You are on page 1of 24

PROYEK KERETA CEPAT JAKARTA - BANDUNG

RELOKASI FASOS FASUM AREA 2

DRAWINGS ALBUM
RELOCATION PUBLIC ACCESS CIJENGKOL
DK 100+480
KABUPATEN BANDUNG BARAT

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
APPROVAL SHEET

RELOCATION WORK:

RELOCATION PUBLIC ACCESS CIJENGKOL


DK 100+480
KABUPATEN BANDUNG BARAT
PREPARED BY APPROVED BY APPROVED BY

PT.WIJAYA KARYA CRDC HSRCC HSRCC


PT WIJAYA KARYA (Persero) Tbk.

( ................................... ) ( ................................... ) ( ................................... )


....................... ....................... .......................

APPROVED BY APPROVED BY APPROVED BY

PT.KCIC PT.PSBI ASSET OWNER


Pilar Sinergi BUMN Indonesia

( ................................... ) ( ................................... ) ( ................................... )


....................... ....................... .......................
21
2
63
64

213

66

69
65 68

RELOCATION PUBLIC ACCESS CIJENGKOL


DK 100+490
67
70

3
71

72
73 77

74

75
76 211

79 78
207

80
87 88
81
208
4 89
209 90

86

91
RELOCATION PUBLIC ACCESS CIJENGKOL
DK 100+480 85 REVISION HISTORY
82

98
84 92
97
PT. ANDIKA PERSADA RAYA
100 102 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
83 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

99

93

103 104
94 101

105

95
5
REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

109

106

A3
GUARDRAIL
LENGHT=36M

RETAINING WALL
RELOCATION PUBLIC ACCESS CIJENGKOL
H=1M, LENGHT=36M
DK 100+490

STONE PAIR
DRAINAGE

CONCRETE BARRIER
LENGHT=90M

RELOCATION PUBLIC ACCESS CIJENGKOL


DK 100+480
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
TYPICAL 1

CL

TYPICAL DETAILS OF THE ROAD

TYPICAL 2

REVISION HISTORY

CL

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

TYPICAL DETAILS OF THE ROAD

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
CL

REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
76
69

85

84
70

80
213

95
77
3
68

94
82

93
75

83
73

207

81
208

209
66

72

74
67

71
65

Ground Road L
Ground Road R

Ground Road CL
Desain Road CL

DK 100+440
TRACK DK 100+420
CENTER OF
DK 100+400
DK 100+380
DK 100+360
DK 100+340
DK 100+320

Desain Road CL
Ground Road L

REVISION HISTORY

PT. ANDIKA PERSADA RAYA


Desain Road CL PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
Ground Road R

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
01
G.0

5
10
4

9
10

10
2
10
90

91

98
88

0
10

3
10
89
69

78
21

87
3
21

97
79

99
70
68

5
86

92
4
76
3

1
10
77

80

85
Ground Road CL
Ground Road L
Desain Road CL
Ground Road R

Desain Road CL
Ground Road L

REVISION HISTORY

Desain Road CL
Ground Road R
PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
DIK 100+340.95

Protection fence
Landmark post
Left Track Right Track
CL CL

Arch revetment slope protection 4.40 4.80 4.40 Arch revetment slope protection
Place bilateral geogrid 521.51 5.0% 5.0% 521.51
DIK100+225.00~DIK100+350.00 Graded crushed stone, 0.7m 1:1.
75
1:1. 75

Protection fence
Landmark post
Group A and Group B soil, 2.3m 5.0%
5.0% 5.0% 518.65
2.00
Group A, B or C fill materials
5.0%
515.76 516.64
516.05 0.50m crushed stone bedding layer and pile capping 515.74

Group A, B or C fill materials

15.00

Range of CFG pile reinforcement


500.74
26.57

Protection fence
Landmark post
DIK 100+360.00
2.00
Protection fence
Landmark post

Left Track Right Track


5.0%
525.70
CL 524.48 CL REVISION HISTORY
00
2.00 1:2. Arch revetment slope protection
5.0% 1:2.0 4.40 4.80 4.40
2.00 0 2.00
521.94 521.71 5.0% 5.0% 521.71
5.0% Graded crushed stone, 0.7m 5.0%
Arch revetment slope protection 520.58 Group A and Group B soil, 2.1m
520.58
519.59
518.69 0.50m crushed stone bedding layer and pile capping
518.10 PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

15.00

Range of CFG pile reinforcement


503.69 REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101

14.40

A3
Protection fence
Landmark post
Protection fence
Landmark post 2.00
528.33 2.00 0 0 5.0%
2.00 1:2. 528.02
5.0%
5.0% DIK 100+380.00
Left Track Right Track Arch revetment slope protection
525.97
1:2. CL CL
00
Arch revetment slope protection 0
0 1:2.

