Professional Documents
Culture Documents
PURCHASER :
SUPPLIER :
ANDRITZ HYDRO GmbH, VIENNA, AUSTRIA
PROJECT:
SETTING CALCULATION-PROTECTION
Date 30.03.2018
Page 1 of page 50 Internal Nº 2801083
SETTING CALCULATION
Table of content
Date 30.03.2018
Page 2 of page 50 Internal Nº 2801083
SETTING CALCULATION
1 General Note
The calculated relay settings are based on various data available during the workout of the docu-
ment. In case of any equipment modification or change of electrical characteristics this document
has to be revised. Therefore all the settings have to be checked and revised during the commis-
sioning on site.
This document provides information about the protective scheme for the generator, excitation
transformer-, main transformer- and unit auxiliary transformer. Please note that the generator,
excitation transformer, main transformer, and unit auxiliary transformer capability curves and de-
tailed technical data are in separate documents. Also the documentation with detailed descrip-
tions of the various protection systems is provided in separate relay documents.
2 Technical Data
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Generator:
Step up transformer
Excitation Transformer:
Date 30.03.2018
Page 3 of page 50 Internal Nº 2801083
SETTING CALCULATION
Current Transformer
PRIMARY SECONDARY
GENERATOR TRANSFORMER HV SIDE 400 1
GENERATOR TRANSFORMER NEUTRAL 400 1
GENERATOR NEUTRAL 6000 1
GENERATOR TERMINAL 6000 1
UNIT AUXILIARY TRANSFORMER T-OFF 100 1
EXCITATION TRANSFORMER T-OFF 100 1
Voltage transformer
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
PRIMARY SECONDARY
PROTECTION CORE 13800V 110V
AVR CORE 13800V 110V
NEUTRAL TRANSFORMER 11000V 240V
METERING CORE 13800V 110V
LINE 230000V 110V
Line Parameter
Date 30.03.2018
Page 4 of page 50 Internal Nº 2801083
SETTING CALCULATION
3 Unit Protection
Sg 129410kVA
Igp = = = 5414.28A
Vgp × √3 13.8kV × √3
CT-ratio of the generator according to single line diagram = 6000A/1A
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Igp 5414.28
Ihvs = ⁄
CT ratio = 6000 = 0.90A
Therefore when setting the differential operating current to 25 % of the relay current rating, i.e
𝐼𝑠 = 1 × 0.25 = 0.25𝐴
Is 0.25
= = 0.27 or 27% of Generator Rated current.
Ihvs 0.90
Date 30.03.2018
Page 5 of page 50 Internal Nº 2801083
SETTING CALCULATION
This distribution of the 3rd harmonic over neutral and terminal side is taken for the evaluation of
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
earth faults close to the generator neutral. The 3rd harmonic is measured in the generator neu-
tral with a single-phase voltage transformer and on the generator leads with a voltage trans-
former in open delta connection. In case of an earth fault, the 3rd harmonic in the neutral is
shorted whereby the value on the generator terminals is increased by the same value (see figure
below).
The following requirement is assumed: the relay with the measurement of the 3rd harmonic
shall protect the 15% of the stator coil close to the neutral point. The other 85% are protected by
a normal overvoltage relay with the measurement of the fundamental frequency.
The correct settings will be determined on site during earth fault tests. For this purpose different
measurements of the 3rd harmonic in the generator neutral and on the generator leads have to
be done in dependence of different generator loads for the healthy condition and for an earth
fault.
( 3rd .Harm.gen. terminal volt. ratio 3rd .Harm.gen. neutral volt. ) measured value
Date 30.03.2018
Page 6 of page 50 Internal Nº 2801083
SETTING CALCULATION
There should be a difference between the measured values for the healthy condition and for the
case of an earth fault. The setting of the operate value has to be chosen to be inside this gap. If it
is not possible, you could try to improve the situation by varying the ratio factor. In case of
measurement difficulties one possibility is to check the earthing of the neutral single transformer
and of the generator leads voltage transformer. There must not be any voltages between the
earthing of both devices.
ing range an alarm and/or trip will be initiated. The adjustable temperature setting in the
DRS menu for the function are given as percentage values of the temperature limit. The
temperature limit is the temperature which will be reached if the transformer operates at
nominal value.
Date 30.03.2018
Page 7 of page 50 Internal Nº 2801083
SETTING CALCULATION
Date 30.03.2018
Page 8 of page 50 Internal Nº 2801083
SETTING CALCULATION
The inadvertent energizing pick up is specified by the parameter "Operate Value I". The
corresponding setting value is normally more sensitive than the value of the conventional
overcurrent protection function (setting depends on the setting of the overcurrent func-
tion). So it has to be ensured that the function only works during nominal conditions.
