GRAVITY SEPARATION EQUIPMENT

FOR GOLD MINING

IHe Holland have been involved in the design and manufacture of especially in the small particle size
mining equipment since the end of the last century Most of this equipment ranges, this concept improves
is used in alluvial mining projects all over the world. feed distribution, requires less con-
In the early days, most of the dredgers built for mining were of the struction space, water and power,
bucket type, with sluice boxes, and these were used for gold mining oper- and reduces operational costs.
ations. But gradually the emphasis changed to alluvial tin mining. With the The present range is based on a
fixed, low gold price between 1945 and 1973, hardly any equipment was modular design consisting of sepa-
sold for gold mining projects. rated cells as shown in Figs. 1 and
Alluvial tin mining, however, continued to develop and bucket dredg- 2.
ers with integrated treatment installations were built in large numbers.
More and more attention was only include alluvial mining, but
given to the efficiency of the treat- also other applications like hard-
ment installations, and this ulti- rock gold mining and the recovery
mately led to the development of of gold as a by-product of sand
the IHC jig. and gravel winning.
These jigs were first used on the
modern bucket dredgers built for In this article we shall examine
use in alluvial tin projects, and after these various applications in gold
1973 again for alluvial gold oper- mining using IHC gravity separa-
ations. tion equipment, and highlight some
of the specific operational parame- Fig 2
In the early Eighties it was realized ters for these applications.
that the highly efficient IHC treat- For gold processing, each cell or
ment installations on board bucket module will as a rule be able to
dredgers, could be used to advan- IHe HOLLAND JIGS process 32 ton/hr of dry solids.
tage in other mining applications. Depending on the required capaci-
IHC developed skid-mounted ty, modules can be combined, the
plants for onshore operations and The basic design of IHC maximum number, twelve, forming
a pontoon-mounted version to work Holland jigs was developed in the a circular jig.
in conjunction with backhoe, grab, late Sixties and combines the tra- If additional capacity is required,
cutter or wheel dredgers. pezoidal shape with the IHC saw- further jigs, each consisting of a
With the decline of the tin market tooth drive characteristic, i.e. a number of modules, can be in-
after 1985, these new concepts rapid upward stroke followed by a stalled.
have come to be used primarily in slow downward movement of the For smaller capacities, a mini-mod-
gold mining projects. These not pulsator. ule jig and a number of small rec-
Besides higher recovery rates, tangular jigs are available.
F'9 ,

THE USE OF JIGS IN


GOLD SEPARATION

In general, jigs are well suit-


ed to use in gold separation pro-
cesses. The high specific density
of gold is an important parameter
in assuring high efficiency in gravi-
ty separation, even for smaller par-
ticle size ranges.
The thick bed characteristics of the
jig, as compared to thin flowing film
concentrators such as spirals and
shaking tables, guarantees a sta-
ble operation and makes the jig
less sensitive to fluctuations in feed
capacity and material parameters.

Furthermore, due to its ductile


character, gold tends to form long
flat particles, giving problems in
--20--------------
'" 3
the separation process when using ze is discharged by belt conveyors ry as clay contents of over 15% re-
thin flowing film concentrators. and the undersize pumped to the duce the efficiency of the jigs.
jig installation.
This makes the jig superior to other The jig feed material is processed For this kind of alluvial gold oper-
gravity methods, particularly for through two cyclones to get rid of ations, three jig stages are normal-
rougher duty/primary concentra- the slimy material. This is necessa- ly used, with the tailings of the pri-
tion, or as pre-concentrator where
feed fluctuations cannot be avoid-
ed.
In the following sections, various
uses of IHe jigs in goldmining
operations will be examined. Every
operation depends on the operat-
ing parameters encountered, not q.'EWl.awr----~-·~-"~-=:=;!,-L_,
1.
only in terms of capacity, but also tE.lDDIl_ C'I'CUl!€I

of flowsheet layout, efficiency and • •


operational control.

