Professional Documents
Culture Documents
Axeia Development Corporation: Green Meadows Residences (Phase 1&2)
Axeia Development Corporation: Green Meadows Residences (Phase 1&2)
AMOUNT
SCOPE OF WORK QTY UNIT UNIT COST TOTAL
EQUIPMENT MATERIAL LABOR
A. DIRECT COST:
1. SURVEY WORKS 87,480.00 sqm 1.50 ₱ 131,220.00
3. EARTHWORKS
A. Excavation/Cut 26,976.00 cu.m. 30.00 ₱ 809,280.00
4. ROADWORKS
A. Excavation/Cut 17,036.00 cu.m 30.00 ₱ 511,080.00
5. SLOPE PROTECTION
A. SP-1: Gravity Type Retaining Wall, Dimension: 2.00m(L) x 2.00m(H) 7.00 nos
Lean Concrete Works: 1.16 cum 5,200.00 5,100.00 100.00 ₱ 6,006.00
Portland Cement, Type 1P 10.40 bag 240.00 230.00 10.00 ₱ 2,494.80
White Sand 0.58 cum 1,450.00 1,300.00 150.00 ₱ 837.38
Gravel G-1 1.16 cum 1,550.00 1,400.00 150.00 ₱ 1,790.25
Excavation & Riprap Works Use Class A Mixture: 21.56 cum 280.00 280.00 ₱ 6,036.80
Boulder, Class C 21.56 cum 2,250.00 1,450.00 800.00 ₱ 48,510.00
Portland Cement, Type 1P 55.47 bag 240.00 230.00 10.00 ₱ 13,313.78
White Sand 3.08 cum 1,350.00 1,200.00 150.00 ₱ 4,160.56
3"Ø x 3m PVC Pipe 3.73 pcs 565.00 540.00 25.00 ₱ 2,109.33
Gravel G-1 (For Gravel Pack) 0.38 cum 1,190.00 1,040.00 150.00 ₱ 449.82
Formworks Needed (Installation & Removal): 7.00 nos
Ordinary Plywood 1/2" thk. 3.50 pcs. 1,140.00 890.00 250.00 ₱ 3,990.00
2" x 2" x 10' rough lumber 17.50 pcs. 235.00 220.00 15.00 ₱ 4,112.50
2" x 3" x 10' rough lumber 17.50 pcs. 340.00 325.00 15.00 ₱ 5,950.00
CWN 1" 0.88 kilo 100.00 95.00 5.00 ₱ 87.50
CWN 3" 1.75 kilo 100.00 95.00 5.00 ₱ 175.00
CWN 2" 0.88 kilo 100.00 95.00 5.00 ₱ 87.50
#16 GI Tie Wire 0.88 kilo 105.00 100.00 5.00 ₱ 91.88
Plastering Works: 26.60 sqm 880.00 780.00 100.00 ₱ 23,408.00
B. SP-2: Gravity Type Retaining Walll, Dimension: 2.00m(L) x 3.00m(H) 5.00 nos
Lean Concrete Works: 1.24 cum 5,200.00 5,100.00 100.00 ₱ 6,435.00
Portland Cement, Type 1P 11.14 bag 240.00 230.00 10.00 ₱ 2,673.00
White Sand 0.62 cum 1,350.00 1,200.00 150.00 ₱ 835.31
Gravel G-1 1.24 cum 1,350.00 1,200.00 150.00 ₱ 1,670.63
Excavation & Riprap Works Use Class A Mixture: 34.65 cum 280.00 280.00 ₱ 9,702.00
Boulder, Class C 34.65 cum 2,250.00 1,450.00 800.00 ₱ 77,962.50
Portland Cement, Type 1P 89.15 bag 240.00 230.00 10.00 ₱ 21,397.15
White Sand 4.95 cum 1,350.00 1,200.00 150.00 ₱ 6,686.61
3"Ø x 3m PVC Pipe 7.50 pcs 565.00 540.00 25.00 ₱ 4,237.50
Gravel G-1 (For Gravel Pack) 0.54 cum 1,350.00 1,200.00 150.00 ₱ 729.00
Formworks Needed (Installation & Removal): 5.00 nos
Ordinary Plywood 1/2" thk. 7.50 pcs. 1,140.00 890.00 250.00 ₱ 8,550.00
2" x 2" x 10' rough lumber 37.50 pcs. 235.00 220.00 15.00 ₱ 8,812.50
2" x 3" x 10' rough lumber 37.50 pcs. 340.00 325.00 15.00 ₱ 12,750.00
CWN 1" 1.25 kilo 100.00 95.00 5.00 ₱ 125.00
CWN 3" 2.50 kilo 100.00 95.00 5.00 ₱ 250.00
CWN 2" 1.25 kilo 100.00 95.00 5.00 ₱ 125.00
#16 GI Tie Wire 1.25 kilo 105.00 100.00 5.00 ₱ 131.25
Plastering Works: 29.00 sqm 880.00 780.00 100.00 ₱ 25,520.00
C. SP-3: Gravity Type Retaining Walll, Dimension: 5.00m(L) x 3.00m(H) 1.00 nos
Page 1 of 20
Lean Concrete Works: 0.76 cum 5,200.00 5,100.00 100.00 ₱ 3,932.50
Portland Cement, Type 1P 6.81 bag 240.00 230.00 10.00 ₱ 1,633.50
White Sand 0.38 cum 1,350.00 1,200.00 150.00 ₱ 510.47
Gravel G-1 0.76 cum 1,350.00 1,200.00 150.00 ₱ 1,020.94
Excavation & Riprap Works Use Class A Mixture: 18.43 cum 280.00 280.00 ₱ 5,159.00
Boulder, Class C 18.43 cum 2,250.00 1,450.00 800.00 ₱ 41,456.25
Portland Cement, Type 1P 47.41 bag 240.00 230.00 10.00 ₱ 11,377.85
White Sand 2.63 cum 1,350.00 1,200.00 150.00 ₱ 3,555.58
3"Ø x 3m PVC Pipe 4.50 pcs 565.00 540.00 25.00 ₱ 2,542.50
Gravel G-1 (For Gravel Pack) 0.32 cum 1,350.00 1,200.00 150.00 ₱ 437.40
Formworks Needed (Installation & Removal): 1.00 nos
Ordinary Plywood 1/2" thk. 2.50 pcs. 1,140.00 890.00 250.00 ₱ 2,850.00
2" x 2" x 10' rough lumber 12.50 pcs. 235.00 220.00 15.00 ₱ 2,937.50
2" x 3" x 10' rough lumber 12.50 pcs. 340.00 325.00 15.00 ₱ 4,250.00
CWN 1" 0.38 kilo 100.00 95.00 5.00 ₱ 37.50
CWN 3" 0.75 kilo 100.00 95.00 5.00 ₱ 75.00
CWN 2" 0.25 kilo 100.00 95.00 5.00 ₱ 25.00
#16 GI Tie Wire 0.25 kilo 105.00 100.00 5.00 ₱ 26.25
Plastering Works: 15.50 sqm 880.00 780.00 100.00 ₱ 13,640.00
D. CW-1: CHB Wall 6" w/o Buttress Wall (Max. H = 1.00m) 438.00 lm
Concreting:
Cement 1,159.56 bags 230.00 230.00 ₱ 266,698.48
Gravel 3/4" 71.50 cu.m. 1,600.00 1,600.00 ₱ 114,399.90
Sand 136.42 cu.m. 1,200.00 1,200.00 ₱ 163,702.39
Gravel G-1 15.69 cu.m. 1,200.00 1,200.00 ₱ 18,828.39
Formworks:
Ordinary Plywood 1/2" thk. 48.19 pcs. 890.00 890.00 ₱ 42,886.60
2" x 2" x 10' rough lumber 346.95 pcs. 220.00 220.00 ₱ 76,328.51
2" x 3" x 10' rough lumber 208.17 pcs. 325.00 325.00 ₱ 67,654.82
CWN 1" 8.67 kilo 90.00 90.00 ₱ 780.63