For this case the inadvertent energizing is blocked by exceeding a setting value called
"Operate Value U" to be delayed that it isn´t active immediately during an inadvertent en-
ergizing,
Date 30.03.2018
Page 9 of page 50 Internal Nº 2801083
SETTING CALCULATION
Date 30.03.2018
Page 10 of page 50 Internal Nº 2801083
SETTING CALCULATION
Ig 6497.136A
Isec = = × 1 A = 1.08A
CTratio 6000A
Ig 5414.28 A
= × 1 A = 0.90 𝐴
CTratio 6000A
Date 30.03.2018
Page 11 of page 50 Internal Nº 2801083
SETTING CALCULATION
F= × × = × × = 1.21
IG VTratio Vr 5414.28 1 × 13800 100
Where
Ir … rated current of the relay
Vr … rated voltage of the relay (100V internally)
Diameter = xd = 1.07
Date 30.03.2018
Page 12 of page 50 Internal Nº 2801083
SETTING CALCULATION
Rotor Current 0.5 V Compensation factor to adapt the external mA-Signal. Ac-
Offset cording to the devices available in the excitation system.
Date 30.03.2018
Page 13 of page 50 Internal Nº 2801083
SETTING CALCULATION
VGen 1 13.8kV 1
VNsec = × = × × 240
√3 NGT ratio √3 11000
= 173.84V
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Time de- 5s Will be coordinated with the supplier of the turbine regula-
lay tor.
Power Direction Has to be determined during commissioning activities.
direc- ...
tion
Phase right The generator has a phase rotation to the right.
Client VSH Prep. DY Contract Nº.
Plant TKT HPP (2X110 MW) Chk. SP 817/2012/HD-VSH-AH
Project Nº C.388/C.389 / V-0322 Appr. SP = +
Index R3 DOC Nº TKT-PR-01-CA-1083-A
HIB
Date 30.03.2018
Page 14 of page 50 Internal Nº 2801083
SETTING CALCULATION
rotation
U G 2 CT
F
SG PT
Offset (R1-R2) 20.71Ω z
tan(30 )
This drawing/document is the INTELLECTUAL PROPERTY of
' R1 R 2 ' 2 2
ANDRITZ HYDRO GmbH, Vienna, Austria
F
sin(arg( z ))
Slope 87.54° slope arg( z )
Imp. Circle Diame- 78.33Ω imp. circle diam. 3 xd ' 2 xT
ter
Imp. Circle Centre -22.61Ω imp. circle diam.
imp. circle cent. 2 xT
2
Slip pulse No 2 The slip pulse number has to be chosen according to
the allowed number the generator is getting out of
step
Time Slot t1 50ms Minimum time for the first slip between crossing of the
impedance vector the right-hand and the left-hand
boundary lines
Slip Cycle T1 3s Maximum time for the first slip-cycle
Time Slot t2 40ms usually the following slips need less time in relation to
Slip Cycle T2 2s the first one
Lock up time-T3 5s Maximum time for the total sequence starting with the
first slip
Negative phase seq 10% The maximum permissible negative phase sequence is
selected to be as per generator manufacturing data
Current interlock 1.2A Current Interlock=1.2 x IN =1.2x1
trip The relay trips, when the impedance vector leaves the
impedance circle.
Current Direction Direction 1 Direction will be checked during commissioning test.
Date 30.03.2018
Page 15 of page 50 Internal Nº 2801083
SETTING CALCULATION
The inadvertent energizing pick up is specified by the parameter "Operate Value I". The corre-
sponding setting value is normally more sensitive than the value of the conventional overcurrent
protection function (setting depends on the setting of the overcurrent function). So it has to be
ensured that the function only works during nominal conditions.
For this case the inadvertent energizing is blocked by exceeding a setting value called "Operate
Value U" to be delayed that it isn´t active immediately during an inadvertent energizing,
Final Selection for the Shaft Current Protection: Use of 5th RMS Harmonic!
The table shows also the internal results (of the DRS shaft current module) for the calculated
RMS value and higher harmonics of the shaft current (please note: the rated module read input
current which results to an internal voltage value of 5V).
Date 30.03.2018
Page 16 of page 50 Internal Nº 2801083
SETTING CALCULATION
In case of a shaft current a dominant increase of the 3th, 5th, 7th&9th harmonic occurs. There-
fore the final selection of the shaft current protection is set to use the accordingly.
The medium sensitivity setting for the shaft current input module is used (1-20mA). The shaft
current protection function itself is set in the way, that the measured internal shaft current is
approximately a tenth (1/10) of the actual real shaft current (protection function conversion fac-
tor of 5A/V covers this condition)!
During different hot commissioning tests as well as during the heat run the shaft current signal
remained stable. Also other practical experience during different load conditions confirmed the
stability. Even load rejection tests did not cause a disturbance signal. Using the 5th Harmonic of
the shaft current signal is a reliable condition.
