Professional Documents
Culture Documents
ENGINEERING
In Indian Scenario
10/4/2017 boben2005@gmail.com
PRODUCT ENGINEERING (FOSSIL BOILERS)
IMPROVEMENTS DONE IN BOILER LAYOUTS
• REDUCTION OF BOILER COLUMNS IN 500 MW CONTRACTS. 53 COLUMNS PROVIDED IN
RAMAGUNDAM UNIT 7, REDUCED TO 43 Nos IN KAHALGOAN & TO 39 Nos IN BELLARY.
• INTEGRATION OF LIFT STRUCTURE WITH BOILER STRUCTURE AS AGAINST STAND-ALONE
STRUCTURE EARLIER.
• WIDER SPACING OF BOILER MAIN COLUMNS (From Boiler centre line ) FOR BETTER ACCESS
SPACE.
• FIRST 250 MW DESIGNED WITH 7 BOWL MILLS WITH REAR MILL ARRANGEMENT & WITH
UNSYMMETRIC ARRANGEMENT OF MILLS { 4 NOS ON LEFT SIDE & 3 NOS ON RIGHT SIDE
WITH A CENTRE GAP} FOR KORBA 2x 250 MW
10/4/2017 boben2005@gmail.com
PRODUCT ENGINEERING (FOSSIL BOILERS IMPROVEMENTS
DONE IN BOILER LAYOUTS
• RETROFIT OF ECONOMISER COIL HANDLING
• IMPROVEMENT OF BRACING PATTERN ON THE REAR SIDE OF THE BOILER
FOR ECONOMISER COIL HANDLING.
• RELOCATION OF GATES IN THE ECONOMISER BYPASS DUCTS FOR
ECONOMISER COIL HANDLING .
• OPTIMIZATION OF DAMPERS IN THE AIR DUCTS TO AIR PREHEATERS.
• LAYOUT FOR THE TWIN REHEATER HEADERS FOR 500 MW NEW CONTRACTS.
10/4/2017 boben2005@gmail.com
REGULAR ARRANGEMENT OF BOILER COLUMNS FOR
RAMAGUNDAM 500 MW UNIT 7 (53 NO OF COLUMNS)
10/4/2017 boben2005@gmail.com
OPTIMIZED BOILER COLUMN LOCATION FOR KAHALGAON 500 MW
(43 NOS OF COLUMNS)
10/4/2017 boben2005@gmail.com
OPTIMIZED ARRANGEMENT OF BOILER COLUMNS FOR
BELLARY 500 MW UNIT (39 NO OF COLUMNS)
10/4/2017 boben2005@gmail.com
DESIGN IMPROVEMENT IN THE BOILER LIFT
STRUCTURE
10/4/2017 boben2005@gmail.com
DIMEMSIONAL DETAILS OF BOILER COLUMNS FOR
KAHALGOAN 500 MW
10/4/2017 boben2005@gmail.com
SUMMARY OF BOILER COLUMN SPACING IN CURRENT 500
MW UNITS
CONTRACT NAME NO OF SPACING OF BOILER MAIN
COLUMNS COLUMNS FROM BOILER CENTRE
LINE
10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
10/4/2017 boben2005@gmail.com
GA OF BOILER
SECTIONAL ELEVATION
10/4/2017 boben2005@gmail.com
GA OF BOILER
SECTIONAL PLAN
10/4/2017 boben2005@gmail.com
BOILER COLUMN
LOCATION WITH
MAIN
AUXILIRIES
10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
KEY PLAN OF BOILER AND ID SYSTEM
10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
LAYOUT OF ID SYSTEM - ELEVATION
10/4/2017 boben2005@gmail.com
BELLARY TPS 1 x 500 MW BOILER
SALIENT FEATURES OF BOILER LAYOUT
LAYOUT OF ID SYSTEM - PLAN
10/4/2017 boben2005@gmail.com
SALIENT FEATURES OF KORBA 2 x 250 MW UNITS
10/4/2017 boben2005@gmail.com
GENERAL ARRANGEMENT DRAWING SIDE ELEVATION: KORBA
2 x 250 MW
10/4/2017 boben2005@gmail.com
KORBA 2 X 250 MW SECTIONAL PLAN
10/4/2017 boben2005@gmail.com
KORBA 2 x 250 MW : I.D SYSTEM SECTIONAL
ELEVATION
10/4/2017 boben2005@gmail.com
KORBA 2 x 250 MW : I.D SYSTEM PLAN
10/4/2017 boben2005@gmail.com
Structure for handling of Eco. Coils from Zero mtr. to 43.5 mtrs.
10/4/2017 boben2005@gmail.com
Replacement work of Eco. Bank in Unit#4
10/4/2017 boben2005@gmail.com
10/4/2017 boben2005@gmail.com
Eco. Coil shifting to the position
10/4/2017 boben2005@gmail.com
10/4/2017 boben2005@gmail.com
Manual handling arrangement for insertion and removal of Eco. Coils from platform to
inside the boiler
10/4/2017 boben2005@gmail.com
VINDYACHAL
UNIT Nos. 7 & 8
(NO HANDLING
ENVISAGED)
WITH PERMANENT
BRACING
10/4/2017 boben2005@gmail.com
SIMHADRI
WITH REMOVABLE
BRACING
10/4/2017 boben2005@gmail.com
TALCHER 4X500MW
WITH POST
10/4/2017 boben2005@gmail.com
KAHALGAON 2X500MW
OPEN
WITHOUT POST AND
BRACINGS
10/4/2017 boben2005@gmail.com
EARLIER ARRANGEMENT
WITH GATES HINDERING
THE ECONOMISER COIL
WITHDRAWAL
10/4/2017 boben2005@gmail.com
MODIFIED ARRANGEMENT
OF GATES TO
FACILITATE THE EASY
WITHDRAWAL OF
ECONOMISER COILS
10/4/2017 boben2005@gmail.com
B – BIPLANE DAMPER
L – LOUVER DAMPER
10/4/2017 boben2005@gmail.com
10/4/2017 boben2005@gmail.com
B – BIPLANE DAMPER
L – LOUVER DAMPER
10/4/2017 boben2005@gmail.com
LAYOUT OF SINGLE HRH HEADER
10/4/2017 boben2005@gmail.com
NEW LAYOUT WITH TWIN HRH HEADER
10/4/2017 boben2005@gmail.com
MODIFIED ROUTING OF HRH PIPING