CWN 3" 34.69 kilo 90.00 90.00 ₱ 3,122.53
CWN 4" 52.04 kilo 90.00 90.00 ₱ 4,683.80
#16 GI Tie Wire 15.61 kilo 100.00 100.00 ₱ 1,561.27
Steel Works/ Masonry Works/Tooljoint:
10 mm dia. X 6 m. Deformed Bar (Grade 40) 1,650.17 pcs 160.00 160.00 ₱ 264,027.26
12 mm dia. X 6 m. Deformed Bar (Grade 40) 1,194.08 pcs 240.00 240.00 ₱ 286,578.87
16 mm dia. X 6 m. Deformed Bar (Grade 40) 289.12 pcs. 345.00 345.00 ₱ 99,747.49
CHB 6" 5,963.17 pcs 20.00 20.00 ₱ 119,263.30
Cement 483.02 bags 230.00 230.00 ₱ 111,093.76
Sand 40.25 cu.m. 1,200.00 1,200.00 ₱ 48,301.64
#16 GI Tie Wire 437.14 kilo 100.00 100.00 ₱ 43,713.98
4" dia PVC orange x 3 m. 144.56 pcs. 485.00 485.00 ₱ 70,112.36
Gravel G-1 39.03 cu.m. 1,200.00 1,200.00 ₱ 46,837.95
Labor 438.00 lm. 1,500.00 1,500.00 ₱ 657,000.00
Page 2 of 20
4" dia PVC orange x 3 m. 71.67 pcs. 485.00 485.00 ₱ 34,758.33
Gravel G-1 19.35 cu.m. 1,200.00 1,200.00 ₱ 23,220.00
Labor 115.00 lm. 1,500.00 1,500.00 ₱ 172,500.00
7. SEWERLINE
a.) Manhole (300mmØ = 12inØ): 156.00 nos
Materials:
Portland Cement 780.00 bag 230.00 230.00 ₱ 179,400.00
Gravel G-1 25.35 cum 1,200.00 1,200.00 ₱ 30,420.00
Sand 62.14 cum 1,200.00 1,200.00 ₱ 74,571.72
6" Ordinary CHB 6,864.00 pcs 20.00 20.00 ₱ 137,280.00
10mm x 6m DSB 1,716.00 pcs 160.00 160.00 ₱ 274,560.00
12mm x 6m DSB 218.40 pcs 240.00 240.00 ₱ 52,416.00
GI Tie Wire #16 5.00 kgs 100.00 100.00 ₱ 500.00
1/2" Pywood 16.00 pcs 890.00 890.00 ₱ 14,240.00
2"x4"x10' Rough Lumber 32.00 pcs 440.00 440.00 ₱ 14,080.00
2"x4"x8' Rough Lumber 32.00 pcs 350.00 350.00 ₱ 11,200.00
CWN 2" 4.00 kgs 90.00 90.00 ₱ 360.00
CWN 1" 2.00 kgs 90.00 90.00 ₱ 180.00
Labor:
Manual Excavation (For Trimming) 55.90 cum 260.00 260.00 ₱ 14,533.16
Concreting of Bottom Part of Manhole 15.21 cum 300.00 300.00 ₱ 4,563.00
CHB Laying 6" 619.50 sqm 250.00 250.00 ₱ 154,874.00
Concreting of Manhole Cover 156.00 nos 150.00 150.00 ₱ 23,400.00
Rebar Fabrication 1,252.71 kgs 5.00 5.00 ₱ 6,263.56
Rebar Installation 1,252.71 kgs 5.00 5.00 ₱ 6,263.56
Formworks Fabrication (For Manhole Cover) 157.56 sqm 180.00 180.00 ₱ 28,360.80
Formworks Installation (For Manhole Cover) 157.56 sqm 300.00 300.00 ₱ 47,268.00
Hauling, Backfilling & General Cleaning Works 156.00 nos 650.00 650.00 ₱ 101,400.00
Page 3 of 20
Formworks Installation (For Manhole Cover) 10.10 sqm 300.00 300.00 ₱ 3,030.00
Hauling, Backfilling & General Cleaning Works 10.00 nos 650.00 650.00 ₱ 6,500.00
Pipe Collaring:
Portland Cement 180.00 bag 230.00 230.00 ₱ 41,400.00
White Sand 17.00 cum 1,200.00 1,200.00 ₱ 20,400.00
Labor:
RCP Lowering & Installation including pipe collaring w/ equipment
assistance 332.00 pcs 750.00 300.00 450.00 ₱ 249,000.00
8. BRIDGE CONSTRUCTION
Bedding & Lean Concrete Works:
Boulder, Class C 114.00 cum 2,250.00 1,450.00 800.00 ₱ 256,500.00
Portland Cement, Type 1P 103.00 bag 230.00 230.00 ₱ 23,690.00
White Sand 24.00 cum 1,200.00 1,200.00 ₱ 28,800.00
Gravel G-1 12.00 cum 1,200.00 1,200.00 ₱ 14,400.00
Labor : Bedding Compaction 228.00 sqm 150.00 150.00 ₱ 34,200.00
Lean Concrete 12.00 cum 5,800.00 5,500.00 300.00 ₱ 69,600.00
Grouted Riprap Works including Excavation, Class A Mixture (Wingwall, Riprap,
Railing Guards & Shear Key Apron):
Boulder, Class C 281.00 cum 1,450.00 1,450.00 ₱ 407,450.00
Portland Cement, Type 1P 2,529.00 bag 230.00 230.00 ₱ 581,670.00
White Sand 140.50 cum 1,300.00 1,300.00 ₱ 182,650.00
Labor : Riprap Works + Excavation Works 281.00 cum 1,100.00 300.00 800.00 ₱ 309,100.00
Reinforced Concrete Pipe, Class 1:
Reinforced Concrete Pipe (RCP, Class 1, with Tongue & Groove, 1500mmØ
26.00 pcs 11,500.00 11,500.00 ₱ 299,000.00
x 1.00M) =
Portland Cement, Type 1P (For Pipe Collaring) 9.00 bag 230.00 230.00 ₱ 2,070.00
White Sand (For Pipe Collaring) 1.00 cum 1,200.00 1,200.00 ₱ 1,200.00
Labor : RCP Lowering & Installation including pipe collaring w/ equipment
assistance 26.00 pcs 1,500.00 800.00 700.00 ₱ 39,000.00
Formworks Needed:
Ordinary Plywood 1/2" 100.00 pcs 890.00 890.00 ₱ 89,000.00
2" x 2" x 10' Rough Lumber 900.00 pcs 220.00 220.00 ₱ 198,000.00
2" x 3" x 10' Rough Lumber 600.00 pcs 325.00 325.00 ₱ 195,000.00
CWN 1" 5.00 kgs 90.00 90.00 ₱ 450.00
CWN 3" 10.00 kgs 90.00 90.00 ₱ 900.00
CWN 4" 15.00 kgs 90.00 90.00 ₱ 1,350.00
Page 5 of 20
CWN 2" 20.00 kgs 90.00 90.00 ₱ 1,800.00
GI Wire #16 12.00 kgs 100.00 100.00 ₱ 1,200.00
Labor : Formworks Fabrication/Installation & Removal 554.40 sqm 380.00 380.00 ₱ 210,672.00
Backfilling of Earth Filling Materials including compaction 1,280.48 cum 305.00 195.00 110.00 ₱ 390,544.88
Labor:
Gabion works, Excavation, and backfilling w equipment assistance 115.20 cum 1,410.00 300.00 1,110.00 ₱ 162,432.00
Roadworks:
Roadway: 102.00 sq.m.