Therefore the setting was chosen to provide a lower operate value as an alarm stage and a high-
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Stage 1: A, alarm stage, time delay 10s (corresponds to a real shaft current of approx. _
Stage 2: A, trip stage, time delay 10s (corresponds to a real shaft current of approx. _)
Ig 5414.28 A
= × 1 A = 0.90A
CTratio 6000A
Setting is selected 15% of generator CT secondary current =0.9*17%=0.15A
Date 30.03.2018
Page 17 of page 50 Internal Nº 2801083
SETTING CALCULATION
ICP=SGT/220kVx√3=132MVA/220kVx√3=346.2A
Icp 346.42
I CS 1A 0.86 A
CTratio 400 A
With 0.2A differential current setting the setting as a percentage of the rated secondary current can be cal-
culated
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Is 0.2
%I CS 100 23%
I CS 0.86 A
By choosing a differential current setting of 0.2A secondary the primary setting is calculated as follows.
CT Ratio Compensation
CT compensation 2-1=CTratio1/CTratio2=400/400=1
Date 30.03.2018
Page 18 of page 50 Internal Nº 2801083
SETTING CALCULATION
SMT 132MVA
IHV−pri = = = 346.42 A
VHV × √3 220kV × √3
346.42
IHVs = = 0.86A
400
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Is = 1 x 0.2 = 0.2 A
IS 0.2
∆Is % = × 100 = = 23.25%
IHVs 0.86
Date 30.03.2018
Page 19 of page 50 Internal Nº 2801083
SETTING CALCULATION
2nd harmonic 20% Default value, will be adapted during the commissioning ac-
tivities.
5th harmonic 15% Default value, will be adapted during the commissioning ac-
tivities.
High Set Over 8.0A High set over current during three-phase faults.
current
CT-ratio 0.94 The compensation factor considers the ratio of the trans-
compensation former and the ratios of the different CTs located on the HV-
and LV-side of the transformer. It is calculated according to
the following formula:
This drawing/document is the INTELLECTUAL PROPERTY of
CTsystem2
ANDRITZ HYDRO GmbH, Vienna, Austria
CT ratioComp =
system 1
CTsystem1 × tr. ratio system 2
6000⁄
= 1
400⁄ × 220000
1 13800
= 0.94
4.2 Generator Transformer Overcurrent and Earth fault Protection, 50/51T (F13,F23)
Parameter Setting Setting calculation and comments
Operate 1.5A The rated current on the 220kV side is
value
stage 1 SMT 132MVA
IHV−pri = = = 339.62 A
VHV × √3 220kV × √3
339.62
IHVs = = 0.84A
400
Setting the operating current to 130% of the relay cur-
rent rating, i.e.
Date 30.03.2018
Page 20 of page 50 Internal Nº 2801083
SETTING CALCULATION
Time delay 0.5 s Will have to be coordinated with the settings of the line
stage 2 over current functions.
4.3 Generator Neutral Overcurrent and Earth fault Protection, 51MTN (F13,F23)
Parameter Setting Setting calculation and comments
Operate 1.5 A The rated current
value
SG 129.41MVA
IHV−pri = = = 339.62 A
VHV × √3 220kV × √3
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
339.62
IHVs = = 0.84A
400
Setting the operating current to 180% of the relay cur-
rent rating, i.e.as per client comments
Date 30.03.2018
Page 21 of page 50 Internal Nº 2801083
SETTING CALCULATION
stage 2
Time delay 1s
stage 2
Nominal 50.0
frequency
Nominal 110
Voltage
IT 339.62
ISetting = = × 25% = 0.21A
CT 400
Date 30.03.2018
Page 22 of page 50 Internal Nº 2801083
SETTING CALCULATION
IExc−pri 35.14 A
IExc−sec = = × 1 A = 0.35 A
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
CTratio 100A
Time delay 0s Has to be coordinated with the settings of the other over
stage 2 current relays in the system.
Type Over de- The function has to detect over current conditions.
tection
Date 30.03.2018
Page 23 of page 50 Internal Nº 2801083
SETTING CALCULATION
Date 30.03.2018
Page 24 of page 50 Internal Nº 2801083
SETTING CALCULATION
7 Line Protection:
Purpose
This document presents a review of the generally accepted setting calculation based on 115kV Line
protection scheme. Its purpose is to present the concepts of line protection and to describe the typical
means of implementing such concepts. The document lists the particular protective functions as how
they overlap and complement each other for back-up and outlines the philosophy about the selection of
the protection setting values.
Note:
The calculated relay settings are based on maximum and minimum short circuit levels and different da-
ta sheets available during the workout (e.g. generator data sheet, generator transformer data sheet, cir-
cuit breaker data sheet, line data sheet & single line diagram). In case of any equipment modification or
change of various electrical characteristics this document has to be revised. Therefore all the settings
have to be checked and revised during the commissioning on site.
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Generally the calculation of the settings is done according to our best knowledge and conscience.
Also the documentation with detailed descriptions of the various protection systems are provided in
separate relay documents.
The calculation of the line differential protection shall be based on a short circuit scenario.
