You are on page 1of 8

Phone: +923212423631, +923112511105

SENIOR ELECTRICAL DESIGN ENGINEER Email: mudassir160@gmail.com


MUHAMMAD MUDASSIR MIRZA Linkedin:linkedin.com/in/muhammad-
mudassir-979b3992
Address: R-960, Block-16, Dastagir,
Karachi, Pakistan
____________________________________________________________________________

OBJECTIVE

As a Focused and result-oriented professional, in the Oil & Gas Industry with a proven track
record in Design Engineering and Consultancy, pursuing a new career opportunity in Engineering
Design & Management where my extensive experience can be utilized in the Oil & Gas Sector
that can contribute to the success of the organization.

JOB HIGHLIGHTS

Over Twenty-Four (24) years of Experience as a Senior Electrical Design Engineer with
accumulated technical expertise through involvement in the Engineering Design of wide range
of plants including:
• Liquefied Petroleum gas (LPG)
• Oil and gas production
• Petroleum refining
• Petrochemicals

Having being involved in Conceptual Engineering, FEED & Detailed Engineering. Also involved
in close coordination with Clients, Contractors, Stakeholders, Operators, Uitlity Companies,
Government Departments, Other Disciplines etc.

As a Principal & Lead Electrical Engineer have worked on FEED documents like Hazardous
Area Classification Drawings, Electrical system Description, Key / Overall Single Line
Diagrams, Conceptual Substation Layouts, Conceptual Cable Routing Layouts, Grounding &
Lighting Drawings, Electrical Equipment List, Electrical Equipment Specifications &
Datasheets, Electrical Load List, Calculations, Preliminary Cable Schedule Electrical System
Studies such as Short Circuit Study, Load Flow Analysis, Motor Starting Analysis, Protective
Device Coordination Study, Arc Flash Hazard Analysis.

During Detailed Engineering Stage have worked upon documents such as Identification of Power
Requirement in terms of utility, self-generation, AC/DC UPS as emergency power schematic
diagram, AC/DC UPS Load List and its sizing calculations, AC/DC UPS DB Single Line
diagram, AC/DC UPS Specifications and Datasheet, Electrical Load List preparation, Overall &
MDB & MV/LV Switchgear Single Line Diagrams, MV / LV Switchgear Specification /
Datasheet, Preparation from Basic conceptual / FEED to Detailed Engineering Stage of the
Project, Preparation of Cable Schedule for Power & Control cables for Transformers, Generators,
Motors, Main and Sub-distribution DB’s, Designing of Cabling System involving cable sizing
and Cable layouts comprising of Cable Trench and Cable trays, Designing of 13.8/6.6/3.3 kV
substations or retrofitting the existing one including equipment sizing & selection (such as
Transformer, DC Batteries & Chargers, MV / LV Switchgear), Auxiliary Power System Design,
GA drawings for equipment placement, Designing of Earthing system involving calculation of
Grounding Grid system for substation and the earthing loop for the facility, Designing of
1|C V - M u d a s s i r -E E
Lightning Protection System along with calculations, Genset, Transformer & UPS Sizing and
designing different power schemes for distribution based on ATS & AMF.

Furthermore have worked on documents during Detailed Engineering stage such as Designing of
Lighting system for both indoor / outdoor facilities involving Lighting Calculations, Lighting
cable schedule & schematics, Proposing upstream interconnections of Power Source with the
existing Electrical systems and / or with Distribution DB’s. Performing Adequacy Checks on the
proposed tie-ins to which new Electrical Loads are envisaged to be connected.

Classification of Hazardous Areas and Selection of Electrical Enclosures to be specified in the data
sheets and specifications as per NEC / NFPA / IEC Standards. Familiar with API RP500, Relevant
IEC, NEC / NFPA Standards.

Electrical design including Selection and Sizing of Electrical equipment including sizing of
cables Switchgear design and selection along with control schematics / philosophies, Logic
diagrams, Electrical equipment data sheets, control wiring & cabling, Electrical specification,
Datasheets, Material take off, BOQ etc. Preparation of Tie-in Schedule in case of using Spare
circuits from Existing Electrical systems.