Ready Mix Concrete (3000 psi, G1, S4) 15.30 cu.m. 5,100.00 5,100.00 ₱ 78,041.54
C-Purlins, 2" x 6" x 1.5mm x 6m 4.75 pc 1,050.00 1,050.00 ₱ 4,991.34
DSB, 12mm x 6m (Grade 40) (including stakes) 12.47 pc 230.00 230.00 ₱ 2,867.48
Ordinary Plywood, 3/8” 0.25 pc 1,260.00 1,260.00 ₱ 313.74
GI Wire, #16 0.67 kg 100.00 100.00 ₱ 66.65
Asphalt Sealants 0.81 bag 1,500.00 1,500.00 ₱ 1,215.67
Labor – Concreting of pavement 102.00 sq.m. 100.00 100.00 ₱ 10,200.00
Labor:
Manual Excavation 1.54 cum 260.00 260.00 ₱ 400.08
Column & Post Concreting 24.04 pcs 500.00 500.00 ₱ 12,021.66
Cutting, Welding & Steel Works 24.04 pcs 250.00 250.00 ₱ 6,010.83
Cyclone Fence Installation 36.00 lm 200.00 200.00 ₱ 7,200.00
Painting of Cyclone Fence 56.66 sqm 75.00 75.00 ₱ 4,249.72
Cleaning & Hauling Works 36.00 lm 650.00 650.00 ₱ 23,400.00
General Cleaning & Hauling Works 1.00 lot 15,000.00 15,000.00 ₱ 15,000.00
9. WATERLINE
A. Supply & Installation of Water Tank including structural supports all in
accordance with designer's specification. 85,000.00 gal 0.00 ** NOT INCLUDED ** ₱ -
B. Gate Valves:
Materials:
1.) C.I. Gate Valve Mechanical Type with complete accessories - flange
and operating nuts,bolts&washer (MJ/MJ) :
50mmØ 5.00 set 5,700.00 5,500.00 200.00 ₱ 28,500.00
100mmØ 1.00 set 10,800.00 10,500.00 300.00 ₱ 10,800.00
150mmØ 1.00 set 16,500.00 16,000.00 500.00 ₱ 16,500.00
200mmØ 4.00 set 28,500.00 28,000.00 500.00 ₱ 114,000.00
2.) PVC Valve Box (for 50mmØ, 100mmØ, 150mmØ & 200mmØ) :
uPVC Pipe Blue (Series 8, Class 150), 125mmØ x 6m 1.00 pcs 3,400.00 3,100.00 300.00 ₱ 3,400.00
uPVC Pipe Blue (Series 8, Class 150), 150mmØ x 6m 1.00 pcs 6,800.00 6,200.00 600.00 ₱ 6,800.00
3.) Hinged C.I. Frame and Cover Marked "W" & Year of Construction 11.00 set 2,100.00 1,900.00 200.00 ₱ 23,100.00
Page 6 of 20
Labor & Hydrotest 36.00 pcs 480.00 480.00 ₱ 17,280.00
uPVC Pipe Blue (Series 8, Class 150), 125mmØ x 6m 0.20 pcs 3,100.00 3,100.00 ₱ 620.00
uPVC Pipe Blue (Series 8, Class 150), 150mmØ x 6m 0.30 pcs 6,200.00 6,200.00 ₱ 1,860.00
Hinged C.I. Frame and Cover Marked "W" & Year of Construction 6.00 pcs 1,900.00 1,900.00 ₱ 11,400.00
G.I. 90°Elbow, 75mmØ 6.00 pcs 800.00 800.00 ₱ 4,800.00
G.I. Pipe, 75mmØ x 6m (Schedule 40) 2.00 pcs 4,200.00 4,200.00 ₱ 8,400.00
Angle Fire Hydrant 75mmØ with cap, chain & ring 6.00 set 21,500.00 21,500.00 ₱ 129,000.00
Labor (Fire Hydrant Installation) 6.00 pcs 3,000.00 3,000.00 ₱ 18,000.00
G. Household Connections :
Single Connections:
50mmØ x 3/4"mmØ Cast Iron Saddle Clamp 39.00 pcs 400.00 250.00 150.00 ₱ 15,600.00
150mmØ x 3/4"mmØ Cast Iron Saddle Clamp 5.00 pcs 800.00 650.00 150.00 ₱ 4,000.00
200mmØ x 3/4"mmØ Cast Iron Saddle Clamp 2.00 pcs 1,350.00 1,200.00 150.00 ₱ 2,700.00
3/4"Ø Brass Coupling Adaptor 46.00 pcs 550.00 550.00 ₱ 25,300.00
20mmØ(3/4") Polyethylene Tubing 218.00 lm 35.00 35.00 ₱ 7,630.00
3/4"Ø Male Coupling Adaptor (Brass Type) 46.00 pcs 550.00 550.00 ₱ 25,300.00
3/4" x 1/2" G.I. Elbow Reducer/PE Elbow (Threaded) 46.00 pcs 75.00 75.00 ₱ 3,450.00
Nipple GI (Schedule 40, Commercial) 12.50mmØ x 450mm 0.00 pcs 120.00 120.00 ₱ -
1/2"Ø G.I. End Plug (Schedule 40) 46.00 pcs 35.00 35.00 ₱ 1,610.00
Teflon Tape 10.00 roll 20.00 20.00 ₱ 200.00
Labor: Waterline Installation & Testing 46.00 units 400.00 400.00 ₱ 18,400.00
Page 7 of 20
Double Connections:
50mmØ x 3/4"mmØ Cast Iron Saddle Clamp 333.00 pcs 400.00 250.00 150.00 ₱ 133,200.00
100mmØ x 3/4"mmØ Cast Iron Saddle Clamp 2.00 pcs 700.00 550.00 150.00 ₱ 1,400.00
150mmØ x 3/4"mmØ Cast Iron Saddle Clamp 37.00 pcs 800.00 650.00 150.00 ₱ 29,600.00
200mmØ x 3/4"mmØ Cast Iron Saddle Clamp 25.00 pcs 1,350.00 1,200.00 150.00 ₱ 33,750.00
3/4"Ø Brass Coupling Adaptor 397.00 pcs 550.00 550.00 ₱ 218,350.00
3/4"Ø Polyethylene Tubing 2,306.00 lm 35.00 35.00 ₱ 80,710.00
3/4"Ø Male Coupling Adaptor (Brass Type) 397.00 pcs 550.00 550.00 ₱ 218,350.00
GI Tee Threaded 3/4"Ø x 3/4"Ø 397.00 pcs 90.00 90.00 ₱ 35,730.00
Nipple GI (Schedule 40, Commercial) 3/4"Ø x 300mm 794.00 pcs 70.00 70.00 ₱ 55,580.00
