Basic Data for Bridge works & culvert works

(as per MORTH specification no.1703.3)

1 Cement mortar 1:2 using 20mm metal

1m3 Cost of sand 324kg/m3

0.720MT cost of cement

2 Cement mortar 1:2 using 40mm metal

1m3 cost of sand 294kg/m3


0.653 MT cost of cement

3 Cement mortar 1:1.5 using 40mm

1m3 cost of sand 310kg/m3

0.688 MT cost of cement

4 Cement mortar 1:1.5 using 20mm

1m3 cost of sand 340kg/m3

0.760 Mt cost of cement

5 Cement mortar 1:1.5 using 20mm, 12mm metal (Design mix)

1m3 cost of sand 380kg/m3

0.840 Mt cost of cement

6 Cement mortar 1:1.2 using 20mm 12mm metal (Design mix)

1m3 cost of sand 450kg/m3

1.00 Mt cost of cement

Maximum cement content shall not exceed 450 kg / cum


Bridge & culvert works for 2020-2021

Basic Data for Cement mortar Cement Requirment

1 M10 (CC 1:3:6) using 40mm (Nominal Mix)

1m3 Cost of sand 186kg/m3

0.413MT cement

2 M15 (CC 1:2:4) using 20mm (Nominal Mix)

1m3 cost of sand 324kg/m3


0.720 MT cost of cement

3 M15 (CC 1:2:4) using 40mm (Nominal Mix)

1m3 cost of sand 294kg/m3

0.653 MT cost of cement

4 M20 (1:1.5) using 40mm (Nominal Mix)

1m3 cost of sand 312kg/m3

0.693 Mt cost of cement

5 M20 (1:1.5) using 20mm (Nominal Mix)

1m3 cost of sand 342kg/m3

0.760 Mt cost of cement

6 M25 using 20, 12mm metal (Design Mix)

1m3 cost of sand 380kg/m3


0.845 Mt cost of cement

M30 Design Mix (using 20, 12mm metal)


7
1m3 cost of sand 400kg/m3

0.889 Mt cost of cement


8 M35 / M40 and above (using 20, 12mm metal)

1m3 cost of sand 420kg/m3

0.934MT cost of cement

9 M30 (CC wearing coat for deck slab) (Design Mix)

Cement 300kg/10m2 400kg/m3

10 Dry Lean Cement concerete (M 7.5) (Road work CC pavement)


1m3 cost of sand 151kg/m3

333.35 kg cost of cement

11 Cost of Steel
1.05MT Cost of steel
10kg Binding wire
35 Nos Fitter I class

12 CC Pavement M40 (Design Mix)


1m3 cost of sand 360kg/m3

0.800 MT cost of cement

Average rate for all CD works in one estimate should be worked out and enclosed along with the any one sub
estimate for preparing Schedule-A

Crash barrier = Rate / cum


PVC pipe = Rate / RM
Box Culvert (wall) Minimum M25

Paver Block for Foot path = M30 grade 60mm thick paver block
Paver Block for Road = M40 grade 80mm thick paver block

All Centering should be worked out such as Abutment, Pier, Bed Block cum Dirt wall, Deck Slab etc.,
except hand rails and post
Retaining wall - upto 3m only PCC should be used
Above 3m only RCC should be used (M25)

Upkeeping quantity - using Gravel for shoulders should be avoided

Drain - in Builtup area covered with slab every 10m with Manhole must
in outer area - Open Drain