Performed the following Electrical System Studies:

Short Circuit Analysis, Load Flow Analysis, Motor Starting Analysis, Protective Device
Coordination Study, Arc Flash Hazard Analysis.

OIL & GAS INDUSTRY WORK HISTORY

ILF Consulting Engineers (January 2023 till date)

Currently Working as a Lead Electrical Engineer in ILF. The project that is recently at hand is
the Detailed Engineering of Nawara, Tunisia Front End Compression. The objective of the
project is to increase the pressure of the gas coming from the depleted wells to carry it to the
Central processing Facility (CPF) at one end.

Zishan Engineers (Pvt.) Ltd (2007 to 2023)

Serving as a Lead Electrical Engineer since 2007, responsible for Conceptual, FEED & Detailed
Engineering Design Works on different Oil & Gas Projects as summarized below:

Lead Electrical Engineer on GASCO Project, Saudia Arabia

The project was to replace all of the LPG plants (27 Nos.) installed across seven cities of KSA
with the modern technology plants. Our responsibilities on this project as owner’s consultant was
to review the design submitted by EPC companies like KOSAN CRISPLANT & SIRAGA and
Project Management consultancy. The Engineering deliverables comprised of Cable Schedule,
Electrical Load list, Cable Sizing Calculations, Single Line Diagrams, Short circuit Study,
Earthing Layouts, Cable layouts, Control Wiring Diagrams.

Principal Electrical Engineer on Petro Rabigh Project, Saudia Arabia

2|C V - M u d a s s i r -E E
Front End Engineering and Design Works for EPC Contractor. Preparation of proposals for tie-
ins of the New system to the existing system. Preparation of preliminary documents like Cable
Schedule, Electrical Load List, Cable layouts, Earthing and Lighting Layouts in accordance with
the Existing Petro Rabigh Industrial Conversion Park, Rabigh, Philosophy.

Senior Electrical Engineer on Aramco Fire Stations Projects, Saudia Arabia

Detailed Engineering design of Electrical system for 2 ASL crude oil loading bays. Scope
includes the Engineering of developing industrial Electrical Network for distribution of Power
supply for the Fire system. Preparation of preliminary documents like Cable Schedule, Electrical
Load List, Cable layouts, Earthing and Lighting Layouts in accordance with the Existing Aramco
Design.

Lead Electrical Engineer on Saudi Arabian Parsons Limited Yanbu Project, Saudi
Arabia

Detailed Engineering Design of 13.8 kV substations, retrofitting the existing one including
equipment sizing & selection (such as Transformer, DC Batteries & Chargers, MV / LV
Switchgear), Auxiliary Power System Design, GA drawings for equipment placement.

Principal Electrical Engineer on North piers RAS TANURA Project, Saudia Arabia

The project involved developing Electrical Distribution Network for new evacuation pumps on
Gasoline loading arms headers at north piers RAS TANURA and proposed Electrical tie-ins with
the existing Power System. It also involved the Adequacy check of the existing Electrical System
Power Supply system for addition of new Electrical system.

Senior Electrical Engineer on New facilities for BRRI Oil & Water injection Wells Project

Front-end engineering and design (FEED) studies for the new gas oil separation plant in the Abu
Ali Island, as well as for the additional gas processing facilities at the Khursaniyah gas treatment
facility for the Berri oil field expansion project. Prepared the Engineering Design Package for
the Detailed Engineering Contractor.

Lead Electrical Engineer on Qurayyah Sea Water Plant (QSWP) Project, Saudi Aramco

The project was to replace existing high-cost titanium pumps with the non-metallic sealless pump
for hypochlorite distribution. QSWP has six hypochlorite pumps supplying continuous
hypochlorite for its operation of seawater treatment. These pumps were made of titanium, which
is costly material to produce parts. These pumps are continuously operated for operational
requirement and also get damaged quite frequently due to many reasons of its process
characteristics and some abnormality. Evaluation of the Existing Electrical System for adequacy
of the newly replaced pumps and proposed modifications and further new Electrical System for
the new pumps according to the New Pump kW ratings. The project also involved modifications
in the earthing system.