3/4" x 1/2" G.I. Elbow Reducer/PE Elbow 794.00 pcs 75.00 75.00 ₱ 59,550.00
Nipple GI (Schedule 40, Commercial) 1/2"Ø x 450mm 794.00 pcs 120.00 120.00 ₱ 95,280.00
1/2"Ø G.I. End Plug (Schedule 40) 794.00 pcs 35.00 35.00 ₱ 27,790.00
Teflon Tape 20.00 roll 20.00 20.00 ₱ 400.00
Labor: Waterline Installation & Testing 794.00 units 600.00 600.00 ₱ 476,400.00
Formworks:
Ordinary Plywood 1/2" thk. 119.24 pcs 890.00 890.00 ₱ 106,121.97
2" x 2" x 10' Rough Lumber 547.00 pcs 220.00 220.00 ₱ 120,340.00
2" x 3" x 10' Rough Lumber 547.00 pcs 325.00 325.00 ₱ 177,775.00
CWN 1" 34.07 kgs 90.00 90.00 ₱ 3,066.12
CWN 3" 109.50 kgs 90.00 90.00 ₱ 9,855.40
CWN 4" 163.04 kgs 90.00 90.00 ₱ 14,673.59
GI Wire #16 51.10 kgs 100.00 100.00 ₱ 5,110.21
Labor:
Manual Excavation 552.39 cum 260.00 260.00 ₱ 143,621.15
Formworks Fabrication 591.32 sqm 180.00 180.00 ₱ 106,438.31
Rebar Fabrication 19,990.64 kgs 5.00 5.00 ₱ 99,953.22
Rebar Installation 19,990.64 kgs 5.00 5.00 ₱ 99,953.22
Formworks Installation & Removal 591.32 sqm 300.00 300.00 ₱ 177,397.19
CHB Laying 3,710.98 sqm 300.00 300.00 ₱ 1,113,295.12
Concreting 90.04 cum 300.00 300.00 ₱ 27,011.09
Tool Jointing 3,710.98 sqm 10.00 10.00 ₱ 37,109.84
Cleaning & Hauling 1,645.00 lm 60.00 60.00 ₱ 98,700.00
Labor:
Manual Excavation 19.23 cum 260.00 260.00 ₱ 5,001.01
Column & Post Concreting 300.54 pcs 500.00 500.00 ₱ 150,270.76
Cutting, Welding & Steel Works 300.54 pcs 250.00 250.00 ₱ 75,135.38
Cyclone Fence Installation 450.00 lm 200.00 200.00 ₱ 90,000.00
Painting of Cyclone Fence 708.29 sqm 75.00 75.00 ₱ 53,121.55
Cleaning & Hauling Works 450.00 lm 60.00 60.00 ₱ 27,000.00
Page 9 of 20
AXEIA DEVELOPMENT CORPORATION
Project : GREEN MEADOWS RESIDENCES (PHASE 1&2)
Location : Brgy. Calansayan, San Jose, Batangas City
Subject : (BOQ) BILL OF QUANTITIES - Land Development
AMOUNT
SCOPE OF WORK QTY UNIT UNIT COST TOTAL
EQUIPMENT MATERIAL LABOR
A. DIRECT COST:
1. SURVEY WORKS 87,480.00 sqm 1.50 ₱ 131,220.00
3. EARTHWORKS
A. Excavation/Cut 26,976.00 cu.m. 30.00 ₱ 809,280.00
###
B. Engineering Fill 33,763.00 cu.m. 45.00 ₱ 1,519,335.00
4. ROADWORKS
A. Excavation/Cut 17,036.00 cu.m 30.00 ₱ 511,080.00
5. SLOPE PROTECTION
A. SP-1: Gravity Type Retaining Wall, Dimension: 2.00m(L) x 2.00m(H) 7.00 nos ###
Lean Concrete Works: 1.16 cum 5,200.00 5,100.00 100.00 ₱ 6,006.00
Portland Cement, Type 1P 10.40 bag 240.00 230.00 10.00 ₱ 2,494.80
White Sand 0.58 cum 1,450.00 1,300.00 150.00 ₱ 837.38
Gravel G-1 1.16 cum 1,550.00 1,400.00 150.00 ₱ 1,790.25
Excavation & Riprap Works Use Class A Mixture: 21.56 cum 280.00 280.00 ₱ 6,036.80
Boulder, Class C 21.56 cum 2,250.00 1,450.00 800.00 ₱ 48,510.00
Portland Cement, Type 1P 55.47 bag 240.00 230.00 10.00 ₱ 13,313.78
White Sand 3.08 cum 1,350.00 1,200.00 150.00 ₱ 4,160.56
3"Ø x 3m PVC Pipe 3.73 pcs 565.00 540.00 25.00 ₱ 2,109.33
Gravel G-1 (For Gravel Pack) 0.38 cum 1,190.00 1,040.00 150.00 ₱ 449.82
Formworks Needed (Installation & Removal): 7.00 nos
Ordinary Plywood 1/2" thk. 3.50 pcs. 1,140.00 890.00 250.00 ₱ 3,990.00
2" x 2" x 10' rough lumber 17.50 pcs. 235.00 220.00 15.00 ₱ 4,112.50
2" x 3" x 10' rough lumber 17.50 pcs. 340.00 325.00 15.00 ₱ 5,950.00
CWN 1" 0.88 kilo 100.00 95.00 5.00 ₱ 87.50
CWN 3" 1.75 kilo 100.00 95.00 5.00 ₱ 175.00
CWN 2" 0.88 kilo 100.00 95.00 5.00 ₱ 87.50
#16 GI Tie Wire 0.88 kilo 105.00 100.00 5.00 ₱ 91.88
Plastering Works: 26.60 sqm 880.00 780.00 100.00 ₱ 23,408.00
B. SP-2: Gravity Type Retaining Walll, Dimension: 2.00m(L) x 3.00m(H) 5.00 nos ###
Lean Concrete Works: 1.24 cum 5,200.00 5,100.00 100.00 ₱ 6,435.00
Portland Cement, Type 1P 11.14 bag 240.00 230.00 10.00 ₱ 2,673.00
White Sand 0.62 cum 1,350.00 1,200.00 150.00 ₱ 835.31
Gravel G-1 1.24 cum 1,350.00 1,200.00 150.00 ₱ 1,670.63
Excavation & Riprap Works Use Class A Mixture: 34.65 cum 280.00 280.00 ₱ 9,702.00
Boulder, Class C 34.65 cum 2,250.00 1,450.00 800.00 ₱ 77,962.50
Portland Cement, Type 1P 89.15 bag 240.00 230.00 10.00 ₱ 21,397.15
White Sand 4.95 cum 1,350.00 1,200.00 150.00 ₱ 6,686.61
