NOTES :-

3000 - FROM FINISH FLOOR LEVEL


Dimension are in millimeters unless otherwise indicated.
A A
architrave (AR1) Dimensions indicated in the drawing are approximate. Actual
sizes could vary at the site. It is contractor's responsibility to
DETAIL - A8 check the actual sizes and do the minor changes accordingly.
For details of Iron Mongery, refer Schedule of door hardware
Engineered timber ML-02-80522
Frame Width 1490 Architrave Frame Width 1490
Engineered timber panel
Door Width Eq Door Width Eq Door Width Eq Door Width Eq

DETAIL - A14

E
B ML-02-80525 B

245
40mm Tk. Engineered Timber door sash
100

225

Architrave height 2850


Vision Panel
2850

Finish Opening height 2100


Frame Height 2095
Door Height 2032

Door Frame height 2095


EQ
5mm S/S strips

1200
embedded to door sash 600mm Long Pull handle
C (Back to back fixing) C

600mm Long Pull handle


(Back to back fixing) OUT IN
DETAIL - A11

EQ
ML-02-80523
950

450
D DETAIL - A5 D

225
ML-02-80520 BLOCK 5C

FFL. FFL. FFL. ZONE 4C ZONE 4D ZONE 6C ZONE 6D

BLOCK 5B

OUT SIDE ELEVATION INSIDE ELEVATION ZONE 4B ZONE 4A ZONE 6B ZONE 6A

BLOCK 5A

ZONE 9B

ELEVATIONS
ZONE 3C ZONE 3D ZONE 7C ZONE 7D

2 3 SECTION - A
- Scale 1:25 - Scale 1:25 ZONE 3B ZONE 3A
ZONE 9A
ZONE 7B ZONE 7A

ZONE 1B ZONE 1C

E ZONE 2B ZONE 2A ZONE 8B ZONE 8A E

ZONE 1A

KEY PLAN
DETAIL - A13
ML-02-80524

A
-
DOOR SASH DETAIL

F 01. Thickness 40mm F


02. Size 693(w) x 2032(h) Rev. Date Desd. Description Drwn. Chk'd App'd

03. Stile 32(t) x 50(w)mm hardwood with min density 650kg/m³ This drawing was prepared by CECB based on Architectural design drawings prepared by M/s Muditha Jayakody Associates Pvt.
Ltd, who was the Main Consultant/Architectural Consultant for Defence Headquarters Complex Project, Akuregoda till 30.09.2016.
04. Top, Bottom& Intermediate Rail 32(t) x 50(w)mm hardwood with min density 650kg/m³ Client DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
IN 06. Lock Block 32(t) x 50(w)mm hardwood with min density 650kg/m³ MINISTRY OF DEFENCE

DETAIL - A15 07. Door Core 32 mm Particle board with min density 600kg/m³ Project

08. face 3.6(t) mm MR plywood DEFENCE HEADQUARTERS COMPLEX - AKUREGODA


ML-02-80525
09. Lipping 10(t) x 30(w)mm Teak lipping Project Management & Procurement
200

PROJECT MANAGEMENT UNIT OF THE ARMED FORCES


10. Finish 0.5mm Timber veneer with AC coating
Architectural Consultant (with effect from 01-10-2016)
11. Vision Panel 6mm Thick 100mm x 1200mm laminated safety Glass / Wired Glass for Fire rated Doors
OUT 12. Glass Beading 18(w) x 32(t)mm hardwood glass beading fastened with 1(d)x30(I)mm nail CENTRAL ENGINEERING CONSULTANCY BUREAU
G G
Door Frame width 1490 13. Glazing System 20(w) x 2(t)mm fire seal and calcium silicate setting block N/A Engineering , Quantity Surveying & Construction Management

Finish Masonary opening width1500 14. Inner framing for Glass N/A CENTRAL ENGINEERING CONSULTANCY BUREAU
15. Outer Framing For Glass N/A 415, Bauddhaloka Mawatha, Colombo 07.
TEL : 0112668800 FAX: 0112687369

Construction by
CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES
A
Drawing Title
-
MAIN BUILDING
BLOCK 02
1 PLAN DOOR TYPE - A2f1(HARDWARE SET NO- 07)
- Scale
TYPICAL DETAILED PLAN, ELEVATIONS & SECTION
1:25
Designed Recommended
YGAD ...............................................
CONSULTANT ARCHITECT / SENIOR ARCHITECT
Drawn ANJ /KKD
H Approved H
........................................
Checked TOT DGM (Architectural)
Submitted Scale Date Status
TGRS 1:25 23.12.2020
CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2 TEN
Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A3 DHQC-CECB-MB-TI-AR-DW-ML-02-80507 -
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 23 December 2020

You might also like