General information

1 A 2 When slab formwork is used,


- the props have to be erected plumb.
- it must be seen to it that the system cannot be moved horizontally at
slab level.
1200 1200 1200 1200 (Carrying off of existing horizontal loads according to DIN 4421)
- tension ties for cantilevers have to be assembled tightly.

VT 20 - 330 CM
VT 20 - 330 CM LEGEND

Site to provide tie down to prevent over turning at cantilever

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM
area

1200
A VT 20 - 215 CM
VT 20 - 330 CM
VT 20 - 330 CM
VT 20 - 215 CM
Prop + Crosshead

Only Prop

895
VT 20 - 215 CM VT 20 - 215 CM
For further details refer PERI Brochures
VT 20 - 330 CM
VT 20 - 215 CM VT 20 - 330 CM VT 20 - 215 CM
If any void areas , provide suitable support by site
1300

VT 20 - 330 CM

VT 20 - 330 CM

20 - 330 CM

VT 20 - 330 CM
VT 20 - 215 CM VT 20 - 215 CM
All Upstand Beam,Wall to be cast later
VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM
VT 20 - 215 CM
200 VT 20 - 215 CM

1800
Tripod not shown in plan for clarity

VT
VT 20 - 215 CM VT 20 - 215 CM
1300

1200 465 1200 1200 1200 1200 465 1200 NOTES FOR SLAB / BEAM FORMWORK :
VT 20 - 215 CM VT 20 - 215 CM
VT 20 - 330 CM 1.) FORMWORK IS DESIGNED USING 18mm PLYWOOD WITH MAX. SPACING FOR :
VT 20 - 330 CM
a.) SECONDARY GIRDERS :-
VT 20 - 215 CM VT 20 - 215 CM
570

VT 20 - 330 CM AT SLAB (220 mm) = 610 mm


VT 20 - 215 CM VT 20 - 330 CM VT 20 - 215 CM
AT BEAM (600~1000 mm) = 406 mm
VT 20 - 265 CM

VT 20 - 265 CM

VT 20 - 265 CM

VT 20 - 265 CM
VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM
VT 20 - 215 CM VT 20 - 215 CM
1800

1200

b.) PRIMARY GIRDERS : AS SHOWN IN DRAWING


VT 20 - 215 CM VT 20 - 215 CM 2.) FOR ALTERATIONS USE THE "PERI DESIGN TABLES"
3.) TRIPODS ARE NECESSARY ONLY FOR ERECTION OF THE SLAB FORMWORK.
VT 20 - 330 CM
VT 20 - 215 CM VT 20 - 330 CM VT 20 - 215 CM
AND THEY CAN BE REMOVED IMMEDIATELY AFTER POURING.
4.) PROPS MUST BE ERECTED IN TRUE VERTICAL.
570

VT 20 - 215 CM VT 20 - 330 CM VT 20 - 215 CM


VT 20 - 330 CM

VT 20 - 215 CM
200 VT 20 - 215 CM
1300

PROP BRACING DETAIL


VT 20 - 330 CM

VT 20 - 330 CM

- 330 CM

VT 20 - 330 CM
VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM

VT 20 - 330 CM
VT 20 - 215 CM VT 20 - 215 CM *refer to Assembly Instructions for more details
1800

VT 20 - 215 CM VT 20 - 215 CM

VT 20 - 215 CM
VT 20 VT 20 - 215 CM
1300

VT 20 - 330 CM
VT 20 - 330 CM
VT 20 - 215 CM VT 20 - 215 CM
895

VT 20 - 215 CM VT 20 - 215 CM
GENERAL NOTES:-
VT 20 - 330 CM 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRES .
VT 20 - 215 CM VT 20 - 330 CM VT 20 - 215 CM

B 2. THIS DRAWING SHOULD BE READ INCONJUNCTION WITH RELEVANT


ARCHITECTURAL AND STRUCTURAL DRAWING.
VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM

VT 20 - 215 CM
270000

3. THE WRITTEN DIMENSIONS TO BE CONSIDERED.


1200

VT 20 - 330 CM upstand wall


VT 20 - 330 CM
to be casted later

TOC ( +5.000
)

200
A

600
700

700
VT 20 l= 3,30m VT 20 l= 3,30m

VT 20 l= 2,15m
VT 20 l= 2,15m VT 20 l= 2,15m

Diesel Generator Room


Roof Slab Formwork Layout
SCALE 1:33

4780
4580

Site
Anc
hor

by
General Arrangement Drawing

lab
to s

to s
lab
PEP ERGO D-500

PEP ERGO D-500


PEP ERGO D-500

PEP ERGO D-500

PEP ERGO D-500

PEP ERGO D-500

PEP ERGO D-500

PEP ERGO D-500

PEP ERGO D-500

PEP ERGO D-500


hor
by

R
PERI L.L.C.

Anc
Site
25-0009107-B024_0.dwg Diesel Generator Room Slab Formwork

Phone: + 971 (0)4.3 26 29 92


P. O. Box 27933 Fax: + 971 (0)4.3 26 29 93
TOC ( +0.220
) Dubai - United Arab Emirates E-Mail: perillc@perime.com

s s Name Date
Aztec Middle East
re
Company

Project 400/132KV CANAL GARD


r o g drawn: Christian Tadeo 2020-08-26

Section A-A p
Diesel Generator Room SlabnFormwork
checked:

Subject I Copyright of this drawing and


associated documents are property of
SCALE 1:33 Multiflex PERI. They may not be reproduced or
made available to third persons,
2021-02-06

Scale Drawing-no. Sheet Revision especially competitors, without our


1:50 25-0009107-B024 1 0 consent
.

h/b = 594 / 841 mm