Assuming that the two generator is in operation and the energy is transmitted via the overhead line, a
line current is received for rated conditions of
SG 129410kVA
I 2X 10828.5A
115kV 3 13.8kV 3
St 129410kVA
Ihvp 5414.28A Generator Rated Current 13.8kV side
Vhvp 3 13.8kV 3
Vhvp 220kV
K 15.94 Transformer Ratio
Vlvp 13.8kV
Ihvp 5414.28
Ihvp 339.66A Generator Primary Current w.r.t. transformer HV
Transformer _ Ratio 15.94
Ihvp 339.04
Ihvs 1A 0.85 A Generator Secondaryy Current w.r.t. transformer
CTratio 400 A
HV
but less than the fault current on the 220KV busbar system
It is assumed that the minimum fault level is given in case only one generator is feeding the fault cur-
rent.
Date 30.03.2018
Page 25 of page 50 Internal Nº 2801083
SETTING CALCULATION
The positive sequence reactances calculated on a 115kV-base of generator and transformers are:
generator XG 80.41
SG 129.41MVA
uk " V 2 0.12 220kV
2
XT 44.0
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
transformer
STr 132MVA
The circuit diagram for a 3-phase fault on the transformer HV-side (respectively on the busbar) is:
XG XT
c Vn
3
c Vn 1 1.1 220kV 1
Ik " 1123.08 A
3 XG XT 3 80.41 44
I F 1123.08 A .
Ihvp 1123.08
Ihvs 1A 0.75 A
CTratio 1500 A
Date 30.03.2018
Page 26 of page 50 Internal Nº 2801083
SETTING CALCULATION
That is in turn
Parameter tIdminHigh:
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
This setting defines the time that IdminHigh will be active after the previously dead protected circuit has
been connected to the power source. A setting of 1s is sufficient.
Parameter IdUnre:
Values of differential currents above the unrestrained limit generate a trip disregarding all other criteria,
that is, irrespective of the internal or external fault discriminator and any presence of harmonics. It is in-
tended for for fast tripping of internal faults with high fault currents. The recommended setting os 120%
of the highest through fault current.
1 S N ,UT 1 132000kVA
Ik , p 2886.83 A
uk ,UT UN 3 0.12 220kV 3
Ik , p 2886.83 A
I k ,s 1.92 A
CTratio 1500 A /1A
Parameter NegSeqDiffEn:
The negative sequence fault discriminator can be set On/Off. It is an important complement to the per-
centage restrained differential function. As it is directional, it can distinguish between external and inter-
nal faults, also in difficult conditions. It is recommended that it is always activated.
Parameter NegSeqROA:
This is the setting of the relay operate angle of the negative sequence current based internal/external
fault discriminator considering the negative sequnce current on both line ends. Ideally the angle is zero
degrees for internal faults and 180 degrees for external faults. However measuring errors can occur.
The default value 60 degrees is recommended in most cases.
Parameter IminNegSeq:
The local and the sum of all remote negative sequence currents are compared separately if they are
above the set threshold value IminNegSeq. If either is below the threshold, no comparison is made. The
default value 0.04 Ibase can be used.
Parameter AddDelay:
The possibility of delayed operation for small differential currents can be set On/Off. It is set to Off.
Date 30.03.2018
Page 27 of page 50 Internal Nº 2801083
SETTING CALCULATION
Setting Range
Parameter Recommended Unit
Min Max
Differential Protection (L3CPDIF)
GlobeBaseSel 1 1
NoOfUsedCTs 2/3 2
Operation On/Off On
IdMin 0.20 2.00 0.30 IB
IdMinHigh 0.20 10.00 1.0 IB
tIdMinHigh 0.000 60.000 1.0 S
IdUnre 1.00 50.00 3.00 IB
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
CrossBlockEn No/Yes No
ChargeCurEnable Off/On On
Date 30.03.2018
Page 28 of page 50 Internal Nº 2801083
SETTING CALCULATION
FL Fault Locator
DrepchN0IL1 1 ch
DrepchN0IL2 2 ch
DrepchN0IL3 3 ch
DrepchN0IN 4 ch
DrepchN0IP 0 ch
DrepchNoUL1 5 ch
DrepchNoUL2 6 ch
DrepchN0UL3 7 ch
UL1Gain 1
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
UL2Gain 1
UL3Gain 1
R1A 10.3 Ohm/p
X1A 45.5 Ohm/p
R1B 6.56 Ohm/p
X1B 28.3 Ohm/p
R1L 7.11 Ohm/p
X1L 33.9 Ohm/p
R0L 30.1 Ohm/p
X0L 97.6 Ohm/p
R0M 0 Ohm/p
X0M 0 Ohm/p
Line Length 82.0 Km
50BF Breaker Failure
GlobalBaseSel 1
Operation On
functionMode Current
BuTripMode 1 out of 3
No CBPos
RetripMode
Check
IP> 20%IB
I>BlkCont 20%IB
IN> 20%IB
T1 0.10s
T2 0.20s
T2Mph 0.20s
tpulse 0.20s
Client VSH Prep. DY Contract Nº.