Lead Electrical Engineer on Issam kabbani khairy (Ikk) complex and ware houses
Project, (DAMMAM), Saudia Arabia

3|C V - M u d a s s i r -E E
The project involved Building Electrification works and Earthing lightning protection for the
complex and different warehouses. Proposed electrical Tie-ins for building DB’s with the
existing Electrical system which also involved adequacy check of existing system components
such as Transformers, Gensets, Bus bar ampacities and kA ratings, cable sizes etc.

Lead Electrical on SABIC Project, Saudia Arabia

The project was related to Revamp of MCC Room which involved evaluation of safety distances
for operator’s movement & their maintenance activities according to industrial codes and
standards such as NFPA, NEC. Also proposing modifications in terms of latest ELV systems
technologies such as Fire alarm, CCTV system, Access Control system etc. Also performed
adequacy checks study on Switchgear Bus bar sizes i.e., ampacities & kA ratings.

Lead Electrical Project Oman Refineries and Petrochemicals Project, Sultanate of Oman

FEED design and proposed electrical tie-in confirmation for the expansion and the modification
works for the truck loading facilities at Sohar Refinery Complex.

Lead Electrical Engineer Fujairah Project, UAE

Electrical Engineering Design Services which include LV & MV distribution, Lighting system,
Earthing and System Analysis for the construction of new oil terminal with four new jetties and
expansion in the existing loading and off-loading facilities.

Principal Electrical Engineer Gas Export Pipeline Project, Badra-Zubaidah Republic of


Iraq

The job included the Engineering Design of Electrical systems establishing the Power
requirements of multiple loads like Leak Detection system, Cathodic Protection system, F & G
systems, HIPPS, PAGA system, Access Control System, LAN system, Telephone System, ESD
system, Analyzer Skid, Metering Skid, Lighting Loads, etc. by allocating Feeders from existing
electrical system through bringing New PDB’s, UPS & Generators into the system with an ATS
arrangement. Along with the Engineering Documents, Material Specifications & Datasheets,
Material requisition (MR) and Technical Bid Evaluation (TBE) were also in SOW.

Lead Electrical Engineer CNERGYICO PK LIMITED Project (formerly BYCO)

The projects are related to Detailed Engineering for KEROSENE HYDROTREATER (KHT)
& SULPHUR RECOVERY UNIT (SRU). These are relocated units. The detailed engineering
involves Adequacy checks of Existing Electrical Equipment and sizing for New Electrical
equipment as well. There multiple tie-ins of New Electrical loads with the existing Electrical
system. The network system voltages are 11 kV, 3.3 kV & 0.415 kV.

Lead Electrical Engineer on Attock Petroleum limited (APL) Projects

The job included designing of Electrical networks / system and preparation of construction
packages for the contractors of the following sites:

Mehmoodkot Oil Terminal Shikarpur Oil Terminal


Sahiwal Oil Terminal
4|C V - M u d a s s i r -E E
Port Qasim Oil Terminal, Karachi

The scope of work also included review & evaluation of technical documents submitted by the
contractor, Procurement Assistance and Bid evaluation.

Lead Electrical on Engineer United Energy Pakistan (UEP) Project (formerly British
Petroleum)

Proposed modifications in the design of cabling system of the KAUSAR Phase II project, a
Gas Processing Facility, as per NEC Article 501, since the cabling system was on closed
conduit system. Evaluation of Electrical & Instrumentation equipment Hazardous ratings as per
Hazardous Area Classification.

Lead Electrical Engineer on M/s K-Electric 10 MW & 30 MW Power Plants for Korangi
& Site Plants each.