3"Ø x 3m PVC Pipe 7.50 pcs 565.00 540.00 25.00 ₱ 4,237.50
Gravel G-1 (For Gravel Pack) 0.54 cum 1,350.00 1,200.00 150.00 ₱ 729.00
Formworks Needed (Installation & Removal): 5.00 nos
Ordinary Plywood 1/2" thk. 7.50 pcs. 1,140.00 890.00 250.00 ₱ 8,550.00
2" x 2" x 10' rough lumber 37.50 pcs. 235.00 220.00 15.00 ₱ 8,812.50
2" x 3" x 10' rough lumber 37.50 pcs. 340.00 325.00 15.00 ₱ 12,750.00
CWN 1" 1.25 kilo 100.00 95.00 5.00 ₱ 125.00
CWN 3" 2.50 kilo 100.00 95.00 5.00 ₱ 250.00
CWN 2" 1.25 kilo 100.00 95.00 5.00 ₱ 125.00
#16 GI Tie Wire 1.25 kilo 105.00 100.00 5.00 ₱ 131.25
Page 10 of 20
Plastering Works: 29.00 sqm 880.00 780.00 100.00 ₱ 25,520.00
C. SP-3: Gravity Type Retaining Walll, Dimension: 5.00m(L) x 3.00m(H) 1.00 nos ###
Lean Concrete Works: 0.76 cum 5,200.00 5,100.00 100.00 ₱ 3,932.50
Portland Cement, Type 1P 6.81 bag 240.00 230.00 10.00 ₱ 1,633.50
White Sand 0.38 cum 1,350.00 1,200.00 150.00 ₱ 510.47
Gravel G-1 0.76 cum 1,350.00 1,200.00 150.00 ₱ 1,020.94
Excavation & Riprap Works Use Class A Mixture: 18.43 cum 280.00 280.00 ₱ 5,159.00
Boulder, Class C 18.43 cum 2,250.00 1,450.00 800.00 ₱ 41,456.25
Portland Cement, Type 1P 47.41 bag 240.00 230.00 10.00 ₱ 11,377.85
White Sand 2.63 cum 1,350.00 1,200.00 150.00 ₱ 3,555.58
3"Ø x 3m PVC Pipe 4.50 pcs 565.00 540.00 25.00 ₱ 2,542.50
Gravel G-1 (For Gravel Pack) 0.32 cum 1,350.00 1,200.00 150.00 ₱ 437.40
Formworks Needed (Installation & Removal): 1.00 nos
Ordinary Plywood 1/2" thk. 2.50 pcs. 1,140.00 890.00 250.00 ₱ 2,850.00
2" x 2" x 10' rough lumber 12.50 pcs. 235.00 220.00 15.00 ₱ 2,937.50
2" x 3" x 10' rough lumber 12.50 pcs. 340.00 325.00 15.00 ₱ 4,250.00
CWN 1" 0.38 kilo 100.00 95.00 5.00 ₱ 37.50
CWN 3" 0.75 kilo 100.00 95.00 5.00 ₱ 75.00
CWN 2" 0.25 kilo 100.00 95.00 5.00 ₱ 25.00
#16 GI Tie Wire 0.25 kilo 105.00 100.00 5.00 ₱ 26.25
Plastering Works: 15.50 sqm 880.00 780.00 100.00 ₱ 13,640.00
D. CW-1: CHB Wall 6" w/o Buttress Wall (Max. H = 1.00m) 438.00 lm
Concreting: ###
Cement 1,159.56 bags 230.00 230.00 ₱ 266,698.48
Gravel 3/4" 71.50 cu.m. 1,600.00 1,600.00 ₱ 114,399.90
Sand 136.42 cu.m. 1,200.00 1,200.00 ₱ 163,702.39
Gravel G-1 15.69 cu.m. 1,200.00 1,200.00 ₱ 18,828.39
Formworks:
Ordinary Plywood 1/2" thk. 48.19 pcs. 890.00 890.00 ₱ 42,886.60
2" x 2" x 10' rough lumber 346.95 pcs. 220.00 220.00 ₱ 76,328.51
2" x 3" x 10' rough lumber 208.17 pcs. 325.00 325.00 ₱ 67,654.82
CWN 1" 8.67 kilo 90.00 90.00 ₱ 780.63
CWN 3" 34.69 kilo 90.00 90.00 ₱ 3,122.53
CWN 4" 52.04 kilo 90.00 90.00 ₱ 4,683.80
#16 GI Tie Wire 15.61 kilo 100.00 100.00 ₱ 1,561.27
Steel Works/ Masonry Works/Tooljoint:
10 mm dia. X 6 m. Deformed Bar (Grade 40) 1,650.17 pcs 160.00 160.00 ₱ 264,027.26
12 mm dia. X 6 m. Deformed Bar (Grade 40) 1,194.08 pcs 240.00 240.00 ₱ 286,578.87
16 mm dia. X 6 m. Deformed Bar (Grade 40) 289.12 pcs. 345.00 345.00 ₱ 99,747.49
CHB 6" 5,963.17 pcs 20.00 20.00 ₱ 119,263.30
Cement 483.02 bags 230.00 230.00 ₱ 111,093.76
Sand 40.25 cu.m. 1,200.00 1,200.00 ₱ 48,301.64
#16 GI Tie Wire 437.14 kilo 100.00 100.00 ₱ 43,713.98
4" dia PVC orange x 3 m. 144.56 pcs. 485.00 485.00 ₱ 70,112.36
Gravel G-1 39.03 cu.m. 1,200.00 1,200.00 ₱ 46,837.95
Labor 438.00 lm. 1,500.00 1,500.00 ₱ 657,000.00
7. SEWERLINE
a.) Manhole (300mmØ = 12inØ): 156.00 nos
Materials: ###
Portland Cement 780.00 bag 230.00 230.00 ₱ 179,400.00
Gravel G-1 25.35 cum 1,200.00 1,200.00 ₱ 30,420.00
Sand 62.14 cum 1,200.00 1,200.00 ₱ 74,571.72
6" Ordinary CHB 6,864.00 pcs 20.00 20.00 ₱ 137,280.00
10mm x 6m DSB 1,716.00 pcs 160.00 160.00 ₱ 274,560.00
12mm x 6m DSB 218.40 pcs 240.00 240.00 ₱ 52,416.00
GI Tie Wire #16 5.00 kgs 100.00 100.00 ₱ 500.00
1/2" Pywood 16.00 pcs 890.00 890.00 ₱ 14,240.00
2"x4"x10' Rough Lumber 32.00 pcs 440.00 440.00 ₱ 14,080.00
2"x4"x8' Rough Lumber 32.00 pcs 350.00 350.00 ₱ 11,200.00
CWN 2" 4.00 kgs 90.00 90.00 ₱ 360.00
CWN 1" 2.00 kgs 90.00 90.00 ₱ 180.00
Labor:
Manual Excavation (For Trimming) 55.90 cum 260.00 260.00 ₱ 14,533.16
Concreting of Bottom Part of Manhole 15.21 cum 300.00 300.00 ₱ 4,563.00