Plant TKT HPP (2X110 MW) Chk. SP 817/2012/HD-VSH-AH
Project Nº C.388/C.389 / V-0322 Appr. SP = +
Index R3 DOC Nº TKT-PR-01-CA-1083-A
HIB
Date 30.03.2018
Page 29 of page 50 Internal Nº 2801083
SETTING CALCULATION
Note: the base current IB is chosen to be the rated primary CT current: 1500A
Setting Range
Parameter Recommended Unit
Min Max
Residual Over Current 67N EF4PTOC
General
GlobalBaseSel 1
Zero seq Zero seq
SeqTypeUPol
Neg seq
Zero seq Zero seq
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
SeqTypeIpol
Neg seq
Zero seq Zero seq
SeqTypeDir
Neg seq
Setting Group 1
Operation Off/On On -
Enable
EnDir Enable
Disable
AngleRCA -180 180 +65 deg
Voltage/ Current/ Du-
polMethod Voltage -
al
UPolMin 1 100 1 %UB
IPolMin 2 100 5 %IB
RNPol 0.5 1000 10.3 ohm
2ndHarmStab 5 100 20 %
Off/ SOTF/
UnderTime/
SOTF SOTF - Off -
+UnderTim
e
Date 30.03.2018
Page 30 of page 50 Internal Nº 2801083
SETTING CALCULATION
Step-1 67N
Off / Non-
directional
DirMode1
Forward Re-
verse - Forward -
ANSI Ext.
inv. / /ANSI
Very inv.
ANSI Norm.
inv.,IEC
Characterist1 - IEC Def. Time -
Norm.
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
inv./IEC
Very inv. IEC
inv./ IEC Ext.
inv / IEC S.T.
2
5
IN1> 1 1 35.0 %IB
0
0
6 0.00
t1 0 3 s
0 1
9
k1 0.05 9 0.01 0.05 -
9
1
0
IMin1 1 1 10.0 %IB
0
0
1
IN1Mult 1 0.1 1.0 -
0
6 0.00
t1Min 10 0.00 s
0 1
HarmRestrain1 Off/ On - On -
Off / Non-
directional
DirMode2
Forward Re-
verse - Forward
Date 30.03.2018
Page 31 of page 50 Internal Nº 2801083
SETTING CALCULATION
ANSI Ext.
inv. / /ANSI
Very inv.
ANSI Norm.
inv.,IEC
Characterist2 - IEC Def. Time -
Norm.
inv./IEC
Very inv. IEC
inv./ IEC Ext.
inv / IEC S.T.
IN1> 1 250 230.0 %IB
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
t1 0 60 0.6 s
100
IMin2 1 50% %IB
0
IN1Mult 1 10 1.0 -
HarmRestrain2 Off/ On - On -
FR Fault Locator
Operation On
PrefaultRecT 6 s
PostfaultRecT 2 s
Timelimit 4 s
PostRetrig Off
MaxNOStoreRec 100
ZeroAngleRef 1 ch
OpModeTest off
Setting Range
Parameter Recommended Unit
Min Max
Scheme Communication ECPSCH
Operation On/Off On
Intertrip/Per UR/Per
Scheme Per UR
OR/Blocking
Date 30.03.2018
Page 32 of page 50 Internal Nº 2801083
SETTING CALCULATION
Setting Range
Parameter Recommended Unit
Min Max
Overcurrent Protection OC4PTOC
General
GlobalBaseSel 1
DFT
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
DFT
MeasType (Discrete Fourier Fil-
RMS
ter)
Setting Group 1
Operation Off/On On -
AngleRCA 40 65 +55 deg
AngleROA 40 89 +80 deg
StartPhSel 1 out of 3 -
Step-1 67
Off / Non-
directional
DirMode1
Forward Re-
verse - Forward -
ANSI Ext.
inv. / /ANSI
Very inv.
ANSI Norm.
inv.,IEC
Characterist1 - IEC Def. Time -
Norm.
inv./IEC
Very inv. IEC
inv./ IEC Ext.
inv / IEC S.T.
2
5
IN1> 1 1 90 %IB
0
0
t1 0 6 0.00 3 s
Client VSH Prep. DY Contract Nº.