The scope included for the Power connection of 132 kV Grid Auxiliary Loads & Earthing &
11 kV Generation and its Auxiliaries. The Engineering Design documents involved Earthing
Layout and calculations, Lighting Calculation and Layout, Lightning Calculations and Layout,
Electrical Load list, Cable Schedule, Cable Sizing Calculations, Control Wiring Diagrams, AC
/ DC UPS Sizing Calculations, Cable layouts, Transformer Sizing Calculations etc.

Principal Electrical Engineer on IFFCO Project

The expansion includes New 200 TPD Edible Oil Refinery, Margarine Producing Unit,
Hydrogen Generation Unit and Packaging of the Products. The Electrical Works included the
design of Low Voltage Electrical Network which involved Power Transmission on 11 KV
Network at both the source and receiving end. The job was mainly based on producing
engineering deliverables of different electrical items namely, Transformers, Standby Diesel
Generators, Power (LV & MV) and Control Cables, Cable Trays, Lighting and Earthing
accessories.

Lead Electrical Engineer on Bosicor Project

Electrical Design Works of M/s. Bosicor Pakistan Limited. An Oil Refinery Unit Revamp
Project The project involved the revamping of the existing facility at Mozakund, Hub. The
engineering included the cable layouts for the new cabling and earthing system which included
the preparation of the cable schedule, cable sizing, Electrical Load list, SLD, Earthing cable
schedule, Power cable & earthing cable layouts.

Lead Electrical Engineer on Overseas Oil Trading Oil Company Project

Designing of Low Voltage Electrical System for M/s. Overseas Oil Trading Company (OOTC)
Machike Terminal. The design works was mainly comprising of Sizing of Equipments like
WAPDA Connection Transformers, Standby Diesel Generators, LV Motors Output Power
required to maintain respective BHP at input of Pumps, Low Voltage Power and Control Cables
and Layouts of Cables, Lighting and Earthing. Also Preparation of Procurement Packages for
different electrical items comprising of relevant BOQ’s, Specifications and Data sheets.

Senior Electrical Engineer on BOPL Project

5|C V - M u d a s s i r -E E
M/s. Bosicor Oil Pakistan Limited (BOPL), Mozakund, Hub Plant. This was Oil Refinery
project comprising of several relocated units. The procurement package was based on Cable
Schedule, Respective BOQ and Extensive Cable Layout comprising mainly on cable trenches.
The cable sizing calculations was mainly the job in this project for low voltage (LV) and
medium voltage (MV) systems i.e., 415V & 3.3 kV systems.

Senior Electrical Engineer on BCPL Project

M/s. Bosicor Chemical Pakistan Limited (BCPL) This was a petrochemical plant project. The
job mainly was comprising of producing the engineering documents for Power (LV 0.415kV
& MV 6.6kV) and Control Cables, i.e., cable schedule, cable sizing calculations, Plant Area
Lighting, Lighting Calculations for outdoor area along with lighting schematics, lighting cable
schedule, Grounding of Equipments, Earthing calculations, earthing cable schedule. The
Packages consist of Specifications and Data sheets and relevant BOQ’s.

Lead Electrical Engineer on Hascombe Project

Designing of Low Voltage Electrical System for M/s. Hascombe Storage Limited (HSL)
Shikarpur, Terminal. This was an Oil storage terminal project. The design works was mainly
comprising of Sizing of Equipments like WAPDA Connection Transformers, Standby Diesel
Generators, LV Motors Output Power required to maintain respective BHP at input of Pumps,
Low Voltage Power and Control Cables and Layouts of Cables, Lighting and Earthing. Also
Preparation of Procurement Packages for different electrical items comprising of relevant
BOQ’s, Specifications and Data sheets.

Lead Electrical Engineer on LOTTE Project

Detailed Engineering Works for Catalyst Recovery Unit Project of M/s. LOTTE Pakistan PTA
Limited. The scope of work included the detailed engineering works required for the integration
of catalyst Recovery Unit with the existing system. Preparation of Engineering design packages
and Tender which included related documents like cable schedule, Lighting and Earthing
system, Cable tray layouts. System adequacy checks of the existing system for integration with
Catalyst Recovery Unit and preparation of tie-in reports.

