CURRICULUM VITAE

GENERAL INFORMATION

Full name: Quang Nguyen Phạm


Date of birth: 1976
Gender: Male
Marital status: Married
Address: Ho Chi Minh city
E mail: nguyenquang27021976@gmail.com
Cell phone: 0902449916

EXPERIENCE
From 10/2020 up to Now Techgel

Position: Project director

Responsibilities:

 Management Design, construction, testing and commissioning of for project


according international standard such as IEEE, IEC, LEED, NFPA, ASHREA, BS,
AS …
 Guide and review design and checking specification, comment and approve design,
specification, BOQ of project
 Issue tender document included specification, construction drawing, technical data
and other document relevant
 Issue procurement plan, issue BOQ, data sheet for equipment
 Checking and approve all shop drawing, MOS, BOQ, T&C procedure of project in
phase construction
 Analyse and control, risks that may occur during project implementation
 Management project included but unlimited such as
Page: 2

- Control and monitoring schedule project, from phase design to hand over of MEP
system to the complete target project
- Working with stack holder process every issue on site
Feature project
+ THAI HOA POWER WIN FARM (2021)
+ Project scale : 90MW
+ Scope of work: Management design and construction power win turbine and
Substation, transmission line 220 KV
* Main responsibility:
- Issue and management design plan, Tender plan, construction plan
- Issue Guide line electrical in phase design and construction
- Mentoring and checking Engineers in phase design and construction
- Issue check list design and construction according NEC, tracking progress
- Issue T & C procedure for facility system
- Review design 220KV substation, and facility to the ensure compliance with
customer required
- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet
- Review calculation transformer, total load, selection cable, grounding, illuminance
lighting and function protection relay
- Review quality control plan, BOQ, MOS, HSE plan of sub- contract…
- Working with stack holder such as architect team, structure team process every
issue on site-
From 2017 to 2020: Hyundai engineering & construction
Position: deputy electrical manager.

Responsibilities:

 Management Design, construction, testing and commissioning, service electrical hight


voltage system medium voltage system, LV system, for project according
international standard such as IEEE, IEC, NFPA, BS, AS …
Page: 3

 Guide and review design and checking specification, comment and approve design,
specification, BOQ of project
 Guide and review design of High Voltage substation, facility system and Low
Voltage switchboards, motor control systems, transformer, generators, UPS system,
grounding system Cable tray system, synchronized system, High Voltage and Low
Voltage cable systems, lighting and small power systems,
 Calculation boundary arc flash, Voltage drop, parameter protect relay, load demand,
starting method for motor controller
 Issue tender document included specification, construction drawing, technical data
and other document relevant
 Checking and approve all shop drawing, MOS, BOQ, T&C procedure of project in
phase construction
 Analyse and control, risks that may occur during project implementation
 Management project included but unlimited such as
 Control and monitoring schedule project, from phase design to hand over of MEP
system to the complete target project
 Issue man power, HSE plan, schedule project
 Issue and training IOM to the customer, leader hand over electrical system to client
 Working with stack holder process every issue on site
 Feature project
Coal fired thermal power plant Jimah power
Project scale: 2000MW with 2 unit ( 1000MW/unit)
+ Scope of work: Management design and construction BOP for project
* Main responsibility:
- Issue and management design plan, Tender plan, construction plan
- Issue Guide line electrical in phase design and construction
- Mentoring and checking Engineers in phase design and construction
- Issue check list design and construction according NEC, IEEE, ANSI tracking
progress
- Issue T & C procedure for facility system
Page: 4

- Review design HV substation, HV transmission line to the ensure compliance


with customer required
- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet
- Review calculation transformer, NGR, total load, selection cable, grounding,
illuminance lighting and function protection relay
- Review quality control plan, BOQ, MOS, HSE plan of sub- contract…
- Working with stack holder such as architect team, structure team process every
issue on site

