CARPENTRY WORKS
3 CARPENTER BABO SOKIB
4 CARPENTER BUGAAY ARCHIE
5 CARPENTER DAJARME OSCAR INSTALLATION OF PVC DOOR 10TH TO 11TH FLOO
CARPENTER MARCIAL JUVY
CARPENTER RIVERA RONALD
6 CARPENTER HADJIRUDDINHELMAN ABSENT
CARPENTER MANAYUBA GONZALO
7 CARPENTER PASCUAL MICHAEL INSTALLATION OF BOARD UP AT 12TH FLOOR UNIT
CARPENTER BONGAO EDGE ROY
CARPENTER NAVARRO FERDINAN INSTALLATION OF BOARD UP AT 11TH FLOOR H
2 CARPENTER ABUNIDAR ARABANI
VINYL WORKS
211 VINYL INSTALLER BARADAS JOHN ERIC PREPARATION FLOORING AT 12TH FLOOR U
212 VINYL INSTALLER CASICO FLORO GROUT APPLICATION BALCONY AND T&B AT 10TH F
214 VINYL INSTALLER GANATE MITCHELE
PREPARATION FLOORING AT 11TH FLOOR UN
217 VINYL INSTALLER MARK JOSEPH CAMO
213 VINYL INSTALLER DAWENG JON JON PREPARATION FLOORING AT 12TH FLOOR U
216 VINYL INSTALLER LUMONGSOD JEFFREY PREPARATION FLOORING AT 12TH FLOOR U
218 VINYL INSTALLER ROCA MARK ANTHONY PREPARATION FLOORING AT 12TH FLOOR U
215 VINYL INSTALLER GARZON SHELA ABSENT
TILE WORKS
104 TILES SETTER QUINTERO FELIX RECTIFICATION OF TILES T&B AT 9TH FLOOR
105 TILES SETTER SANTISAS SAMMIE RECTIFICATION OF TILES BALCONY AT 10TH FLOO
107 TILES SETTER VICTORIA JULLIUS RECTIFICATION OF TILES BALCONY AT 11TH FLOO
TILES SETTER GANOZA SAMMY RECTIFICATION OF TILES T&B AT 10TH FLOOR
TILES SETTER LIBANDING REYNAN RECTIFICATION OF TILES BALCONY AT 10TH FLO
103 TILES SETTER ARAÑA CRISTHOPER TILES INSTALLATION ELEVATOR LOBBY AT 14T
106 TILES SETTER TALES FRANSISCO LEO ABSENT
PLUMBING WORKS
PLUMBER GONZALVO JONMAL PIPE INST. BALCONY DRAIN 10 - 11 FLOO
PLUMBER TROXON ROBERT
PLUMBER VALDEZ MARK ANTHONY PIPE INST. BALCONY / AIRCON DRAIN SWIMMING
PLUMBER LAURITO QUIJANO
PLUMBER REFORSADO REGIE
CHIPPING PREPARATION FOR INST. PIPING OF LATERAL SANITAR
PLUMBER REFORSADO RAY FLOOR.
PLUMBER ASDUCO RECARDO
PLUMBER CAMA RENALDO INST. OF STAB OUT FOR LAVATORY AT 17TH
PLUMBER BUMDALIAN EDZEL
INST. OF WATER LINE LOOPING AND SUPPLY FOR T&B
PLUMBER FLORES PAUL
PLUMBER ALDUNEZA ALDRINO
PLUMBER HURANCIA ARVIN INST. OF HUNGER FOR SANITARY AND WATER LINE A
PLUMBER RYAN
FOREMAN NEAR CARLO SITE SUPERVISION
WORKS
ABSENT
ALLATION OF BOARD UP AT 12TH FLOOR UNIT 5, 6, 17 TO 24
ORKS
PREPARATION FLOORING AT 12TH FLOOR UNIT 21
UT APPLICATION BALCONY AND T&B AT 10TH FLOOR UNIT 22
RKS
RECTIFICATION OF TILES T&B AT 9TH FLOOR UNIT 22
ECTIFICATION OF TILES BALCONY AT 10TH FLOOR UNIT 16
ECTIFICATION OF TILES BALCONY AT 11TH FLOOR UNIT 27
RECTIFICATION OF TILES T&B AT 10TH FLOOR UNIT 25
ECTIFICATION OF TILES BALCONY AT 10TH FLOOR UNIT 6
TILES INSTALLATION ELEVATOR LOBBY AT 14TH FLOOR
ABSENT
WORKS
PIPE INST. BALCONY DRAIN 10 - 11 FLOOR
SITE SUPERVISION
G WORKS