Kathmandu,
BAGMATI PROVINCE, NEPAL.
Chabahil-7, Kathmandu.
Volume: 1 of 3
Submitted by:
Acknowledgements
Firstly, we would like to express our sincere gratitude towards Nepal Telecommunication
Authority (NTA) team from Shreekunja Bhawan, Kamaladi, Kathmandu for the opportunity
of planning and designing of Prefab Office Building, Guard House and Container Foundation
support. The NTA team was helpful during the field visit and design phase of this study. We
are also thankful to the technical officers and all other staff members of NTA for various
technical advice and support during the course of this study. We would also like to thank the
authors and publishers of all the books, manuals, reports, codes and research papers referred
for the preparation of this report.
Table of Contents
INTRODUCTION 1
1.1 BACKGROUND........................................................................................................................1
PROJECT AREA 3
3.1 Plot Detail..............................................................................................................................3
3.2 Site Accessibility.....................................................................................................................4
Methodology 5
4.1 Study Methodology...............................................................................................................5
4.1.1 .Collection and review of related documents................................................................6
4.1.2 The Organizational Structure.........................................................................................7
4.2 General Design Principle........................................................................................................7
4.2.1 Workflow.......................................................................................................................7
4.2.2 Straight Line Principle....................................................................................................7
4.2.3 Work Stations.................................................................................................................7
4.2.4 Private Offices................................................................................................................7
4.2.5 Semiprivate offices.........................................................................................................7
4.2.6 Conference Requirements.............................................................................................8
4.2.7 Means of Escape............................................................................................................8
4.2.8 Office Services................................................................................................................8
4.3 Components of Master Plan................................................................................................10
4.4 Design Concept....................................................................................................................10
RESULT OUTPUT 11
5.1 ARCHITECTURAL DRAWINGS...............................................................................................11
5.2 ENGINEERING DRAWINGS DETAILS......................................................................................11
1.1 BACKGROUND......................................................................1
List of Figures
Figure 3-1 Project Location Map............................................................................................................3
Volumes
Vol-1: Main Report (Detailed Project Report)
1INTRODUCTION
This final report has been prepared as per the agreement made between Nepal Telecommunications
Authority (NTA) and Civil Desk Engineering Consultancy Pvt. Ltd. (CDEC) for preparation of Detail
Engineering Report for Planning and Designing of Prefab Office Building, Guard House and Container
Foundation Support. This is a Detailed Project Report of proposed NTA Building at Saraswoti Nagar,
Chabahil -7, Kathmandu. The study was conducted in 2020.
This study is carried out based on the first step evaluation of site condition by the design team. This
step involves the site visit and consultation with the NTA team regarding their requirements and
needs for the project. The basic aim of the structural design is to build a structure, which is safe,
fulfilling the intended purpose during its estimated life span, economical in terms of initial and
maintenance cost, durable and also maintaining a good aesthetic appearance. The key objective of
this project would be to create well-coordinated spaces in a very systematic and efficient manner
thereby creating a very good and harmonious architecture that will serve the necessities of all the
occupants as well as the change of people approaching either directly or indirectly.
This project is located in the Kathmandu Municipality of the ward – 7, Chabihil, with land area of
1339.41 sq. m. The Main structure of the project is the office building with plinth area of 3645 sq.ft.
The Estimated cost of the Administrative Building complex is NRs…………………
1.1 BACKGROUND
The mission of NTA is to create the optimum conditions for the development of telecommunications
sector in Nepal by serving the public interest in terms of quality, choice and value for money; healthy
competition among service providers and the nation in its drive for socio-economic advancement
through efficient private sector participation.
Steel is tensile. It has a high strength to weight ratio which means it has high strength per unit mass.
SoSo, no matter how large the overall structure is, the steel sections will be small and lightweight,
unlike other building materials. Steel can be easily fabricated and produced massively. Steel sections
can be produced off-site at shop floors and then assembled onsite. This saves time and increases the
efficiency of the overall construction process. Structural steel is very flexible. You can mold it into
any shape, without changing its properties.
Light weight Autoclaved Aerate Block (AAC) block is used for internal and external partition wall. AAC
wall has an excellent Sound Transmission Class (STC) rating of 44. Highest thermal rating in the
industry. ThusThus, provides well insulated interiors, keeping out warm air in summers and cold air
in winters. AAC reduces Air Conditioning costs by up to 30% Earthquake forces on structure are
proportional to the weight of the building, hence AAC shows excellent resistance to the earthquake
forces. Regions of high seismic activity like japan exclusively use AAC.
As per out scope of work, detailed engineering design of electricity and sanitation of Prefab Office
Building and Bill of Quantities (BOQ) and cost estimate for the proposed design is provided.