From 2009 to 2017: PV engineering consultancy


Position: electrical manager.
Responsibilities:
 Management Design, construction, testing and commissioning, service electrical
medium voltage system, , for project according international standard such as IEEE,
IEC, EVN
 Guide and review design and checking specification, comment and approve design,
specification, BOQ of project
 Review design of High Voltage system and Low Voltage system, for project
 Issue tender document included specification, construction drawing, technical data
and other document relevant
 Checking and approve all shop drawing, MOS, BOQ, T&C procedure of project in
phase construction
 Analyse and control, risks that may occur during project implementation
 Management project included but unlimited such as
 Control and monitoring schedule project, from phase design to hand over to the
complete target project
 Issue HSE plan, schedule project
 Working with stack holder to the process every issue
 Feature project
Page: 5

- Coal fired thermal power plant Vung Ang


- Project scale 2 x 600MW
Scope of work: design BOP for power plant
+ Main duty
- Issue and management, construction plan
- Mentoring and checking electrical, mechanical Engineers in phase design and
construction
- Issue check list design and construction electrical, supply water, water treatment,
waste water treatment according NEC, IEEE and tracking progress
- Review design to the ensure compliance with customer required
- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet
- Coal fired thermal power plant Long phú 1
- Project scale 2 x 600MW
Scope of work: management design electrical system for BOP
+ Main duty
- Issue and management design plan
- Mentoring and checking electrical Engineers in phase design
- Issue check list design and construction electrical, according NEC, IEEE and
tracking progress
- Issue T & C procedure for electrical system
- Review design to the ensure compliance with customer required
- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet
- Coal fired thermal power plant Thai bình 2
- Project scale 2 x 600MW
Scope of work: design BOP for power plant
+ Main duty
- Issue and management, design plan
- Mentoring and checking electrical, Engineers in phase design
- Issue check list design and construction electrical, according NEC, IEEE and
tracking progress
- Issue T & C procedure for electrical system
Page: 6

- Review design to the ensure compliance with customer required


- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet

From 2001 to 2009: Electrical construction 2 in Ho Chi Minh city


Position: electrical leader.
Responsibilities:
 Management Design, construction, testing and commissioning, service electrical
medium voltage system, , for project according international standard such as IEEE,
IEC, EVN
 Guide and review design and checking specification, comment and approve design,
specification, BOQ of project
 Review design of High Voltage system and Low Voltage system, for project
 Issue tender document included specification, construction drawing, technical data
and other document relevant
 Checking and approve all shop drawing, MOS, BOQ, T&C procedure of project in
phase construction
 Analyse and control, risks that may occur during project implementation
 Management project included but unlimited such as
 Control and monitoring schedule project, from phase design to hand over to the
complete target project
 Issue HSE plan, schedule project
 Working with stack holder to the process every issue
 Feature project

+ Project Transmission line 110KV DAMI -HAM THUAN (2008)


Scope of work: Construction substation and transmission line
+ Main duty
- Issue and management, construction plan
- Mentoring and checking electrical, mechanical Engineers in phase design and
construction
Page: 7

- Issue check list design and construction electrical, supply water, water treatment,
waste water treatment according NEC, IEEE and tracking progress
- Issue T & C procedure for electrical system
- Review design to the ensure compliance with customer required
- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet
+ Project Transmission line 110KV SOUTH VIET NAM (2011)
Scope of work: Construction substation and transmission line
+ Main duty
- Issue and management, construction plan
- Mentoring and checking electrical, mechanical Engineers in phase design and
construction
- Issue check list design and construction electrical, supply water, water treatment,
waste water treatment according NEC, IEEE and tracking progress
- Issue T & C procedure for electrical system
- Review design to the ensure compliance with customer required
- Checking and Issue RFQ included specification, drawing, data sheet, calculation
sheet

EDUCATION

 1996-2001 University Polytechnics Ho Chi Minh city - Major: Electrical system


power.

 Certificate level 1 of electrical Design

 Certificate of Supervision. Level 1

 Certificate of Project Manager

SKILLS
 Foreign languages: English
 Computer knowledge:
Page: 8

+ Microsoft Office
+ AutoCAD
+ ETAPl
+ PDMS