3. WIDER SPACING OF BOILER MAIN COLUMNS (From Boiler centre line ) FOR BETTER
ACCESS SPACE.
4. FIRST 250 MW DESIGNED WITH 7 BOWL MILLS WITH REAR MILL ARRANGEMENT &
WITH UNSYMMETRIC ARRANGEMENT OF MILLS { 4 NOS ON LEFT SIDE & 3 NOS ON
RIGHT SIDE WITH A CENTRE GAP} FOR KORBA 2x 250 MW
9) LAYOUT FOR THE TWIN REHEATER HEADERS FOR 500 MW NEW CONTRACTS.
WITH PERMANENT
BRACING
WITH REMOVABLE
BRACING
WITH POST
B – BIPLANE DAMPER
L – LOUVER DAMPER
03/27/2021 Boiler Design 34
03/27/2021 Boiler Design 35
MODIFIED ARRANGEMENT
OF DAMPERS WITH 2
BIPLANE & 1 LOUVER
B – BIPLANE DAMPER
L – LOUVER DAMPER
03/27/2021 Boiler Design 36
LAYOUT OF SINGLE HRH HEADER