K-Electric (Formerly KESC (2003 to 2007)

Worked in KESC as Assistant Manager (CSC_SIMZ_II), First with the Army Management and
then, after Management Change over due to privatization policy of the government, with the
Private Management and assisted the Manager (CSC_SIMZ_II) on top of all other Assistant
Managers in the Center. The job responsibilities were:

- Organize and perform the Meter Reading in the days of the monthly billing i.e., First
two weeks of every month

- Monitoring the Consumption trends of both LV & HV consumers

- Surveys of different industries to perform,

(a) the Load Analysis as per recent load scenario of the consumer, it involves the
check for the load above the 40 KW mostly.

6|C V - M u d a s s i r -E E
(b) Slowness detection of the Energy meters due to low consumption of the
particular consumer.
(c) All possible checks for theft i.e., verifying the C.T Ratio as per billing
record & etc.

(d) Check for Original KESC seals on the Energy Meter Enclosures

(e) Check for the seals of P.T on the 11 KV Consumers

(f) Verification for the correct billing tariff as per recent billing record

(g) Verification of the correct multiplying factor as per billing record

- Assessment of the supplementary bills or undercharge bills raised due to any one of
the above findings or the other

- Update the findings of the consumers in the billing record and also direct all other
Assistant Managers to update the changes for their respective consumers due to change
of Energy Meter or the other finding evaluated during the site visit.

- Organize the activities for the recovery of the revenue raised due to monthly billing

- Physically check the status of the consumer as stated in his application and verifying
that status through consumption trend of Sui Gas Bill or other possible / available
alternative i.e., Income Tax or GST submittals etc.

- Calling for the Testing of Energy Meters through Mobile Testing Van.

- Attending the staff complaints being faced during the execution of the routine
activities and offering them the best possible solutions.

- Managing the Meter Reading and Survey Staff.

- Attending the Consumers in the absence of the Manager.

Sheikh Wilayat Ahmed & Sons (2001 to 2003)

Performed as a Support Engineer for the Low Voltage Switchgear Products. The responsibilities
involved to present the product line of different switchgear items of the brands like; Fuji, LG,
MG, ABB with envisaging the product into the Client’s Electrical systems. Further
responsibilities included:

- Cost Estimation as per the company price lists and policy discounts over
multiple projects.
7|C V - M u d a s s i r -E E
- Offer the client with technical proposals customized according to their needs and
requirements.

- Target the market of upcoming and current projects, maintenance and


revamp solutions.

Systematic Engineering Services (1998 to 2001)

Served as E & I Engineer for the organization. And involved in the designing activities on the
E & I part. Responsible for designing activities for Industrial Electrical Networks in oil and gas
fields related to Low Voltage applications as per relevant Standards for Oil and Gas Industry.
Also involved in the designing for modification of existing electrical systems.

PROJECTS HIGHLIGHTS

Designing for the Electrical Network for the Metering System on one of the Keamari Oil
Terminal (KTC) of M/s. Pakistan State Oil Company Ltd. The job mainly consisted of
designing cabling system involving engineering documents like; cable schedule, cable
sizing calculations, tie-in schedule for Power tapping circuits from existing electrical
system

Designing and Supervision, Coordination for the Installation of the Radar Tank Level
Gauging System on different terminals of M/s. Shell Pakistan Ltd., namely Sheikhpura,
Rawalpindi etc.

M/s. Pak Arab Refinery Company Ltd., The scope of work included the designing of
Electrical system for Low Voltage MCC / Switchgear, replacement of 500 KVA
Transformer with 1500 KVA Transformer, cabling system comprising cable schedule
cable sizing calculations.

EDUCATIONAL QUALIFICATION

B.Eng. (Electrical): N.E.D University of Engineering & Tech., Pakistan in 1998

MBA (Finance): Karachi University of Business School, Pakistan in 2008

PROFESSIONAL AFFILIATION

• Registered professional engineer from Pakistan Engineering Council, Pakistan.

REFERENECE:

Shall be furnished upon request

8|C V - M u d a s s i r -E E

You might also like