From 20011 up to Now : Fuji- CAC Corporation
Responsibilities:
Management project, control schedule, cash flow, cost project, control and monitoring
quality project to the ensure complete project successful ,operation stack holder ,
contractor Manage status of all project, Check daily jobs of all project management
team members. Responsible for checking the phases of all projects including phases
closing reports,
- Reparse and update Business Plan relating to PM. Project manager Process ,
Management MEP
Management Design, construction, commissioning, service electrical MV, LV system,
automation system, FA, CCTV, MATV, PA, ACCESS DOOR, SMART HOME,
HVAC, ACMV, PMS, FIRE FIGHTING system, waste water treatment , water supply
system , guide line design PCS 7, Scada, DCS for projects EPC for oil and gas,
industry. Factory , food and beverages , FPSO, JACK UP, RIG UP, PLATFORM , high
Page: 2
building. Management project, control schedule, cash flow, cost project, control and
monitoring quality project to the ensure complete project successful ,operation stack
holder , contractor , checking design manage and installing for boiler system, air
compressor, oil pump, utility system, issue specification, data sheet and selection for
equipment of jack up, platform, manufacture oil and gas , food, beverages chemical,
thermal power plant, hydro power plant……Feature project
Project EPC Cement Dong Banh plant ( 2011)
+ main duty :
Management project, control schedule, cash flow, cost project, control and
monitoring quality project to the ensure complete project successful ,operation stack
holder , contractor Manage status of all project Check daily jobs of all project
management team members\ Responsible for checking the phases of all projects
including phases closing reports Reparse and update Business Plan relating to PM
Checking and to guide design electrical system, ELV system, firefighting, waste
water treatment, water supply, automation system, pneumatic system, HVAC
comply with standards IEC,IEEE, ANSI, NEMA,BS, NFPA, ASHREA,SMACNA,
NEC, PHCC, ASPE ,LEED Issue specification for MEAP project Issue BOM for
project Check and approval shop drawing, spec equipment for MEAP
Project EPC Cement Nam Son plant (2011)
Management project, control schedule, cash flow, cost project, control and
monitoring quality project to the ensure complete project successful to guide design
electrical system, ELV system, fire fighting, waste water treatment, water supply,
automation system, pneumatic system, HVAC comply with standards IEC, IEEE,
ANSI, NEMA,BS NFPA, ASHREA, SMACNA, NEC, PHCC, ASPE Issue
specification for MEAP project Issue BOM for project Check and approval shop
drawing, spec equipment for MEP
Manufacture Bunge plant
+ scope of work: construction electrical system, automation system, ELV system,
design switchboards system
* Main duty
: Project engineering manage, check drawings, revise design to comply with IEEE,
ANSI , NFPA, ASHREA, NEMA, API standards, issue BOQ, to manage technical
project
Hydro power Song Bung 2 plant (2012)
+ scope of work: construction electrical system for utility , automation system , ELV
system, design switchboards system for utility
Page: 3
* Main duty
: Management project, control schedule, cash flow, cost project, control and
monitoring quality project to the ensure complete project successful, working with
stack holder
Project engineering manage, check drawings, revise design to comply with IEC,
NFPA, ASHREA, NEC, LEED standards, issue BOQ, to manage technical project
- Leader phase testing & commissioning
Manufacture COCACOLA Thủ Đức ( 2013)
+ scope of work: construction electrical system, automation system, ELV system,
design switchboards system
* Response: Project engineering manager, check design , revise design to
comply with IEC ,NEMA, IEEE, NFPA, ASHREA, NEC, NFC, LEED standards
issue BOQ, to manage technical project
Project CUU LONG jack up (2013)
Management design synchronizing, power limit, top driver, drilling consoler
system comply with ANSI, NEMA, API, ABS, DNV IEEE, NFPA, NEC
standards
Project DAI HUNG platform
Guide design synchronizing, power limit, well heat system, electrical
system, HVAC for platform comply with ANSI, NEMA, API, ABS, DNV IEEE,
NFPA, NEC, ASHREA standards
Manufacture COCACOLA CAMBODIA ( 2015)
+ scope of work: construction electrical system, automation system, ELV
system, design switchboards system
* Response: : Management project, control schedule, cash flow, cost
project, control and monitoring quality project to the ensure complete project
successful , working with stack holder
Project engineering manager, check design , revise design to comply with IEC
,NEMA, IEEE, NFPA, ASHREA, NEC, NFC, LEED standards issue BOQ, to
manage technical project
Manufacture Nutreco ( 2016)
+ scope of work: Management design and construction electrical system,
automation system, ELV system, design switchboards system, HVAC system
* Response: Project engineering manager, check design , revise design to
comply with IEC ,NEMA, IEEE, NFPA, ASHREA, NEC, NFC, LEED standards
issue BOQ, to manage technical project
Feature project
S11 building, S7-S8 building,S1 building, R1 building, R9 building,Tan Thuan
industry zone, building 401 HAM TU, shopping mall center district 7, office
building No 20 CONG HOA.
From 2004 to 2007: KIEN THO electrical technical company in Ho Chi Minh city
EDUCATION
Certificate of Supervision.
SKILLS
Foreign languages: English
Computer knowledge:
+ Microsoft Office
+ AutoCAD
+ Ecodial
+ Doc win