6.00
4.40 4.80 4.40 Arch revetment slope protection
2.00 2.00
521.91 5.0% 5.0% 521.91
5.0% Graded crushed stone, 0.7m 5.0%
520.78 520.78
Group A and Group B soil, 2.1m
5.0% 5.0%
518.30

Protection fence
REVISION HISTORY

Landmark post
Protection fence
Landmark post

531.27
2.00
2.00 2.00 0 5.0%
:2.0 528.30
5.0% 5.0% 1
526.98
DIK 100+400.00
Arch revetment slope protection
PT. ANDIKA PERSADA RAYA
Left Track Right Track PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
1:2. CL CL JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
00 00
6.00 1:2. Arch revetment slope protection

6.00
Arch revetment slope protection 4.40 4.80 4.42
2.00 2.00
522.11 5.0% 5.0% 522.11
5.0% Graded crushed stone, 0.7m 5.0%
520.98 520.98
Group A and Group B soil, 2.1m
5.0% 5.0%
518.50 518.50

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
Protection fence
Landmark post

Protection fence
Landmark post
532.73
2.00
5.0% 1:2. 2.00
529.75 00
2.00 2.00 00 5.0%
1:2. 528.50
Arch revetment slope protection 5.0% 5.0%
DIK 100+420.00
Right Track Arch revetment slope protection
Left Track
1:2. CL CL
00 00
Arch revetment slope protection 1:2.
6.00

6.00
Arch revetment slope protection
4.40 4.80 4.44
2.00 2.00
522.31 5.0% 5.0% 522.31
5.0% Graded crushed stone, 0.7m 5.0%
521.18 521.18
Group A and Group B soil, 2.1m
5.0% 5.0%
518.70 518.70

REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
5
10
4
10

0
10

11
2
10
90

91
88

98
69

0
10
1

89

3
78
21

10
87
79

97
70
68

99
86
76
3

5
92
77

8
1

10
10
80

85

84
73

75

6
10
67

72

82
7
74

20

95
81
71

94
20

7
20

10
93

2
83

96

11
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

DETAIL RETAINING WALL


SKALA : NTS

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
SECURITY FENCE STANDARDS

INLET INLET INLET

CROSS SECTION LONG SECTION OF SECURITY FENCE

5
15∅10 (N5)

∅16-100 (N1)
N1
∅12-100 (N7)

PAGAR PENGAMAN

∅12-200 (N6) ∅16-200 (N2)

4
∅12-200 (N4) ∅16-200 (N3)
3

2
PONDASI 6

CROSS SECTION LONG SECTION OF SECURITY FENCE


15.6

14.5 REVISION HISTORY


5.9°

10

20.5
10

45
42+h/cos

44+h

∅16-100 (B1)
100.4

∅16
N1
23

235.8 ∅16 ∅16 ∅12 ∅12 ∅16B1 6 6


30+h

N2 N3 N7 ∅16B2 B3∅10
.3

103.8+h 71+h/cos5.9° N4 33.4 184.8


39+h

70+h
9.51

∅12 ∅10-200 (B3)


85.3

1 184.8 35.6
23.6

23.6

N6
114+h 17.4 63.6 23
6
∅16-100 (B2)
58.6 58.6
20 29 26 PT. ANDIKA PERSADA RAYA
∅10B4 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
63.6 35.6
20 ∅10-200 (B4) JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
23
10 10 23.6
∅10 ∅10
L-8
N5 B5
100

BAR TABLE OF SECURITY FENCE BAR TABLE OF FOUNDATION SECURITY FENCE

VOLUME TABLE OF SECURITY FENCE / M VOLUME TABLE OF FOUNDATION SECURITY FENCE / M


DIAMETER
LENGHTTOTALTOTAL
TOTALTOTAL DIAMETER
LENGHT
TOTALTOTALTOTAL
TOTAL
CODE CODE
OF IRON OF IRON
LENGHT
WEIGHT
WEIGHT OF IRON OF IRON
LENGHT
WEIGHT
WEIGHT
(cm) (m) (kg) (kg) (cm) (m) (kg) (kg)
N1 BjTU 235.8
16 10 23.5837.26 B1 BjTU 184.8
16 10 18.48
29.20 REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101

53.34
N2 BjTU 123.8
16 5 6.19 9.78 54.22 B2 BjTU 152.8
16 10 15.28
24.14
N3 BjTU 90.89
16 5 4.54 7.18 35.6 15 5.48 3.38
B3 BjTP 10
N4 BjTP 12
90 5 4.5 3.99 35.6 10 3.65 2.25 17.35
B4 BjTP 10
100 15
N5 BjTP 10 15.0 9.26 22.16 100 19 19.00
B5 BjTP 10 11.72
N6 BjTP 12
134 5 6.7 5.94 CONCRETE K-300 = 0.315 M3; BjTU = 53.34 Kg; BjTP = 17.35 Kg
N7 BjTP 12
33.4 10 3.34 2.97
CONCRETE K-300 = 0.39 M3; BjTU = 54.22 Kg; BjTP = 22.16 Kg A3

You might also like