.31
Weight of Container g = 76.18 76.18
Weight of Dry Soil g = 92.20 92.20
Water Content % = 28.2 20.9
Initial Final
Wt of Wet Soil + Mold g = 194.38 187.69
Weight of Mold g = 76.18 76.18
Weight of Wet Soil g = 118.20 111.51
Height of Sample cm = 1.900 1.719
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 54.44
Bulk Density Mg/m3 = 1.96 2.05
Dry Density Mg/m3 = 1.53 1.69
0.80
0.75
0.70
Void Ratio (-)
0.65
0.60
0.55
0.50
0.45
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 195.61 187.45
Wt. of Can + Dry Soil g = 169.17 169.17
Weight of Water g = 26.44 18.28
Weight of Container g = 76.42 76.42
Weight of Dry Soil g = 92.75 92.75
Water Content % = 28.5 19.7
Initial Final
Wt of Wet Soil + Mold g = 195.61 187.45
Weight of Mold g = 76.42 76.42
Weight of Wet Soil g = 119.19 111.03
Height of Sample cm = 1.900 1.703
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 53.95
Bulk Density Mg/m3 = 1.98 2.06
Dry Density Mg/m3 = 1.54 1.72
0.90
0.85
0.80
Void Ratio (-)
0.75
0.70
0.65
0.60
0.55
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 191.73 185.76
Wt. of Can + Dry Soil g = 163.90 163.90
Weight of Water g = 27.83 21.86
Weight of Container g = 76.67 76.67
Weight of Dry Soil g = 87.23 87.23
Water Content % = 31.9 25.1
Initial Final
Wt of Wet Soil + Mold g = 191.73 185.76
Weight of Mold g = 76.67 76.67
Weight of Wet Soil g = 115.06 109.09
Height of Sample cm = 1.900 1.758
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 55.68
Bulk Density Mg/m3 = 1.91 1.96
Dry Density Mg/m3 = 1.45 1.57
0.82
0.80
0.78
0.76
0.74
Void Ratio (-)
0.72
0.70
0.68
0.66
0.64
0.62
0.60
0.58
0.56
0.54
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 191.78 184.49
Wt. of Can + Dry Soil g = 164.95 164.95
Weight of Water g = 26.83 19.54
Weight of Container g = 73.05 73.05
Weight of Dry Soil g = 91.90 91.90
Water Content % = 29.2 21.3
Initial Final
Wt of Wet Soil + Mold g = 191.78 184.49
Weight of Mold g = 73.05 73.05
Weight of Wet Soil g = 118.73 111.44
Height of Sample cm = 1.900 1.744
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 55.24
Bulk Density Mg/m3 = 1.97 2.02
Dry Density Mg/m3 = 1.53 1.66
0.66
0.64
0.62
0.60
0.58
Void Ratio (-)
0.56
0.54
0.52
0.50
0.48
0.46
0.44
0.42
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 194.33 190.39
Wt. of Can + Dry Soil g = 173.41 173.41
Weight of Water g = 20.92 16.98
Weight of Container g = 73.32 73.32
Weight of Dry Soil g = 100.09 100.09
Water Content % = 20.9 17.0
Initial Final
Wt of Wet Soil + Mold g = 194.33 190.39
Weight of Mold g = 73.32 73.32
Weight of Wet Soil g = 121.01 117.07
Height of Sample cm = 1.900 1.793
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 56.77
Bulk Density Mg/m3 = 2.01 2.06
Dry Density Mg/m3 = 1.66 1.76
0.68
0.66
0.64
0.62
Void Ratio (-)
0.60
0.58
0.56
0.54
0.52
0.50
0.48
1 10 100 1,000 10,000
Cc Compressibility Index
pc' Preconsolidation Pressure
Tested By:
TOTAL SOUTH PARS 11 LIMITED GSPL
Checked By:
Initial Final
Wt. of Can + Wet Soil g = 200.50 196.99
Wt. of Can + Dry Soil g = 175.95 175.95
Weight of Water g = 24.55 21.04
Weight of Container g = 77.30 77.30
Weight of Dry Soil g = 98.65 98.65
Water Content % = 24.9 21.3
Initial Final
Wt of Wet Soil + Mold g = 200.50 196.99
Weight of Mold g = 77.30 77.30
Weight of Wet Soil g = 123.20 119.69
Height of Sample cm = 1.900 1.795
Diameter of Sample cm = 6.35 6.35
Volume of Sample cm 3 = 60.18 56.84
Bulk Density Mg/m3 = 2.05 2.11
Dry Density Mg/m3 = 1.64 1.74
APPENDIX A6
REPRESENTATIVE SAMPLE PHOTOGRAPHS
SPD12
SPD13
APPENDIX A7
TIDAL VARIATIONS
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - SOUTH PARS SPD13-1 LOCATION CPC
Predicted & Measured Tidal Variations 31 July - 02 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to Bahragan using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
03.08.05 04.08.05 05.08.05
Time (hours) Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
End of SPD13-1
1.0
0.5
Start of SPD13-2
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - SOUTH PARS SPD13-1 & SPD13-2 LOCATIONS CPC
Predicted & Measured Tidal Variations 03 - 05 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to Bahragan using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
05.08.05 06.08.05 07.08.05
Time (hours) Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - SOUTH PARS SPD12-1 LOCATION CPC
Predicted & Measured Tidal Variations 05 - 07 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to Bahragan using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
09.08.05 10.08.05 11.08.05
Time (hours) Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - SOUTH PARS SPD12-2 LOCATION CPC
Predicted & Measured Tidal Variations 09 - 11 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to Bahragan using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
11.08.05 12.08.05 13.08.05
Time (hours) Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG OB1-1 & OB1-2 LOCATIONS CPC
Predicted & Measured Tidal Variations 11 - 13 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB1 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
13.08.05 14.08.05
Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG OB2-1 & OB2-2 LOCATIONS CPC
Predicted & Measured Tidal Variations 13 - 14 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB2 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
14.08.05 15.08.05
Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG E6-1 & E6-2 LOCATIONS CPC
Predicted & Measured Tidal Variations 14 - 15 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB2 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
15.08.05 16.08.05
Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG E2-1 & E2-2 LOCATIONS CPC
Predicted & Measured Tidal Variations 15 - 16 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB2 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
17.08.05 18.08.05
Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG E8-1 & E8-2 LOCATIONS CPC
Predicted & Measured Tidal Variations 17 - 18 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB2 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
18.08.05 19.08.05
Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG E9-1 LOCATION CPC
Predicted & Measured Tidal Variations 18 - 19 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB2 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7
19.08.05 20.08.05
Time (hours) Time (hours)
0:00 6:00 12:00 18:00 0:00 0:00 6:00 12:00 18:00 0:00
3.0
2.5
Tidal variation (m above CD)
2.0
1.5
1.0
0.5
0.0
Drawn
TOTAL SOUTH PARS 11 LTD - PARS LNG E7-1, E1-1, E5-1 and E4-1 LOCATIONS CPC
Predicted & Measured Tidal Variations 19 - 20 August 2005 Checked
RC
Predicted: Approved
Admiralty Co-Tidal Atlas, Persian Gulf, NP214, referenced to OB2 using Simple Harmonic Method SM
Date Report No. Appendix No.
Measured:
Echo sounder readings recorded onboard 27.10.05 WRE/8207/03/05/85 A7