Plant TKT HPP (2X110 MW) Chk. SP 817/2012/HD-VSH-AH
Project Nº C.388/C.389 / V-0322 Appr. SP = +
Index R3 DOC Nº TKT-PR-01-CA-1083-A
HIB
Date 30.03.2018
Page 33 of page 50 Internal Nº 2801083
SETTING CALCULATION
0 1
9
k1 0.05 9 0.01 0.05 -
9
1
0
IMin1 1 1 50 %IB
0
0
1
IN1Mult 1 0.1 1.0 -
0
6 0.00
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
t1Min 10 0.00 s
0 1
Reset typr curve1 Instantaneous
DirMode Forward
Charateristics2 IEC Def. Time
I2> 250%IB
T2 0.6 s
Imin2 50%IB
I2Mult 1
Date 30.03.2018
Page 34 of page 50 Internal Nº 2801083
SETTING CALCULATION
Setting Range
Parameter Recommended Unit Description
Min Max Step
Fault locator
LMBRFLO
LMBRFLO
Group settings
DrepchN0IL1 1 ch
DrepchN0IL2 2 ch
DrepchN0IL3 3 ch
DrepchN0IN 4 ch
DrepchN0IP 0 ch
DrepchNoUL1 5 ch
DrepchNoUL2 6 ch
DrepchN0UL3 7 ch
UL1Gain 1
UL2Gain 1
UL3Gain 1
Source resistance A
R1A 0.001 1500.000 0.001 10.3 ohm/p
(near end)
Source reactance A
X1A 0.001 1500.000 0.001 45.5 ohm/p
(near end)
Source resistance B
R1B 0.001 1500.000 0.001 6.56 ohm/p
(far end)
Source reactance B
X1B 0.001 1500.000 0.001 28.3 ohm/p
(far end)
Positive sequence
R1L 0.001 1500.000 0.001 7.114 ohm/p
line resistance
Positive sequence
X1L 0.001 1500.000 0.001 33.877 ohm/p
line reactance
Zero sequence line
R0L 0.001 1500.000 0.001 30.075 ohm/p
resistance
Zero sequence line
X0L 0.001 1500.000 0.001 97.625 ohm/p
reactance
Zero sequence
R0M 0.000 1500.000 0.001 0.000 ohm/p mutual resistance for
double circuit lines
Date 30.03.2018
Page 35 of page 50 Internal Nº 2801083
SETTING CALCULATION
Zero sequence
mutual reactance
X0M 0.000 1500.000 0.001 0.000 ohm/p
for double circuit
lines
Operation mode of
OperationDir Off / Non-directional / Forward / Reverse Forward directionality
Positive sequence
X1PP 0.10 3000.00 0.01 27.10 ohm/p
reactance reach
Positive seq. re-
R1PP 0.01 1000.00 0.01 5.69 ohm/p sistance for zone
characteristic angle
Positive sequence
X1PE 0.10 3000.00 0.01 27.10 ohm/p
reactance reach,Ph-E
Positive seq. re-
sistance for zone
R1PE 0.01 1000.00 0.01 5.69 ohm/p
characteristic an-
gle,Ph-E
Zero sequence reac-
Xo 0.10 9000.00 0.01 78.10 ohm/p
tance reach
Zero sequence re-
Ro 0.01 3000.00 0.01 24.06 ohm/p sistance for zone
characteristic angle
Fault resistance reach
RFPP 0.10 3000.00 0.01 39.2 ohm/l
in ohm/loop , Ph-Ph
Fault resistance reach
RFPE 0.10 9000.00 0.01 56.7 ohm/l
in ohm/loop , Ph-E
Operation mode
Operation PP On/Off On Off/On of Ph-Ph loops
Operation mode
Timer t1PP On/Off On Off/On of Zone timer,
Ph-Ph
Time delay of trip,Ph-
tPP 0.000 60.000 0.001 0.000 s Ph
Operation mode
Operation PE On/Off On Off/On of Ph-E loops
Operation mode
Timer t1PE On/Off On Off/On of Zone timer,
Ph-E
Date 30.03.2018
Page 36 of page 50 Internal Nº 2801083
SETTING CALCULATION
Phase-Earth loops
Minimum operate
IMinOpIN 5 1000 1 5 %IB residual current for
Phase-Earth loops
Distance protec-
tion zone, quadri-
ZMQAPDIS: 2
lateral character-
istic (zone 2)
Group settings
characteristic (zone 2-
Operation On/Off On 5)
Base current , i.e rated
IBase 1 99999 1 1000 A current
Base voltage , i.e.rated
Ubase 0.05 2000.00 0.05 220.00 kV voltage
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Operation mode of
OperationDir Off / Non-directional / Forward / Reverse Forward directionality
Positive sequence
X1 0.10 3000.00 0.01 40.65 ohm/p
reactance reach
Positive sequence
R1 0.01 1000.00 0.01 8.54 ohm/p
resistance reach
Zero sequence reac-
X0 0.10 9000.00 0.01 117.15 ohm/p
tance reach
Zero sequence re-
R0 0.01 3000.00 0.01 36.09 ohm/p sistance for zone
characteristic angle
Fault resistance reach
RFPP 0.10 3000.00 0.01 56.9 ohm/l
in ohm/loop , Ph-Ph
Fault resistance reach
RFPE 0.10 9000.00 0.01 77.0 ohm/l
in ohm/loop , Ph-E
