Approval: Tech. Svcs. Dept. Original Issue Date: 01/01/2007 No. ENV-11
PURPOSE: The purpose of this procedure is for implementing corrective and preventive
actions to address actual and potential nonconformities as well as taking any
actions to mitigate any related impacts. This procedure addresses the
requirements of ISO 14001, 4.5.3.
DEFINITIONS:
1. Procedure
1.1 Potential and actual nonconformities are identified and reported to the
Technical Services Department following the communication procedure (ENV-
05). Potential and actual nonconformities can be identified through:
• Internal or external communications (ENV-05)
• Emergency Preparedness and Response (ENV-08)
• Monitoring and measurement activities (ENV-09)
• Regulatory compliance evaluations (ENV-10)
• Internal EMS audits (ENV-13)
• Third Party audits
• General observations related to possible corrective or preventive
actions
• Regulatory inspections
Description of Revision(s): 1/2/2008; 1/23/08. 5/12/08; insert Section 1.3 related to the Findings Log (ENV-11B) for tracking
actions for findings graded “O” (observation) and “RC” (Requires Correction); 6/3/10
“K” or “G” drive as controlled documents; 7/14/10- Tech. Svcs. Dept.; 8/17/10 –job titles;11/26/10 - 1.7; 1/31/12 – RCA; 7/2/13- #1.8
NONCONFORMITY, CORRECTIVE ACTION AND PREVENTIVE ACTION
Approval: Tech. Svcs. Dept. Original Issue Date: 01/01/2007 No. ENV-11
1.4 The Technical Services Department completes a NCR form and assigns a
sequential NCR number. The NCR is issued to the Facility Manager in the
area in which the potential or actual nonconformance was identified.
1.5 The Technical Services Department determines the corrective action, taking
into consideration causes and preventive actions that need to be taken.
Depending on the type of nonconformance, an additional root cause analysis
may be necessary to determine the source of the problem and to prevent the
problem from reoccurring in the future. This information is entered onto the
NCR along with a target date for completion. Appropriate Senior
Management and Facility Manager(s) may assist with determining
corrective/preventive actions, as needed.
1.6 The Facility Manager in the area(s) in which the NCR was issued is
responsible for tracking the corrective actions and for ensuring their
completion.
1.7 The Technical Services Department reviews the completed corrective and/or
preventive action for effectiveness prior to its closure. The review occurs on,
at least, a semiannual basis. During the review, the NCRs are analyzed to
determine if there are potential trends developing which would require
modifications to procedures.
1.8 The Technical Services Department will work with any responsible party to
determine if further analysis or follow-up is needed after the review of the
NONCONFORMITY, CORRECTIVE ACTION AND PREVENTIVE ACTION
Approval: Tech. Svcs. Dept. Original Issue Date: 01/01/2007 No. ENV-11
2. Responsibilities
3. Training
3.1 Training needs will be identified and conducted, if required, in accordance
with ENV-04.
4. Records
4.1 Nonconformance Report (NCR) Form (ENV-11A)
4.2 Findings Log (ENV-11B)