CHB Laying 6" 619.50 sqm 250.00 250.00 ₱ 154,874.00
Concreting of Manhole Cover 156.00 nos 150.00 150.00 ₱ 23,400.00
Rebar Fabrication 1,252.71 kgs 5.00 5.00 ₱ 6,263.56
Rebar Installation 1,252.71 kgs 5.00 5.00 ₱ 6,263.56
Formworks Fabrication (For Manhole Cover) 157.56 sqm 180.00 180.00 ₱ 28,360.80
Formworks Installation (For Manhole Cover) 157.56 sqm 300.00 300.00 ₱ 47,268.00
Hauling, Backfilling & General Cleaning Works 156.00 nos 650.00 650.00 ₱ 101,400.00
Page 12 of 20
Concreting of Bottom Part of Manhole 1.30 cum 300.00 300.00 ₱ 390.00
CHB Laying 6" 47.99 sqm 250.00 250.00 ₱ 11,997.77
Concreting of Manhole Cover 10.00 nos 150.00 150.00 ₱ 1,500.00
Rebar Fabrication 98.81 kgs 5.00 5.00 ₱ 494.06
Rebar Installation 98.81 kgs 5.00 5.00 ₱ 494.06
Formworks Fabrication (For Manhole Cover) 10.10 sqm 180.00 180.00 ₱ 1,818.00
Formworks Installation (For Manhole Cover) 10.10 sqm 300.00 300.00 ₱ 3,030.00
Hauling, Backfilling & General Cleaning Works 10.00 nos 650.00 650.00 ₱ 6,500.00
Page 13 of 20
Concreting of Manhole Cover (2pcs. Per manhole) 9.00 nos 150.00 150.00 ₱ 1,350.00
Rebar Fabrication 161.20 kgs 5.00 5.00 ₱ 806.01
Rebar Installation 161.20 kgs 5.00 5.00 ₱ 806.01
Formworks Fabrication (For Manhole Cover & RC Wall 4" thk.) 19.89 sqm 180.00 180.00 ₱ 3,580.20
Formworks Installation (For Manhole Cover & RC Wall 4" thk.) 96.71 sqm 300.00 300.00 ₱ 29,011.50
Hauling, Backfilling & General Cleaning Works 9.00 nos 650.00 650.00 ₱ 5,850.00
Pipe Collaring:
Portland Cement 180.00 bag 230.00 230.00 ₱ 41,400.00
White Sand 17.00 cum 1,200.00 1,200.00 ₱ 20,400.00
Labor:
RCP Lowering & Installation including pipe collaring w/ equipment 332.00 pcs 750.00 300.00 450.00 ₱ 249,000.00
assistance
8. BRIDGE CONSTRUCTION
Bedding & Lean Concrete Works: ###
Boulder, Class C 114.00 cum 2,250.00 1,450.00 800.00 ₱ 256,500.00
Portland Cement, Type 1P 103.00 bag 230.00 230.00 ₱ 23,690.00
White Sand 24.00 cum 1,200.00 1,200.00 ₱ 28,800.00
Gravel G-1 12.00 cum 1,200.00 1,200.00 ₱ 14,400.00
Labor : Bedding Compaction 228.00 sqm 150.00 150.00 ₱ 34,200.00
Lean Concrete 12.00 cum 5,800.00 5,500.00 300.00 ₱ 69,600.00
Grouted Riprap Works including Excavation, Class A Mixture (Wingwall, Riprap,
Railing Guards & Shear Key Apron):
Boulder, Class C 281.00 cum 1,450.00 1,450.00 ₱ 407,450.00
Portland Cement, Type 1P 2,529.00 bag 230.00 230.00 ₱ 581,670.00
White Sand 140.50 cum 1,300.00 1,300.00 ₱ 182,650.00
Labor : Riprap Works + Excavation Works 281.00 cum 1,100.00 300.00 800.00 ₱ 309,100.00
Reinforced Concrete Pipe, Class 1:
Reinforced Concrete Pipe (RCP, Class 1, with Tongue & Groove, 1500mmØ
26.00 pcs 11,500.00 11,500.00 ₱ 299,000.00
x 1.00M) =
Portland Cement, Type 1P (For Pipe Collaring) 9.00 bag 230.00 230.00 ₱ 2,070.00
Page 14 of 20
White Sand (For Pipe Collaring) 1.00 cum 1,200.00 1,200.00 ₱ 1,200.00
Labor : RCP Lowering & Installation including pipe collaring w/ equipment
26.00 pcs 1,500.00 800.00 700.00 ₱ 39,000.00
assistance
Formworks Needed:
Ordinary Plywood 1/2" 100.00 pcs 890.00 890.00 ₱ 89,000.00
2" x 2" x 10' Rough Lumber 900.00 pcs 220.00 220.00 ₱ 198,000.00
2" x 3" x 10' Rough Lumber 600.00 pcs 325.00 325.00 ₱ 195,000.00
CWN 1" 5.00 kgs 90.00 90.00 ₱ 450.00
CWN 3" 10.00 kgs 90.00 90.00 ₱ 900.00
CWN 4" 15.00 kgs 90.00 90.00 ₱ 1,350.00
CWN 2" 20.00 kgs 90.00 90.00 ₱ 1,800.00
GI Wire #16 12.00 kgs 100.00 100.00 ₱ 1,200.00
Labor : Formworks Fabrication/Installation & Removal 554.40 sqm 380.00 380.00 ₱ 210,672.00
Backfilling of Earth Filling Materials including compaction 1,280.48 cum 305.00 195.00 110.00 ₱ 390,544.88
Labor:
Gabion works, Excavation, and backfilling w equipment assistance 115.20 cum 1,410.00 300.00 1,110.00 ₱ 162,432.00
Roadworks:
Roadway: 102.00 sq.m. ###
Ready Mix Concrete (3000 psi, G1, S4) 15.30 cu.m. 5,100.00 5,100.00 ₱ 78,041.54
C-Purlins, 2" x 6" x 1.5mm x 6m 4.75 pc 1,050.00 1,050.00 ₱ 4,991.34
DSB, 12mm x 6m (Grade 40) (including stakes) 12.47 pc 230.00 230.00 ₱ 2,867.48
Ordinary Plywood, 3/8” 0.25 pc 1,260.00 1,260.00 ₱ 313.74
GI Wire, #16 0.67 kg 100.00 100.00 ₱ 66.65
