Professional Documents
Culture Documents
Lokasi Inspeksi (Inspection Location) : Tanggal inspeksi (Date of Inspection) Tanggal inspeksi (Date of Inspection)
*) Kolom Inspeksi II dan III digunakan apabila ada pekerjaan yang tidak memenuhi syarat ( ada Ketidaksesuaian Produk)
(Inspection columns II and III are used when there are work that do not qualify (there Incompatibility Products))
02/MAU-MR/R0
b
(Responsible person)
Production Manager
esuaian Produk)
`
02/MAU-MR
CHECK LIST INSTRUKSI KERJA
(WORK INSTRUCTIONS CHECK LIST) Nomor Urut :
SEBELUM BEKISTING DINDING BETON (Serial Number)
(BEFORE FORMWORK OF CONCRETE WALL)
Nomor Referensi Gambar
PROYEK [ Kode ] : (Drawings Reference number) :
Pipe support & sabuk dinding beton tersedia dan layak pakai
8 (Pipe support and concrete
wall belt are available and suitable to be used)
Lokasi Inspeksi (Inspection Location) : Tanggal inspeksi (Date of Inspection) Tanggal inspeksi (Date of Inspection) Tanggal inspeksi (Date of Inspection
Yang membuat (Created by) Yang membuat (Created by) Yang membuat (Created by)
Supervisor
Mengetahui (Approved by)
Quality Control
Rekomendasi (Recommendation)
02/MAU-M
CHECK LIST INSTRUKSI KERJA
(WORK INSTRUCTIONS CHECK LIST) Nomor Urut :
SEBELUM PENGECORAN DINDING BETON (Serial Number)
(BEFORE CONCRETE WALL CASTING)
Nomor Referensi Gambar
PROYEK [ Kode ] : (Drawings Reference number) :
Lokasi Inspeksi (Inspection Location) : Tanggal inspeksi (Date of Inspection) Tanggal inspeksi (Date of Inspection) Tanggal inspeksi (Date of Inspec
Yang membuat (Created by) Yang membuat (Created by) Yang membuat (Created b
*) Kolom Inspeksi II dan III digunakan apabila ada pekerjaan yang tidak memenuhi syarat ( ada Ketidaksesuaian Produk)
02/MAU-MR/R0
Supervisor
Mengetahui (Approved by)
Quality Control
Rekomendasi (Recommendation)