Action code: AT FIRST OPPORTUNITY
Type: Laby® -GI Fuel Gas Compressor – All types

To whom it may concern,

Periodic analysis of coolant quality and inspection of the cooling water system is

mandatory. First cases are reported where components in the cooling water system and

the compressor failed due to corrosion.

Laby® -GI Fuel Gas Compressor system are provided with two individual cooling
systems. In general, the quality of both cooling water circuits (Fresh water and
Glycol/water) must be checked at least once a week. We therefore align our inspection
interval with the requirements of the engine licensor, MAN ES.
For more details, please refer to attached document, CL_031_00. If you have further

information, please contact Hyundai Global Service.

Faithfully yours,

G. Y. Oh, General Manager

Head of Machinery Service Dep’t

Technical Warranty Division


Tel. +82 52 204 7860 Fax. +82 52 202 7801

E-mail : service@hyundai-gs.com
Hi-Service : http://www.hyundai-gs.com/

1/1
PERIODICAL TESTING OF
COOLING WATER
JULY 23, 2019

Service Letter

Action code: At first opportunity

Reference Instruction Manual, Chapter 3.4 and 8.6.5 Cooling System


Concerns Owners and operators of Laby®-GI fuel gas compressors – all types

LNGM News Channel burckhardtcompression.com/lngm-news

Dear Sir or Madam

Periodic analysis of coolant quality and inspection of the cooling water system is mandatory. First cases
are reported where components in the cooling water system and the compressor failed due to corrosion.

Thomas Hess Tanya Iannuzzi


Manager Business Development LNGM Manager Business Development Marine
Systems Division Services Division

Burckhardt Compression, 24-hour emergency tel.: +41 52 262 53 53


ship.support@burckhardtcompression.com, www.burckhardtcompression.com Document no.: CI_031_00
Laby®-GI compressor systems are provided with two individual Due to recent incidents we advise to check the cooling water
cooling systems: system quality immediately, if no analysis was done for the past 6
• A fresh water cooling system supplying cooling water for months.
interstage gas coolers, the crank gear lubrication oil cooler and
the water-cooled electric drive (if applicable) In general, the quality of both cooling water circuits (fresh water
and glycol/water) must be checked at least once a weak. We
• A glycol/water cooling system to provide coolant to the com-
therefore align our inspection interval with the requirements of the
pressor itself (heat barriers on 1st stage cylinder blocks, cooling
engine maker MAN Diesel & Turbo.
water jackets on cylinder blocks of stages 2 to 5, the high-
pressure piston rod packing and the crosshead guides) 1

P&I diagrams of the system can be found in the individual project


specific documentation and in the compressor's instruction manual.

Both circuits are supplied by external systems, designed and pro-


vided by the yard.

First coolant system filling is arranged by the yard during commis-


sioning.

Burckhardt Compression specifies minimum requirements concern-


ing general cooling water quality. Reference is made to the com-
pressor instruction manual chapter 3.4 and 8.6.5 "Cooling System"
and referenced documents.

Detailed cooling water treatment remains in the responsibility of


the operator. Currently, there are no guidance documents available
from Burckhardt Compression specifying selection or handling of
additives to the cooling water.

Within the scope of Burckhardt Compression, all materials in


contact with the coolant media are carbon steel resp. cast steel/
cast iron products. No aluminum is applied in the systems. Piping
systems are not galvanized.

As a basis for a proper cooling water quality, we recommend the


following major concentrations of the coolant media:

Parameter Concentration Range

System type Fresh water Glycol/water

Total hardness ≤ 10 dH ≤ 10 dH

pH value @ 20 °C 2 6.5 … 9.5 6.5 … 9.5

Chloride ion content ≤ 50 mg/L (≤ 50 ppm) ≤ 50 mg/L (≤ 50 ppm)

1
Compressors of type 6LP190 with piston rod diameter 75 mm are equipped with glycol/water cooling on the guide bearings.
2
Allowable upper limit of the pH value might be higher, based on requirements of chemical additive maker.