3 PROJECT AREA
Kathmandu is the capital and eldest metropolitan city of Nepal. The city is the urban core of the
Kathmandu Valley in the Himalayas. The city stands at an elevation of approximately 1,400 meters
(4,600ft) in the bowl-shaped valley in central Nepal surrounded by four major mountains, namely:
Shivapuri, Phulchowki, Nagarjun and Chandragiri. It is inhabited by 671,846 (2001) people. The
Kathmandu District accounts for a population density of only 97 per square kilometers whereas
Kathmandu metropolitan city has a density of 13,225 per square kilometers.
The project area is located in northern edge of Kathmandu Municipality in ward no 7, Saraswoti
Nagar, Chabahil. Dhobi Khola lies approximately 50m west of the property. The site property around
550m north east of Dhobi Khola Bridge in Ring Road. The latitude and Longitude of the site is 27° 43’
31.7’’ N and 85°20’58.9’’ E respectively.
According to the site condition, the ground lies below the road level hence, proper earth filling works
should be carried out in the site to prevent from water logging and to maintain proper drainage
system. Garbage’s and rubbish materials deposited in the site needs to be cleared before
implementing the project work. If required a proper shelter arrangement should be made for the
homeless person staying inside the land area.
4Methodology
This report of Prefab Office Building is based on an exploratory research methodology. Project
introduction, topic selection, site study, collection of primary and secondary data, critical analysis,
interviews and key contact person based detailed survey were the different processes involved to
come to the finalization of this report
4.2.1 Workflow
The relationship of individual as determined by operating procedure must be the governing factor is
any layout. Regarding operations, process and procedures involved in individuals' tasks. The
workstation should be provided in such a way that it creates smooth straight-line flow of work. The
knowledge forms the function of office should be translated and laid out as best possible space
layout within the limitations of the given building.
Visitors receive the first impression of an organization from the décor and layout of the reception
area. It should be attractive, neat, business like and above all adequate to accommodate normal
visitor traffic.
The basic unit of workstation is desk and its function are changing with time. With the change in
planning concepts, workstation concepts are also changing. Simple desk with drawers is the
conventional workstation but now automated workstations are introduced. With the change in
equipment’s like computers from typewriters space requirement of stations have changed.
The aim of workstations is same but their physical requirements are different. The equipment and
task requirements, workstation size, number of components, adjustment alternatives, lighting, filing
facilities and storage space and equipment accessories are some of the most prominent differences.
Building Location
Efficient site Planning
and Building Layout
Accessibility
Building Orientation
Flow of Public
Outdoor Space
Privacy
The major components incorporated in the overall design of the masterplan of the NTA Prefab
Building are mentioned below.
a. Main office building block
b. Container foundation support
c. Guard House
d. Main entrance from western side and side entrance from eastern side
e. Parking area for the staffs and the visitors
The site is easily accessible from motorable road at both the eastern and western side. According to
the proposed plans, the main gate is located in the north eastern corner of the plot. A guard house
of area 240 sq. ft. lies adjacent to the south of the gate. Parking area lies to the south of the guard
house. The entrance road to the area goes west through the main gate then curves south around the
guard house and end in the parking area. A container storage area is proposed along the southern
boundary of the plot. Motor cycle parking is proposed along the western boundary of the plot.
The main prefab office building lies in the western part of the plot. The building can be entered
through the main doors proposed opposite to the parking lot and is 3507.1 sq.ft. An emergency stair
case is proposed at the back of the building, opposite to the main stair case.
A reception and waiting room is proposed to the right of the main entrance. The main entrance
divides the floor into two halves and leads to the main stair case. The northern half is proposed as
office rooms in the ground floor plan and the southern half has Kitchen, Training Room and
Lab/Server Room.
The first floor has two senior office rooms with reception and waiting areas in the southern half of
the building. More office rooms and a meeting hall is proposed in the northern half of the first floor.
In the second floor plan, a hall with stage area is proposed in the northern half of the building.
Separate male and female toilets and terrace areas are proposed in the second floor as well.
5RESULT OUTPUT
The consultant has prepared the architectural drawings and 3D design of proposed engineering
structures.
The consultant has prepared the following plans and working drawings:
As per agreement we have prepared detail architectural, structural, sanitary and electrical designs/
drawings and its associated detail quantity estimate, including abstract of cost of the project. The
cost calculations are based on the rate analysis of Kathmandu Municipality rate for Financial Year
2077/78. It is recommended that the office building needs to be completed as soon as possible.
A Geotechnical soil test is recommended as the site is very close to Dhobi Khola and
commercial/offices building need bearing capacity of soil for foundation design.
73D Layout
Front Elevation
Master Plan
North Elevation
South Elevation
East Elevation
West Elevation