Dimension are in millimeters unless otherwise indicated.


Dimensions indicated in the drawing are approximate.
A Actual sizes could vary at the site. It is contractor's A
responsibility to check the actual sizes and do the minor
Ceiling Level changes accordingly.
For details of Iron Mongery, refer Schedule of door
3000 - FROM FINISH FLOOR LEVEL hardware sets and Master Schedule of door hardware,
fittings and accessories.
2830 - FROM FINISH FLOOR LEVEL

Frame Width 1790


Ceiling & led down light (Works by others)
B Door Width 842 Door Width 842 ( With 5mm s/s strips as per elevation ) B

DETAIL - B1
ML-02-80529

225
Top frame (type F3 )

225
AC coated door sash

C C

Finish Opening height 2100


Door Frame height 2095
Door Sash Height 2032
Door Sash Height 2032

EQ
Frame Height 2095

300mm Long Pull handle


(Back to back fixing)
300

300
300mm Long Pull handle
(Back to back fixing)

D D
EQ

OUT IN
Automatic door bottom seal
DETAIL - B2
BLOCK 5C

ZONE 4C ZONE 4D ZONE 6C ZONE 6D


245

ML-02-80529 BLOCK 5B

FFL. FFL. FFL. ZONE 4B ZONE 4A ZONE 6B ZONE 6A

BLOCK 5A

OUT SIDE ELEVATION INSIDE ELEVATION ZONE 3C ZONE 3D


ZONE 9B
ZONE 7C ZONE 7D

E
ELEVATIONS 2 ELEVATIONS 3 SECTION - A ZONE 3B ZONE 3A
ZONE 9A
ZONE 7B ZONE 7A
E

- Scale 1:25 - Scale 1:25 ZONE 1B ZONE 1C

ZONE 2B ZONE 2A ZONE 8B ZONE 8A

ZONE 1A

A
- KEY PLAN

Finish Masonary opening width1800


F F
Door Frame width 1790 Rev. Date Desd. Description Drwn. Chk'd App'd

DETAIL - B3 Door opening width 1660 DOOR SASH DETAIL This drawing was prepared by CECB based on Architectural design drawings prepared by M/s Muditha Jayakody Associates Pvt.
Ltd, who was the Main Consultant/Architectural Consultant for Defence Headquarters Complex Project, Akuregoda till 30.09.2016.
ML-02-80529 Client DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
01. Thickness 40mm MINISTRY OF DEFENCE
IN 02. Size 842(w) x 2032(h)
Project
03. Stile 32(t) x 50(w)mm hardwood DEFENCE HEADQUARTERS COMPLEX - AKUREGODA
04. Top, Bottom& Intermediate Rail 32(t) x 50(w)mm hardwood Project Management & Procurement
06. Lock Block 32(t) x 50(w)mm hardwood PROJECT MANAGEMENT UNIT OF THE ARMED FORCES
07. Door Core 32mm Thick Fenlite core min density Architectural Consultant (with effect from 01-10-2016)

08. face 3.6(t) mm MR plywood CENTRAL ENGINEERING CONSULTANCY BUREAU


G 09. Lipping 10(t) x 40(w)mm Teak lipping Engineering , Quantity Surveying & Construction Management
G
10. Finish AC Type Coating
OUT A 11. Vision Panel N/A CENTRAL ENGINEERING CONSULTANCY BUREAU
- 415, Bauddhaloka Mawatha, Colombo 07.
12. Glass Beading N/A TEL : 0112668800 FAX: 0112687369

Construction by
CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES
Drawing Title
MAIN BUILDING
BLOCK 02
DETAIL - B4 DOOR TYPE- B1g1(HARDWARE SET NO.02)
ML-02-80530 TYPICAL DETAILED PLAN,ELEVATION & SECTION
1 PLAN Designed YGAD
Recommended
...............................................
CONSULTANT ARCHITECT / SENIOR ARCHITECT
- Scale 1:25 Drawn DSS/KKD
H Approved H
........................................
Checked TOT DGM (Architectural)
Submitted Scale Date Status
TGRS 1:25 23.12.2020
CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2 TEN
Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A3 DHQC-CECB-MB-TI-AR-DW-ML-02-80512 -
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.