Asphalt Sealants 0.81 bag 1,500.00 1,500.00 ₱ 1,215.67
Labor – Concreting of pavement 102.00 sq.m. 100.00 100.00 ₱ 10,200.00
Labor:
Manual Excavation 1.54 cum 260.00 260.00 ₱ 400.08
Column & Post Concreting 24.04 pcs 500.00 500.00 ₱ 12,021.66
Cutting, Welding & Steel Works 24.04 pcs 250.00 250.00 ₱ 6,010.83
Cyclone Fence Installation 36.00 lm 200.00 200.00 ₱ 7,200.00
Painting of Cyclone Fence 56.66 sqm 75.00 75.00 ₱ 4,249.72
Cleaning & Hauling Works 36.00 lm 650.00 650.00 ₱ 23,400.00
General Cleaning & Hauling Works 1.00 lot 15,000.00 15,000.00 ₱ 15,000.00
9. WATERLINE
B. Gate Valves:
Materials:
1.) C.I. Gate Valve Mechanical Type with complete accessories - flange
and operating nuts,bolts&washer (MJ/MJ) : ###
50mmØ 5.00 set 5,700.00 5,500.00 200.00 ₱ 28,500.00
100mmØ 1.00 set 10,800.00 10,500.00 300.00 ₱ 10,800.00
150mmØ 1.00 set 16,500.00 16,000.00 500.00 ₱ 16,500.00
200mmØ 4.00 set 28,500.00 28,000.00 500.00 ₱ 114,000.00
2.) PVC Valve Box (for 50mmØ, 100mmØ, 150mmØ & 200mmØ) :
uPVC Pipe Blue (Series 8, Class 150), 125mmØ x 6m 1.00 pcs 3,400.00 3,100.00 300.00 ₱ 3,400.00
uPVC Pipe Blue (Series 8, Class 150), 150mmØ x 6m 1.00 pcs 6,800.00 6,200.00 600.00 ₱ 6,800.00
3.) Hinged C.I. Frame and Cover Marked "W" & Year of Construction 11.00 set 2,100.00 1,900.00 200.00 ₱ 23,100.00
Page 15 of 20
White Sand 0.21 cum 1,350.00 1,200.00 150.00 ₱ 282.74
Gravel G-1 0.42 cum 1,350.00 1,200.00 150.00 ₱ 565.48
12mmØx 6m DSB Bar (Grade 33) 1.30 pcs 255.00 240.00 15.00 ₱ 331.50
GI Tie Wire #16 0.11 kgs 105.00 100.00 5.00 ₱ 11.64
uPVC Pipe Blue (Series 8, Class 150), 125mmØ x 6m 0.20 pcs 3,100.00 3,100.00 ₱ 620.00
uPVC Pipe Blue (Series 8, Class 150), 150mmØ x 6m 0.30 pcs 6,200.00 6,200.00 ₱ 1,860.00
Hinged C.I. Frame and Cover Marked "W" & Year of Construction 6.00 pcs 1,900.00 1,900.00 ₱ 11,400.00
G.I. 90°Elbow, 75mmØ 6.00 pcs 800.00 800.00 ₱ 4,800.00
G.I. Pipe, 75mmØ x 6m (Schedule 40) 2.00 pcs 4,200.00 4,200.00 ₱ 8,400.00
Angle Fire Hydrant 75mmØ with cap, chain & ring 6.00 set 21,500.00 21,500.00 ₱ 129,000.00
Labor (Fire Hydrant Installation) 6.00 pcs 3,000.00 3,000.00 ₱ 18,000.00
G. Household Connections :
Page 16 of 20
Single Connections:
50mmØ x 3/4"mmØ Cast Iron Saddle Clamp 39.00 pcs 400.00 250.00 150.00 ₱ 15,600.00
150mmØ x 3/4"mmØ Cast Iron Saddle Clamp 5.00 pcs 800.00 650.00 150.00 ₱ 4,000.00
200mmØ x 3/4"mmØ Cast Iron Saddle Clamp 2.00 pcs 1,350.00 1,200.00 150.00 ₱ 2,700.00
3/4"Ø Brass Coupling Adaptor 46.00 pcs 550.00 550.00 ₱ 25,300.00
20mmØ(3/4") Polyethylene Tubing 218.00 lm 35.00 35.00 ₱ 7,630.00
3/4"Ø Male Coupling Adaptor (Brass Type) 46.00 pcs 550.00 550.00 ₱ 25,300.00
3/4" x 1/2" G.I. Elbow Reducer/PE Elbow (Threaded) 46.00 pcs 75.00 75.00 ₱ 3,450.00
Nipple GI (Schedule 40, Commercial) 12.50mmØ x 450mm 0.00 pcs 120.00 120.00 ₱ -
1/2"Ø G.I. End Plug (Schedule 40) 46.00 pcs 35.00 35.00 ₱ 1,610.00
Teflon Tape 10.00 roll 20.00 20.00 ₱ 200.00
Labor: Waterline Installation & Testing 46.00 units 400.00 400.00 ₱ 18,400.00
Double Connections:
50mmØ x 3/4"mmØ Cast Iron Saddle Clamp 333.00 pcs 400.00 250.00 150.00 ₱ 133,200.00
100mmØ x 3/4"mmØ Cast Iron Saddle Clamp 2.00 pcs 700.00 550.00 150.00 ₱ 1,400.00
150mmØ x 3/4"mmØ Cast Iron Saddle Clamp 37.00 pcs 800.00 650.00 150.00 ₱ 29,600.00
200mmØ x 3/4"mmØ Cast Iron Saddle Clamp 25.00 pcs 1,350.00 1,200.00 150.00 ₱ 33,750.00
3/4"Ø Brass Coupling Adaptor 397.00 pcs 550.00 550.00 ₱ 218,350.00
3/4"Ø Polyethylene Tubing 2,306.00 lm 35.00 35.00 ₱ 80,710.00
3/4"Ø Male Coupling Adaptor (Brass Type) 397.00 pcs 550.00 550.00 ₱ 218,350.00
GI Tee Threaded 3/4"Ø x 3/4"Ø 397.00 pcs 90.00 90.00 ₱ 35,730.00
Nipple GI (Schedule 40, Commercial) 3/4"Ø x 300mm 794.00 pcs 70.00 70.00 ₱ 55,580.00
3/4" x 1/2" G.I. Elbow Reducer/PE Elbow 794.00 pcs 75.00 75.00 ₱ 59,550.00
Nipple GI (Schedule 40, Commercial) 1/2"Ø x 450mm 794.00 pcs 120.00 120.00 ₱ 95,280.00
1/2"Ø G.I. End Plug (Schedule 40) 794.00 pcs 35.00 35.00 ₱ 27,790.00
Teflon Tape 20.00 roll 20.00 20.00 ₱ 400.00