IHe JIGS IN ALLUVIAL


GOLD MINING
.........
The treatment installation
shown in Fig. 3 was designed and
built for an alluvial gold mining .,._WATU;UNT.,;

operation in West Africa and con- ~::..ao.ullOH


sists of a scrubber/screening unit
and a separate jig plant with six
modules as the primary stage.

The feed material is fed into the


scrubber/screen drum assisted by
monitors, thoroughly washed and '" 4
screened off at 9.5 mm. The oversi-

-------------21-
a sand and gravel operation in the
U.S.A. The deposit contains alluvial
gold, which is recovered as a by-
product.
The gold used to be recovered by
two sluice boxes, but analysis
showed that an important part of
the gold was lost by using this
method.
A three-stage IHC jig system was
installed. consisting of a 12-mod-
ule jig as the primary stage, a 2-
module jig as the secondary stage
and a mini-module as the tertiary
stage.
Fig. 7 shows the installation of the
primary jig.
F'95

mary stage being discharged, as


can be seen in the flowsheet
shown in Fig. 4.
The primary stage concentrate is
fed into the secondary jig stage. of
which the tailings are recirculated
via the primary stage.
The secondary stage concentrate
is further upgraded in the tertiary
jig stage, producing the final con-
centrate. Tailings from the tertiary
stage are also recirculated via the
secondary stage.
FIg 6

The purpose of the primary jig is to Important factors in the choice of


get the highest possible recovery, the IHC jig system were:
while the secondary and tertiary
jigs are used as clean-up stages to - The system had to have a higher
increase the quality of the concen- recovery rate than the sluice
trate. boxes.
- The jig operation might not inter-
Fig. 5 gives a detailed view of the fere with the sand and gravel
six-module jig plant with cyclones. process, and thus possibly delay
Even when treating material with the main product operation.
high clay content, recovery rates of - The system had to be able to co-
over 96% have been measured on pe with surges of sand and grav-
gold particles down to 50 11m. el which exceeded the average
Using IHC jigs in three stages design capacity.
enables ratios of concentration - As the system had to be built
between 2000 and 4000 to be within the existing plant, a mini-
achieved. mum of construction space was
demanded.
IHC JIGS FOR GOLD The IHe jig system proved itself
RECOVERY IN SAND AND from the outset, giving very high
GRAVEL OPERATIONS gold recovery rates at high capaci-
ties and with a minimum of mainte-
nance.
The next example of the use
of IHC jigs is shown in Fig. 6. This Fig. 8 shows the primary jig in
picture shows the process tower of operation.

- 2 2 - - - - - - - - - -_ _
IHC JIGS IN HARD-ROCK
GOLD OPERATION

Fig. 9 shows two 12-module


IHC jigs installed as primary gravi- This results in a higher percentage have proved able to maintain a
ty separators in a hard-rock gold of gold than average material recir- high performance in terms of both
processing plant. culating in the ballmill circuit, and recovery and ratio of concentra-
The flowsheet of this operation is is known as overmilling of the gold. tion, while requiring only minimum
reproduced in Fig. 10. The installation of a gravity step will maintenance.
reduce this effect, as the gold will FI(} 10
Using a gravity stop between the be recovered before it can be re-
ballmills and the chemical recovery circulated by the cyclone. More-
systems will result in recovery of over, gold particles with an oxidiz-
the free gold at an earlier stage ed coating will be concentrated by
and more effectively in terms of the gravity step, whereas certain
cost. chemical processes will have prob-
lems.
Furthermore, the cyclone classi-
fies, which means that it separates High slime contents, very small
not only by particle size (for which ballmill discharge and feed surges
it is installed), but also by specific cause the jigs to operate near the
gravity. limit and demand much more at-
Gold, with its very high specific tention, compared with the other
gravity, will report earlier to the two examples described above.
apex discharge of the cyclone than However, operating under proper
similar sized rock-matrix material. process conditions, the IHC jigs