FLOOR LEVEL DATE INSPECTED UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT U
18TH LEVEL 1801 1802 1803 1804 1805 1806 1807 1808 1809 1810 1811 1812 1814
17TH LEVEL 1701 1702 1703 1704 1705 1706 1707 1708 1709 1710 1711 1712 1714
16TH LEVEL 1601 1602 1603 1604 1605 1606 1607 1608 1609 1610 1611 1612 1614
15TH LEVEL 1501 1502 1503 1504 1505 1506 1507 1508 1509 1510 1511 1512 1514
14TH LEVEL 1401 1402 1403 1404 1405 1406 1407 1408 1409 1410 1411 1412 1414
12TH LEVEL 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 1212 1214
11TH LEVEL Mock up Floor 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1114
LEGEND: CONTRAC
MEC
READY TO RECEIVED PAINTING CONTRACTOR FLUX
FIRST FINAL COAT APPLIED(GCRC) FORTHR
INSPECTED BY VISTA( 18units) DUN WO
SHEELD
R-KING/
Prepared By:
ARKS
25th floor vinyl
floor grinding.
33rd Floor
of 14th floor.
r sealant and
n 12th floor