Labor: Waterline Installation & Testing 794.00 units 600.00 600.00 ₱ 476,400.00
Formworks:
Ordinary Plywood 1/2" thk. 119.24 pcs 890.00 890.00 ₱ 106,121.97
2" x 2" x 10' Rough Lumber 547.00 pcs 220.00 220.00 ₱ 120,340.00
2" x 3" x 10' Rough Lumber 547.00 pcs 325.00 325.00 ₱ 177,775.00
CWN 1" 34.07 kgs 90.00 90.00 ₱ 3,066.12
CWN 3" 109.50 kgs 90.00 90.00 ₱ 9,855.40
CWN 4" 163.04 kgs 90.00 90.00 ₱ 14,673.59
GI Wire #16 51.10 kgs 100.00 100.00 ₱ 5,110.21
Labor:
Manual Excavation 552.39 cum 260.00 260.00 ₱ 143,621.15
Formworks Fabrication 591.32 sqm 180.00 180.00 ₱ 106,438.31
Rebar Fabrication 19,990.64 kgs 5.00 5.00 ₱ 99,953.22
Rebar Installation 19,990.64 kgs 5.00 5.00 ₱ 99,953.22
Formworks Installation & Removal 591.32 sqm 300.00 300.00 ₱ 177,397.19
CHB Laying 3,710.98 sqm 300.00 300.00 ₱ 1,113,295.12
Concreting 90.04 cum 300.00 300.00 ₱ 27,011.09
Tool Jointing 3,710.98 sqm 10.00 10.00 ₱ 37,109.84
Cleaning & Hauling 1,645.00 lm 60.00 60.00 ₱ 98,700.00
Labor:
Manual Excavation 19.23 cum 260.00 260.00 ₱ 5,001.01
Column & Post Concreting 300.54 pcs 500.00 500.00 ₱ 150,270.76
Cutting, Welding & Steel Works 300.54 pcs 250.00 250.00 ₱ 75,135.38
Page 17 of 20
Cyclone Fence Installation 450.00 lm 200.00 200.00 ₱ 90,000.00
Painting of Cyclone Fence 708.29 sqm 75.00 75.00 ₱ 53,121.55
Cleaning & Hauling Works 450.00 lm 60.00 60.00 ₱ 27,000.00
B. INDIRECT COST:
Mobilization & Demobilization 1.00 lot 200,000.00 200,000.00 ₱ 200,000.00
Tools/Machines Needed 1.00 lot 150,000.00 150,000.00 ₱ 150,000.00
Temporary Connections, Power & Water (Assumption 2yrs.) 1.00 lot 200,000.00 200,000.00 ₱ 200,000.00
Temporary Facilities (Barracks) 1.00 unit 180,000.00 180,000.00 ₱ 180,000.00
Temporary Facilities (Warehouse) 1.00 unit 100,000.00 100,000.00 ₱ 100,000.00
Site Management (Assumption 2yrs.) 1.00 lot 550,000.00 550,000.00 ₱ 550,000.00
Contractor's Tax-EWT, 2% 1.00 lot 1,115,020.27 1,115,020.27 ₱ 1,115,020.27
Page 18 of 20
AXEIA DEVELOPMENT CORPORATION
Project :
Location :
Subject :
No.: PARTICULARS 1ST MONTH 2ND MONTH 3RD MONTH 4TH MONTH 5TH MONTH 6TH MONTH 7TH MONTH 8TH MO
A. DIRECT COST: W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
1. SURVEY WORKS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2. CLEARING AND GRUBBING #REF! #REF! #REF! #REF!
3. EARTHWORKS (Excavation & Engineering Fill) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4. ROADWORKS:
Road Excavation/Cutting #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Road Engineering Fill #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Coarse Materials & Preparation #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Road & Alleys #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Curbs & Gutter #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Concrete Sidewalk #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5. SLOPE PROTECTION:
SP-1: Gravity Type Retaining Wall, Dimension: 2.00m(L) x 2.00m(H) #REF! #REF!
SP-2: Gravity Type Retaining Walll, Dimension: 2.00m(L) x 3.00m(H) #REF! 0.16%
SP-3: Gravity Type Retaining Walll, Dimension: 5.00m(L) x 3.00m(H) #REF!
CHB Wall-1: 6" w/o Buttress Wall (Max. H = 1.00m) #REF! #REF! #REF! #REF! #REF! #REF!
CHB Wall-2: 6" w/ Buttress Wall (Max. H = 2.00m) #REF! #REF! #REF! #REF! #REF! #REF!
CHB Wall-3: 6" w/ Buttress Wal (Max. H = 3.00m) #REF! #REF! #REF! #REF! #REF! #REF!
6. RETAINING WALL FOR SPLIT ELEVATION:
RW-1: Retaining Wall (0.80m - 1.00m) #REF! #REF! #REF!
RW-2: Retaining Wall (0.60m - 0.79m) #REF! #REF! #REF! #REF!
7. SEWERLINE:
Manholes (300mmØ to 900mmØ) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reinforced Concrete Piping #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Steel Grating #REF! #REF!
8. CONSTRUCTION OF BRIDGE:
9. WATERLINE:
WEEKLY ACCOMPLISHMENTS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
MONTHLY ACCOMPLISHMENTS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF
Prepared By:
8TH MONTH 9TH MONTH 10TH MONTH 11TH MONTH 12TH MONTH
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!