Operation mode
Operation PP On/Off On Off/On of Ph-Ph loops
Operation mode
Timer tPP On/Off On Off/On of Zone timer,
Ph-Ph
Time delay of trip,Ph-
tPP 0.000 60.000 0.001 0.3 s Ph
Operation mode
Operation PE On/Off On Off/On of Ph-E loops
Operation mode
Timer tPE On/Off On Off/On of Zone timer,
Ph-E
Date 30.03.2018
Page 37 of page 50 Internal Nº 2801083
SETTING CALCULATION
Distance protec-
tion zone, quadri-
ZMQAPDIS: 5
lateral character-
istic (zone 5)
Group settings
Date 30.03.2018
Page 38 of page 50 Internal Nº 2801083
SETTING CALCULATION
forward direction
Angle to blinder in
fourth quadrant for
ArgDir 5 45 1 15 Deg forward direction
Minimum operate
IMinOp 5 30 1 10 %IB current in % Ibase
characteristic
Group settings
Base current , i.e rated
IBase 1 99999 1 1000 A current
Base voltage , i.e.rated
UBase 0.05 2000.00 0.05 220.00 kV voltage
3Io limit for blocking
INBlockPP 10 100 1 40 %Ph phase-to-phase meas-
uring loops
3Io limit for blocking
INReleasePE 10 100 1 20 %Ph phase-to-earth meas-
uring loops
Forward resistive
RLdFw 1.00 3000.00 0.01 178.56 ohm/p reach within the load
impedance area
Reverse resistive reach
RLdRv 1.00 3000.00 0.01 178.56 ohm/p within the load im-
pedance area
Load angle determin-
ArgLd 5 70 1 39 Deg ing the load imped-
ance reach
Positive sequence
X1 0.50 3000.00 0.01 126.65 ohm/p
reactance reach
Zero sequence reac-
X0 0.50 9000.00 0.01 228.92 ohm/p
tance reach
Fault resistance reach
RFFwPP 0.50 3000.00 0.01 383.47 ohm/l
Ph-Ph, forward
Fault resistance reach
RFRvPP 0.50 3000.00 0.01 383.47 ohm/l
Ph-Ph, reverse
Fault resistance reach
RFFwPE 1.00 9000.00 0.01 167.79 ohm/l
Ph-E, forward
Fault resistance reach
RFRvPE 1.00 9000.00 0.01 167.79 ohm/l
Ph-E, reverse
Operation mode
Timer tPP On/Off On Off/On of Zone timer,
Ph-Ph
Time delay of trip,Ph-
tPP 0.000 60.000 0.001 3.000 s Ph
Operation mode
Timer tPE On/Off On Off/On of Zone timer,
Ph-E
Date 30.03.2018
Page 39 of page 50 Internal Nº 2801083
SETTING CALCULATION
uring loops
Date 30.03.2018
Page 40 of page 50 Internal Nº 2801083
SETTING CALCULATION
CurrRev On
tPickupRev 0.020 s
tDelayRev 0.060 s
WEI Echo&Trip
tPickupWEI 0.010 s
Date 30.03.2018
Page 41 of page 50 Internal Nº 2801083
SETTING CALCULATION
U<Base 220 kV
UPP< 70%UB
UPN< 70%UB
Date 30.03.2018
Page 42 of page 50 Internal Nº 2801083
SETTING CALCULATION
1/2ph+1*3ph, 1ph+1*2/3ph
To be set ON if AR is to
StartByCBOpen On/Off Off be started by CB open
position
Select the CB aux
CBAuxContType NormClosed , NormOpen NormOpen contact type NC/NO
for CBPOS input
Select type of circuit
CB ReadyType CO, OCO CO breaker ready signal
Open time for shot 1
t1 1ph 0.000 60.000 0.001 1.3 s ,single-phase
Open time for shot 1
t1 3ph 0.000 60.000 0.001 1.1 s ,delayed reclosing 3ph
Open time for shot 1,
t1 3PhHS 0.000 60.000 0.001 0.60 s high speed reclosing
3ph
Duration of reclaim
tReclaim 0.00 6000.00 0.01 180 s
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
time
Maximum wait time
tSync 0.00 6000.00 0.01 30 s for synchrocheck OK
Extended dead time
Extended t1 On/Off Off for loss of permissive
channel
Open time extebded
tExtended t1 0.000 60.000 0.001 0.400 s by this value if extend-
ed t1 is true
Inhibit reclosing reset
tInhibit 0.000 60.000 0.001 0.400 s time
Maximum trip pulse
tTrip 0.200 60.000 0.001 0.200 s duration
Shorten closing pulse
CutPulse On/Off Off at a new trip off/On
Duration of the circuit
tPulse 0.200 60.000 0.001 0.200 s breaker closing pulse
Advance to next shot if
Follow CB Off CB has been closed
during dead time
Min time that CB must
tCBClosedMin 0.00 6000.00 0.01 5 s be closed before new
sequence allows
AutoCont Off
Date 30.03.2018
Page 43 of page 50 Internal Nº 2801083
SETTING CALCULATION
Voltage Phasors
3U0/U2
Comp.
