PRODUCT ENGINEERING (FOSSIL BOILERS)
IMPROVEMENTS DONE IN BOILER LAYOUTS
• REDUCTION OF BOILER COLUMNS IN 500 MW CONTRACTS. 53 COLUMNS PROVIDED IN
RAMAGUNDAM UNIT 7, REDUCED TO 43 Nos IN KAHALGOAN & TO 39 Nos IN BELLARY.
• INTEGRATION OF LIFT STRUCTURE WITH BOILER STRUCTURE AS AGAINST STAND-ALONE
STRUCTURE EARLIER.
• WIDER SPACING OF BOILER MAIN COLUMNS (From Boiler centre line ) FOR BETTER ACCESS
SPACE.
• FIRST 250 MW DESIGNED WITH 7 BOWL MILLS WITH REAR MILL ARRANGEMENT & WITH
UNSYMMETRIC ARRANGEMENT OF MILLS { 4 NOS ON LEFT SIDE & 3 NOS ON RIGHT SIDE
WITH A CENTRE GAP} FOR KORBA 2x 250 MW

10/4/2017 boben2005@gmail.com
PRODUCT ENGINEERING (FOSSIL BOILERS IMPROVEMENTS
DONE IN BOILER LAYOUTS
• RETROFIT OF ECONOMISER COIL HANDLING
• IMPROVEMENT OF BRACING PATTERN ON THE REAR SIDE OF THE BOILER
FOR ECONOMISER COIL HANDLING.
• RELOCATION OF GATES IN THE ECONOMISER BYPASS DUCTS FOR
ECONOMISER COIL HANDLING .
• OPTIMIZATION OF DAMPERS IN THE AIR DUCTS TO AIR PREHEATERS.
• LAYOUT FOR THE TWIN REHEATER HEADERS FOR 500 MW NEW CONTRACTS.

10/4/2017 boben2005@gmail.com
REGULAR ARRANGEMENT OF BOILER COLUMNS FOR
RAMAGUNDAM 500 MW UNIT 7 (53 NO OF COLUMNS)

10/4/2017 boben2005@gmail.com
OPTIMIZED BOILER COLUMN LOCATION FOR KAHALGAON 500 MW
(43 NOS OF COLUMNS)

10/4/2017 boben2005@gmail.com
OPTIMIZED ARRANGEMENT OF BOILER COLUMNS FOR
BELLARY 500 MW UNIT (39 NO OF COLUMNS)

10/4/2017 boben2005@gmail.com
DESIGN IMPROVEMENT IN THE BOILER LIFT
STRUCTURE

10/4/2017 boben2005@gmail.com
DIMEMSIONAL DETAILS OF BOILER COLUMNS FOR
KAHALGOAN 500 MW

10/4/2017 boben2005@gmail.com
SUMMARY OF BOILER COLUMN SPACING IN CURRENT 500
MW UNITS
CONTRACT NAME NO OF SPACING OF BOILER MAIN
COLUMNS COLUMNS FROM BOILER CENTRE
LINE

RAMAGUNDAM 500 53 NOS 13 M


MW UNIT 7

KAHALGOAN 500 MW 43 NOS 15.5 M

BELLARY 500 MW 39 NOS 14.5 M


10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT

• SIDE MILL LAYOUT.


• 7 NUMBERS OF XRP 1003 BOWL MILLS
• WIDER MAIN BOILER COLUMN PITCHING AT 29 MTRS.
• TRISECTOR REGEN AIRHEATER 31.5 VIM(T) 2000 - USED IN THIS
CONTRACT

10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT

• LARGE MAN HOLE DOOR(1.8 x 0.9 Mt) ENVISAGED IN PENT HOUSE


FOR MAINTANECE.
• CL ELEVATION OF RING HEADER = 10.25 Mtrs.
• CL ELEVATION OF DRUM = 70.608 Mtrs.
• BOTTOM OF THE CEILING GIRDER = 78.550 Mts.

10/4/2017 boben2005@gmail.com
GA OF BOILER
SECTIONAL ELEVATION

10/4/2017 boben2005@gmail.com
GA OF BOILER
SECTIONAL PLAN

10/4/2017 boben2005@gmail.com
BOILER COLUMN
LOCATION WITH
MAIN
AUXILIRIES

10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
KEY PLAN OF BOILER AND ID SYSTEM

10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
LAYOUT OF ID SYSTEM - ELEVATION

10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
LAYOUT OF ID SYSTEM - PLAN

10/4/2017 boben2005@gmail.com
SALIENT FEATURES OF KORBA 2 x 250 MW UNITS

1. FIRST 250 MW UNIT WITH SEVEN BOWL MILLS WITH


REAR MILL LAYOUT.

1. MILLS LOCATED UNSYMMETRICALLY ABOUT THE


BOILER AXIS : 4 NOS ON THE LEFT SIDE & 3 NOS ON THE
RIGHT SIDE WITH AN EMPTY BAY AT THE CENTRE

10/4/2017 boben2005@gmail.com
GENERAL ARRANGEMENT DRAWING SIDE ELEVATION: KORBA
2 x 250 MW

10/4/2017 boben2005@gmail.com
KORBA 2 X 250 MW SECTIONAL PLAN

10/4/2017 boben2005@gmail.com
KORBA 2 x 250 MW : I.D SYSTEM SECTIONAL
ELEVATION

10/4/2017 boben2005@gmail.com
KORBA 2 x 250 MW : I.D SYSTEM PLAN

10/4/2017 boben2005@gmail.com
Structure for handling of Eco. Coils from Zero mtr. to 43.5 mtrs.

10/4/2017 boben2005@gmail.com
Replacement work of Eco. Bank in Unit#4

10/4/2017 boben2005@gmail.com
10/4/2017 boben2005@gmail.com
Eco. Coil shifting to the position

10/4/2017 boben2005@gmail.com
10/4/2017 boben2005@gmail.com
Manual handling arrangement for insertion and removal of Eco. Coils from platform to
inside the boiler

10/4/2017 boben2005@gmail.com
VINDYACHAL
UNIT Nos. 7 & 8
(NO HANDLING
ENVISAGED)

WITH PERMANENT
BRACING

10/4/2017 boben2005@gmail.com
SIMHADRI

WITH REMOVABLE
BRACING

10/4/2017 boben2005@gmail.com
TALCHER 4X500MW

WITH POST

10/4/2017 boben2005@gmail.com
KAHALGAON 2X500MW
OPEN
WITHOUT POST AND
BRACINGS

10/4/2017 boben2005@gmail.com
EARLIER ARRANGEMENT
WITH GATES HINDERING
THE ECONOMISER COIL
WITHDRAWAL

10/4/2017 boben2005@gmail.com
MODIFIED ARRANGEMENT
OF GATES TO
FACILITATE THE EASY
WITHDRAWAL OF
ECONOMISER COILS

10/4/2017 boben2005@gmail.com
B – BIPLANE DAMPER
L – LOUVER DAMPER
10/4/2017 boben2005@gmail.com
10/4/2017 boben2005@gmail.com
B – BIPLANE DAMPER
L – LOUVER DAMPER
10/4/2017 boben2005@gmail.com
LAYOUT OF SINGLE HRH HEADER

10/4/2017 boben2005@gmail.com
NEW LAYOUT WITH TWIN HRH HEADER

10/4/2017 boben2005@gmail.com
MODIFIED ROUTING OF HRH PIPING

OLD ARRANGEMENT MODIFIED ARRANGEMENT


10/4/2017 boben2005@gmail.com