0=Off, 1=ExternalCtrl ,
Operation Off, External ctrl , On On 2=On
UAmpPreComp5 0 %
UAmpPreComp30 0 %
UAmpPreComp100 0 %
3U0DbRepInt 5 Type
3U0ZeroDb 0 m%
3U0Min 5 %UB
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
3U0Max 5 %UB
3U0Reptyp Int dead-
band
3U0LimHys 5 %
3U0AngDbRepint 10 Type
3U0AngZeroDb 0 m%
3U0AngMin -180 Deg
3U0AngMax 180 Deg
3U0AngRepTyp Cyclic
U2DbrepInt 5
U2DbZero 0
U2DbMin 3
U2DbMax 3
U2Reptyp Int dead-
band
U2DbLimHys 5
U2AngDbRepInt 10
U2DbMin -180
U2DbMax 180
U2DbAngReptyp Cyclic
Logic timer set
Timer 3U0
Operation On
T 90 s
Date 30.03.2018
Page 44 of page 50 Internal Nº 2801083
SETTING CALCULATION
TimerU2
Operation On
t 90 s
Disturbance Re-
FR
port
Operation On
PrefaultRecT 6 s
PostfaultRecT 2 s
TimeLimit 4 s
PostRetrig Off
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
MaxNoStoreRec 100
ZeroAngleRef 1 Ch
OpmodeTest off
F25 Synchronizing
GblBaseSelBus 1
GblBaseSelLine 1
SelPhaseBus1 PhaseL2
SelPhaseBus2 PhaseL2
SelPhaseLine1 PhaseL2
SelPhaseLine2 PhaseL2
Phaseshift 0 Deg
Operation On
Operationsync On
UHighBusSynch 70 %UBB
UHighLineSynch 70 %UBL
UdiffSynch 0.10 pu
FreqDiffMin 0.01 Hz
FreqDiffMax 0.25 Hz
Tbreaker 0.08 s
Tclosepulse 0.2 s
Date 30.03.2018
Page 45 of page 50 Internal Nº 2801083
SETTING CALCULATION
tmaxSynch 600 s
tminSynch 2 s
Operationsc On
UdiffSC 0.1 pu
FreqDiffA 0.2 Hz
FreqDiffM 0.2 Hz
PhaseDiffA 30 Deg
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
PhaseDiffM 30 Deg
tSCA 0.1 S
tSCM 0.1 S
AutoEnerg Both
MmanEnerg Both
ManEnergDBDL Off
UhighBusEnerg 70 %UBB
UhighLineEnerg 70 %UBL
UlowBusEnerg 30 %UBB
UlowlineEnerg 30 %UBL
tAutoEnerg 0.1 S
tManEnerg 0.1 S
F59 Overvoltage
GlobalbaseSel 1
Operation On
OperationStep1 On
Definite
Charateristics
Time
Opmode1 1 out of 3
T1 2.1 S
Date 30.03.2018
Page 46 of page 50 Internal Nº 2801083
SETTING CALCULATION
tiMin 60 S
K1 1 %UB
HystAbs1 0.5
GlobalbaseSel 1
Operation On
OperationStep1 On
Definite
Charateristics1
This drawing/document is the INTELLECTUAL PROPERTY of
Time
ANDRITZ HYDRO GmbH, Vienna, Austria
Opmode1 1 out of 3
U1< 80 %UB
T1 9 S
T1min 5 s
K1 1
IntBLKsel1 off
IntBlkstval1 20 %UB
tblkUV1 0 s
MeasType DFT
Operation On
AngleRCA 55 Deg
AngleROA 80 Deg
StartPhSel 1 out of 3
DirMode1 Forward
I1> 90 %IB
T1 3 S
Imin1 50 %IB
I1Mult 1
Date 30.03.2018
Page 47 of page 50 Internal Nº 2801083
SETTING CALCULATION
DirMode2 Forward
T2> 0.6 S
I2Mult 1
Residual Overcur-
F67N
rent
Globalbasesel 1
SeqtypeUpol Zeroseq
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
SeqtypeIpol Zeroseq
SeqtypeIDir Zeroseq
Operation On
EnDir Disable
AngleRCA 65 Deg
polMethod Voltage
UpolMin 1 %UB
IpolMin 5 %IB
IN>Dir 10 %IB
2ndharmStab 20 %
BlkParTransf Off
UseStartValue IN4>
SOTF Off
DirMode1 Forward
IN>1 35 %IB
T1 3 S
Imin1 10 %IB
IN1Mult 1
Dirmode2 Forward
Date 30.03.2018
Page 48 of page 50 Internal Nº 2801083
SETTING CALCULATION
IN>2 230
T2 0.6
Imin2 50
IN2Mult 1
HarmBlock2 on
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
Date 30.03.2018
Page 49 of page 50 Internal Nº 2801083
SETTING CALCULATION
Differential Protection
ICP=SGT/220kVx√3=132MVA/220kVx√3=346.2A
Icp 346.42
I CS 1A 0.86 A
CTratio 400 A
This drawing/document is the INTELLECTUAL PROPERTY of
ANDRITZ HYDRO GmbH, Vienna, Austria
With 0.2A differential current setting the setting as a percentage of the rated secondary current can be cal-
culated
Is 0.2
%I CS 100 23%
I CS 0.86 A
By choosing a differential current setting of 0.2A secondary the primary setting is calculated as follows.
CT Ratio Compensation
CT compensation 2-1=CTratio1/CTratio2=400/400=1
Date 30.03.2018
Page 50 of page 50 Internal Nº 2801083